Element Materials Technology Irvine
41 Tesla, 92618, Irvine, CA, United States
Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.
Only the laboratory you pick gets your contact details. We ask the others without them.
Contact this laboratory
Work at Element Materials Technology Irvine?
Claim this profile to keep it accurate.
Register record
- A2LARefreshed
- 3310.04Active
Accredited standards
55Our reading of the A2LA scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.
IEC
IEC 60730-1Automatic electrical controls - Part 1: General requirements
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 60730-2-14Name not checked yet
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 60945Maritime navigation and radiocommunication equipment and systems - General requirements - Methods of testing and required test results
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 61000-6-7Name not checked yet
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 61000-6-8Name not checked yet
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 61131-2Name not checked yet
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 61131-6Name not checked yet
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 61326-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 62040-1-2Name not checked yet
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 62233Measurement methods for electromagnetic fields of household appliances and similar apparatus with regard to human exposure
AS/CA S042.5:2022; AS/CA S042.1:2022; AS/CA A17.5:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; KDB 447498 D01; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020
IEC 62311Assessment of electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (0 Hz to 300 GHz)Certificate says EN 62311. Probably the same standard; not checked against the EN document.
AS/CA S042.5:2022; AS/CA S042.1:2022; AS/CA A17.5:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; KDB 447498 D01; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020
IEC 62368-1Audio/video, information and communication technology equipment - Part 1: Safety requirements
IEC 62368-1; EN 62368-1; UL 62368-1; CAN/CSA-C22.2 No. 62368-1; US (FCC) 47 CFR FCC Part 15; ANSI C63.10; ANSI C63.17; FCC KDB Publication 905462 D02 (v02); KDB 291074 D02; ANSI C63.26:2015; TIA-102.CAAA-E; ANSI/TIA-603-E; ANSI C63.27 (2017); ANSI C63.30-2021; Canada (ISED) RSS series; ETSI EN 300 series
IEC 60601 series
IEC 60601-1Medical electrical equipment - Part 1: General requirements for basic safety and essential performance
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 60601-2-5Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 60601-2-10Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 60601-2-22Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 60601-2-24Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 60601-2-30Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 60601-2-57Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 60601-2-62Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 60601-2-83Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
EN
EN 12895Name not checked yet
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
EN 50130-4Alarm systems - Part 4: Electromagnetic compatibility - Product family standard: Immunity requirements for components of fire, intruder, hold up, CCTV, access control and social alarm systems
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
EN 50270Name not checked yet
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
EN 50293Name not checked yet
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
EN 50364Name not checked yet
AS/CA S042.5:2022; AS/CA S042.1:2022; AS/CA A17.5:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; KDB 447498 D01; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020
EN 50383Name not checked yet
AS/CA S042.5:2022; AS/CA S042.1:2022; AS/CA A17.5:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; KDB 447498 D01; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020
EN 50566Name not checked yet
AS/CA S042.5:2022; AS/CA S042.1:2022; AS/CA A17.5:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; KDB 447498 D01; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020
EN 50663Generic standard for assessment of low power electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (10 MHz - 300 GHz)
AS/CA S042.5:2022; AS/CA S042.1:2022; AS/CA A17.5:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; KDB 447498 D01; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020
ETSI
ETSI EN 300 386Name not checked yet
RRA Public Notification 2011-24 (Dec. 23, 2011); RRA Announce 2012-21, K only (Jun. 28, 2012); RRA 2013-3 and 2013-24, June 17, 2013, Korean only; RRA 2014-8 and RRA 2014-37 (June 23, 2014); RRA Public Notification 2015-27 (Dec. 03 2015); RRA Announce 2015-110 (Dec. 3, 2015); RRA Public Notification 2016-26 (Dec.19 2016); RRA Announce 2016-79 (Dec.19 2016); RRA Public Notification 2017-19 (Dec. 28, 2017); RRA Announce 2017-71 (Dec. 28, 2017); MSIT Public Notification 2023-18, June 20, 2023; AS/NZS 4268:2017 + Amd 1: 2021; ETSI EN 300 440 V2.2.1 (2018-07); AS/NZS 2772.2; AS/NZS 4268; Taiwan LP0002 (2024); IS2019 (2020); RTTE01 (2020); IMDA TS CMT (September 2020); IMDA TS CMT (December 2024); IMDA TS LMR Issue 1 (October 2016); IMDA TS SRD Issue 1, Rev. 3 (Sept 2023); IMDA TS UWB Issue 1 (October 2016); IMDA TS WBA Issue 1 (October 2016); Article 6 Paragraph 1 Item 1 of the Regulations for Enforcement of the Radio Law (Ministry of Posts and Telecommunications Notification No. 127 of 1988); MIC Notice No. 88 Annex 1 and Annex 22-3; MIC Notification 88 Annex 43; MIC Notification No. 88 Annex 22-5; EN 300 386; AS/CA S042.4:2022
ETSI EN 300 440Name not checked yet
RRA Public Notification 2011-24 (Dec. 23, 2011); RRA Announce 2012-21, K only (Jun. 28, 2012); RRA 2013-3 and 2013-24, June 17, 2013, Korean only; RRA 2014-8 and RRA 2014-37 (June 23, 2014); RRA Public Notification 2015-27 (Dec. 03 2015); RRA Announce 2015-110 (Dec. 3, 2015); RRA Public Notification 2016-26 (Dec.19 2016); RRA Announce 2016-79 (Dec.19 2016); RRA Public Notification 2017-19 (Dec. 28, 2017); RRA Announce 2017-71 (Dec. 28, 2017); MSIT Public Notification 2023-18, June 20, 2023; AS/NZS 4268:2017 + Amd 1: 2021; ETSI EN 300 440 V2.2.1 (2018-07); AS/NZS 2772.2; AS/NZS 4268; Taiwan LP0002 (2024); IS2019 (2020); RTTE01 (2020); IMDA TS CMT (September 2020); IMDA TS CMT (December 2024); IMDA TS LMR Issue 1 (October 2016); IMDA TS SRD Issue 1, Rev. 3 (Sept 2023); IMDA TS UWB Issue 1 (October 2016); IMDA TS WBA Issue 1 (October 2016); Article 6 Paragraph 1 Item 1 of the Regulations for Enforcement of the Radio Law (Ministry of Posts and Telecommunications Notification No. 127 of 1988); MIC Notice No. 88 Annex 1 and Annex 22-3; MIC Notification 88 Annex 43; MIC Notification No. 88 Annex 22-5; EN 300 386; AS/CA S042.4:2022
ETSI EN 301 489-35Name not checked yet
ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); Hong Kong HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1033, Issue 7 (March 2012); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; KS X 3129; Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, Dec 31, 2019; Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Technical Requirements for Measurement of Electromagnetic Field Strength (RRA Public Notification 2023-11, Jun 30, 2023); Notice on Conformity Assessment of Broadcasting and Communications Equipment (RRA Public Notification 2023-3, Feb 3, 2023); Unlicensed Radio Equipment Established Without Notice (MSIT Public Notification 2023-18, June 20, 2023); Unlicensed Radio Equipment Established Without Notice (MSIT Public Notification 2024-10, July 5, 2024); RRA Announce 2011-32, K only (Dec 27, 2011); RRA Public Notification 2012-21 (Nov. 06, 2012)
ETSI EN 301 489-50Name not checked yet
ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); Hong Kong HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1033, Issue 7 (March 2012); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; KS X 3129; Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, Dec 31, 2019; Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Technical Requirements for Measurement of Electromagnetic Field Strength (RRA Public Notification 2023-11, Jun 30, 2023); Notice on Conformity Assessment of Broadcasting and Communications Equipment (RRA Public Notification 2023-3, Feb 3, 2023); Unlicensed Radio Equipment Established Without Notice (MSIT Public Notification 2023-18, June 20, 2023); Unlicensed Radio Equipment Established Without Notice (MSIT Public Notification 2024-10, July 5, 2024); RRA Announce 2011-32, K only (Dec 27, 2011); RRA Public Notification 2012-21 (Nov. 06, 2012)
ETSI EN 301 489-51Name not checked yet
ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); Hong Kong HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1033, Issue 7 (March 2012); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; KS X 3129; Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, Dec 31, 2019; Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Technical Requirements for Measurement of Electromagnetic Field Strength (RRA Public Notification 2023-11, Jun 30, 2023); Notice on Conformity Assessment of Broadcasting and Communications Equipment (RRA Public Notification 2023-3, Feb 3, 2023); Unlicensed Radio Equipment Established Without Notice (MSIT Public Notification 2023-18, June 20, 2023); Unlicensed Radio Equipment Established Without Notice (MSIT Public Notification 2024-10, July 5, 2024); RRA Announce 2011-32, K only (Dec 27, 2011); RRA Public Notification 2012-21 (Nov. 06, 2012)
ETSI EN 301 489-52Name not checked yet
ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); Hong Kong HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1033, Issue 7 (March 2012); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; KS X 3129; Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, Dec 31, 2019; Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Technical Requirements for Measurement of Electromagnetic Field Strength (RRA Public Notification 2023-11, Jun 30, 2023); Notice on Conformity Assessment of Broadcasting and Communications Equipment (RRA Public Notification 2023-3, Feb 3, 2023); Unlicensed Radio Equipment Established Without Notice (MSIT Public Notification 2023-18, June 20, 2023); Unlicensed Radio Equipment Established Without Notice (MSIT Public Notification 2024-10, July 5, 2024); RRA Announce 2011-32, K only (Dec 27, 2011); RRA Public Notification 2012-21 (Nov. 06, 2012)
ETSI EN 303 454Name not checked yet
ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); Hong Kong HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1033, Issue 7 (March 2012); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; KS X 3129; Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, Dec 31, 2019; Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Technical Requirements for Measurement of Electromagnetic Field Strength (RRA Public Notification 2023-11, Jun 30, 2023); Notice on Conformity Assessment of Broadcasting and Communications Equipment (RRA Public Notification 2023-3, Feb 3, 2023); Unlicensed Radio Equipment Established Without Notice (MSIT Public Notification 2023-18, June 20, 2023); Unlicensed Radio Equipment Established Without Notice (MSIT Public Notification 2024-10, July 5, 2024); RRA Announce 2011-32, K only (Dec 27, 2011); RRA Public Notification 2012-21 (Nov. 06, 2012)
IEC 80601 series
IEC 80601-2-30Medical electrical equipment - Part 2-30: Particular requirements for the basic safety and essential performance of automated non-invasive sphygmomanometers
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 80601-2-60Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 80601-2-61Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 80601-2-77Name not checked yet
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 61010 series
IEC 61010-1Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 1: General requirements
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 61010-2-010Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
IEC 61010-2-030Name not checked yet
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
ISO
ISO 9919Medical electrical equipment - Particular requirements for the basic safety and essential performance of pulse oximeter equipment for medical use
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
ISO 14117Active implantable medical devices - Electromagnetic compatibility - EMC test protocols for implantable cardiac pacemakers, implantable cardioverter defibrillators and cardiac resynchronization devices
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
ISO 80601-2-61Medical electrical equipment - Part 2-61: Particular requirements for basic safety and essential performance of pulse oximeter equipment
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
IEC 60601-2-10:2012+AMD1:2016+AMD2:2023 CSV; IEC 60601-2-10; EN 60601-2-10; CAN/CSA-C22.2 No. 60601-2-10; IEC 60601-2-22; EN 60601-2-22; CAN/CSA-C22.2 No. 60601-2-22; IEC 60601-2-24; EN 60601-2-24; IEC 60601-2-30; EN 60601-2-30; IEC 60601-2-57 Edition 1.0 2011-01; IEC 60601-2-57; EN 60601-2-57; CAN/CSA-C22.2 No. 60601-2-57; IEC 60601-2-62:2013; EN 60601-2-62:2015; CAN/CSA-C22.2 No. 60601-2-62:15; IEC 60601-2-83; EN 60601-2-83; CAN/CSA-C22.2 No. 60601-2-83; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; IEC 80601-2-60; EN 80601-2-60; CAN/CSA-C22.2 No. 80601-2-60; ISO 80601-2-61; EN 80601-2-61; CAN/CSA-C22.2 No. 80601-2-61; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19; IEC 60601-2-5:2009; EN 60601-2-5:2015; CSA C22.2 No. 60601-2-5:11; IEC 61010-1; EN 61010-1; UL 61010-1; CAN/CSA-C22.2 No. 61010-1; IEC 61010-2-010; EN 61010-2-010; UL 61010-2-010; CAN/CSA-C22.2 No. 61010-2-010; IEC 61010-2-030; EN 61010-2-030; UL 6
ISO 14708 series
ISO 14708-1Implants for surgery - Active implantable medical devices - Part 1: General requirements for safety, marking and for information to be provided by the manufacturer
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
ISO 14708-3Implants for surgery - Active implantable medical devices - Part 3: Implantable neurostimulators
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
ISO 14708-4Implants for surgery - Active implantable medical devices - Part 4: Implantable infusion pump systems
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
Other standards
ANSI C63.17Name not checked yet
ANSI C63.17:2013; ANSI C63.10:2013; ANSI C63.10:2020; FCC KDB 905462 D02 (v02); ANSI/TIA-603-E; TIA-102.CAAA-E; ANSI C63.26:2015
ANSI/TIA-603-EName not checked yet
ANSI/TIA-603-E; TIA-102.CAAA-E; ANSI C63.26:2015
AS/NZS 2772.2Name not checked yet
RRA Public Notification 2011-24 (Dec. 23, 2011); RRA Announce 2012-21, K only (Jun. 28, 2012); RRA 2013-3 and 2013-24, June 17, 2013, Korean only; RRA 2014-8 and RRA 2014-37 (June 23, 2014); RRA Public Notification 2015-27 (Dec. 03 2015); RRA Announce 2015-110 (Dec. 3, 2015); RRA Public Notification 2016-26 (Dec.19 2016); RRA Announce 2016-79 (Dec.19 2016); RRA Public Notification 2017-19 (Dec. 28, 2017); RRA Announce 2017-71 (Dec. 28, 2017); MSIT Public Notification 2023-18, June 20, 2023; AS/NZS 4268:2017 + Amd 1: 2021; ETSI EN 300 440 V2.2.1 (2018-07); AS/NZS 2772.2; AS/NZS 4268; Taiwan LP0002 (2024); IS2019 (2020); RTTE01 (2020); IMDA TS CMT (September 2020); IMDA TS CMT (December 2024); IMDA TS LMR Issue 1 (October 2016); IMDA TS SRD Issue 1, Rev. 3 (Sept 2023); IMDA TS UWB Issue 1 (October 2016); IMDA TS WBA Issue 1 (October 2016); Article 6 Paragraph 1 Item 1 of the Regulations for Enforcement of the Radio Law (Ministry of Posts and Telecommunications Notification No. 127 of 1988); MIC Notice No. 88 Annex 1 and Annex 22-3; MIC Notification 88 Annex 43; MIC Notification No. 88 Annex 22-5; EN 300 386; AS/CA S042.4:2022
CISPR 14-2Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 2: Immunity - Product family standardCertificate says EN 55014-2. Probably the same standard; not checked against the EN document.
IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30, clause 202; ISO 80601-2-61 (2017), clause 202; ISO 80601-2-61 (2011), clause 202; ISO 9919 Ed. 2.0 (2005), clause 36; IEC 80601-2-77:2019+A1:2023; EN IEC 80601-2-77:2021+A1:2023; ANSI/AAMI/IEC 80601-2-77:2020; CAN/CSA-C22.2 No. 80601-2-77:19, clause 202; ISO 14117 (2012) sections 4 and 5; ISO 14708-1 (2014) clause 27; ISO 14708-3 (2017-04) clause 27; ISO 14708-4 (2008-11-15) clause 27; ISO 14708-4:2022 Clause 27; EN 60945 (2002) [excluding clauses 8 and 11]; IEC 60945 (2002) [excluding clauses 8 and 11]; GR-1089-CORE, Issue 7; IEC 61000-6-7 (2014); IEC 61000-6-8 (2020); EN 50293:2012; EN 50270:2015; IEC 61131-2 (2017) Sec. 7.3; IEC 61131-6 (2012); EN 61131-6 (2013); EN IEC 61326-1 (2021); IEC 61326-1 (2020); EN 61326-1 (2013); Lloyd's Register - LR Type; Approval System Test Specification 1 (2013, 2015); EN 50130-4 (2011) +A1 (2014); EN 55014-2 (1997); EN 55014-2 (1997) +A1 (2001)+A2 (2008); IEC 60730-1 Ed. 4.0 (2010) +(2013); EN 60730-1 (2011); EN 60730-1:2016 +A2:2022; EN 60730-2-14:2019; IEC 62040-1-2 (2002); EN 12895:2015+A1:2019; IEC 60601-1; EN 60601-1; CAN/CSA-C22.2 No. 60601-1; IEC 60601-1:2005 + A1 (2012); IEC 60601-1:2005+AMD1:2012+AMD2:2020; ANSI/AAMI ES60601-1; ANSI/AAMI ES60601-1:2005/A2:2021; ANSI/AAMI ES60601-1:2005/(R)2012 & A1:2012, C1:2009/(R)2012 & A2:2010/(R)2012 (Cons. Text) [Incl. AMD2:2021]
FCC PART 15Radio Frequency Devices
47 CFR FCC Part 15 Subpart B (using ANSI C63.4-20143); 47 CFR FCC Part 18 (using FCC MP-5:1986); ICES-GEN (Issue 2, February 2024); ICES-001 (Issue 5, July 2020); ICES-002 (Issue 7, September 2020); ICES-003 (Issue 7, October 2020); ICES-004 (Issue 5, October, 2022); ICES-005 (Issue 5, December 2018); ICES-006 (Issue 3, July 2018); International IEC/CISPR 11 Ed. 6.0 (2015) +A1 (2016); CISPR 11 Ed. 6.2 (2019); CISPR 11: 2015 A1:2016 A2:2019; IEC/CISPR 11 Ed. 4.1 (2004-06) +A2 (2006); IEC/CISPR 11 Ed. 5 (2009-05) +A1 (2010); IEC/CISPR 11:2024; CISPR 12 (2007) + A1 (2009); CISPR 14-1:2020; CISPR 14-1 (2005) + A1 (2008) + A2 (2011); CISPR 14-1 (2016); CISPR 14-2 (2020); IEC/CISPR 22 Ed. 5 (2005) +A1(2005) +A2 (2006); IEC/CISPR 22 Ed. 6.0 (2008-09); CISPR 32 Ed. 2.1 (2015) + A1(2019); CISPR 32 Ed. 1 (2012-01); CISPR 16-2-1:2014; CISPR 16-2-1:2014+A1:2017; CISPR 16-2-2:2010; CISPR 16-2-3:2016; CISPR 16-2-3:2019
IEC 62368-1; EN 62368-1; UL 62368-1; CAN/CSA-C22.2 No. 62368-1; US (FCC) 47 CFR FCC Part 15; ANSI C63.10; ANSI C63.17; FCC KDB Publication 905462 D02 (v02); KDB 291074 D02; ANSI C63.26:2015; TIA-102.CAAA-E; ANSI/TIA-603-E; ANSI C63.27 (2017); ANSI C63.30-2021; Canada (ISED) RSS series; ETSI EN 300 series
RSS-102Name not checked yet
AS/CA S042.5:2022; AS/CA S042.1:2022; AS/CA A17.5:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; KDB 447498 D01; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020
Scope as published by A2LA
14 lines
ISO/IEC 17025
Active3310.04
The scope document we hold says it is valid until 2027-06-30.
Location
Labs with overlapping accredited scope in United States
- Intertek Testing Services NAMenlo Park, CA · ~575 kmA2LAShares 3 accredited test methodsANSI/TIA-603-EIEC 61010-1IEC 62368-1
- TUV SUD AmericaSan Diego, CA · ~124 kmA2LAShares 2 accredited test methodsIEC 60601-1IEC 62368-1
- HCT AmericaMilpitas, CA · ~556 kmA2LAShares 2 accredited test methodsANSI/TIA-603-ERSS-102
- Bay Area ComplianceSunnyvale, CA · ~560 kmA2LAShares 2 accredited test methodsIEC 60601-1IEC 62368-1
- UL Verification ServicesFremont, CA · ~571 kmA2LAShares 2 accredited test methodsANSI/TIA-603-ERSS-102
Accreditation data refreshed from the A2LA register on .
This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the A2LA entry linked above.