CTC Laboratories, Inc.
Room 207, 208 of Building A , Room 101 of Building B, No. 7, Lanqing 1st Road, Luhu Community, Guanhu Subdistrict, Longhua District, Shenzhen, Guangdong , 518110, People's Republic of China, Shenzhen, Guangdong, China
Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.
Only the laboratory you pick gets your contact details. We ask the others without them.
Contact this laboratory
Work at CTC Laboratories, Inc.?
Claim this profile to keep it accurate.
Register record
- A2LARefreshed
- 4340.01Active
Certificates and scope
1ISO/IEC 17025
Active4340.01
The scope document we hold says it is valid until 2027-11-30.
Accredited scope, certificate 4340.01
| Line | Discipline | Method | Matrix | Range |
|---|---|---|---|---|
| 1 | electrical | CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CRF 47, FCC Part 18; FCC OST/MP-5:1986; CISPR 22:2005; EN 55022:2010; CISPR 32; EN 55032; BS EN 55032; ICES-GEN; ICES-003; ICES-005; ICES-001; AS/NZS CISPR 32; J55032; VCCI V-3; VCCI V-32-1; CISPR 11; EN 55011; BS EN 55011; J55011; AS CISPR 11; CISPR 14-1; EN 55014-1; BS EN 55014-1; J55014-1; AS/NZS CISPR 14-1; CISPR 15; EN IEC 55015; BS EN IEC 55015; J55015; AS/NZS CISPR 15; IEC 61000-3-2; EN IEC 61000-3-2; JIS C 61000-3-2; BS EN IEC 61000-3-2; AS/NZS 61000.3.2; IEC 61000-3-3; EN 61000-3-3; BS EN 61000-3-3; AS/NZS 61000.3.3; IEC 61000-4-2; EN 61000-4-2; AS/NZS 61000.4.2; BS EN 61000-4-2 | unintentional and intentional radiators | to 40 GHz |
| 2 | - | - | - | - |
| 3 | electrical | FCC CFR 47; FCC Part 15; ANSI C63.10-2020; FCC KDB 905462 D02 (v02); FCC Parts 22; FCC Parts 24; FCC Parts 25; ANSI/TIA-603-E-2016; ANSI C63.26-2015; ISED RSS-GEN; RSS-119; RSS-130; RSS-132; RSS-133; RSS-135; RSS-139; RSS-140; RSS-192; RSS-195; RSS-197; RSS-198; RSS-199; RSS-210; RSS-215; RSS-216; RSS-220; RSS-247; RSS-248; RSS-310; ANSI C63.26-2015; ANSI C63.10-2020; ANSIC63.10-2020+Cor 1-2023+C63.10a-2024 + Errata to C63.10a-2024; Article 2 Paragraph 1 item 8; Article 2 Paragraph 1 item 19; Article 2 Paragraph 1 item 19-2; Article 2 Paragraph 1 item 19-2-2; Article 2 Paragraph 1 item 19-2-3; Article 2 Paragraph 1 item 19-3; Article 2 Paragraph 1 item 11-3; Article 2 Paragraph 1 item 11-7; Article 2 Paragraph 1 item 11-4; Article 2 Paragraph 1 item 11-8; Article 2 Paragraph 1 item 11-19; Article 2 Paragraph 1 item 11-19-2; Article 2 Paragraph 1 item 11-19-3; Article 2 Paragraph 1 item 11-21; Article 2 Paragraph 1 item 11-54; Article 2 Paragraph 1 item 54-6; Article 2 Paragraph 1 item 11-30; Article 2 Paragraph 1 item 11-34; Article 2 Paragraph 1 item 21-3; Article 2 Paragraph 1 item 54; Article 2 Paragraph 1 item 79; Article 2 Paragraph 1 item 80; Public notice of MIC No.99(2004); Test method of Technical Standards Conformity Approval, etc. for Terminal Equipment Paragraph # 2, 7 and 10; Article 3; Article 4; Article 6; Article 7; Article 17~32; Article 34; Article 34-8 | - | to 40 GHz |
| 4 | electrical | EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 330; EN 300 440; EN 303 372-1; EN 303 372-2; EN 303 340; EN 303 345-1; EN 303 345-2; EN 303 345-3; EN 303 345-4; EN 303 413; EN 303 417; EN 301 357; EN 300 422-1; EN 300 422-2; EN 300 422-3; EN 300 422-4; EN 302 291-1; EN 302 291-2; EN 302 208; EN 300 328; EN 301 893; EN 302 502; EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; ETSI EN 301 908-25; EN 300 113; EN 300 086; EN 300 296; ETSI TS 138 521-1; 3GPP TS 38.521-1; ETSI TS 138 521-3; 3GPP TS 38.521-3; ETSI TS 136 521-1; 3GPP TS 36 521-1; ETSI TS 134 121-1; 3GPP TS 34 121-1; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI EN 303 687; AS/NZS 4268; AS/NZS 4771; AS/CA S042.1; AS/CA S042.4; AS/CA S042.5; EN 50364; EN 50383; EN 50385; BS EN 50385; EN 50566; EN 50663; BS EN 50663; EN 62233; EN IEC 62311; BS EN IEC 62311; EN 62369-1; EN 62479; BS EN EN 62479; EN 50665; BS EN 50665; EN 62493; IEC 62233; IEC 62493; AS/NZS 2772.1; AS/NZS 2772.2; EN IEC 62680-1-2; BS EN IEC 62680-1-2; IEC 62680-1-2; EN IEC 62680-1-3; BS EN IEC 62680-1-3; IEC 62680-1-3; SASO IEC 62680-1-2; SASO IEC 62680-1-3 | - | - |
| 5 | electrical | IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; J62368-1; GB 4943.1; BS EN IEC 62368-1; IEC 61347-1; EN 61347-1; EN IEC 61347-1; AS/NZS 61347.1; IEC 61347-2-13; EN 61347-2-13; EN IEC 61347-2-13; AS 61347.2.13; JIS C 8303; A S/NZS 3112; EN 50075; BS 1363-1; UL1310; CSA C22.2 NO. 223-15; (EU) 2023/826; (EU) 2019/2021; (EU) 2019/2013; (EU) 2019/1782; (EU) 617/2013 | - | - |
| 6 | electrical | ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10: 2020; FCC KDB 905462 D02 (v02); ANSI/TIA-603-E; ANSI C63.26-2015 | - | to 40000 MHz |
| 7 | electrical | ANSI/TIA-603-E; ANSI C63.26-2015 | - | to 40000 MHz |
| 8 | electrical | - | - | - |
Ranges are reproduced from the accredited scope document as published. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.
Labs with overlapping accredited scope in China
- MRT Technology (Suzhou) Co.,Suzhou, JiangsuA2LAShares 3 accredited test methodsANSI C63.4:2014ANSI/TIA-603-EIEC 62368-1
- Shenzhen Acote TechnologyShenzhen, Guangdong ProvinceA2LAShares 3 accredited test methodsANSI C63.4:2014ANSI/TIA-603-EEN 300 328
- Shenzhen HUAK Testing Technology Co.,ShenzhenA2LAShares 3 accredited test methodsANSI C63.4:2014ANSI/TIA-603-EIEC 62368-1
- Shenzhen Tongzhou Testing Co.,ShenzhenA2LAShares 3 accredited test methodsANSI C63.4:2014ANSI/TIA-603-EIEC 62368-1
- Shenzhen UnionTrust Quality and Technology Co.,Shenzhen, GuangdongA2LAShares 3 accredited test methodsANSI C63.4:2014ANSI/TIA-603-EIEC 62368-1
Accreditation data refreshed from the A2LA register on .
This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the A2LA entry linked above.