FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
Italy

Intek S.p.a.

Via Mazzini, 75, 25086, Rezzato, Italy

ACCREDIA|00855ISO/IEC 17025Register refreshed 2026-09-25
Certificates
1
Scope items
17
Standards
99
Locations
1

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at Intek S.p.a.?

Claim this profile to keep it accurate.

Register record

ACCREDIARefreshed
00855Active

Accredited standards

99

Our reading of the ACCREDIA scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

IEC

IEC 60068-2-1Environmental testing - Part 2-1: Tests - Test A: Cold
As written on the certificate · Line 8 (ACCREDIA 00855)

EN 60068-2-1:2007; IEC 60068-2-1:2007; IACS UR E10 1991 Rev 10:2024; EN 50498:2010; EN 55035:2017/A11:2020; EN 50121-4:2016/A1:2019; EN 50121-5:2017/A1:2019; EN 50121-3-2:2015; EN 50121-3-2:2016/A1:2019; CISPR 24:2010/COR1:2011/AMD1:2015; EN 55024:2010/A1:2015; EN 12016:2013

IEC 60068-2-2Environmental testing - Part 2-2: Tests - Test B: Dry heat
As written on the certificate · Line 7 (ACCREDIA 00855)

EN 61010-1:2010/A1:2019/AC:2019; IEC 61010-1:2010/COR1:2011/COR2:2013/AMD1:2016/COR1:2019; EN 61326-1:2013; EN IEC 61326-1:2021; IEC 61326-1:2020; Lloyd’s Register Type Approval System Test Specification Number 1 (2024); EN 60068-2-2:2007; IEC 60068-2-2:2007

IEC 60112Name not checked yet
As written on the certificate · Line 13 (ACCREDIA 00855)

EN ISO 14982:2009; EN 61373:2010/AC:2017; IEC 61373:2010/COR1:2011; IEC 62236-3-2:2018; EN 60112:2003/A1:2009; EN IEC 60112:2020; IEC 60112:2003/AMD1:2009; IEC 60112:2020; EN 60695-2-10:2013 + EN 60695-2-12:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-12:2021; IEC 60695-2-10:2013 + IEC 60695-2-12:2010/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-12:2021; EN 60255-26:2013/AC:2013; EN 60670-1:2005/A1:2013/Cor:2007/Cor:2012; EN IEC 60670-1:2021/A11:2021; IEC 60670-1:2015

IEC 60255-26Name not checked yet
As written on the certificate · Line 13 (ACCREDIA 00855)

EN ISO 14982:2009; EN 61373:2010/AC:2017; IEC 61373:2010/COR1:2011; IEC 62236-3-2:2018; EN 60112:2003/A1:2009; EN IEC 60112:2020; IEC 60112:2003/AMD1:2009; IEC 60112:2020; EN 60695-2-10:2013 + EN 60695-2-12:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-12:2021; IEC 60695-2-10:2013 + IEC 60695-2-12:2010/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-12:2021; EN 60255-26:2013/AC:2013; EN 60670-1:2005/A1:2013/Cor:2007/Cor:2012; EN IEC 60670-1:2021/A11:2021; IEC 60670-1:2015

IEC 60335-1Household and similar electrical appliances - Safety - Part 1: General requirements
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

IEC 60533Name not checked yet
As written on the certificate · Line 12 (ACCREDIA 00855)

UNI CEI EN ISO/IEC 17025:2018; EN 50155:2007/AC:2012/Cor:2010; IEC 60571:2012; IEC 60533:2015; EN IEC 61543:2023/A11:2023; IEC 61543:2022; EN 61009-1:2012/A11:2015/A12:2016/A13:2021/A1:2014/A2:2014

IEC 60571Name not checked yet
As written on the certificate · Line 12 (ACCREDIA 00855)

UNI CEI EN ISO/IEC 17025:2018; EN 50155:2007/AC:2012/Cor:2010; IEC 60571:2012; IEC 60533:2015; EN IEC 61543:2023/A11:2023; IEC 61543:2022; EN 61009-1:2012/A11:2015/A12:2016/A13:2021/A1:2014/A2:2014

IEC 60664-1Name not checked yet
As written on the certificate · Line 3 (ACCREDIA 00855)

EN 60947-4-1:2010/A1:2012; EN IEC 60947-4-1:2019/AC:2020/AC:2021; EN IEC 60947-3:2021/AC:2021; IEC 60947-3:2020/COR1:2021; EN 60947-1:2007/A1:2011/A2:2014; EN IEC 60947-1:2021/AC:2023/AC:2024; IEC 60947-1:2020/COR1:2022/COR2:2024; EN 60664-1:2007

IEC 60669-2-1Name not checked yet
As written on the certificate · Line 2 (ACCREDIA 00855)

EN 60669-2-1:2004/Corr:2007/A1:2009/A 12:2010; EN IEC 60669-2-1:2022/A11:2022; EN IEC 60669-2-1:2022/A11:2022/AC:2024; IEC 60669-2-1:2021; EN 61326-3-1:2017; IEC 61326-3-1:2017; EN 61326-3-2:2008; EN IEC 61326-3-2:2018; IEC 61326-3-2:2008; IEC 61326-3-2:2017; EN 61326-2-6:2013; EN IEC 61326-2-6:2021; IEC 61326-2-6:2012; IEC 61326-2-6:2020; EN 50270:2015; EN 50270:2015/AC:2016; EN 61326-2-3:2013; EN IEC 61326-2-3:2021; IEC 61326-2-3:2012; IEC 61326-2-3:2020; EN 60947-2:2017/A1:2020; IEC 60947-2:2024

IEC 60730-1Automatic electrical controls - Part 1: General requirements
As written on the certificate · Line 10 (ACCREDIA 00855)

EN 60079-18:2015/A1:201/AC:2018; IEC 60079-18:2014/AMD1:2017/COR1:2018; EN IEC 61800-5-1:2023; IEC 61800-5-1:2022/COR1:2023; EN 61800-5-1:2007/A1:2017/A11:2021; EN IEC 61800-3:2023; EN IEC 61800-2:2021; IEC 61800-2:2021; EN 50130-4:2011/A1:2014; EN 61131-2:2007; EN 61204-3:2000; EN IEC 61204-3:2018; IEC 61204-3:2016; EN 62080:2009/A2:2015; IEC 62080:2001/AMD1:2008/AMD2:2015; EN 60730-2-7:2010/AC:2011; EN IEC 60730-2-7:2020; IEC 60730-2-7:2015; EN 60730-1:2016/A1:2019; EN 60730-1:2016/A1:2019/A2:2022; IEC 60730-1:2013/Cor1:2014/AMD1:2015/AMD2:2020; EN IEC 60730-1:2024/A11:2024; IEC 60730-1:2022

IEC 60730-2-7Name not checked yet
As written on the certificate · Line 10 (ACCREDIA 00855)

EN 60079-18:2015/A1:201/AC:2018; IEC 60079-18:2014/AMD1:2017/COR1:2018; EN IEC 61800-5-1:2023; IEC 61800-5-1:2022/COR1:2023; EN 61800-5-1:2007/A1:2017/A11:2021; EN IEC 61800-3:2023; EN IEC 61800-2:2021; IEC 61800-2:2021; EN 50130-4:2011/A1:2014; EN 61131-2:2007; EN 61204-3:2000; EN IEC 61204-3:2018; IEC 61204-3:2016; EN 62080:2009/A2:2015; IEC 62080:2001/AMD1:2008/AMD2:2015; EN 60730-2-7:2010/AC:2011; EN IEC 60730-2-7:2020; IEC 60730-2-7:2015; EN 60730-1:2016/A1:2019; EN 60730-1:2016/A1:2019/A2:2022; IEC 60730-1:2013/Cor1:2014/AMD1:2015/AMD2:2020; EN IEC 60730-1:2024/A11:2024; IEC 60730-1:2022

IEC 60945Maritime navigation and radiocommunication equipment and systems - General requirements - Methods of testing and required test results
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

IEC 61009-1Name not checked yet
As written on the certificate · Line 12 (ACCREDIA 00855)

UNI CEI EN ISO/IEC 17025:2018; EN 50155:2007/AC:2012/Cor:2010; IEC 60571:2012; IEC 60533:2015; EN IEC 61543:2023/A11:2023; IEC 61543:2022; EN 61009-1:2012/A11:2015/A12:2016/A13:2021/A1:2014/A2:2014

IEC 61010-1Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 1: General requirements
As written on the certificate · Line 7 (ACCREDIA 00855)

EN 61010-1:2010/A1:2019/AC:2019; IEC 61010-1:2010/COR1:2011/COR2:2013/AMD1:2016/COR1:2019; EN 61326-1:2013; EN IEC 61326-1:2021; IEC 61326-1:2020; Lloyd’s Register Type Approval System Test Specification Number 1 (2024); EN 60068-2-2:2007; IEC 60068-2-2:2007

As written on the certificate · Line 15 (ACCREDIA 00855)

EN 61010-1:2010/A1:2019/AC:2019; IEC 61010-1:2010/COR1:2011/COR2:2013/AMD1:2016/COR1:2019

IEC 61131-2Name not checked yet
As written on the certificate · Line 10 (ACCREDIA 00855)

EN 60079-18:2015/A1:201/AC:2018; IEC 60079-18:2014/AMD1:2017/COR1:2018; EN IEC 61800-5-1:2023; IEC 61800-5-1:2022/COR1:2023; EN 61800-5-1:2007/A1:2017/A11:2021; EN IEC 61800-3:2023; EN IEC 61800-2:2021; IEC 61800-2:2021; EN 50130-4:2011/A1:2014; EN 61131-2:2007; EN 61204-3:2000; EN IEC 61204-3:2018; IEC 61204-3:2016; EN 62080:2009/A2:2015; IEC 62080:2001/AMD1:2008/AMD2:2015; EN 60730-2-7:2010/AC:2011; EN IEC 60730-2-7:2020; IEC 60730-2-7:2015; EN 60730-1:2016/A1:2019; EN 60730-1:2016/A1:2019/A2:2022; IEC 60730-1:2013/Cor1:2014/AMD1:2015/AMD2:2020; EN IEC 60730-1:2024/A11:2024; IEC 60730-1:2022

IEC 61204-3Name not checked yet
As written on the certificate · Line 10 (ACCREDIA 00855)

EN 60079-18:2015/A1:201/AC:2018; IEC 60079-18:2014/AMD1:2017/COR1:2018; EN IEC 61800-5-1:2023; IEC 61800-5-1:2022/COR1:2023; EN 61800-5-1:2007/A1:2017/A11:2021; EN IEC 61800-3:2023; EN IEC 61800-2:2021; IEC 61800-2:2021; EN 50130-4:2011/A1:2014; EN 61131-2:2007; EN 61204-3:2000; EN IEC 61204-3:2018; IEC 61204-3:2016; EN 62080:2009/A2:2015; IEC 62080:2001/AMD1:2008/AMD2:2015; EN 60730-2-7:2010/AC:2011; EN IEC 60730-2-7:2020; IEC 60730-2-7:2015; EN 60730-1:2016/A1:2019; EN 60730-1:2016/A1:2019/A2:2022; IEC 60730-1:2013/Cor1:2014/AMD1:2015/AMD2:2020; EN IEC 60730-1:2024/A11:2024; IEC 60730-1:2022

IEC 61373Railway applications - Rolling stock equipment - Shock and vibration tests
As written on the certificate · Line 13 (ACCREDIA 00855)

EN ISO 14982:2009; EN 61373:2010/AC:2017; IEC 61373:2010/COR1:2011; IEC 62236-3-2:2018; EN 60112:2003/A1:2009; EN IEC 60112:2020; IEC 60112:2003/AMD1:2009; IEC 60112:2020; EN 60695-2-10:2013 + EN 60695-2-12:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-12:2021; IEC 60695-2-10:2013 + IEC 60695-2-12:2010/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-12:2021; EN 60255-26:2013/AC:2013; EN 60670-1:2005/A1:2013/Cor:2007/Cor:2012; EN IEC 60670-1:2021/A11:2021; IEC 60670-1:2015

IEC 61439-2Name not checked yet
As written on the certificate · Line 4 (ACCREDIA 00855)

EN IEC 61439-2:2021; IEC 61439-2:2020; EN 61439-2:2011; IEC 61439-2:2011; EN 61439-4:2013

IEC 61439-4Name not checked yet
As written on the certificate · Line 4 (ACCREDIA 00855)

EN IEC 61439-2:2021; IEC 61439-2:2020; EN 61439-2:2011; IEC 61439-2:2011; EN 61439-4:2013

IEC 61543Name not checked yet
As written on the certificate · Line 12 (ACCREDIA 00855)

UNI CEI EN ISO/IEC 17025:2018; EN 50155:2007/AC:2012/Cor:2010; IEC 60571:2012; IEC 60533:2015; EN IEC 61543:2023/A11:2023; IEC 61543:2022; EN 61009-1:2012/A11:2015/A12:2016/A13:2021/A1:2014/A2:2014

IEC 61547Equipment for general lighting purposes - EMC immunity requirementsCertificate says EN 61547. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

IEC 62052-11Name not checked yet
As written on the certificate · Line 1 (ACCREDIA 00855)

EN IEC 62053-21:2021/A11:2021; IEC 62053-21:2020; EN IEC 62053-23:2021/A11:2021; IEC 62053-23:2020; EN 62053-23:2003/A1:2017/AC:2018; IEC 62053-23:2003/AMD1:2016/COR1:2018; EN 50470-3:2006/A1:2018; EN 50470-3:2022; EN 50470-1:2006/A1:2018; EN IEC 62052-11:2021/A11:2022; IEC 62052-11:2020

IEC 62053-21Name not checked yet
As written on the certificate · Line 1 (ACCREDIA 00855)

EN IEC 62053-21:2021/A11:2021; IEC 62053-21:2020; EN IEC 62053-23:2021/A11:2021; IEC 62053-23:2020; EN 62053-23:2003/A1:2017/AC:2018; IEC 62053-23:2003/AMD1:2016/COR1:2018; EN 50470-3:2006/A1:2018; EN 50470-3:2022; EN 50470-1:2006/A1:2018; EN IEC 62052-11:2021/A11:2022; IEC 62052-11:2020

IEC 62053-23Name not checked yet
As written on the certificate · Line 1 (ACCREDIA 00855)

EN IEC 62053-21:2021/A11:2021; IEC 62053-21:2020; EN IEC 62053-23:2021/A11:2021; IEC 62053-23:2020; EN 62053-23:2003/A1:2017/AC:2018; IEC 62053-23:2003/AMD1:2016/COR1:2018; EN 50470-3:2006/A1:2018; EN 50470-3:2022; EN 50470-1:2006/A1:2018; EN IEC 62052-11:2021/A11:2022; IEC 62052-11:2020

IEC 62080Name not checked yet
As written on the certificate · Line 10 (ACCREDIA 00855)

EN 60079-18:2015/A1:201/AC:2018; IEC 60079-18:2014/AMD1:2017/COR1:2018; EN IEC 61800-5-1:2023; IEC 61800-5-1:2022/COR1:2023; EN 61800-5-1:2007/A1:2017/A11:2021; EN IEC 61800-3:2023; EN IEC 61800-2:2021; IEC 61800-2:2021; EN 50130-4:2011/A1:2014; EN 61131-2:2007; EN 61204-3:2000; EN IEC 61204-3:2018; IEC 61204-3:2016; EN 62080:2009/A2:2015; IEC 62080:2001/AMD1:2008/AMD2:2015; EN 60730-2-7:2010/AC:2011; EN IEC 60730-2-7:2020; IEC 60730-2-7:2015; EN 60730-1:2016/A1:2019; EN 60730-1:2016/A1:2019/A2:2022; IEC 60730-1:2013/Cor1:2014/AMD1:2015/AMD2:2020; EN IEC 60730-1:2024/A11:2024; IEC 60730-1:2022

IEC 62233Measurement methods for electromagnetic fields of household appliances and similar apparatus with regard to human exposure
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

IEC 62236-3-2Name not checked yet
As written on the certificate · Line 13 (ACCREDIA 00855)

EN ISO 14982:2009; EN 61373:2010/AC:2017; IEC 61373:2010/COR1:2011; IEC 62236-3-2:2018; EN 60112:2003/A1:2009; EN IEC 60112:2020; IEC 60112:2003/AMD1:2009; IEC 60112:2020; EN 60695-2-10:2013 + EN 60695-2-12:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-12:2021; IEC 60695-2-10:2013 + IEC 60695-2-12:2010/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-12:2021; EN 60255-26:2013/AC:2013; EN 60670-1:2005/A1:2013/Cor:2007/Cor:2012; EN IEC 60670-1:2021/A11:2021; IEC 60670-1:2015

IEC 62262Name not checked yet
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

IEC 61000 series

IEC 61000-3-2Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current ≤ 16 A per phase)
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

IEC 61000-3-3Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤ 16 A per phase and not subject to conditional connection
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

IEC 61000-4-2Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity testCertificate says EN 61000-4-2:2009. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

IEC 61000-4-3Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity testCertificate says EN 61000-4-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

IEC 61000-4-4Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

IEC 61000-4-5Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

IEC 61000-4-6Electromagnetic compatibility (EMC) - Part 4-6: Testing and measurement techniques - Immunity to conducted disturbances, induced by radio-frequency fields
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

IEC 61000-4-8Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

IEC 61000-4-11Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests for equipment with input current up to 16 A per phase
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

IEC 61000-4-12Electromagnetic Compatibility (EMC) - Part 4-12: Testing and measurement techniques - Ring wave immunity test
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

IEC 61000-4-16Name not checked yet
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

IEC 61000-4-18Name not checked yet
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

IEC 61000-4-29Electromagnetic compatibility (EMC) - Part 4-29: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations on d.c. input power port immunity tests
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

IEC 61000-6-1Electromagnetic compatibility (EMC) - Part 6-1: Generic standards - Immunity standard for residential, commercial and light-industrial environments
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

IEC 61000-6-2Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity standard for industrial environments
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

IEC 61000-6-3Electromagnetic compatibility (EMC) - Part 6-3: Generic standards - Emission standard for equipment in residential environmentsCertificate says EN 61000-6-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

EN

EN 12016Name not checked yet
As written on the certificate · Line 8 (ACCREDIA 00855)

EN 60068-2-1:2007; IEC 60068-2-1:2007; IACS UR E10 1991 Rev 10:2024; EN 50498:2010; EN 55035:2017/A11:2020; EN 50121-4:2016/A1:2019; EN 50121-5:2017/A1:2019; EN 50121-3-2:2015; EN 50121-3-2:2016/A1:2019; CISPR 24:2010/COR1:2011/AMD1:2015; EN 55024:2010/A1:2015; EN 12016:2013

EN 50130-4Alarm systems - Part 4: Electromagnetic compatibility - Product family standard: Immunity requirements for components of fire, intruder, hold up, CCTV, access control and social alarm systems
As written on the certificate · Line 10 (ACCREDIA 00855)

EN 60079-18:2015/A1:201/AC:2018; IEC 60079-18:2014/AMD1:2017/COR1:2018; EN IEC 61800-5-1:2023; IEC 61800-5-1:2022/COR1:2023; EN 61800-5-1:2007/A1:2017/A11:2021; EN IEC 61800-3:2023; EN IEC 61800-2:2021; IEC 61800-2:2021; EN 50130-4:2011/A1:2014; EN 61131-2:2007; EN 61204-3:2000; EN IEC 61204-3:2018; IEC 61204-3:2016; EN 62080:2009/A2:2015; IEC 62080:2001/AMD1:2008/AMD2:2015; EN 60730-2-7:2010/AC:2011; EN IEC 60730-2-7:2020; IEC 60730-2-7:2015; EN 60730-1:2016/A1:2019; EN 60730-1:2016/A1:2019/A2:2022; IEC 60730-1:2013/Cor1:2014/AMD1:2015/AMD2:2020; EN IEC 60730-1:2024/A11:2024; IEC 60730-1:2022

EN 50155Railway applications - Rolling stock - Electronic equipment
As written on the certificate · Line 12 (ACCREDIA 00855)

UNI CEI EN ISO/IEC 17025:2018; EN 50155:2007/AC:2012/Cor:2010; IEC 60571:2012; IEC 60533:2015; EN IEC 61543:2023/A11:2023; IEC 61543:2022; EN 61009-1:2012/A11:2015/A12:2016/A13:2021/A1:2014/A2:2014

EN 50270Name not checked yet
As written on the certificate · Line 2 (ACCREDIA 00855)

EN 60669-2-1:2004/Corr:2007/A1:2009/A 12:2010; EN IEC 60669-2-1:2022/A11:2022; EN IEC 60669-2-1:2022/A11:2022/AC:2024; IEC 60669-2-1:2021; EN 61326-3-1:2017; IEC 61326-3-1:2017; EN 61326-3-2:2008; EN IEC 61326-3-2:2018; IEC 61326-3-2:2008; IEC 61326-3-2:2017; EN 61326-2-6:2013; EN IEC 61326-2-6:2021; IEC 61326-2-6:2012; IEC 61326-2-6:2020; EN 50270:2015; EN 50270:2015/AC:2016; EN 61326-2-3:2013; EN IEC 61326-2-3:2021; IEC 61326-2-3:2012; IEC 61326-2-3:2020; EN 60947-2:2017/A1:2020; IEC 60947-2:2024

EN 50293Name not checked yet
As written on the certificate · Line 14 (ACCREDIA 00855)

EN 60670-22:2006; EN 60670-24:2013/A11:2023; EN IEC 63044-5-1:2019/A1:2024; EN 50293:2012; ISO 16750-4:2023; ISO 20653:2023; UNECE 97R01/09 (2021)

EN 50470-1Name not checked yet
As written on the certificate · Line 1 (ACCREDIA 00855)

EN IEC 62053-21:2021/A11:2021; IEC 62053-21:2020; EN IEC 62053-23:2021/A11:2021; IEC 62053-23:2020; EN 62053-23:2003/A1:2017/AC:2018; IEC 62053-23:2003/AMD1:2016/COR1:2018; EN 50470-3:2006/A1:2018; EN 50470-3:2022; EN 50470-1:2006/A1:2018; EN IEC 62052-11:2021/A11:2022; IEC 62052-11:2020

EN 50470-3Name not checked yet
As written on the certificate · Line 1 (ACCREDIA 00855)

EN IEC 62053-21:2021/A11:2021; IEC 62053-21:2020; EN IEC 62053-23:2021/A11:2021; IEC 62053-23:2020; EN 62053-23:2003/A1:2017/AC:2018; IEC 62053-23:2003/AMD1:2016/COR1:2018; EN 50470-3:2006/A1:2018; EN 50470-3:2022; EN 50470-1:2006/A1:2018; EN IEC 62052-11:2021/A11:2022; IEC 62052-11:2020

EN 50491-5-2Name not checked yet
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

EN 50491-5-3Name not checked yet
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

EN 50498Electromagnetic compatibility (EMC) - Product family standard for aftermarket electronic equipment in vehicles
As written on the certificate · Line 8 (ACCREDIA 00855)

EN 60068-2-1:2007; IEC 60068-2-1:2007; IACS UR E10 1991 Rev 10:2024; EN 50498:2010; EN 55035:2017/A11:2020; EN 50121-4:2016/A1:2019; EN 50121-5:2017/A1:2019; EN 50121-3-2:2015; EN 50121-3-2:2016/A1:2019; CISPR 24:2010/COR1:2011/AMD1:2015; EN 55024:2010/A1:2015; EN 12016:2013

IEC 60079 series

IEC 60079-1Name not checked yet
As written on the certificate · Line 9 (ACCREDIA 00855)

EN IEC 60079-15:2019; IEC 60079-15:2017; EN IEC 60079-7:2015/A1:2018; EN IEC 60079-7:2015/A1:2018/A11:2024; IEC 60079-7:2015/AMD1:2017; EN 60079-11:2012; IEC 60079-11:2011/COR1:2012; EN 60079-31:2014; EN IEC 60079-31:2024; IEC 60079-31:2013; IEC 60079-31:2022; IEC 60079-31:2022/COR1:2023; EN 60079-1:2014/AC:2018; EN 60079-1:2014/AC:2018/A11:2024; IEC 60079-1:2014/COR1:2018

IEC 60079-7Name not checked yet
As written on the certificate · Line 9 (ACCREDIA 00855)

EN IEC 60079-15:2019; IEC 60079-15:2017; EN IEC 60079-7:2015/A1:2018; EN IEC 60079-7:2015/A1:2018/A11:2024; IEC 60079-7:2015/AMD1:2017; EN 60079-11:2012; IEC 60079-11:2011/COR1:2012; EN 60079-31:2014; EN IEC 60079-31:2024; IEC 60079-31:2013; IEC 60079-31:2022; IEC 60079-31:2022/COR1:2023; EN 60079-1:2014/AC:2018; EN 60079-1:2014/AC:2018/A11:2024; IEC 60079-1:2014/COR1:2018

IEC 60079-11Name not checked yet
As written on the certificate · Line 9 (ACCREDIA 00855)

EN IEC 60079-15:2019; IEC 60079-15:2017; EN IEC 60079-7:2015/A1:2018; EN IEC 60079-7:2015/A1:2018/A11:2024; IEC 60079-7:2015/AMD1:2017; EN 60079-11:2012; IEC 60079-11:2011/COR1:2012; EN 60079-31:2014; EN IEC 60079-31:2024; IEC 60079-31:2013; IEC 60079-31:2022; IEC 60079-31:2022/COR1:2023; EN 60079-1:2014/AC:2018; EN 60079-1:2014/AC:2018/A11:2024; IEC 60079-1:2014/COR1:2018

IEC 60079-15Name not checked yet
As written on the certificate · Line 9 (ACCREDIA 00855)

EN IEC 60079-15:2019; IEC 60079-15:2017; EN IEC 60079-7:2015/A1:2018; EN IEC 60079-7:2015/A1:2018/A11:2024; IEC 60079-7:2015/AMD1:2017; EN 60079-11:2012; IEC 60079-11:2011/COR1:2012; EN 60079-31:2014; EN IEC 60079-31:2024; IEC 60079-31:2013; IEC 60079-31:2022; IEC 60079-31:2022/COR1:2023; EN 60079-1:2014/AC:2018; EN 60079-1:2014/AC:2018/A11:2024; IEC 60079-1:2014/COR1:2018

IEC 60079-18Name not checked yet
As written on the certificate · Line 10 (ACCREDIA 00855)

EN 60079-18:2015/A1:201/AC:2018; IEC 60079-18:2014/AMD1:2017/COR1:2018; EN IEC 61800-5-1:2023; IEC 61800-5-1:2022/COR1:2023; EN 61800-5-1:2007/A1:2017/A11:2021; EN IEC 61800-3:2023; EN IEC 61800-2:2021; IEC 61800-2:2021; EN 50130-4:2011/A1:2014; EN 61131-2:2007; EN 61204-3:2000; EN IEC 61204-3:2018; IEC 61204-3:2016; EN 62080:2009/A2:2015; IEC 62080:2001/AMD1:2008/AMD2:2015; EN 60730-2-7:2010/AC:2011; EN IEC 60730-2-7:2020; IEC 60730-2-7:2015; EN 60730-1:2016/A1:2019; EN 60730-1:2016/A1:2019/A2:2022; IEC 60730-1:2013/Cor1:2014/AMD1:2015/AMD2:2020; EN IEC 60730-1:2024/A11:2024; IEC 60730-1:2022

IEC 60079-31Name not checked yet
As written on the certificate · Line 9 (ACCREDIA 00855)

EN IEC 60079-15:2019; IEC 60079-15:2017; EN IEC 60079-7:2015/A1:2018; EN IEC 60079-7:2015/A1:2018/A11:2024; IEC 60079-7:2015/AMD1:2017; EN 60079-11:2012; IEC 60079-11:2011/COR1:2012; EN 60079-31:2014; EN IEC 60079-31:2024; IEC 60079-31:2013; IEC 60079-31:2022; IEC 60079-31:2022/COR1:2023; EN 60079-1:2014/AC:2018; EN 60079-1:2014/AC:2018/A11:2024; IEC 60079-1:2014/COR1:2018

IEC 60947 series

IEC 60947-1Name not checked yet
As written on the certificate · Line 3 (ACCREDIA 00855)

EN 60947-4-1:2010/A1:2012; EN IEC 60947-4-1:2019/AC:2020/AC:2021; EN IEC 60947-3:2021/AC:2021; IEC 60947-3:2020/COR1:2021; EN 60947-1:2007/A1:2011/A2:2014; EN IEC 60947-1:2021/AC:2023/AC:2024; IEC 60947-1:2020/COR1:2022/COR2:2024; EN 60664-1:2007

IEC 60947-2Name not checked yet
As written on the certificate · Line 2 (ACCREDIA 00855)

EN 60669-2-1:2004/Corr:2007/A1:2009/A 12:2010; EN IEC 60669-2-1:2022/A11:2022; EN IEC 60669-2-1:2022/A11:2022/AC:2024; IEC 60669-2-1:2021; EN 61326-3-1:2017; IEC 61326-3-1:2017; EN 61326-3-2:2008; EN IEC 61326-3-2:2018; IEC 61326-3-2:2008; IEC 61326-3-2:2017; EN 61326-2-6:2013; EN IEC 61326-2-6:2021; IEC 61326-2-6:2012; IEC 61326-2-6:2020; EN 50270:2015; EN 50270:2015/AC:2016; EN 61326-2-3:2013; EN IEC 61326-2-3:2021; IEC 61326-2-3:2012; IEC 61326-2-3:2020; EN 60947-2:2017/A1:2020; IEC 60947-2:2024

IEC 60947-3Name not checked yet
As written on the certificate · Line 3 (ACCREDIA 00855)

EN 60947-4-1:2010/A1:2012; EN IEC 60947-4-1:2019/AC:2020/AC:2021; EN IEC 60947-3:2021/AC:2021; IEC 60947-3:2020/COR1:2021; EN 60947-1:2007/A1:2011/A2:2014; EN IEC 60947-1:2021/AC:2023/AC:2024; IEC 60947-1:2020/COR1:2022/COR2:2024; EN 60664-1:2007

IEC 60947-4-1Name not checked yet
As written on the certificate · Line 3 (ACCREDIA 00855)

EN 60947-4-1:2010/A1:2012; EN IEC 60947-4-1:2019/AC:2020/AC:2021; EN IEC 60947-3:2021/AC:2021; IEC 60947-3:2020/COR1:2021; EN 60947-1:2007/A1:2011/A2:2014; EN IEC 60947-1:2021/AC:2023/AC:2024; IEC 60947-1:2020/COR1:2022/COR2:2024; EN 60664-1:2007

IEC 60947-5-1Name not checked yet
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

IEC 60947-5-2Name not checked yet
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

ISO

ISO 7637-3Road vehicles - Electrical disturbances from conduction and coupling - Part 3: Electrical transient transmission by capacitive and inductive coupling via lines other than supply lines
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

ISO 11452-2Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 2: Absorber-lined shielded enclosure
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

ISO 11452-4Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 4: Harness excitation methods
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

ISO 14982Agricultural and forestry machinery - Electromagnetic compatibility - Test methods and acceptance criteria
As written on the certificate · Line 13 (ACCREDIA 00855)

EN ISO 14982:2009; EN 61373:2010/AC:2017; IEC 61373:2010/COR1:2011; IEC 62236-3-2:2018; EN 60112:2003/A1:2009; EN IEC 60112:2020; IEC 60112:2003/AMD1:2009; IEC 60112:2020; EN 60695-2-10:2013 + EN 60695-2-12:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-12:2021; IEC 60695-2-10:2013 + IEC 60695-2-12:2010/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-12:2021; EN 60255-26:2013/AC:2013; EN 60670-1:2005/A1:2013/Cor:2007/Cor:2012; EN IEC 60670-1:2021/A11:2021; IEC 60670-1:2015

ISO 16750-4Road vehicles - Environmental conditions and testing for electrical and electronic equipment - Part 4: Climatic loads
As written on the certificate · Line 14 (ACCREDIA 00855)

EN 60670-22:2006; EN 60670-24:2013/A11:2023; EN IEC 63044-5-1:2019/A1:2024; EN 50293:2012; ISO 16750-4:2023; ISO 20653:2023; UNECE 97R01/09 (2021)

ISO 20653Road vehicles - Degrees of protection (IP code) - Protection of electrical equipment against foreign objects, water and access
As written on the certificate · Line 14 (ACCREDIA 00855)

EN 60670-22:2006; EN 60670-24:2013/A11:2023; EN IEC 63044-5-1:2019/A1:2024; EN 50293:2012; ISO 16750-4:2023; ISO 20653:2023; UNECE 97R01/09 (2021)

IEC 61326 series

IEC 61326-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
As written on the certificate · Line 7 (ACCREDIA 00855)

EN 61010-1:2010/A1:2019/AC:2019; IEC 61010-1:2010/COR1:2011/COR2:2013/AMD1:2016/COR1:2019; EN 61326-1:2013; EN IEC 61326-1:2021; IEC 61326-1:2020; Lloyd’s Register Type Approval System Test Specification Number 1 (2024); EN 60068-2-2:2007; IEC 60068-2-2:2007

IEC 61326-2-3Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-3: Particular requirements - Test configuration, operational conditions and performance criteria for transducers with integrated or remote signal conditioning
As written on the certificate · Line 2 (ACCREDIA 00855)

EN 60669-2-1:2004/Corr:2007/A1:2009/A 12:2010; EN IEC 60669-2-1:2022/A11:2022; EN IEC 60669-2-1:2022/A11:2022/AC:2024; IEC 60669-2-1:2021; EN 61326-3-1:2017; IEC 61326-3-1:2017; EN 61326-3-2:2008; EN IEC 61326-3-2:2018; IEC 61326-3-2:2008; IEC 61326-3-2:2017; EN 61326-2-6:2013; EN IEC 61326-2-6:2021; IEC 61326-2-6:2012; IEC 61326-2-6:2020; EN 50270:2015; EN 50270:2015/AC:2016; EN 61326-2-3:2013; EN IEC 61326-2-3:2021; IEC 61326-2-3:2012; IEC 61326-2-3:2020; EN 60947-2:2017/A1:2020; IEC 60947-2:2024

IEC 61326-2-6Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular requirements - In vitro diagnostic (IVD) medical electrical equipment
As written on the certificate · Line 2 (ACCREDIA 00855)

EN 60669-2-1:2004/Corr:2007/A1:2009/A 12:2010; EN IEC 60669-2-1:2022/A11:2022; EN IEC 60669-2-1:2022/A11:2022/AC:2024; IEC 60669-2-1:2021; EN 61326-3-1:2017; IEC 61326-3-1:2017; EN 61326-3-2:2008; EN IEC 61326-3-2:2018; IEC 61326-3-2:2008; IEC 61326-3-2:2017; EN 61326-2-6:2013; EN IEC 61326-2-6:2021; IEC 61326-2-6:2012; IEC 61326-2-6:2020; EN 50270:2015; EN 50270:2015/AC:2016; EN 61326-2-3:2013; EN IEC 61326-2-3:2021; IEC 61326-2-3:2012; IEC 61326-2-3:2020; EN 60947-2:2017/A1:2020; IEC 60947-2:2024

IEC 61326-3-1Name not checked yet
As written on the certificate · Line 2 (ACCREDIA 00855)

EN 60669-2-1:2004/Corr:2007/A1:2009/A 12:2010; EN IEC 60669-2-1:2022/A11:2022; EN IEC 60669-2-1:2022/A11:2022/AC:2024; IEC 60669-2-1:2021; EN 61326-3-1:2017; IEC 61326-3-1:2017; EN 61326-3-2:2008; EN IEC 61326-3-2:2018; IEC 61326-3-2:2008; IEC 61326-3-2:2017; EN 61326-2-6:2013; EN IEC 61326-2-6:2021; IEC 61326-2-6:2012; IEC 61326-2-6:2020; EN 50270:2015; EN 50270:2015/AC:2016; EN 61326-2-3:2013; EN IEC 61326-2-3:2021; IEC 61326-2-3:2012; IEC 61326-2-3:2020; EN 60947-2:2017/A1:2020; IEC 60947-2:2024

IEC 61326-3-2Name not checked yet
As written on the certificate · Line 2 (ACCREDIA 00855)

EN 60669-2-1:2004/Corr:2007/A1:2009/A 12:2010; EN IEC 60669-2-1:2022/A11:2022; EN IEC 60669-2-1:2022/A11:2022/AC:2024; IEC 60669-2-1:2021; EN 61326-3-1:2017; IEC 61326-3-1:2017; EN 61326-3-2:2008; EN IEC 61326-3-2:2018; IEC 61326-3-2:2008; IEC 61326-3-2:2017; EN 61326-2-6:2013; EN IEC 61326-2-6:2021; IEC 61326-2-6:2012; IEC 61326-2-6:2020; EN 50270:2015; EN 50270:2015/AC:2016; EN 61326-2-3:2013; EN IEC 61326-2-3:2021; IEC 61326-2-3:2012; IEC 61326-2-3:2020; EN 60947-2:2017/A1:2020; IEC 60947-2:2024

IEC 60695 series

IEC 60695-2-10Name not checked yet
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

As written on the certificate · Line 13 (ACCREDIA 00855)

EN ISO 14982:2009; EN 61373:2010/AC:2017; IEC 61373:2010/COR1:2011; IEC 62236-3-2:2018; EN 60112:2003/A1:2009; EN IEC 60112:2020; IEC 60112:2003/AMD1:2009; IEC 60112:2020; EN 60695-2-10:2013 + EN 60695-2-12:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-12:2021; IEC 60695-2-10:2013 + IEC 60695-2-12:2010/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-12:2021; EN 60255-26:2013/AC:2013; EN 60670-1:2005/A1:2013/Cor:2007/Cor:2012; EN IEC 60670-1:2021/A11:2021; IEC 60670-1:2015

IEC 60695-2-11Name not checked yet
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

IEC 60695-2-12Name not checked yet
As written on the certificate · Line 13 (ACCREDIA 00855)

EN ISO 14982:2009; EN 61373:2010/AC:2017; IEC 61373:2010/COR1:2011; IEC 62236-3-2:2018; EN 60112:2003/A1:2009; EN IEC 60112:2020; IEC 60112:2003/AMD1:2009; IEC 60112:2020; EN 60695-2-10:2013 + EN 60695-2-12:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-12:2021; IEC 60695-2-10:2013 + IEC 60695-2-12:2010/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-12:2021; EN 60255-26:2013/AC:2013; EN 60670-1:2005/A1:2013/Cor:2007/Cor:2012; EN IEC 60670-1:2021/A11:2021; IEC 60670-1:2015

IEC 60695-2-13Name not checked yet
As written on the certificate · Line 6 (ACCREDIA 00855)

EN 62262:2002/A1:2021; IEC 62262:2002/AMD1:2021; EN 60695-2-10:2013 + EN 60695-2-11:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-11:2021; EN IEC 60695-2-10:2021/AC:2024 + EN IEC 60695-2-11:2021; IEC 60695-2-10:2021 + IEC 60695-2-11:2021; IEC 60695-2-10:2021/COR1:2024 + IEC 60695-2-11:2021; EN 61000-4-12:2017; IEC 61000-4-12:2017; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; EN IEC 61000-4-3:2020; IEC 61000-4-3:2020; EN IEC 61000-4-11:2020/AC:2020/AC:2022; IEC 61000-4-11:2020/COR1:2020/COR2:2022; EN 61000-4-2:2009; IEC 61000-4-2:2008; EN IEC 61000-4-6:2023; IEC 61000-4-6:2023; EN 61000-4-4:2012; IEC 61000-4-4:2012; EN IEC 61000-4-18:2019/AC:2019; IEC 61000-4-18:2019/COR1:2019; EN 60695-2-10:2013 + EN 60695-2-13:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-13:2021; IEC 60695-2-10:2013 + IEC 60695-2-13:2010/COR1:2012/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-13:2021; EN 61000-3-3:2013; EN 61000-3-3:2013/A1:2019/A2:2021/AC:2022; IEC 61000-3-3:2013/AMD1:2017/AMD2:2021/COR1:2022

CISPR

CISPR 14-2Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 2: Immunity - Product family standardCertificate says EN 55014-2, IEC 55014-2. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

CISPR 24Information technology equipment - Immunity characteristics - Limits and methods of measurementCertificate says EN 55024. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 8 (ACCREDIA 00855)

EN 60068-2-1:2007; IEC 60068-2-1:2007; IACS UR E10 1991 Rev 10:2024; EN 50498:2010; EN 55035:2017/A11:2020; EN 50121-4:2016/A1:2019; EN 50121-5:2017/A1:2019; EN 50121-3-2:2015; EN 50121-3-2:2016/A1:2019; CISPR 24:2010/COR1:2011/AMD1:2015; EN 55024:2010/A1:2015; EN 12016:2013

CISPR 35Electromagnetic compatibility of multimedia equipment - Immunity requirementsCertificate says EN 55035. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 8 (ACCREDIA 00855)

EN 60068-2-1:2007; IEC 60068-2-1:2007; IACS UR E10 1991 Rev 10:2024; EN 50498:2010; EN 55035:2017/A11:2020; EN 50121-4:2016/A1:2019; EN 50121-5:2017/A1:2019; EN 50121-3-2:2015; EN 50121-3-2:2016/A1:2019; CISPR 24:2010/COR1:2011/AMD1:2015; EN 55024:2010/A1:2015; EN 12016:2013

EN 50121 series

EN 50121-3-2Railway applications - Electromagnetic compatibility - Part 3-2: Rolling stock - Apparatus
As written on the certificate · Line 8 (ACCREDIA 00855)

EN 60068-2-1:2007; IEC 60068-2-1:2007; IACS UR E10 1991 Rev 10:2024; EN 50498:2010; EN 55035:2017/A11:2020; EN 50121-4:2016/A1:2019; EN 50121-5:2017/A1:2019; EN 50121-3-2:2015; EN 50121-3-2:2016/A1:2019; CISPR 24:2010/COR1:2011/AMD1:2015; EN 55024:2010/A1:2015; EN 12016:2013

EN 50121-4Railway applications - Electromagnetic compatibility - Part 4: Emission and immunity of the signalling and telecommunications apparatus
As written on the certificate · Line 8 (ACCREDIA 00855)

EN 60068-2-1:2007; IEC 60068-2-1:2007; IACS UR E10 1991 Rev 10:2024; EN 50498:2010; EN 55035:2017/A11:2020; EN 50121-4:2016/A1:2019; EN 50121-5:2017/A1:2019; EN 50121-3-2:2015; EN 50121-3-2:2016/A1:2019; CISPR 24:2010/COR1:2011/AMD1:2015; EN 55024:2010/A1:2015; EN 12016:2013

EN 50121-5Name not checked yet
As written on the certificate · Line 8 (ACCREDIA 00855)

EN 60068-2-1:2007; IEC 60068-2-1:2007; IACS UR E10 1991 Rev 10:2024; EN 50498:2010; EN 55035:2017/A11:2020; EN 50121-4:2016/A1:2019; EN 50121-5:2017/A1:2019; EN 50121-3-2:2015; EN 50121-3-2:2016/A1:2019; CISPR 24:2010/COR1:2011/AMD1:2015; EN 55024:2010/A1:2015; EN 12016:2013

ETSI

ETSI EN 301 489-1Name not checked yet
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

ETSI EN 301 489-3Name not checked yet
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

ETSI EN 301 489-17Name not checked yet
As written on the certificate · Line 5 (ACCREDIA 00855)

ETSI EN 301 489-3 V2.3.2 2023; ETSI EN 301 489-17 V3.3.1 2024; ETSI EN 301 489-1 V1.9.2 2011; ETSI EN 301 489-1 V2.2.3 2019; EN 61000-4-29:2000; IEC 61000-4-29:2000; EN 60945:2002; IEC 60945:2002/COR1:2008; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2016; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; EN 61000-4-8:2010; IEC 61000-4-8:2009; EN 61000-4-16:2016; IEC 61000-4-16:2015; EN 61000-3-2:2014

IEC 60670 series

IEC 60670-1Name not checked yet
As written on the certificate · Line 13 (ACCREDIA 00855)

EN ISO 14982:2009; EN 61373:2010/AC:2017; IEC 61373:2010/COR1:2011; IEC 62236-3-2:2018; EN 60112:2003/A1:2009; EN IEC 60112:2020; IEC 60112:2003/AMD1:2009; IEC 60112:2020; EN 60695-2-10:2013 + EN 60695-2-12:2010/A1:2014; EN IEC 60695-2-10:2021 + EN IEC 60695-2-12:2021; IEC 60695-2-10:2013 + IEC 60695-2-12:2010/AMD1:2014; IEC 60695-2-10:2021 + IEC 60695-2-12:2021; EN 60255-26:2013/AC:2013; EN 60670-1:2005/A1:2013/Cor:2007/Cor:2012; EN IEC 60670-1:2021/A11:2021; IEC 60670-1:2015

IEC 60670-22Name not checked yet
As written on the certificate · Line 14 (ACCREDIA 00855)

EN 60670-22:2006; EN 60670-24:2013/A11:2023; EN IEC 63044-5-1:2019/A1:2024; EN 50293:2012; ISO 16750-4:2023; ISO 20653:2023; UNECE 97R01/09 (2021)

IEC 60670-24Name not checked yet
As written on the certificate · Line 14 (ACCREDIA 00855)

EN 60670-22:2006; EN 60670-24:2013/A11:2023; EN IEC 63044-5-1:2019/A1:2024; EN 50293:2012; ISO 16750-4:2023; ISO 20653:2023; UNECE 97R01/09 (2021)

IEC 61800 series

IEC 61800-2Name not checked yet
As written on the certificate · Line 10 (ACCREDIA 00855)

EN 60079-18:2015/A1:201/AC:2018; IEC 60079-18:2014/AMD1:2017/COR1:2018; EN IEC 61800-5-1:2023; IEC 61800-5-1:2022/COR1:2023; EN 61800-5-1:2007/A1:2017/A11:2021; EN IEC 61800-3:2023; EN IEC 61800-2:2021; IEC 61800-2:2021; EN 50130-4:2011/A1:2014; EN 61131-2:2007; EN 61204-3:2000; EN IEC 61204-3:2018; IEC 61204-3:2016; EN 62080:2009/A2:2015; IEC 62080:2001/AMD1:2008/AMD2:2015; EN 60730-2-7:2010/AC:2011; EN IEC 60730-2-7:2020; IEC 60730-2-7:2015; EN 60730-1:2016/A1:2019; EN 60730-1:2016/A1:2019/A2:2022; IEC 60730-1:2013/Cor1:2014/AMD1:2015/AMD2:2020; EN IEC 60730-1:2024/A11:2024; IEC 60730-1:2022

IEC 61800-3Adjustable speed electrical power drive systems - Part 3: EMC requirements and specific test methods for PDS and machine tools
As written on the certificate · Line 10 (ACCREDIA 00855)

EN 60079-18:2015/A1:201/AC:2018; IEC 60079-18:2014/AMD1:2017/COR1:2018; EN IEC 61800-5-1:2023; IEC 61800-5-1:2022/COR1:2023; EN 61800-5-1:2007/A1:2017/A11:2021; EN IEC 61800-3:2023; EN IEC 61800-2:2021; IEC 61800-2:2021; EN 50130-4:2011/A1:2014; EN 61131-2:2007; EN 61204-3:2000; EN IEC 61204-3:2018; IEC 61204-3:2016; EN 62080:2009/A2:2015; IEC 62080:2001/AMD1:2008/AMD2:2015; EN 60730-2-7:2010/AC:2011; EN IEC 60730-2-7:2020; IEC 60730-2-7:2015; EN 60730-1:2016/A1:2019; EN 60730-1:2016/A1:2019/A2:2022; IEC 60730-1:2013/Cor1:2014/AMD1:2015/AMD2:2020; EN IEC 60730-1:2024/A11:2024; IEC 60730-1:2022

IEC 61800-5-1Name not checked yet
As written on the certificate · Line 10 (ACCREDIA 00855)

EN 60079-18:2015/A1:201/AC:2018; IEC 60079-18:2014/AMD1:2017/COR1:2018; EN IEC 61800-5-1:2023; IEC 61800-5-1:2022/COR1:2023; EN 61800-5-1:2007/A1:2017/A11:2021; EN IEC 61800-3:2023; EN IEC 61800-2:2021; IEC 61800-2:2021; EN 50130-4:2011/A1:2014; EN 61131-2:2007; EN 61204-3:2000; EN IEC 61204-3:2018; IEC 61204-3:2016; EN 62080:2009/A2:2015; IEC 62080:2001/AMD1:2008/AMD2:2015; EN 60730-2-7:2010/AC:2011; EN IEC 60730-2-7:2020; IEC 60730-2-7:2015; EN 60730-1:2016/A1:2019; EN 60730-1:2016/A1:2019/A2:2022; IEC 60730-1:2013/Cor1:2014/AMD1:2015/AMD2:2020; EN IEC 60730-1:2024/A11:2024; IEC 60730-1:2022

IEC 63044 series

IEC 63044-5-1Name not checked yet
As written on the certificate · Line 14 (ACCREDIA 00855)

EN 60670-22:2006; EN 60670-24:2013/A11:2023; EN IEC 63044-5-1:2019/A1:2024; EN 50293:2012; ISO 16750-4:2023; ISO 20653:2023; UNECE 97R01/09 (2021)

IEC 63044-5-2Name not checked yet
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

IEC 63044-5-3Name not checked yet
As written on the certificate · Line 11 (ACCREDIA 00855)

ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 7637-3:2016; UNECE 116R01/01 (2023); EN 60947-5-1:2017/AC:2020; IEC 60947-5-1:2016; EN IEC 60947-5-1:2025; IEC 60947-5-1:2024; EN 50491-5-3:2010; EN IEC 63044-5-3:2019/A1:2024; EN IEC 63044-5-2:2019/A1:2024; EN 50491-5-2:2010; EN IEC 60947-5-2:2020/A11:2022; IEC 60947-5-2:2019; EN 62233:2008/COR:2008; IEC 62233:2005; CISPR 14-2:2020; EN 55014-2:1997/A1:2001/A2:2008; EN IEC 55014-2:2021; EN IEC 60335-1:2023/A11:2023; EN 60335-1:2012/A11:2014/AC:2014/A13:2017/A14:2019/A1:2019/A2:2019/A15:2021/A16:2023

Scope as published by ACCREDIA

17 lines
ACCREDIA

ISO/IEC 17025

Active

00855

View scope

Location

Via Mazzini, 75, Rezzato, 25086, IT

45.51383, 10.30422

Open in Maps

Accreditation data refreshed from the ACCREDIA register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the ACCREDIA entry linked above.