FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
Poland

Centrum Technologiczne Budownictwa Instytut Badań i Certyfikacji

ul. Przemysłowa 23, 35-105, Rzeszów, Poland

PCA|AB 535ISO/IEC 17025Register refreshed 2026-09-25
Certificates
1
Scope items
6
Standards
36
Locations
1

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at Centrum Technologiczne Budownictwa Instytut Badań i Certyfikacji?

Claim this profile to keep it accurate.

Register record

PCARefreshed
AB 535Active

Accredited standards

36

Our reading of the PCA scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

EN

EN 196-1Name not checked yet
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

EN 480-1Name not checked yet
As written on the certificate · Line 5 (PCA AB 535)

PN-EN 480-1:2014-12; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12390-3:2011+AC:2012; PN-EN 12390-3:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-B-19306:2004; PN-B-19307:2004; PN-EN 772-16:2011; PN-EN 772-13:2001; PN-EN 772-1+A1:2015-10; PN-EN 772-18:2011; PN-S-96012:1997; PN-S-96013:1997; PN-EN 1433:2005; PN-EN 1433:2005/A1:2007; PN-EN 1542:2000

EN 933-1Tests for geometrical properties of aggregates - Part 1: Determination of particle size distribution - Sieving method
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 933-3Tests for geometrical properties of aggregates - Part 3: Determination of particle shape - Flakiness index
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 1097-3Name not checked yet
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 1338Name not checked yet
As written on the certificate · Line 4 (PCA AB 535)

PN-EN 1338:2005+AC:2007; PN-EN 1339:2005+AC:2007; PN-EN 1340:2004+AC:2007; BN-64/8931-02; PN-S-02205:1998; Warunki techniczne PKP PLK Id-3 2009; KPRNPP-2013 GDDKiA Załącznik B3; Instrukcja GDDP 1998

EN 1339Name not checked yet
As written on the certificate · Line 4 (PCA AB 535)

PN-EN 1338:2005+AC:2007; PN-EN 1339:2005+AC:2007; PN-EN 1340:2004+AC:2007; BN-64/8931-02; PN-S-02205:1998; Warunki techniczne PKP PLK Id-3 2009; KPRNPP-2013 GDDKiA Załącznik B3; Instrukcja GDDP 1998

EN 1340Name not checked yet
As written on the certificate · Line 4 (PCA AB 535)

PN-EN 1338:2005+AC:2007; PN-EN 1339:2005+AC:2007; PN-EN 1340:2004+AC:2007; BN-64/8931-02; PN-S-02205:1998; Warunki techniczne PKP PLK Id-3 2009; KPRNPP-2013 GDDKiA Załącznik B3; Instrukcja GDDP 1998

EN 1367-1Name not checked yet
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 1367-6Name not checked yet
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 1433Name not checked yet
As written on the certificate · Line 5 (PCA AB 535)

PN-EN 480-1:2014-12; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12390-3:2011+AC:2012; PN-EN 12390-3:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-B-19306:2004; PN-B-19307:2004; PN-EN 772-16:2011; PN-EN 772-13:2001; PN-EN 772-1+A1:2015-10; PN-EN 772-18:2011; PN-S-96012:1997; PN-S-96013:1997; PN-EN 1433:2005; PN-EN 1433:2005/A1:2007; PN-EN 1542:2000

As written on the certificate · Line 6 (PCA AB 535)

EN 1433:2002; EN 1433:2002/A1:2005

EN 1542Name not checked yet
As written on the certificate · Line 5 (PCA AB 535)

PN-EN 480-1:2014-12; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12390-3:2011+AC:2012; PN-EN 12390-3:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-B-19306:2004; PN-B-19307:2004; PN-EN 772-16:2011; PN-EN 772-13:2001; PN-EN 772-1+A1:2015-10; PN-EN 772-18:2011; PN-S-96012:1997; PN-S-96013:1997; PN-EN 1433:2005; PN-EN 1433:2005/A1:2007; PN-EN 1542:2000

EN 1744-1Tests for chemical properties of aggregates - Part 1: Chemical analysis
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 12504-1Testing concrete in structures - Part 1: Cored specimens - Taking, examining and testing in compression
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

EN 13892-1Name not checked yet
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 13892-2Name not checked yet
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 12350 series

EN 12350-1Testing fresh concrete - Part 1: Sampling and common apparatus
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

EN 12350-2Testing fresh concrete - Part 2: Slump-test
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

As written on the certificate · Line 5 (PCA AB 535)

PN-EN 480-1:2014-12; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12390-3:2011+AC:2012; PN-EN 12390-3:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-B-19306:2004; PN-B-19307:2004; PN-EN 772-16:2011; PN-EN 772-13:2001; PN-EN 772-1+A1:2015-10; PN-EN 772-18:2011; PN-S-96012:1997; PN-S-96013:1997; PN-EN 1433:2005; PN-EN 1433:2005/A1:2007; PN-EN 1542:2000

EN 12350-5Name not checked yet
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

EN 12350-6Name not checked yet
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

EN 12350-7Testing fresh concrete - Part 7: Air content - Pressure methods
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

As written on the certificate · Line 5 (PCA AB 535)

PN-EN 480-1:2014-12; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12390-3:2011+AC:2012; PN-EN 12390-3:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-B-19306:2004; PN-B-19307:2004; PN-EN 772-16:2011; PN-EN 772-13:2001; PN-EN 772-1+A1:2015-10; PN-EN 772-18:2011; PN-S-96012:1997; PN-S-96013:1997; PN-EN 1433:2005; PN-EN 1433:2005/A1:2007; PN-EN 1542:2000

EN 12350-8Name not checked yet
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

EN 12390 series

EN 12390-3Testing hardened concrete - Part 3: Compressive strength of test specimens
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

As written on the certificate · Line 5 (PCA AB 535)

PN-EN 480-1:2014-12; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12390-3:2011+AC:2012; PN-EN 12390-3:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-B-19306:2004; PN-B-19307:2004; PN-EN 772-16:2011; PN-EN 772-13:2001; PN-EN 772-1+A1:2015-10; PN-EN 772-18:2011; PN-S-96012:1997; PN-S-96013:1997; PN-EN 1433:2005; PN-EN 1433:2005/A1:2007; PN-EN 1542:2000

EN 12390-5Name not checked yet
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

EN 12390-6Name not checked yet
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

EN 12390-7Testing hardened concrete - Part 7: Density of hardened concrete
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

EN 12390-8Name not checked yet
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

EN 1015 series

EN 1015-3Name not checked yet
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 1015-6Name not checked yet
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 1015-7Name not checked yet
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 1015-11Name not checked yet
As written on the certificate · Line 3 (PCA AB 535)

PN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18

EN 772 series

EN 772-1Name not checked yet
As written on the certificate · Line 5 (PCA AB 535)

PN-EN 480-1:2014-12; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12390-3:2011+AC:2012; PN-EN 12390-3:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-B-19306:2004; PN-B-19307:2004; PN-EN 772-16:2011; PN-EN 772-13:2001; PN-EN 772-1+A1:2015-10; PN-EN 772-18:2011; PN-S-96012:1997; PN-S-96013:1997; PN-EN 1433:2005; PN-EN 1433:2005/A1:2007; PN-EN 1542:2000

EN 772-13Name not checked yet
As written on the certificate · Line 5 (PCA AB 535)

PN-EN 480-1:2014-12; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12390-3:2011+AC:2012; PN-EN 12390-3:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-B-19306:2004; PN-B-19307:2004; PN-EN 772-16:2011; PN-EN 772-13:2001; PN-EN 772-1+A1:2015-10; PN-EN 772-18:2011; PN-S-96012:1997; PN-S-96013:1997; PN-EN 1433:2005; PN-EN 1433:2005/A1:2007; PN-EN 1542:2000

EN 772-16Name not checked yet
As written on the certificate · Line 5 (PCA AB 535)

PN-EN 480-1:2014-12; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12390-3:2011+AC:2012; PN-EN 12390-3:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-B-19306:2004; PN-B-19307:2004; PN-EN 772-16:2011; PN-EN 772-13:2001; PN-EN 772-1+A1:2015-10; PN-EN 772-18:2011; PN-S-96012:1997; PN-S-96013:1997; PN-EN 1433:2005; PN-EN 1433:2005/A1:2007; PN-EN 1542:2000

EN 772-18Name not checked yet
As written on the certificate · Line 5 (PCA AB 535)

PN-EN 480-1:2014-12; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12390-3:2011+AC:2012; PN-EN 12390-3:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-B-19306:2004; PN-B-19307:2004; PN-EN 772-16:2011; PN-EN 772-13:2001; PN-EN 772-1+A1:2015-10; PN-EN 772-18:2011; PN-S-96012:1997; PN-S-96013:1997; PN-EN 1433:2005; PN-EN 1433:2005/A1:2007; PN-EN 1542:2000

Other standards

PN-88/B-06250Name not checked yet
As written on the certificate · Line 2 (PCA AB 535)

PN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07

Scope as published by PCA

6 lines
PCA

ISO/IEC 17025

Active

AB 535

The scope document we hold says it is valid until 2028-09-30.

View on PCA

Accredited scope, certificate AB 535

LineDisciplineMethodMatrixRange
1chemical-wyroby, materiały i obiekty budowlane; building products, building materials and building items-
2materialsPN-88/B-06250; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-3:2011+AC:2012; PN-EN12390-3:2019-07; PN-EN 12504-1:2011; PN-EN 12504-1:2019-08; PN-EN 12504-1:2019-08/AC:2021-01; PN-EN 12390-6:2011; PN-EN 12390-6:2024-04; PN-EN 12390-7:2011; PN-EN 12390-7:2019-08; PN-EN 12390-7:2019-08/AC:2021-01; PN-EN 12390-8:2011; PN-EN 12390-8:2019-08; PKN-CEN/TS 12390-9:2007; PKN-CEN/TS 12390-9:2017-07; PN-B-06265:2018-10; PN-B-06265:2022-08; PN-EN 12390-5:2019-08; NO-17-A204:2015; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-EN 12350-5:2011; PN-EN 12350-5:2019-08; PN-EN 12350-8:2012; PN-EN 12350-8:2019-08; PN-EN 12350-6:2011; PN-EN 12350-6:2019-08; PN-EN 12350-1:2011; PN-EN 12350-1:2019-07; PN-EN 12350-1:2019-07/Ap1:2022-06; PN-EN 196-1:2016-07Concrete0.2 to 1.6 MPa
3materialsPN-EN 1015-3:2000+A1:2005+A2:2007; PN-EN 1015-6:2000+A1:2007; PN-EN 1015-7:2000; PN-EN 1015-11:2001+A1:2007; PN-EN 1015-11:2020-04; PN-EN 13892-2:2004; PN-EN 13892-1:2004; PN-91/B-06714/15; PN-EN 933-1:2012; PN-78/B-06714/26; PN-78/B-06714/40; PN-78/B-06714/19; PN-76/B-06714/12; PN-EN 933-3:2012; PN-EN 1744-1+A1:2013-05; PN-77/B-06714/07; PN-EN 1097-3:2000; PN-EN 1367-1:2007; PN-EN 1367-6:2008; Procedura Badawcza GDDKiA PB/1/18; Procedura Badawcza GDDKiA PB/2/18Zaprawy; Podkłady podłogowe; Podkłady podłogowe (na bazie cementu); Kruszywo0 to 31.5 mm; kN
4materialsPN-EN 1338:2005+AC:2007; PN-EN 1339:2005+AC:2007; PN-EN 1340:2004+AC:2007; BN-64/8931-02; PN-S-02205:1998; Warunki techniczne PKP PLK Id-3 2009; KPRNPP-2013 GDDKiA Załącznik B3; Instrukcja GDDP 1998Betonowe kostki brukowe; Betonowe płyty brukowe; Krawężniki i obrzeża betonowe; Podłoże i nasypy; Warstwy konstrukcyjne nawierzchni i zasypki1 to 3000 kN
5materialsPN-EN 480-1:2014-12; PN-EN 12350-2:2011; PN-EN 12350-2:2019-07; PN-EN 12390-3:2011+AC:2012; PN-EN 12390-3:2019-07; PN-EN 12350-7:2011; PN-EN 12350-7:2019-08; PN-B-19306:2004; PN-B-19307:2004; PN-EN 772-16:2011; PN-EN 772-13:2001; PN-EN 772-1+A1:2015-10; PN-EN 772-18:2011; PN-S-96012:1997; PN-S-96013:1997; PN-EN 1433:2005; PN-EN 1433:2005/A1:2007; PN-EN 1542:2000Domieszki do betonu; Elementy ścienne drobnowymiarowe – bloczki; Elementy ścienne drobnowymiarowe – pustaki; Elementy murowe; Podbudowa i ulepszone podłoże z gruntu stabilizowanego cementem; Podbudowa z chudego betonu; Kanały odwadniające nawierzchnię – kratki – pokrywy – korytka; Wyroby i systemy do ochrony i napraw konstrukcji betonowych0.5 to 3000 kN; %; mm
6materialsEN 1433:2002; EN 1433:2002/A1:2005Prefabrykowane kanały spustowe-

Ranges are reproduced from the accredited scope document as published. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.

Location

ul. Przemysłowa 23, Rzeszów, 35-105, PL

50.01332, 22.01617

Open in Maps

Accreditation data refreshed from the PCA register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the PCA entry linked above.