FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
United States

TUV SUD America

5945 Cabot Parkway, Suite 100, 30005, Alpharetta, GA, United States

A2LA|2955.09A2LA|2955.26ISO/IEC 17025Register refreshed 2026-09-25
Certificates
2
Scope items
32
Standards
100
Locations
2
One of 2 locations. View the organization

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at TUV SUD America?

Claim this profile to keep it accurate.

Register record

A2LARefreshed
2955.09Active
2955.26Active

Accredited standards

100

Our reading of the A2LA scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

ETSI

ETSI EN 300 086Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 300 113Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 300 220-1Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 300 220-2Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 300 220-3-1Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 300 220-3-2Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 300 220-4Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 300 296Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 300 328Wideband transmission systems; Data transmission equipment operating in the 2,4 GHz band; Harmonised Standard for access to radio spectrum
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 300 330Short Range Devices (SRD); Radio equipment in the frequency range 9 kHz to 25 MHz and inductive loop systems in the frequency range 9 kHz to 30 MHz; Harmonised Standard covering the essential requirements of article 3.2 of Directive 2014/53/EU
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 300 440Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 301 441Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 301 489-1Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 301 489-12Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 301 511Global System for Mobile communications (GSM); Mobile Stations (MS) equipment; Harmonised Standard covering the essential requirements of article 3.2 of Directive 2014/53/EU
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 301 893Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 301 908-1Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 301 908-2Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 301 908-13Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 302 065-1Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 302 065-2Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 302 065-3Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 302 065-4Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 302 208Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 302 502Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 303 413Satellite Earth Stations and Systems (SES); Global Navigation Satellite System (GNSS) receivers; Radio equipment operating in the 1 164 MHz to 1 300 MHz and 1 559 MHz to 1 610 MHz frequency bands; Harmonised Standard for access to radio spectrum
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 303 417Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 303 687Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI EN 303 883Name not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

ETSI TS 103 701Name not checked yet
As written on the certificate · Line 13 (A2LA 2955.26)

EN IEC 60335-2-89:2022/A11:2022; CSA 60335-2-89:21; AS/NZS 60335-2-89:2020; IEC/EN/CSA/AS-NZS 60335-2-89; IEC 60335-2-90:2015/A1:2019; IEC 60335-2-90:2006/A2:2014; EN 60335-2-90:2006/A1:2010; EN IEC 60335-2-90:2021; AS/NZS 60335-2-90:2020; IEC/EN/CSA/AS-NZS 60335-2-90; UL 1561; UL 507:2017/R:2023-08; CSA C22.2 No.113:2018; UL 197; CSA C22.2 No. 187; UL 867; CSA C22.2 No. 107.1; CSA C22.2 No. 107.2; CSA C22.2 No. 107.3; UL 22; UL 1563; UL 174; IEC/UL/CSA 60730-2-x (All Inclusive); UL 50/50E CSA 94.x (All Inclusive); IEC/EN 60204-1; UL 3030; UL 3100; UL 9741; UL 73; TS 103 701

As written on the certificate · Line 13 (A2LA 2955.09)

EN IEC 60335-2-89:2022/A11:2022; CSA 60335-2-89:21; AS/NZS 60335-2-89:2020; IEC/EN/CSA/AS-NZS 60335-2-89; IEC 60335-2-90:2015/A1:2019; IEC 60335-2-90:2006/A2:2014; EN 60335-2-90:2006/A1:2010; EN IEC 60335-2-90:2021; AS/NZS 60335-2-90:2020; IEC/EN/CSA/AS-NZS 60335-2-90; UL 1561; UL 507:2017/R:2023-08; CSA C22.2 No.113:2018; UL 197; CSA C22.2 No. 187; UL 867; CSA C22.2 No. 107.1; CSA C22.2 No. 107.2; CSA C22.2 No. 107.3; UL 22; UL 1563; UL 174; IEC/UL/CSA 60730-2-x (All Inclusive); UL 50/50E CSA 94.x (All Inclusive); IEC/EN 60204-1; UL 3030; UL 3100; UL 9741; UL 73; TS 103 701

IEC 60335 series

IEC 60335-1Household and similar electrical appliances - Safety - Part 1: General requirements
As written on the certificate · Line 9 (A2LA 2955.26)

UL/CSA/EN/IEC/AS/NZS 60950-1; EN 60950-1 (Ed.2)+A1+A2; EN 60950-1 (2006+A11:2009+A1:2010+A12:2011+A2:2013); IEC 60950-1 (2001, 2005+A1:2009+A2:2013); IEC 60950-1 (Ed.1); IEC 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1+A2; UL 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1; IEC 60950-1 (Ed.2)+A2; UL/CSA/EN/IEC/AS/NZS 60950-21; UL/CSA/EN/IEC/AS/NZS 60950-22; UL/CSA/EN/IEC/AS/NZS 60950-23; GB 4943.1; UL/CSA/EN/IEC/AS/NZS 62368-1; IEC 62368-1:2014; IEC 62368-1:2018; IEC 62368-1:2023; UL/CSA 62368-1:2014; EN 62368-1:2014 + A11:2017; UL/CSA 62368-1:2019; EN IEC 62368-1:2020 + A11:2020; IEC 62368-1:2023; EN IEC 62368-1-2024 + A11:2024; UL 62368-1:2019/R:2021-10; CSA C22.2 No. 62368-1:2019/U1:2021-10; UL 1741; UL 2056; UL 1012; UL 1310; IEC 60335-1:2020; IEC 60335-1:2010 + A1:2013+A2:2016; UL/CSA 60335-1:2016; UL/CSA/EN 60335-1; IEC 60335-2-6:2014/A1:2018; EN 60335-2-6:2015/A11:2020; CSA E60335-2-6:18; IEC/EN/CSA 60335-2-6

As written on the certificate · Line 9 (A2LA 2955.09)

UL/CSA/EN/IEC/AS/NZS 60950-1; EN 60950-1 (Ed.2)+A1+A2; EN 60950-1 (2006+A11:2009+A1:2010+A12:2011+A2:2013); IEC 60950-1 (2001, 2005+A1:2009+A2:2013); IEC 60950-1 (Ed.1); IEC 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1+A2; UL 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1; IEC 60950-1 (Ed.2)+A2; UL/CSA/EN/IEC/AS/NZS 60950-21; UL/CSA/EN/IEC/AS/NZS 60950-22; UL/CSA/EN/IEC/AS/NZS 60950-23; GB 4943.1; UL/CSA/EN/IEC/AS/NZS 62368-1; IEC 62368-1:2014; IEC 62368-1:2018; IEC 62368-1:2023; UL/CSA 62368-1:2014; EN 62368-1:2014 + A11:2017; UL/CSA 62368-1:2019; EN IEC 62368-1:2020 + A11:2020; IEC 62368-1:2023; EN IEC 62368-1-2024 + A11:2024; UL 62368-1:2019/R:2021-10; CSA C22.2 No. 62368-1:2019/U1:2021-10; UL 1741; UL 2056; UL 1012; UL 1310; IEC 60335-1:2020; IEC 60335-1:2010 + A1:2013+A2:2016; UL/CSA 60335-1:2016; UL/CSA/EN 60335-1; IEC 60335-2-6:2014/A1:2018; EN 60335-2-6:2015/A11:2020; CSA E60335-2-6:18; IEC/EN/CSA 60335-2-6

IEC 60335-2-6Name not checked yet
As written on the certificate · Line 9 (A2LA 2955.26)

UL/CSA/EN/IEC/AS/NZS 60950-1; EN 60950-1 (Ed.2)+A1+A2; EN 60950-1 (2006+A11:2009+A1:2010+A12:2011+A2:2013); IEC 60950-1 (2001, 2005+A1:2009+A2:2013); IEC 60950-1 (Ed.1); IEC 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1+A2; UL 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1; IEC 60950-1 (Ed.2)+A2; UL/CSA/EN/IEC/AS/NZS 60950-21; UL/CSA/EN/IEC/AS/NZS 60950-22; UL/CSA/EN/IEC/AS/NZS 60950-23; GB 4943.1; UL/CSA/EN/IEC/AS/NZS 62368-1; IEC 62368-1:2014; IEC 62368-1:2018; IEC 62368-1:2023; UL/CSA 62368-1:2014; EN 62368-1:2014 + A11:2017; UL/CSA 62368-1:2019; EN IEC 62368-1:2020 + A11:2020; IEC 62368-1:2023; EN IEC 62368-1-2024 + A11:2024; UL 62368-1:2019/R:2021-10; CSA C22.2 No. 62368-1:2019/U1:2021-10; UL 1741; UL 2056; UL 1012; UL 1310; IEC 60335-1:2020; IEC 60335-1:2010 + A1:2013+A2:2016; UL/CSA 60335-1:2016; UL/CSA/EN 60335-1; IEC 60335-2-6:2014/A1:2018; EN 60335-2-6:2015/A11:2020; CSA E60335-2-6:18; IEC/EN/CSA 60335-2-6

As written on the certificate · Line 9 (A2LA 2955.09)

UL/CSA/EN/IEC/AS/NZS 60950-1; EN 60950-1 (Ed.2)+A1+A2; EN 60950-1 (2006+A11:2009+A1:2010+A12:2011+A2:2013); IEC 60950-1 (2001, 2005+A1:2009+A2:2013); IEC 60950-1 (Ed.1); IEC 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1+A2; UL 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1; IEC 60950-1 (Ed.2)+A2; UL/CSA/EN/IEC/AS/NZS 60950-21; UL/CSA/EN/IEC/AS/NZS 60950-22; UL/CSA/EN/IEC/AS/NZS 60950-23; GB 4943.1; UL/CSA/EN/IEC/AS/NZS 62368-1; IEC 62368-1:2014; IEC 62368-1:2018; IEC 62368-1:2023; UL/CSA 62368-1:2014; EN 62368-1:2014 + A11:2017; UL/CSA 62368-1:2019; EN IEC 62368-1:2020 + A11:2020; IEC 62368-1:2023; EN IEC 62368-1-2024 + A11:2024; UL 62368-1:2019/R:2021-10; CSA C22.2 No. 62368-1:2019/U1:2021-10; UL 1741; UL 2056; UL 1012; UL 1310; IEC 60335-1:2020; IEC 60335-1:2010 + A1:2013+A2:2016; UL/CSA 60335-1:2016; UL/CSA/EN 60335-1; IEC 60335-2-6:2014/A1:2018; EN 60335-2-6:2015/A11:2020; CSA E60335-2-6:18; IEC/EN/CSA 60335-2-6

IEC 60335-2-7Name not checked yet
As written on the certificate · Line 10 (A2LA 2955.26)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

As written on the certificate · Line 10 (A2LA 2955.09)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

IEC 60335-2-11Name not checked yet
As written on the certificate · Line 10 (A2LA 2955.26)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

As written on the certificate · Line 10 (A2LA 2955.09)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

IEC 60335-2-12Household and similar electrical appliances - Safety - Part 2-12: Particular requirements for warming plates and similar appliances
As written on the certificate · Line 10 (A2LA 2955.26)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

As written on the certificate · Line 10 (A2LA 2955.09)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

IEC 60335-2-21Name not checked yet
As written on the certificate · Line 10 (A2LA 2955.26)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

As written on the certificate · Line 10 (A2LA 2955.09)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

IEC 60335-2-24Name not checked yet
As written on the certificate · Line 10 (A2LA 2955.26)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

As written on the certificate · Line 10 (A2LA 2955.09)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

IEC 60335-2-29Name not checked yet
As written on the certificate · Line 10 (A2LA 2955.26)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

As written on the certificate · Line 10 (A2LA 2955.09)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

IEC 60335-2-30Name not checked yet
As written on the certificate · Line 10 (A2LA 2955.26)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

As written on the certificate · Line 10 (A2LA 2955.09)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

IEC 60335-2-37Name not checked yet
As written on the certificate · Line 10 (A2LA 2955.26)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

As written on the certificate · Line 10 (A2LA 2955.09)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

IEC 60335-2-38Name not checked yet
As written on the certificate · Line 10 (A2LA 2955.26)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

As written on the certificate · Line 10 (A2LA 2955.09)

IEC 60335-2-7:2008/A2:2016; EN 60335-2-7:2010/A2:2019; CSA E60335-2-7:13; IEC/EN/CSA 60335-2-7; IEC 60335-2-11:2019; IEC 60335-2-11:2008/A2:2015; EN 60335-2-11:2010/A2:2018; CSA E60335-2-11:13; IEC/EN/CSA 60335-2-11; IEC 60335-2-12:2002/A2:2017; EN 60335-2-12: 2003/A2:2019; CSA 60335-2-12:20; IEC/EN/CSA 60335-2-12; IEC 60335-2-21:2012; IEC 60335-2-21:2012/AMD1:2018; IEC 60335-2-21:2022; EN 60335-2-21:2021 + A1:2021; EN 60335-2-21 2003 + A1 + A2:2008; IEC 60335-2-24:2010/A2:2017; CSA 60335-2-24:2022; UL 60335-2-24:2022; EN 60335-2-24:2010/A11:2020; IEC/EN/UL/CSA 60335-2-24; IEC 60335-2-29:2016; IEC 60335-2-29:2016/A1:2019; IEC 60335-2-29:2003; IEC 60335-2-29:2003/A2:2009; CAN/CSA E60335-2-29; EN 60335-2-29; IEC 60335-2-30:2009; IEC 60335-2-30:2009/A2:2021; IEC 60335-2-30; IEC 60335-2-37:2017; IEC 60335-2-37:2017/A2:2011; IEC 60335-2-37:2021; CSA E60335-2-37:2020; IEC/EN/CSA 60335-2-37; IEC 60335-2-38:2002; IEC 60335-2-38:2002/A2:2017; IEC 60335-2-38:2021; CSA E60335-2-38:2001; IEC/EN/CSA 60335-2-38; UL 60335-2-40:2012

IEC 60335-2-40Name not checked yet
As written on the certificate · Line 11 (A2LA 2955.26)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

As written on the certificate · Line 11 (A2LA 2955.09)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

IEC 60335-2-41Name not checked yet
As written on the certificate · Line 11 (A2LA 2955.26)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

As written on the certificate · Line 11 (A2LA 2955.09)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

IEC 60335-2-42Name not checked yet
As written on the certificate · Line 11 (A2LA 2955.26)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

As written on the certificate · Line 11 (A2LA 2955.09)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

IEC 60335-2-43Name not checked yet
As written on the certificate · Line 11 (A2LA 2955.26)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

As written on the certificate · Line 11 (A2LA 2955.09)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

IEC 60335-2-48Name not checked yet
As written on the certificate · Line 11 (A2LA 2955.26)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

As written on the certificate · Line 11 (A2LA 2955.09)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

IEC 60335-2-49Name not checked yet
As written on the certificate · Line 11 (A2LA 2955.26)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

As written on the certificate · Line 11 (A2LA 2955.09)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

IEC 60335-2-50Name not checked yet
As written on the certificate · Line 11 (A2LA 2955.26)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

As written on the certificate · Line 11 (A2LA 2955.09)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

IEC 60335-2-52Name not checked yet
As written on the certificate · Line 11 (A2LA 2955.26)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

As written on the certificate · Line 11 (A2LA 2955.09)

UL 60335-2-40:2022; CSA C22.2 No. 60335-2-40:2022; EN 60335-2-40:2003/A13:2012; EN 60335-2-40:2010/A11:2020; EN 60335-2-40:2003/A13:2012; IEC 60335-2-41:2012; CSA E60335-2-41:2013; IEC 60335-2-41:2002; IEC 60335-2-41:2002/A2:2009; EN 60335-2-41:2003/A2:2010; IEC/EN/CSA 60335-2-41; IEC 60335-2-42:2021; IE 60335-2-42:2002; IEC 60335-2-42:2002/A2:2017; CSA E60335-2-42:20; EN 60335-2-42:2003/A11:2012; IEC/EN/CSA 60335-2-42; IEC 60335-2-43:2017; CAN/CSA-E60335-2-43:2023; EN IEC 60335-2-43:2020; EN 60335-2-43:2003/A2:2008; IEC/EN/CSA 60335-2-43; IEC 60335-2-48:2021; IEC 60335-2-48:2002/A2:2017; CSA 60335-2-48:20; EN 60335-2-48:2003/A11:2012; IEC/EN/CSA 60335-2-48; IEC 60335-2-49:2021; IEC 60335-2-49:2002/A2:2017; CSA 60335-2-49:20; EN 60335-2-49:2003/A11:2012; IEC/EN/CSA 60335-2-49; IEC 60335-2-50:2021; IEC 60335-2-50:2002/A2:2017; CSA 60335-2-50:20; EN 60335-2-50:2003/A1:2008; IEC/EN/CSA 60335-2-50; IEC 60335-2-52:2021; IEC 60335-2-52:2002/A2:2017; CSA 60335-2-52:2014; EN 60335-2-52:2003/A11:2010; IEC/EN/CSA 60335-2-52

IEC 60335-2-55Name not checked yet
As written on the certificate · Line 12 (A2LA 2955.26)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

As written on the certificate · Line 12 (A2LA 2955.09)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

IEC 60335-2-60Name not checked yet
As written on the certificate · Line 12 (A2LA 2955.26)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

As written on the certificate · Line 12 (A2LA 2955.09)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

IEC 60335-2-64Name not checked yet
As written on the certificate · Line 12 (A2LA 2955.26)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

As written on the certificate · Line 12 (A2LA 2955.09)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

IEC 60335-2-65Name not checked yet
As written on the certificate · Line 12 (A2LA 2955.26)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

As written on the certificate · Line 12 (A2LA 2955.09)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

IEC 60335-2-75Name not checked yet
As written on the certificate · Line 12 (A2LA 2955.26)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

As written on the certificate · Line 12 (A2LA 2955.09)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

IEC 60335-2-80Name not checked yet
As written on the certificate · Line 12 (A2LA 2955.26)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

As written on the certificate · Line 12 (A2LA 2955.09)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

IEC 60335-2-82Name not checked yet
As written on the certificate · Line 12 (A2LA 2955.26)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

As written on the certificate · Line 12 (A2LA 2955.09)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

IEC 60335-2-85Name not checked yet
As written on the certificate · Line 12 (A2LA 2955.26)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

As written on the certificate · Line 12 (A2LA 2955.09)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

IEC 60335-2-89Name not checked yet
As written on the certificate · Line 12 (A2LA 2955.26)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

As written on the certificate · Line 13 (A2LA 2955.26)

EN IEC 60335-2-89:2022/A11:2022; CSA 60335-2-89:21; AS/NZS 60335-2-89:2020; IEC/EN/CSA/AS-NZS 60335-2-89; IEC 60335-2-90:2015/A1:2019; IEC 60335-2-90:2006/A2:2014; EN 60335-2-90:2006/A1:2010; EN IEC 60335-2-90:2021; AS/NZS 60335-2-90:2020; IEC/EN/CSA/AS-NZS 60335-2-90; UL 1561; UL 507:2017/R:2023-08; CSA C22.2 No.113:2018; UL 197; CSA C22.2 No. 187; UL 867; CSA C22.2 No. 107.1; CSA C22.2 No. 107.2; CSA C22.2 No. 107.3; UL 22; UL 1563; UL 174; IEC/UL/CSA 60730-2-x (All Inclusive); UL 50/50E CSA 94.x (All Inclusive); IEC/EN 60204-1; UL 3030; UL 3100; UL 9741; UL 73; TS 103 701

As written on the certificate · Line 12 (A2LA 2955.09)

IEC 60335-2-55:2021; IEC 60335-2-55:2002; IEC 60335-2-55:2002/A1:2008; CSA 60335-2-55:15; EN 60335-2-55:2003/A11:2018; IEC/EN/CSA 60335-2-55; IEC 60335-2-60:2023; IEC 60335-2-60:2017; IEC 60335-2-60:2002/A2:2008; EN 60335-2-60:2003/A12:2010; IEC/EN 60335-2-60; IEC 60335-2-64:2021; IEC 60335-2-64:2002/A2:2017; CSA E60335-2-64:20; EN 60335-2-64:200/A1:2002; IEC/EN/CSA 60335-2-64; IEC 60335-2-65:2023; IEC 60335-2-65:2002/A2:2015; CSA 60335-2-65:11; EN 60335-2-65:2003/A12:2022; IEC/EN/CSA 60335-2-65; IEC 60335-2-75:2012/A2:2018; IEC 60335-2-75:2002/A2:2008; EN 60335-2-75:2004A12:2010; IEC/EN 60335-2-75; IEC 60335-2-80:2015; IEC 60335-2-80:2002/A2:2008; EN 60335-2-80:2003/A2:2009; CSA 60335-2-80:17; IEC/EN/CSA 60335-2-80; IEC 60335-2-82:2017/A1:2020; IEC 60335-2-82:2002/A2:2015; EN 60335-2-82:2003/A2:2020; EN IEC 60335-2:2022; CSA 60335-2-82:20; IEC/EN/CSA 60335-2-82; IEC 60335-2-85:2002/A2:2017; IEC 60335-2-85: 1997; EN 60335-2-85:2003/A2:2020; IEC/EN 60335-2-85; IEC 60335-2-89:2019; IEC 60335-2-89:2010/A2:2015; EN 60335-2-89:2010/A2:2017

As written on the certificate · Line 13 (A2LA 2955.09)

EN IEC 60335-2-89:2022/A11:2022; CSA 60335-2-89:21; AS/NZS 60335-2-89:2020; IEC/EN/CSA/AS-NZS 60335-2-89; IEC 60335-2-90:2015/A1:2019; IEC 60335-2-90:2006/A2:2014; EN 60335-2-90:2006/A1:2010; EN IEC 60335-2-90:2021; AS/NZS 60335-2-90:2020; IEC/EN/CSA/AS-NZS 60335-2-90; UL 1561; UL 507:2017/R:2023-08; CSA C22.2 No.113:2018; UL 197; CSA C22.2 No. 187; UL 867; CSA C22.2 No. 107.1; CSA C22.2 No. 107.2; CSA C22.2 No. 107.3; UL 22; UL 1563; UL 174; IEC/UL/CSA 60730-2-x (All Inclusive); UL 50/50E CSA 94.x (All Inclusive); IEC/EN 60204-1; UL 3030; UL 3100; UL 9741; UL 73; TS 103 701

IEC 60335-2-90Name not checked yet
As written on the certificate · Line 13 (A2LA 2955.26)

EN IEC 60335-2-89:2022/A11:2022; CSA 60335-2-89:21; AS/NZS 60335-2-89:2020; IEC/EN/CSA/AS-NZS 60335-2-89; IEC 60335-2-90:2015/A1:2019; IEC 60335-2-90:2006/A2:2014; EN 60335-2-90:2006/A1:2010; EN IEC 60335-2-90:2021; AS/NZS 60335-2-90:2020; IEC/EN/CSA/AS-NZS 60335-2-90; UL 1561; UL 507:2017/R:2023-08; CSA C22.2 No.113:2018; UL 197; CSA C22.2 No. 187; UL 867; CSA C22.2 No. 107.1; CSA C22.2 No. 107.2; CSA C22.2 No. 107.3; UL 22; UL 1563; UL 174; IEC/UL/CSA 60730-2-x (All Inclusive); UL 50/50E CSA 94.x (All Inclusive); IEC/EN 60204-1; UL 3030; UL 3100; UL 9741; UL 73; TS 103 701

As written on the certificate · Line 13 (A2LA 2955.09)

EN IEC 60335-2-89:2022/A11:2022; CSA 60335-2-89:21; AS/NZS 60335-2-89:2020; IEC/EN/CSA/AS-NZS 60335-2-89; IEC 60335-2-90:2015/A1:2019; IEC 60335-2-90:2006/A2:2014; EN 60335-2-90:2006/A1:2010; EN IEC 60335-2-90:2021; AS/NZS 60335-2-90:2020; IEC/EN/CSA/AS-NZS 60335-2-90; UL 1561; UL 507:2017/R:2023-08; CSA C22.2 No.113:2018; UL 197; CSA C22.2 No. 187; UL 867; CSA C22.2 No. 107.1; CSA C22.2 No. 107.2; CSA C22.2 No. 107.3; UL 22; UL 1563; UL 174; IEC/UL/CSA 60730-2-x (All Inclusive); UL 50/50E CSA 94.x (All Inclusive); IEC/EN 60204-1; UL 3030; UL 3100; UL 9741; UL 73; TS 103 701

IEC

IEC 60204-1Safety of machinery - Electrical equipment of machines - Part 1: General requirements
As written on the certificate · Line 13 (A2LA 2955.26)

EN IEC 60335-2-89:2022/A11:2022; CSA 60335-2-89:21; AS/NZS 60335-2-89:2020; IEC/EN/CSA/AS-NZS 60335-2-89; IEC 60335-2-90:2015/A1:2019; IEC 60335-2-90:2006/A2:2014; EN 60335-2-90:2006/A1:2010; EN IEC 60335-2-90:2021; AS/NZS 60335-2-90:2020; IEC/EN/CSA/AS-NZS 60335-2-90; UL 1561; UL 507:2017/R:2023-08; CSA C22.2 No.113:2018; UL 197; CSA C22.2 No. 187; UL 867; CSA C22.2 No. 107.1; CSA C22.2 No. 107.2; CSA C22.2 No. 107.3; UL 22; UL 1563; UL 174; IEC/UL/CSA 60730-2-x (All Inclusive); UL 50/50E CSA 94.x (All Inclusive); IEC/EN 60204-1; UL 3030; UL 3100; UL 9741; UL 73; TS 103 701

As written on the certificate · Line 13 (A2LA 2955.09)

EN IEC 60335-2-89:2022/A11:2022; CSA 60335-2-89:21; AS/NZS 60335-2-89:2020; IEC/EN/CSA/AS-NZS 60335-2-89; IEC 60335-2-90:2015/A1:2019; IEC 60335-2-90:2006/A2:2014; EN 60335-2-90:2006/A1:2010; EN IEC 60335-2-90:2021; AS/NZS 60335-2-90:2020; IEC/EN/CSA/AS-NZS 60335-2-90; UL 1561; UL 507:2017/R:2023-08; CSA C22.2 No.113:2018; UL 197; CSA C22.2 No. 187; UL 867; CSA C22.2 No. 107.1; CSA C22.2 No. 107.2; CSA C22.2 No. 107.3; UL 22; UL 1563; UL 174; IEC/UL/CSA 60730-2-x (All Inclusive); UL 50/50E CSA 94.x (All Inclusive); IEC/EN 60204-1; UL 3030; UL 3100; UL 9741; UL 73; TS 103 701

IEC 60601-1-2Medical electrical equipment - Part 1-2: General requirements for basic safety and essential performance - Collateral Standard: Electromagnetic disturbances - Requirements and tests
As written on the certificate · Line 6 (A2LA 2955.26)

AS/NZS 61000.3.2; AS/NZS 61000.3.3; AS/NZS 61000.6.3; AS/NZS 61000.6.4; AS/NZS CISPR 14.2; AS/NZS 2772.2; AS/NZS 4268; AS/NZS 4769.1; AS/NZS 4769.2; AS/NZS 62040.2; CNS 13783-1:2013; CNS 13803:2018; CNS 13438:2006; CNS 15936:2016; RTTE01 (2020); LP0002 (2024); IFT-008-2015; NOM-208-SCFI-2016; TCVN 7189:2009; QCVN 18:2022/BTTTT; QCVN 54:2020/BTTTT; QCVN 55:2023/BTTTT; QCVN 60:2023/BTTTT; QCVN 86:2019/BTTTT; QCVN 96:2015/BTTTT; QCVN 103:2016/BTTTT; QCVN 112:2017/BTTTT; QCVN 118:2018/BTTTT; QCVN 130:2022/BTTTT; QCVN 100:2015/BTTTT; QCVN 94:2015/BTTTT; QCVN 72:2013/BTTTT; KS C 9811; KS C IEC 60601-1-2; KS C 9814-1; KS C 9814-2; KS C 9815; KS C 9547; KS X 3124; KS X 3125; KS X 3126; KS X 3127; KS X 3130; KS X 3139; KS X 3135; KS X 3129; KS X 3140; KS C 9040-2; KS C 9832; KS C 9835; KS C 9610-6-1; KS C 9610-6-2; KS C 9610-6-3; KS C 9610-6-4; HKCA 1006; HKCA 1007; HKCA 1008; HKCA 1020

As written on the certificate · Line 7 (A2LA 2955.26)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 6 (A2LA 2955.09)

AS/NZS 61000.3.2; AS/NZS 61000.3.3; AS/NZS 61000.6.3; AS/NZS 61000.6.4; AS/NZS CISPR 14.2; AS/NZS 2772.2; AS/NZS 4268; AS/NZS 4769.1; AS/NZS 4769.2; AS/NZS 62040.2; CNS 13783-1:2013; CNS 13803:2018; CNS 13438:2006; CNS 15936:2016; RTTE01 (2020); LP0002 (2024); IFT-008-2015; NOM-208-SCFI-2016; TCVN 7189:2009; QCVN 18:2022/BTTTT; QCVN 54:2020/BTTTT; QCVN 55:2023/BTTTT; QCVN 60:2023/BTTTT; QCVN 86:2019/BTTTT; QCVN 96:2015/BTTTT; QCVN 103:2016/BTTTT; QCVN 112:2017/BTTTT; QCVN 118:2018/BTTTT; QCVN 130:2022/BTTTT; QCVN 100:2015/BTTTT; QCVN 94:2015/BTTTT; QCVN 72:2013/BTTTT; KS C 9811; KS C IEC 60601-1-2; KS C 9814-1; KS C 9814-2; KS C 9815; KS C 9547; KS X 3124; KS X 3125; KS X 3126; KS X 3127; KS X 3130; KS X 3139; KS X 3135; KS X 3129; KS X 3140; KS C 9040-2; KS C 9832; KS C 9835; KS C 9610-6-1; KS C 9610-6-2; KS C 9610-6-3; KS C 9610-6-4; HKCA 1006; HKCA 1007; HKCA 1008; HKCA 1020

As written on the certificate · Line 7 (A2LA 2955.09)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

IEC 60950-1Information technology equipment - Safety - Part 1: General requirements
As written on the certificate · Line 9 (A2LA 2955.26)

UL/CSA/EN/IEC/AS/NZS 60950-1; EN 60950-1 (Ed.2)+A1+A2; EN 60950-1 (2006+A11:2009+A1:2010+A12:2011+A2:2013); IEC 60950-1 (2001, 2005+A1:2009+A2:2013); IEC 60950-1 (Ed.1); IEC 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1+A2; UL 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1; IEC 60950-1 (Ed.2)+A2; UL/CSA/EN/IEC/AS/NZS 60950-21; UL/CSA/EN/IEC/AS/NZS 60950-22; UL/CSA/EN/IEC/AS/NZS 60950-23; GB 4943.1; UL/CSA/EN/IEC/AS/NZS 62368-1; IEC 62368-1:2014; IEC 62368-1:2018; IEC 62368-1:2023; UL/CSA 62368-1:2014; EN 62368-1:2014 + A11:2017; UL/CSA 62368-1:2019; EN IEC 62368-1:2020 + A11:2020; IEC 62368-1:2023; EN IEC 62368-1-2024 + A11:2024; UL 62368-1:2019/R:2021-10; CSA C22.2 No. 62368-1:2019/U1:2021-10; UL 1741; UL 2056; UL 1012; UL 1310; IEC 60335-1:2020; IEC 60335-1:2010 + A1:2013+A2:2016; UL/CSA 60335-1:2016; UL/CSA/EN 60335-1; IEC 60335-2-6:2014/A1:2018; EN 60335-2-6:2015/A11:2020; CSA E60335-2-6:18; IEC/EN/CSA 60335-2-6

As written on the certificate · Line 9 (A2LA 2955.09)

UL/CSA/EN/IEC/AS/NZS 60950-1; EN 60950-1 (Ed.2)+A1+A2; EN 60950-1 (2006+A11:2009+A1:2010+A12:2011+A2:2013); IEC 60950-1 (2001, 2005+A1:2009+A2:2013); IEC 60950-1 (Ed.1); IEC 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1+A2; UL 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1; IEC 60950-1 (Ed.2)+A2; UL/CSA/EN/IEC/AS/NZS 60950-21; UL/CSA/EN/IEC/AS/NZS 60950-22; UL/CSA/EN/IEC/AS/NZS 60950-23; GB 4943.1; UL/CSA/EN/IEC/AS/NZS 62368-1; IEC 62368-1:2014; IEC 62368-1:2018; IEC 62368-1:2023; UL/CSA 62368-1:2014; EN 62368-1:2014 + A11:2017; UL/CSA 62368-1:2019; EN IEC 62368-1:2020 + A11:2020; IEC 62368-1:2023; EN IEC 62368-1-2024 + A11:2024; UL 62368-1:2019/R:2021-10; CSA C22.2 No. 62368-1:2019/U1:2021-10; UL 1741; UL 2056; UL 1012; UL 1310; IEC 60335-1:2020; IEC 60335-1:2010 + A1:2013+A2:2016; UL/CSA 60335-1:2016; UL/CSA/EN 60335-1; IEC 60335-2-6:2014/A1:2018; EN 60335-2-6:2015/A11:2020; CSA E60335-2-6:18; IEC/EN/CSA 60335-2-6

IEC 61326-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

IEC 61326-2-6Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular requirements - In vitro diagnostic (IVD) medical electrical equipment
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

IEC 62133-1Name not checked yet
As written on the certificate · Line 7 (A2LA 2955.26)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 7 (A2LA 2955.09)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

IEC 62133-2Secondary cells and batteries containing alkaline or other non-acid electrolytes - Safety requirements for portable sealed secondary cells, and for batteries made from them, for use in portable applications - Part 2: Lithium systems
As written on the certificate · Line 7 (A2LA 2955.26)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 7 (A2LA 2955.09)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

IEC 62233Measurement methods for electromagnetic fields of household appliances and similar apparatus with regard to human exposure
As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

IEC 62301Name not checked yet
As written on the certificate · Line 2 (A2LA 2955.26)

EPA ENERGY STAR Program Requirements for Uninterruptible Power Supplies (UPSs) (v 2.0); Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y to Subpart B of 10 CFR Part 430; Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y1 to Subpart B of 10 CFR Part 430; ENERGY STAR Test Method – Rev. Dec 2017; EPA ENERGY STAR Program Requirements for Water Coolers (v. 2.0); ENERGY STAR Test Method for Water Coolers (May 2013); IEC 62301 (2005, 2011); 62018 (2003); 62087 (2011); 62623 (2012); CEA 2037 (2009); CSA C381.1 (2008); C381.2-17; C62301 (2011); C802.2 (2011); 47 CFR, FCC Part 15, Subpart B (using ANSI C63.4-2014); ANSI C63.4-2014; 47 CFR, FCC Part 18 (using MP-5:1986); MP-5:1986; ICES-002; ICES-003; ICES-001; ICES-005; VCCI V-3 (up to 6 GHz); VCCI-CISPR 32:2016 (up to 6 GHz)

As written on the certificate · Line 2 (A2LA 2955.09)

EPA ENERGY STAR Program Requirements for Uninterruptible Power Supplies (UPSs) (v 2.0); Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y to Subpart B of 10 CFR Part 430; Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y1 to Subpart B of 10 CFR Part 430; ENERGY STAR Test Method – Rev. Dec 2017; EPA ENERGY STAR Program Requirements for Water Coolers (v. 2.0); ENERGY STAR Test Method for Water Coolers (May 2013); IEC 62301 (2005, 2011); 62018 (2003); 62087 (2011); 62623 (2012); CEA 2037 (2009); CSA C381.1 (2008); C381.2-17; C62301 (2011); C802.2 (2011); 47 CFR, FCC Part 15, Subpart B (using ANSI C63.4-2014); ANSI C63.4-2014; 47 CFR, FCC Part 18 (using MP-5:1986); MP-5:1986; ICES-002; ICES-003; ICES-001; ICES-005; VCCI V-3 (up to 6 GHz); VCCI-CISPR 32:2016 (up to 6 GHz)

IEC 62311Assessment of electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (0 Hz to 300 GHz)Certificate says EN 62311. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

IEC 62368-1Audio/video, information and communication technology equipment - Part 1: Safety requirements
As written on the certificate · Line 9 (A2LA 2955.26)

UL/CSA/EN/IEC/AS/NZS 60950-1; EN 60950-1 (Ed.2)+A1+A2; EN 60950-1 (2006+A11:2009+A1:2010+A12:2011+A2:2013); IEC 60950-1 (2001, 2005+A1:2009+A2:2013); IEC 60950-1 (Ed.1); IEC 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1+A2; UL 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1; IEC 60950-1 (Ed.2)+A2; UL/CSA/EN/IEC/AS/NZS 60950-21; UL/CSA/EN/IEC/AS/NZS 60950-22; UL/CSA/EN/IEC/AS/NZS 60950-23; GB 4943.1; UL/CSA/EN/IEC/AS/NZS 62368-1; IEC 62368-1:2014; IEC 62368-1:2018; IEC 62368-1:2023; UL/CSA 62368-1:2014; EN 62368-1:2014 + A11:2017; UL/CSA 62368-1:2019; EN IEC 62368-1:2020 + A11:2020; IEC 62368-1:2023; EN IEC 62368-1-2024 + A11:2024; UL 62368-1:2019/R:2021-10; CSA C22.2 No. 62368-1:2019/U1:2021-10; UL 1741; UL 2056; UL 1012; UL 1310; IEC 60335-1:2020; IEC 60335-1:2010 + A1:2013+A2:2016; UL/CSA 60335-1:2016; UL/CSA/EN 60335-1; IEC 60335-2-6:2014/A1:2018; EN 60335-2-6:2015/A11:2020; CSA E60335-2-6:18; IEC/EN/CSA 60335-2-6

As written on the certificate · Line 9 (A2LA 2955.09)

UL/CSA/EN/IEC/AS/NZS 60950-1; EN 60950-1 (Ed.2)+A1+A2; EN 60950-1 (2006+A11:2009+A1:2010+A12:2011+A2:2013); IEC 60950-1 (2001, 2005+A1:2009+A2:2013); IEC 60950-1 (Ed.1); IEC 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1+A2; UL 60950-1 (Ed.2); IEC 60950-1 (Ed.2)+A1; IEC 60950-1 (Ed.2)+A2; UL/CSA/EN/IEC/AS/NZS 60950-21; UL/CSA/EN/IEC/AS/NZS 60950-22; UL/CSA/EN/IEC/AS/NZS 60950-23; GB 4943.1; UL/CSA/EN/IEC/AS/NZS 62368-1; IEC 62368-1:2014; IEC 62368-1:2018; IEC 62368-1:2023; UL/CSA 62368-1:2014; EN 62368-1:2014 + A11:2017; UL/CSA 62368-1:2019; EN IEC 62368-1:2020 + A11:2020; IEC 62368-1:2023; EN IEC 62368-1-2024 + A11:2024; UL 62368-1:2019/R:2021-10; CSA C22.2 No. 62368-1:2019/U1:2021-10; UL 1741; UL 2056; UL 1012; UL 1310; IEC 60335-1:2020; IEC 60335-1:2010 + A1:2013+A2:2016; UL/CSA 60335-1:2016; UL/CSA/EN 60335-1; IEC 60335-2-6:2014/A1:2018; EN 60335-2-6:2015/A11:2020; CSA E60335-2-6:18; IEC/EN/CSA 60335-2-6

IEC 61010 series

IEC 61010-1Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 1: General requirements
As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

IEC 61010-2-010Name not checked yet
As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

IEC 61010-2-051Name not checked yet
As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

IEC 61010-2-081Name not checked yet
As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

IEC 61010-2-091Name not checked yet
As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

IEC 61010-2-101Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 2-101: Particular requirements for in vitro diagnostic (IVD) medical equipment
As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

IEC 61010-2-201Name not checked yet
As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

CISPR

CISPR 11Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurementCertificate says EN 55011. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

CISPR 13Sound and television broadcast receivers and associated equipment - Radio disturbance characteristics - Limits and methods of measurementCertificate says EN 55013. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

CISPR 14-1Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1: EmissionCertificate says EN 55014-1. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

CISPR 15Limits and methods of measurement of radio disturbance characteristics of electrical lighting and similar equipmentCertificate says EN 55015. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

CISPR 22Information technology equipment - Radio disturbance characteristics - Limits and methods of measurementCertificate says EN 55022. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

CISPR 32Electromagnetic compatibility of multimedia equipment - Emission requirementsCertificate says EN 55032. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

IEC 60598 series

IEC 60598-1Luminaires - Part 1: General requirements and tests
As written on the certificate · Line 7 (A2LA 2955.26)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 7 (A2LA 2955.09)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

IEC 60598-2-1Name not checked yet
As written on the certificate · Line 7 (A2LA 2955.26)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 7 (A2LA 2955.09)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

IEC 60598-2-2Name not checked yet
As written on the certificate · Line 7 (A2LA 2955.26)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 7 (A2LA 2955.09)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

IEC 60598-2-4Name not checked yet
As written on the certificate · Line 7 (A2LA 2955.26)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 7 (A2LA 2955.09)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

IEC 60598-2-5Name not checked yet
As written on the certificate · Line 7 (A2LA 2955.26)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 8 (A2LA 2955.26)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

As written on the certificate · Line 7 (A2LA 2955.09)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 8 (A2LA 2955.09)

EN 60598-1:2015; EN IEC 60598-1:2021/A11:2022; EN 60598-2-1:1999; EN IEC 60598-2-1:2021; EN 60598-2-2:2012; EN IEC 60598-2-2:2022; EN 60598-2-4:2018; EN 60598-2-5:2015; UL/CSA/EN/IEC/AS/NZS 61010-1; EN 61010-1:2001; EN 61010-1: 2010 + A1:2019; IEC 61010-1:2001; IEC 61010-1:2010 + A1:2016; UL 61010-1:2004; UL 61010-1:2012/R:2019-01; CSA C22.2 No. 61010-1:2012 + A1:2018; IEC 61010-2-010:2014; IEC 61010-2-010:2019; EN 61010-2-010:2014; UL/CSA 61010-2-010:2019; EN IEC 61010-2-010:2020; UL/EN/CSA 61010-2-010; IEC 61010-2-081:2015; IEC 61010-2-081:2019; UL/CSA 61010-2-081:2019; EN IEC 61010-2-081:2020; UL/EN/CSA 61010-2-081; IEC 61010-2-101:2015; IEC 61010-2-101:2018; UL/CSA 61010-2-101:2019; EN 61010-2-101:2017; EN IEC 61010-2-101:20222/A11:2022; UL/EN/CSA 61010-2-101; UL 61010-2-051:2019; EN IEC 61010-2-051:2021/A11:2021; CAN/CSA-C22.2 No. 61010-2-051:2015; IEC 61010-2-051:2015; IEC 61010-2-201:2017; CAN C22.2 No. 61010-2-201:2018-02; UL 61010-2-201:2018/R:2022-08; CSA C22.2 No. 61010-091; UL 61010-2-091; EN 61010-2-091; UL 61010-2-020

IEC 61000 series

IEC 61000-3-2Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current ≤ 16 A per phase)
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

IEC 61000-3-3Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤ 16 A per phase and not subject to conditional connection
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

IEC 61000-6-3Electromagnetic compatibility (EMC) - Part 6-3: Generic standards - Emission standard for equipment in residential environmentsCertificate says EN 61000-6-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

IEC 61000-6-4Electromagnetic compatibility (EMC) - Part 6-4: Generic standards - Emission standard for industrial environments
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

Other standards

ANSI C63.4American National Standard for Methods of Measurement of Radio-Noise Emissions from Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz
As written on the certificate · Line 14 (A2LA 2955.26)

ANSI C63.4-2014; FCC MP-5 (February 1986); ANSI C63.10-2013; ANSI C63.17-2013; KDB 905462 D02 V02 April 8, 2016; ANSI C63.26-2015; ANSI/TIA-603-E 2016

As written on the certificate · Line 14 (A2LA 2955.09)

ANSI C63.4-2014; FCC MP-5 (February 1986); ANSI C63.10-2013; ANSI C63.17-2013; KDB 905462 D02 V02 April 8, 2016; ANSI C63.26-2015; ANSI/TIA-603-E 2016

ANSI C63.26Name not checked yet
As written on the certificate · Line 15 (A2LA 2955.26)

ANSI C63.26-2015

As written on the certificate · Line 15 (A2LA 2955.09)

ANSI C63.26-2015

AS/NZS 61000.3.2Name not checked yet
As written on the certificate · Line 6 (A2LA 2955.26)

AS/NZS 61000.3.2; AS/NZS 61000.3.3; AS/NZS 61000.6.3; AS/NZS 61000.6.4; AS/NZS CISPR 14.2; AS/NZS 2772.2; AS/NZS 4268; AS/NZS 4769.1; AS/NZS 4769.2; AS/NZS 62040.2; CNS 13783-1:2013; CNS 13803:2018; CNS 13438:2006; CNS 15936:2016; RTTE01 (2020); LP0002 (2024); IFT-008-2015; NOM-208-SCFI-2016; TCVN 7189:2009; QCVN 18:2022/BTTTT; QCVN 54:2020/BTTTT; QCVN 55:2023/BTTTT; QCVN 60:2023/BTTTT; QCVN 86:2019/BTTTT; QCVN 96:2015/BTTTT; QCVN 103:2016/BTTTT; QCVN 112:2017/BTTTT; QCVN 118:2018/BTTTT; QCVN 130:2022/BTTTT; QCVN 100:2015/BTTTT; QCVN 94:2015/BTTTT; QCVN 72:2013/BTTTT; KS C 9811; KS C IEC 60601-1-2; KS C 9814-1; KS C 9814-2; KS C 9815; KS C 9547; KS X 3124; KS X 3125; KS X 3126; KS X 3127; KS X 3130; KS X 3139; KS X 3135; KS X 3129; KS X 3140; KS C 9040-2; KS C 9832; KS C 9835; KS C 9610-6-1; KS C 9610-6-2; KS C 9610-6-3; KS C 9610-6-4; HKCA 1006; HKCA 1007; HKCA 1008; HKCA 1020

As written on the certificate · Line 6 (A2LA 2955.09)

AS/NZS 61000.3.2; AS/NZS 61000.3.3; AS/NZS 61000.6.3; AS/NZS 61000.6.4; AS/NZS CISPR 14.2; AS/NZS 2772.2; AS/NZS 4268; AS/NZS 4769.1; AS/NZS 4769.2; AS/NZS 62040.2; CNS 13783-1:2013; CNS 13803:2018; CNS 13438:2006; CNS 15936:2016; RTTE01 (2020); LP0002 (2024); IFT-008-2015; NOM-208-SCFI-2016; TCVN 7189:2009; QCVN 18:2022/BTTTT; QCVN 54:2020/BTTTT; QCVN 55:2023/BTTTT; QCVN 60:2023/BTTTT; QCVN 86:2019/BTTTT; QCVN 96:2015/BTTTT; QCVN 103:2016/BTTTT; QCVN 112:2017/BTTTT; QCVN 118:2018/BTTTT; QCVN 130:2022/BTTTT; QCVN 100:2015/BTTTT; QCVN 94:2015/BTTTT; QCVN 72:2013/BTTTT; KS C 9811; KS C IEC 60601-1-2; KS C 9814-1; KS C 9814-2; KS C 9815; KS C 9547; KS X 3124; KS X 3125; KS X 3126; KS X 3127; KS X 3130; KS X 3139; KS X 3135; KS X 3129; KS X 3140; KS C 9040-2; KS C 9832; KS C 9835; KS C 9610-6-1; KS C 9610-6-2; KS C 9610-6-3; KS C 9610-6-4; HKCA 1006; HKCA 1007; HKCA 1008; HKCA 1020

EN 50121-4Railway applications - Electromagnetic compatibility - Part 4: Emission and immunity of the signalling and telecommunications apparatus
As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

FCC PART 15Radio Frequency Devices
As written on the certificate · Line 2 (A2LA 2955.26)

EPA ENERGY STAR Program Requirements for Uninterruptible Power Supplies (UPSs) (v 2.0); Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y to Subpart B of 10 CFR Part 430; Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y1 to Subpart B of 10 CFR Part 430; ENERGY STAR Test Method – Rev. Dec 2017; EPA ENERGY STAR Program Requirements for Water Coolers (v. 2.0); ENERGY STAR Test Method for Water Coolers (May 2013); IEC 62301 (2005, 2011); 62018 (2003); 62087 (2011); 62623 (2012); CEA 2037 (2009); CSA C381.1 (2008); C381.2-17; C62301 (2011); C802.2 (2011); 47 CFR, FCC Part 15, Subpart B (using ANSI C63.4-2014); ANSI C63.4-2014; 47 CFR, FCC Part 18 (using MP-5:1986); MP-5:1986; ICES-002; ICES-003; ICES-001; ICES-005; VCCI V-3 (up to 6 GHz); VCCI-CISPR 32:2016 (up to 6 GHz)

As written on the certificate · Line 3 (A2LA 2955.26)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

As written on the certificate · Line 2 (A2LA 2955.09)

EPA ENERGY STAR Program Requirements for Uninterruptible Power Supplies (UPSs) (v 2.0); Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y to Subpart B of 10 CFR Part 430; Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y1 to Subpart B of 10 CFR Part 430; ENERGY STAR Test Method – Rev. Dec 2017; EPA ENERGY STAR Program Requirements for Water Coolers (v. 2.0); ENERGY STAR Test Method for Water Coolers (May 2013); IEC 62301 (2005, 2011); 62018 (2003); 62087 (2011); 62623 (2012); CEA 2037 (2009); CSA C381.1 (2008); C381.2-17; C62301 (2011); C802.2 (2011); 47 CFR, FCC Part 15, Subpart B (using ANSI C63.4-2014); ANSI C63.4-2014; 47 CFR, FCC Part 18 (using MP-5:1986); MP-5:1986; ICES-002; ICES-003; ICES-001; ICES-005; VCCI V-3 (up to 6 GHz); VCCI-CISPR 32:2016 (up to 6 GHz)

As written on the certificate · Line 3 (A2LA 2955.09)

SANS 211:2010; SANS 214-1:2020; SANS 214-2:2009; SANS 2332:2017; SANS 2335:2018; SANS 61326-1:2007; SANS 61000-6-1:2005; SANS 61000-6-2:2005; SANS 61000-6-3:2011; SANS 61000-6-4:2011; CISPR 11; EN 55011; CISPR 13; EN 55013; CISPR 14-1; EN 55014-1; AS/NZS CISPR 14.1; CISPR 15; EN 55015; CISPR 16-2-1; CISPR 16-2-3; CISPR 22; EN 55022; AS/NZS CISPR 22; CISPR 32; EN 55032; AS/NZS CISPR 32; EN 50121-4; EN 61000-6-3; EN 61000-6-4; EN 61326-1; EN 61326-2-6; EN 61000-3-2; IEC 61000-3-2; JIS C 61000-3-2; EN 61000-3-3; IEC 61000-3-3; 47 CFR, FCC Part 15 C; ANSI C63.10-2013; ANSI C63.10-2020; ANSI C63.10-2020+Cor.1-2023; ANSI C63.10a-2024; 47 CFR, FCC Part 15 D; ANSI C63.17-2013; 47 CFR FCC Part 15 E; KDB 905462 D02 April 8, 2016; 47 CFR FCC Part 15 F; 47 CFR, FCC Part 15 H

ICES-003Name not checked yet
As written on the certificate · Line 2 (A2LA 2955.26)

EPA ENERGY STAR Program Requirements for Uninterruptible Power Supplies (UPSs) (v 2.0); Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y to Subpart B of 10 CFR Part 430; Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y1 to Subpart B of 10 CFR Part 430; ENERGY STAR Test Method – Rev. Dec 2017; EPA ENERGY STAR Program Requirements for Water Coolers (v. 2.0); ENERGY STAR Test Method for Water Coolers (May 2013); IEC 62301 (2005, 2011); 62018 (2003); 62087 (2011); 62623 (2012); CEA 2037 (2009); CSA C381.1 (2008); C381.2-17; C62301 (2011); C802.2 (2011); 47 CFR, FCC Part 15, Subpart B (using ANSI C63.4-2014); ANSI C63.4-2014; 47 CFR, FCC Part 18 (using MP-5:1986); MP-5:1986; ICES-002; ICES-003; ICES-001; ICES-005; VCCI V-3 (up to 6 GHz); VCCI-CISPR 32:2016 (up to 6 GHz)

As written on the certificate · Line 2 (A2LA 2955.09)

EPA ENERGY STAR Program Requirements for Uninterruptible Power Supplies (UPSs) (v 2.0); Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y to Subpart B of 10 CFR Part 430; Uniform Test Method for Measuring the Energy Consumption of Battery Chargers incorporated in Appendix Y1 to Subpart B of 10 CFR Part 430; ENERGY STAR Test Method – Rev. Dec 2017; EPA ENERGY STAR Program Requirements for Water Coolers (v. 2.0); ENERGY STAR Test Method for Water Coolers (May 2013); IEC 62301 (2005, 2011); 62018 (2003); 62087 (2011); 62623 (2012); CEA 2037 (2009); CSA C381.1 (2008); C381.2-17; C62301 (2011); C802.2 (2011); 47 CFR, FCC Part 15, Subpart B (using ANSI C63.4-2014); ANSI C63.4-2014; 47 CFR, FCC Part 18 (using MP-5:1986); MP-5:1986; ICES-002; ICES-003; ICES-001; ICES-005; VCCI V-3 (up to 6 GHz); VCCI-CISPR 32:2016 (up to 6 GHz)

J55014-1Name not checked yet
As written on the certificate · Line 7 (A2LA 2955.26)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

As written on the certificate · Line 7 (A2LA 2955.09)

HKCA 1033; HKCA 1035; HKCA 1039; HKCA 1042; HKCA 1043; HKCA 1044; HKCA 1049; IMDA TS WBA (October 2016); IMDA TS SRD (August 2021); VCCI-CISPR 32:2016; J55014-1; J55011; J55013; J55022; J55032; ARIB Standard STD-T33; ARIB Standard STD-T57; ARIB Standard STD-T66; ARIB Standard STD-T81; MIC Article 2-1; IEC 60601-1-2:2014; IEC 60601-1-2:2014+AMD1 2020; IEC 60601-1-2; EN 60601-1-2; UL 4200A; IEC 62133-1:2017; CSA C22.2 No. 62133-1:2020; UL 62123-1 Ed.1 2025; IEC 62133-2:2017/A1:2021; CSA C22.2 No. 62133-2:2020; UL 62133-2 Ed.1 2024; UL 2054; UL 153; UL 1598; UL 2108; UL 8750; UL 1993; UL 1574; UL 8800; UL 8801; UL8802; UL 1838; UL 1573; CAN/CSA C22.2 No. 9.0S1; CAN/CSA C22.2 No. 250.0; CAN/CSA C22.2 No. 250.4; CAN/CSA C22.2 No. 250.13; CAN/CSA C22.2 No. 1993; CAN/CSA C22.2 No 250.1; CAN/CSA-E60598-1; CAN/CSA-E60598-2-4; CAN/CSA-E60598-2-5; IEC 60598-1:2020; IEC 60598-1:2014/A1:2017; IEC 60598-2-1: 2020; IEC 60598-2-1:1979/A1:1987; IEC 60598-2-2:2023; IEC 60598-2-2:2011; IEC 60598-2-4:2017; IEC 60598-2-5:2015

RSS-GENName not checked yet
As written on the certificate · Line 4 (A2LA 2955.26)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); 47 CFR, FCC Part 24; 47 CFR, FCC Part 25 (below 3 GHz); 47 CFR, FCC Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); 47 CFR, Part 90 (below 3 GHz); 47 CFR, Part 95 (below 3 GHz); 47 CFR, Part 97 (below 3 GHz); 47 CFR, Part 101 (below 3 GHz); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; 47 CFR, Part 74 (below 3 GHz); 47 CFR, Part 20; 47 CFR, Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; 47 CFR, FCC Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; 47 CFR, FCC Part 30; 47 CFR, FCC Part 74; 47 CFR, FCC Part 90 (above 3 GHz); 47 CFR, FCC Part 95 (above 3 GHz); 47 CFR, FCC Part 97 (above 3 GHz); 47 CFR, FCC Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123

As written on the certificate · Line 4 (A2LA 2955.09)

RSS-GEN; RSS-102 Issue 6; RSS-102.IPD.MEAS; RSS-210 (<40 GHz); RSS-211 (<40 GHz); RSS-213; RSS-216 (<40 GHz); RSS-220 (<40 GHz); RSS-222; RSS-236; RSS-243; RSS-244; RSS-246; RSS-247 (with DFS); RSS-248; RSS-252; RSS-287; RSS-288; RSS-310; EN 300 086; EN 300 113; EN 300 220-1; EN 300 220-2; EN 300 220-3-1; EN 300 220-3-2; EN 300 220-4; EN 300 296; EN 300 328; EN 300 330; EN 300 440; EN 301 489-1; EN 301 489-12; EN 301 893; EN 302 065-1; EN 302 065-2; EN 302 065-3; EN 302 065-4; EN 303 883; EN 302 502; EN 302 208; EN 303 413; EN 303 417; EN 301 441 (limited to Radio Emissions); EN 301 511; EN 301 908-1; EN 301 908-2; EN 301 908-13; EN 303 687 (limited to RX and Tx); 47 CFR, FCC Part 22 (cellular); Part 24; Part 25 (below 3 GHz); Part 27 (using ANSI C63.26-2015); ANSI C63.26-2015; ANSI/TIA-603-E 2016; 47 CFR, Part 22 (non-cellular); Part 90 (below 3 GHz); Part 95 (below 3 GHz); Part 97 (below 3 GHz); Part 101 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 96 (using ANSI C63.26-2015); 47 CFR, Part 73; Part 74 (below 3 GHz), (using ANSI C63.26-2015); 47 CFR, Part 20; Part 90.219 (using ANSI C63.26-2015); 47 CFR, FCC Part 80; Part 87 (using ANSI C63.26-2015); 47 CFR, FCC Part 25; Part 30; Part 74; Part 90 (above 3 GHz); Part 95 (above 3 GHz); Part 97 (above 3 GHz); Part 101 (using ANSI C63.26-2015); RSS-111; RSS-112; RSS-119; RSS-123; RSS-125; RSS-127; RSS-130; RSS-131; RSS-132; RSS-133; RSS-134; RSS-135; RSS-137; RSS-139; RSS-140; RSS-142; RSS-170; RSS-181; RSS-182; RSS-192; RSS-194; RSS-195; RSS-197; RSS-198; RSS-199; EN 62233; EN 62311; IEEE C95.3

Scope as published by A2LA

32 lines
A2LA

ISO/IEC 17025

Active

2955.09

The scope document we hold says it is valid until 2027-08-31.

View scope
A2LA

ISO/IEC 17025

Active

2955.26

The scope document we hold says it is valid until 2027-08-31.

View scope

Location

5945 Cabot Parkway, Suite 100, Alpharetta, GA, 30005, US

34.07560, -84.29460

Open in Maps

Other Locations

1 other site in this organization

Accreditation data refreshed from the A2LA register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the A2LA entry linked above.