IMQ Certification (UK) Ltd trading as IMQ UK
Noble House, Linford Wood, Capital Drive, MK14 6QP, Milton Keynes, United Kingdom
Visit website- Accredited standards
- 7
- UKAS certificate
- 1
- Site in our directory
- 1
What this lab is accredited for
Our reading of the UKAS scope: each standard once, with its official name where we have checked it.
Only this lab. Searches the 7 standard numbers and the 0 official names we hold. When no standard matches, it searches the method text of every scope line.
EN 50399
EN 50575
IEC 60332-1-1
IEC 60332-1-3
IEC 60332-3-10
IEC 60811-203
IEC 61034-2
BS EN 50399:2011; BS EN 50399:2022 B Smoke emission EN 61034-2:2005; BS EN IEC 60332-3- 10:2018; BS EN 60332-1-1:2004; BS EN 60332-1-3:2004
BS EN 60811-203:2012; BS EN 50575:2014; ISO/IEC 17025:2017 Schedule of Accreditation issued by United Kingdom Accreditation Service 2; IEC 17025
ISO/IEC 17025:2017; EN 50575:2014+A1:2016
EN 50575:2014+A1:2016
Read from the scope as published by UKAS. Register refreshed 2026-11-20.
Scope as published by UKAS
5 lines
ISO/IEC 17025
Active27023
Accredited scope, certificate 27023
| Line | Method | Matrix | Range |
|---|---|---|---|
| 1 | ISO/IEC 17025:2017 | - | - |
| 2 | BS EN 50399:2011; BS EN 50399:2022 B Smoke emission EN 61034-2:2005; BS EN IEC 60332-3- 10:2018; BS EN 60332-1-1:2004; BS EN 60332-1-3:2004 | Power, control and communication cables | - |
| 3 | BS EN 60811-203:2012; BS EN 50575:2014; ISO/IEC 17025:2017 Schedule of Accreditation issued by United Kingdom Accreditation Service 2; IEC 17025 | Power, control, and communication cables; Cables for general applications in construction works subject to reaction to fire requirements | - |
| 4 | ISO/IEC 17025:2017; EN 50575:2014+A1:2016 | - | - |
| 5 | EN 50575:2014+A1:2016 | Power, control and communication cables (1/3):- Power, control and communication cables (for uses subject to regulations on reaction to fire) | - |
Ranges are reproduced from the accredited scope document as published, and only where we found that range printed in the document for the line. Otherwise the cell reads “See scope document”. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.
Location
Accreditation data refreshed from the UKAS register on .
This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the UKAS entry linked above.