Global CS Center of Samsung Electronics Co
(Maetan Dong) 129, Samsung-ro, Yeongtong-Gu, Suwon-Si, Gyeonggi-Do 16677, Korea, South Korea
Visit website- Accredited standards
- 47
- UKAS certificate
- 1
- Sites in our directory
- 2
What this lab is accredited for
Our reading of the UKAS scope: each standard once, with its official name where we have checked it.
Only this lab. Searches the 47 standard numbers and the 26 official names we hold. When no standard matches, it searches the method text of every scope line.
ETSI16
ETSI EN 301 489-1
ETSI EN 301 489-3
ETSI EN 301 489-7
ETSI EN 301 489-8
ETSI EN 301 489-17
ETSI EN 301 489-19
ETSI EN 301 489-23
ETSI EN 301 489-24
ETSI EN 301 489-26
ETSI EN 301 489-33
ETSI EN 301 489-50
ETSI EN 301 489-52
ETSI EN 303 340
ETSI EN 303 372-2
ETSI EN 303 386
ETSI EN 303 446-1
IEC 61000 series14
IEC 61000-3-2Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current ≤ 16 A per phase)
IEC 61000-3-3Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤ 16 A per phase and not subject to conditional connection
IEC 61000-4-2Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
IEC 61000-4-3Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test
IEC 61000-4-4Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
IEC 61000-4-5Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test
IEC 61000-4-6Electromagnetic compatibility (EMC) - Part 4-6: Testing and measurement techniques - Immunity to conducted disturbances, induced by radio-frequency fields
IEC 61000-4-8Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
IEC 61000-4-11Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests for equipment with input current up to 16 A per phase
IEC 61000-6-1Electromagnetic compatibility (EMC) - Part 6-1: Generic standards - Immunity standard for residential, commercial and light-industrial environments
Limits written next to it
this Schedule, but limited to EN IEC 61000-6-1:2019
IEC 61000-6-2Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity standard for industrial environments
IEC 61000-6-3Electromagnetic compatibility (EMC) - Part 6-3: Generic standards - Emission standard for equipment in residential environments
IEC 61000-6-4Electromagnetic compatibility (EMC) - Part 6-4: Generic standards - Emission standard for industrial environments
IEC 61000-6-8
CISPR8
CISPR 11Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurementExclusion+2 national
Limits written next to it
IT Equipment excluding discontinuous EN 55011:2009+A1:2010
National versions in the same scope
AS CISPR 11national version with changes
AS/NZS CISPR 11national version with changes
CISPR 13Sound and television broadcast receivers and associated equipment - Radio disturbance characteristics - Limits and methods of measurement+1 national
National versions in the same scope
AS/NZS CISPR 13identical to it
CISPR 14-1Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1: Emission+2 national
National versions in the same scope
AS CISPR 14.1national version with changes
AS/NZS CISPR 14.1national version with changes
CISPR 14-2Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 2: Immunity - Product family standard
CISPR 22Information technology equipment - Radio disturbance characteristics - Limits and methods of measurement+1 national
National versions in the same scope
AS/NZS CISPR 22identical to it
CISPR 24Information technology equipment - Immunity characteristics - Limits and methods of measurement
CISPR 32Electromagnetic compatibility of multimedia equipment - Emission requirements+1 national
National versions in the same scope
AS/NZS CISPR 32identical to it
CISPR 35Electromagnetic compatibility of multimedia equipment - Immunity requirements
IEC4
IEC 60601-1-2Medical electrical equipment - Part 1-2: General requirements for basic safety and essential performance - Collateral Standard: Electromagnetic disturbances - Requirements and testsSome materials
Limits written next to it
Limited to Small Portable EN 60601-1-2:2015 R5
IEC 60601-2-47
IEC 61204-3
IEC 61960-3Some clauses
Limits written next to it
2.22 Discharge Performance Clause 7.3.2, IEC 61960-3:2017 R4
2.23 Charge (Capacity) Clause 7.4, IEC 61960-3:2017 R4
2.24 Charge (capacity) Clause 7.5, IEC 61960-3:2017 R4
Clause 7.3.1, IEC 61960-3:2017
Clause 7.3.3, IEC 61960-3:2017
2.24 Endurance in cycles Clause 7.6, IEC 61960-3:2017 R4
2.25 Internal resistance Clause 7.7, IEC 61960-3:2017
IEC 60068 series3
IEC 60068-2-1Environmental testing - Part 2-1: Tests - Test A: ColdSome clauses
Limits written next to it
Clause 6, IEC 60068-2-1
IEC 60068-2-2Environmental testing - Part 2-2: Tests - Test B: Dry heatSome clauses
Limits written next to it
Clause 6, IEC 60068-2-2
IEC 60068-2-31Environmental testing - Part 2-31: Tests - Test Ec: Rough handling shocks, primarily for equipment-type specimensSome clauses
Limits written next to it
Clause 5, IEC 60068-2-31
Other standards2
BS 4002
EN 50130-4Alarm systems - Part 4: Electromagnetic compatibility - Product family standard: Immunity requirements for components of fire, intruder, hold up, CCTV, access control and social alarm systems
EN 55014-2:1997+A1:2001+A2:2008; EN 55014-2:2015; EN IEC 55014-2:2021; CISPR 14-2:2008; CISPR 14-2:2015; CISPR 14-2:2020; SANS 214-2:2009; EN 55024:1998+A1:2001+A2:2003; EN 55024:2010; EN 55024:2010+A1:2015; CISPR 24:2010; CISPR 24:2015; EN 55035:2017; EN 55035:2017+A11:2020; CISPR 35:2016; SANS 2335:2018; EN 60601-1-2:2015; IEC 60601-1-2:2014; EN 60601-2-47:2015; IEC 60601-2-47:2012; EN 301 489-1 V1.6.1; EN 301 489-1 V1.8.1; EN 301 489-1 V1.9.2; EN 301 489-1 V2.2.1 (draft); EN 301 489-1 V2.2.3; EN 301 489-3 V1.4.1; EN 301 489-3 V1.6.1; EN 301 489-3 V2.1.1; EN 301 489-3 V2.3.2; EN 301 489-7 V1.3.1; EN 301 489-8 V1.2.1
EN 301 489-17 V1.2.1; EN 301 489-17 V2.1.1; EN 301 489-17 V2.2.1; EN 301 489-17 V3.1.1; EN 301 489-17 V3.2.0; EN 301 489-17 V3.2.4; EN 301 489-17 V3.3.1; EN 301 489-19 V2.1.0; EN 301 489-19 V2.1.1; EN 301 489-19 V2.2.1; EN 301 489-23 V1.4.1; EN 301 489-23 V1.5.1; EN 301 489-24 V1.4.1; EN 301 489-24 V1.5.1; EN 301 489-26 V2.3.2; EN 301 489-33 V2.2.1; EN 301 489-50 V1.2.1; EN 301 489-50 V2.1.1; EN 301 489-50 V2.2.1; EN 301 489-50 V2.3.1; EN 301 489-52 V1.1.0; EN 301 489-52 V2.0.2; EN 301 489-52 V1.2.1; EN 301 489-52 V1.3.1; EN 303 386 V1.6.1; EN 303 446-1 V1.1.0; EN 303 446-1 V1.2.1; QCVN 18:2022/BTTTT; QCVN 86:2019/BTTTT; QCVN 96:2015/BTTTT; QCVN 103:2016/BTTTT; QCVN 112:2017/BTTTT; QCVN 118:2018/BTTTT
EN 303 340 V1.1.2; EN 303 340 V1.2.1; ETSI EN 303 372-2 v1.2.1
CISPR 14-1:2011; CISPR 14-1:2020; AS/NZS CISPR 14.1:2013; AS CISPR 14.1:2018; AS/NZS CISPR 14.1:2021; SANS 214-1:2020; EN 55014-1:2006+A1:2009; EN 55014-1:2006+A1:2009+A2:2011; EN 55014-1:2017; EN 55014-1:2017+A11:2020; EN IEC 55014-1:2021; AS/NZS CISPR 14.1:2003; AS/NZS CISPR 14.1:2010; EN 61000-3-2:2006+A1:2009; EN 61000-3-2:2006+A1:2009+A2:2009; EN 61000-3-2:2014; EN IEC 61000-3-2:2019; EN IEC 61000-3-2:2019+A1:2021; EN IEC 61000-3-2:2019+A1:2021+A2:2024; IEC 61000-3-2:2009; IEC 61000-3-2:2015; IEC 61000-3-2:2018; IEC 61000-3-2 :2018+A1:2020; IEC 61000-3-2:2018+A1:2020+A2:2024; SANS 61000-3-2:2009
EN 61000-3-3:1995 A1:1998+ R3, R4, R5, A2:2005; EN 61000-3-3:2008; EN 61000-3-3:2013; EN 61000-3-3:2013+A1:2019; EN 61000-3-3:2013+A2:2021; IEC 61000-3-3:2008; IEC 61000-3-3:2013; IEC 61000-3-3:2013+A2:2021; SANS 61000-3-3:2009; EN 61000-4-2:1995+A1:1998+ R3, R4, R5, A2:2001; EN 61000-4-2:2009; EN 61000-4-2:2025; IEC 61000-4-2:2001; IEC 61000-4-2:2008; IEC 61000-4-2:2025; SANS 61000-4-2:2009; EN 61000-4-3:1996 R3, R4, R5; EN 61000-4-3:2002+A1:2002; EN 61000-4-3:2006+A1:2008; EN 61000-4-3:2006+A1:2008+ A2:2010; IEC 61000-4-3:2020; IEC 61000-4-3:2002; IEC 61000-4-3:2006; IEC 61000-4-3:2008; IEC 61000-4-3:2010; SANS 61000-4-3:2008; EN 60601-1-2 Table 9 (R5); IEC 60601-1-2 Table 9 (R5)
EN 61000-4-4:1995+A1:2001+A2:2001; EN 61000-4-4:2004; EN 61000-4-4:2004+A1:2010; EN 61000-4-4:2012; IEC 61000-4-4:1995+A1:2000+A2:2001; IEC 61000-4-4:2004; IEC 61000-4-4:2012; SANS 61000-4-4:2011; EN 61000-4-5:1995+A1:2001; EN 61000-4-5:2006; EN 61000-4-5:2014; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5:2005; IEC 61000-4-5:2014; IEC 61000-4-5:2014+A1:2017; SANS 61000-4-5:2006; EN 61000-4-6:1996+A1:2001; EN 61000-4-6:2007; EN 61000-4-6:2009; EN 61000-4-6:2014; EN 61000-4-6:2014+AC:2015; EN IEC 61000-4-6:2023; IEC 61000-4-6:2003; IEC 61000-4-6:2004; IEC 61000-4-6:2006; IEC 61000-4-6:2008; IEC 61000-4-6:2013; IEC 61000-4-6:2023; SANS 61000-4-6:2017
EN 61000-4-8:1993+A1:2001; EN 61000-4-8:2010; IEC 61000-4-8:2001; IEC 61000-4-8:2009; EN 61000-4-11:1994+A1:2001; EN 61000-4-11:2004; EN 61000-4-11:2004+A1:2017; IEC 61000-4-11:1994; IEC 61000-4-11:2004; SANS 61000-4-11:2005; EN 50130-4:1995+A1:1998+A2:2003; EN 61000-6-1:2007; IEC 61000-6-1:2016; EN IEC 61000-6-1:2019; EN 61000-6-2:2005; EN IEC 61000-6-2:2019; IEC 61000-6-2:2016; EN 61000-6-3:2007; EN 61000-6-3:2007+A1:2011; EN IEC 61000-6-3:2021; IEC 61000-6-3:2020; EN 61000-6-4:2007; EN 61000-6-4:2007+A1:2011; EN IEC 61000-6-4:2019; IEC 61000-6-4:2018; EN IEC 61000-6-8:2020; IEC 61000-6-8:2020; EN 61204-3:2000
EN 55011:2007+A2:2007; EN 55011:2009; EN 55011:2009+A1:2010; EN 55011:2016; EN 55011:2016+A1:2017; EN 55011:2016+A11:2020; EN 55011:2016+A2:2021; CISPR 11:2009; CISPR 11:2010; CISPR 11:2015; CISPR 11:2017; CISPR 11:2019; AS/NZS CISPR 11:2004; AS/NZS CISPR 11:2011; AS CISPR 11:2017; AS CISPR 11:2017+A1:2020; SANS 211:2010; EN 55013:2001+A1:2003+A2:2006; EN 55013:2013; CISPR 13:2009; CISPR 13:2015; AS/NZS CISPR 13:2004; AS/NZS CISPR 13:2012; EN 55014-1:2006+A1:2009; EN 55014-1:2006+A1:2009+A2:2011; EN 55014-1:2017; EN 55014-1:2017+A11:2020; EN IEC 55014-1:2021; CISPR 14-1:2011; CISPR 14-1:2020
AS/NZS CISPR 14.1:2003; AS/NZS CISPR 14.1:2010; AS/NZS CISPR 14.1:2013; AS/NZS CISPR 14.1:2018; AS/NZS CISPR 14.1:2021; SANS 214-1:2020; EN 55022:2006+A1:2007; EN 55022:2010+AC1:2011; CISPR 22:2008; AS/NZS CISPR 22:2006; AS/NZS CISPR 22:2009; AS/NZS CISPR 22:2009+A1; EN 55032:2012+AC1:2013; EN 55032:2015; EN 55032 :2015+AC :2016; EN 55032:2015+A11:2020; EN 55032:2015+A11:2020+A1:2020; CISPR 32:2012; CISPR 32:2015; CISPR 32:2015+A1:2019; AS/NZS CISPR 32:2013; AS/NZS CISPR 32:2015; AS/NZS CISPR 32:2015+A1:2020; SANS 2332:2017; IS CISPR 32:2015; EN 55011:2007+ A2:2007; EN 55011:2009; EN 55011:2009+A1:2010; EN 55011:2016; EN 55011:2016+A1:2017; EN 55011:2016+A11:2020; EN 55011:2016+A2:2021
CISPR 11:2009; CISPR 11:2010; CISPR 11:2015; CISPR 11:2017; CISPR 11:2019; AS/NZS CISPR 11:2004; AS/NZS CISPR 11:2011; AS CISPR 11:2017; AS CISPR 11:2017+A1:2020; SANS 211:2010; EN 55013:2001+A1:2003+A2:2006; EN 55013:2013; CISPR 13:2009; CISPR 13:2015; AS/NZS CISPR 13:2004; AS/NZS CISPR 13:2012; EN 55014-1:2006+A1:2009; EN 55014-1:2006+A1:2009+A2:2011; EN 55014-1:2017; EN 55014-1:2017+A11:2020; EN IEC 55014-1:2021; CISPR 14-1:2011; CISPR 14-1:2020; AS/NZS CISPR 14.1:2010; AS/NZS CISPR 14.1:2013; AS CISPR 14.1:2018; AS/NZS CISPR 14.1:2021; SANS 214-1:2020
EN 55022:2006+A1:2007; EN 55022:2010+AC1:2011; CISPR 22:2008; AS/NZS CISPR 22:2006; AS/NZS CISPR 22:2009; AS/NZS CISPR 22:2009+A1; EN 55032:2012+AC1:2013; EN 55032:2015; EN 55032 :2015 +AC :2016; EN 55032:2015+A11:2020; EN 55032:2015+A11:2020+A1:2020; CISPR 32:2012; CISPR 32:2015; CISPR 32:2015+A1:2019; AS/NZS CISPR 32:2013; AS/NZS CISPR 32:2015; AS/NZS CISPR 32:2015+A1:2020; SANS 2332:2017; IS CISPR 32:2015; EN 55013:2001+A1:2003+A2:2006; EN 55013:2013; CISPR 13:2009; CISPR 13:2015; AS/NZS CISPR 13:2004; AS/NZS CISPR 13:2012; EN 55014-1:2006+A1:2009; EN 55014-1:2006+A1:2009+A2:2011; EN 55014-1:2017; EN 55014-1:2017+A11:2020; EN IEC 55014-1:2021
IEEE 1725:2021; TCO for notebooks; TCO for tablets, and smartphones; IEC 60068-2-31; IEC 61960-3:2017
IEC 61960-3:2017; TCO for notebooks; TCO for smartphones, tablets; IEC 60068-2-1; IEC 60068-2-2; IEEE 1725:2021
MCMC MTSFB TC T011:2024; MCMC MTSFB TC T004:2022; NorDig Unified Test plan, v. 2.6.0; NBTC BS 4002-2560 (2017); NBTC BS 4002-2565 (2022); Regulation Of The Minister Of Communication And Informatics of The Republic Of Indonesia Number 4 : 2019; Receiver Specification For Digital Terrestrial Television Samoa February 2016; QCVN 63:2020/BTTTT
MCMC MTSFB TC T011:2024; MCMC MTSFB TC T004:2022; NorDig Unified Test plan, v.2.6.0; NBTC BS 4002-2560 (2017); NBTC BS 4002-2565 (2022); Regulation Of The Minister Of Communication And Information In The Republic Of Indonesia Number 4:2019; Receiver Specification For Digital Terrestrial Television Samoa February 2016; QCVN 63:2020/BTTTT
MCMC MTSFB TC T011:2024; MCMC MTSFB TC T004:2022; NorDig Unified Test plan, v. 2.6.0; NorDig Unified Test Specification for Integrated Receivers/Decoders Part II Section 2.11.Overair Download Testing; NBTC BS 4002-2560 (2017); NBTC BS 4002-2565 (2022); Regulation Of The Minister Of Communication And Informatics of The Republic Of Indonesia Number 4:2019; QCVN 63:2020/BTTTT; Regulation of the Minister Of Communication and Informatics of The Republic of Indonesia Number 3:2014; Receiver Specification For Digital Terrestrial Television Samoa February 2016; MCMC MTSFB TC G002:2020
Read from the scope as published by UKAS. Register refreshed 2026-11-06.
Scope as published by UKAS
21 lines
ISO/IEC 17025
Active4290
Other Locations
1 other site in this organization
Accreditation data refreshed from the UKAS register on .
This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the UKAS entry linked above.