FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
China

Lyns-tci Technology Guangdong Co.,

Room 1201, Unit 2, Building 18, No.7, Science and Technology Boulevard, Houjie Town, Dongguan City, Guangdong, 523960, People's Republic of China, Dongguan City, Guangdong, China

A2LA|5200.02ISO/IEC 17025Register refreshed 2026-09-25
Certificates
1
Scope items
4
Standards
17
Locations
1

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at Lyns-tci Technology Guangdong Co.,?

Claim this profile to keep it accurate.

Register record

A2LARefreshed
5200.02Active

Accredited standards

17

Our reading of the A2LA scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

IEC

IEC 60730-1Automatic electrical controls - Part 1: General requirements
As written on the certificate · Line 1 (A2LA 5200.02)

IEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21

IEC 61683Name not checked yet
As written on the certificate · Line 1 (A2LA 5200.02)

IEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21

As written on the certificate · Line 2 (A2LA 5200.02)

EN 61727; EN 62116; EN 61683; EN 50438; EN 50549-1; EN 50549-2; EN 50549-10; EN 50530; EN 50530/A1; AS/NZS 4777.1; AS/NZS 4777.2; VDE-AR-N 4105; VDE AR-N 4110; VDE AR-N 4120; VDE AR-N 4130; VDE AR-E 2510-2; NRS 097-2-1; NRS 097-2-3; NRS 097-2-1:2024 Edition 3; NRS 097-2-3:2023 Edition 2; G98/2; G98/1-4; G98_NI; G98; G99/2; G99/1-6, G; G99/1-7; G99/1-8; G99; G99_N1; G100/1, G100/1-1; G100/1-2; UTE-C15-400; UTE-C15-712-1; UTE-C15-712-2; XP C15-712-3; ERDF-NOI-RES_10E; ERDF-NOI-RES_13E; ENEDIS-NOI- RES_13E + ENEDIS-NOI-RES_18E; Enedis-PRO-RES_64E; RD 1699/RD 661; RD 413, RD 244; RD 647; Orden TED/749/2020; BOE-A-2020-8965; UNE 206006; UNE 206007-1; UNE 217001 IN; UNE 217001; UNE 217002; P.O. 12.2; P.O. 12.3; PVVC Revision 9; PVVC Revision 10; SI 4777.2; SI 4777.3; ABNT NBR 16149; ABNT NBR 16150; Ordinance INMETRO n°004; Ordinance INMETRO n°357; Ordinance INMETRO n°16/2021; PORTARIA n°140; DE 21 DE MARCO DE 2022; PORTARIA Nº 515; TOR Erzeuger Typ A; TOR Erzeuger Typ B; TOR Erzeuger Typ C; TOR Erzeuger Typ D; TOR Stromerzeugungsanlagen Typ A; TOR Stromerzeugungsanlagen Typ B; TOR Stromerzeugungsanlagen Typ C; TOR Stromerzeugungsanlagen Typ D; RKS-AT: Typ B; RKS-AT: Typ C; RKS-AT: Typ D; Technical regulation 3.2.1; Technical regulation 3.2.2; Technical regulation 3.3.1; Technical requirements for connection of power-generating plants to the low-voltage grid (≤1 kV) Type A and B

IEC 61727Name not checked yet
As written on the certificate · Line 1 (A2LA 5200.02)

IEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21

As written on the certificate · Line 2 (A2LA 5200.02)

EN 61727; EN 62116; EN 61683; EN 50438; EN 50549-1; EN 50549-2; EN 50549-10; EN 50530; EN 50530/A1; AS/NZS 4777.1; AS/NZS 4777.2; VDE-AR-N 4105; VDE AR-N 4110; VDE AR-N 4120; VDE AR-N 4130; VDE AR-E 2510-2; NRS 097-2-1; NRS 097-2-3; NRS 097-2-1:2024 Edition 3; NRS 097-2-3:2023 Edition 2; G98/2; G98/1-4; G98_NI; G98; G99/2; G99/1-6, G; G99/1-7; G99/1-8; G99; G99_N1; G100/1, G100/1-1; G100/1-2; UTE-C15-400; UTE-C15-712-1; UTE-C15-712-2; XP C15-712-3; ERDF-NOI-RES_10E; ERDF-NOI-RES_13E; ENEDIS-NOI- RES_13E + ENEDIS-NOI-RES_18E; Enedis-PRO-RES_64E; RD 1699/RD 661; RD 413, RD 244; RD 647; Orden TED/749/2020; BOE-A-2020-8965; UNE 206006; UNE 206007-1; UNE 217001 IN; UNE 217001; UNE 217002; P.O. 12.2; P.O. 12.3; PVVC Revision 9; PVVC Revision 10; SI 4777.2; SI 4777.3; ABNT NBR 16149; ABNT NBR 16150; Ordinance INMETRO n°004; Ordinance INMETRO n°357; Ordinance INMETRO n°16/2021; PORTARIA n°140; DE 21 DE MARCO DE 2022; PORTARIA Nº 515; TOR Erzeuger Typ A; TOR Erzeuger Typ B; TOR Erzeuger Typ C; TOR Erzeuger Typ D; TOR Stromerzeugungsanlagen Typ A; TOR Stromerzeugungsanlagen Typ B; TOR Stromerzeugungsanlagen Typ C; TOR Stromerzeugungsanlagen Typ D; RKS-AT: Typ B; RKS-AT: Typ C; RKS-AT: Typ D; Technical regulation 3.2.1; Technical regulation 3.2.2; Technical regulation 3.3.1; Technical requirements for connection of power-generating plants to the low-voltage grid (≤1 kV) Type A and B

IEC 62116Name not checked yet
As written on the certificate · Line 1 (A2LA 5200.02)

IEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21

As written on the certificate · Line 2 (A2LA 5200.02)

EN 61727; EN 62116; EN 61683; EN 50438; EN 50549-1; EN 50549-2; EN 50549-10; EN 50530; EN 50530/A1; AS/NZS 4777.1; AS/NZS 4777.2; VDE-AR-N 4105; VDE AR-N 4110; VDE AR-N 4120; VDE AR-N 4130; VDE AR-E 2510-2; NRS 097-2-1; NRS 097-2-3; NRS 097-2-1:2024 Edition 3; NRS 097-2-3:2023 Edition 2; G98/2; G98/1-4; G98_NI; G98; G99/2; G99/1-6, G; G99/1-7; G99/1-8; G99; G99_N1; G100/1, G100/1-1; G100/1-2; UTE-C15-400; UTE-C15-712-1; UTE-C15-712-2; XP C15-712-3; ERDF-NOI-RES_10E; ERDF-NOI-RES_13E; ENEDIS-NOI- RES_13E + ENEDIS-NOI-RES_18E; Enedis-PRO-RES_64E; RD 1699/RD 661; RD 413, RD 244; RD 647; Orden TED/749/2020; BOE-A-2020-8965; UNE 206006; UNE 206007-1; UNE 217001 IN; UNE 217001; UNE 217002; P.O. 12.2; P.O. 12.3; PVVC Revision 9; PVVC Revision 10; SI 4777.2; SI 4777.3; ABNT NBR 16149; ABNT NBR 16150; Ordinance INMETRO n°004; Ordinance INMETRO n°357; Ordinance INMETRO n°16/2021; PORTARIA n°140; DE 21 DE MARCO DE 2022; PORTARIA Nº 515; TOR Erzeuger Typ A; TOR Erzeuger Typ B; TOR Erzeuger Typ C; TOR Erzeuger Typ D; TOR Stromerzeugungsanlagen Typ A; TOR Stromerzeugungsanlagen Typ B; TOR Stromerzeugungsanlagen Typ C; TOR Stromerzeugungsanlagen Typ D; RKS-AT: Typ B; RKS-AT: Typ C; RKS-AT: Typ D; Technical regulation 3.2.1; Technical regulation 3.2.2; Technical regulation 3.3.1; Technical requirements for connection of power-generating plants to the low-voltage grid (≤1 kV) Type A and B

IEC 62262Name not checked yet
As written on the certificate · Line 1 (A2LA 5200.02)

IEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21

IEC 62891Name not checked yet
As written on the certificate · Line 1 (A2LA 5200.02)

IEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21

IEC 63027Name not checked yet
As written on the certificate · Line 3 (A2LA 5200.02)

NC RfG, PTPiREE, PSE S.A.; IRR-DCC-MV; IRR-TIC; Central Electricity Authority (Technical standard for connectivity to the grid); PRAVIDLA PROVOZOVÁNÍ DISTRIBUČNÍCH SOUSTAV; PPDS; VJV2018; NA/EEA-NE7-CH 2020; EIFS 2018:2; NTS Version 2.1; NTS Versión 1.0; C10/11; (LV1, LV2, MV1); GCPP LV; GCPP MV HV; CQC3321; Gridcp (SSDG); Gridcp (MSDG); CEDROSOLAR:2017; MGC; PGC; ssPV; NVF 2021; COMMISSION REGULATION (EU) 2016/631; RENBLAD 342; DEWA; DRRG; Republic of the Philippines ENERGY REGULATORY COMMISSION, RESOLUTION NO.7, Series of 2013; NB/T 32004; IEC 63027; Decision RAE 1165/2020; Portaria no.73; Order no. 208; Ordin_3; 25_2016_TT_BCT; Conditions Governing the Connection and Operation of Mini Generation; Conditions Governing the Connection and Operation of Export Limiting Schemes at LV and MV; EirGrid Grid Code; Egyptian Transmission Grid Code; KNTGC; NERC

IEC 61000 series

IEC 61000-3-2Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current ≤ 16 A per phase)
As written on the certificate · Line 1 (A2LA 5200.02)

IEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21

IEC 61000-3-3Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤ 16 A per phase and not subject to conditional connection
As written on the certificate · Line 1 (A2LA 5200.02)

IEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21

IEC 61000-3-11Electromagnetic compatibility (EMC) - Part 3-11: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems - Equipment with rated current ≤ 75 A and subject to conditional connection
As written on the certificate · Line 1 (A2LA 5200.02)

IEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21

IEC 61000-3-12Electromagnetic compatibility (EMC) - Part 3-12: Limits - Limits for harmonic currents produced by equipment connected to public low-voltage systems with input current >16 A and ≤ 75 A per phaseCertificate says EN 61000-3-12. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 1 (A2LA 5200.02)

IEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21

IEC 61000-4-21Name not checked yet
As written on the certificate · Line 1 (A2LA 5200.02)

IEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21

EN 50549 series

EN 50549-1Name not checked yet
As written on the certificate · Line 2 (A2LA 5200.02)

EN 61727; EN 62116; EN 61683; EN 50438; EN 50549-1; EN 50549-2; EN 50549-10; EN 50530; EN 50530/A1; AS/NZS 4777.1; AS/NZS 4777.2; VDE-AR-N 4105; VDE AR-N 4110; VDE AR-N 4120; VDE AR-N 4130; VDE AR-E 2510-2; NRS 097-2-1; NRS 097-2-3; NRS 097-2-1:2024 Edition 3; NRS 097-2-3:2023 Edition 2; G98/2; G98/1-4; G98_NI; G98; G99/2; G99/1-6, G; G99/1-7; G99/1-8; G99; G99_N1; G100/1, G100/1-1; G100/1-2; UTE-C15-400; UTE-C15-712-1; UTE-C15-712-2; XP C15-712-3; ERDF-NOI-RES_10E; ERDF-NOI-RES_13E; ENEDIS-NOI- RES_13E + ENEDIS-NOI-RES_18E; Enedis-PRO-RES_64E; RD 1699/RD 661; RD 413, RD 244; RD 647; Orden TED/749/2020; BOE-A-2020-8965; UNE 206006; UNE 206007-1; UNE 217001 IN; UNE 217001; UNE 217002; P.O. 12.2; P.O. 12.3; PVVC Revision 9; PVVC Revision 10; SI 4777.2; SI 4777.3; ABNT NBR 16149; ABNT NBR 16150; Ordinance INMETRO n°004; Ordinance INMETRO n°357; Ordinance INMETRO n°16/2021; PORTARIA n°140; DE 21 DE MARCO DE 2022; PORTARIA Nº 515; TOR Erzeuger Typ A; TOR Erzeuger Typ B; TOR Erzeuger Typ C; TOR Erzeuger Typ D; TOR Stromerzeugungsanlagen Typ A; TOR Stromerzeugungsanlagen Typ B; TOR Stromerzeugungsanlagen Typ C; TOR Stromerzeugungsanlagen Typ D; RKS-AT: Typ B; RKS-AT: Typ C; RKS-AT: Typ D; Technical regulation 3.2.1; Technical regulation 3.2.2; Technical regulation 3.3.1; Technical requirements for connection of power-generating plants to the low-voltage grid (≤1 kV) Type A and B

EN 50549-2Name not checked yet
As written on the certificate · Line 2 (A2LA 5200.02)

EN 61727; EN 62116; EN 61683; EN 50438; EN 50549-1; EN 50549-2; EN 50549-10; EN 50530; EN 50530/A1; AS/NZS 4777.1; AS/NZS 4777.2; VDE-AR-N 4105; VDE AR-N 4110; VDE AR-N 4120; VDE AR-N 4130; VDE AR-E 2510-2; NRS 097-2-1; NRS 097-2-3; NRS 097-2-1:2024 Edition 3; NRS 097-2-3:2023 Edition 2; G98/2; G98/1-4; G98_NI; G98; G99/2; G99/1-6, G; G99/1-7; G99/1-8; G99; G99_N1; G100/1, G100/1-1; G100/1-2; UTE-C15-400; UTE-C15-712-1; UTE-C15-712-2; XP C15-712-3; ERDF-NOI-RES_10E; ERDF-NOI-RES_13E; ENEDIS-NOI- RES_13E + ENEDIS-NOI-RES_18E; Enedis-PRO-RES_64E; RD 1699/RD 661; RD 413, RD 244; RD 647; Orden TED/749/2020; BOE-A-2020-8965; UNE 206006; UNE 206007-1; UNE 217001 IN; UNE 217001; UNE 217002; P.O. 12.2; P.O. 12.3; PVVC Revision 9; PVVC Revision 10; SI 4777.2; SI 4777.3; ABNT NBR 16149; ABNT NBR 16150; Ordinance INMETRO n°004; Ordinance INMETRO n°357; Ordinance INMETRO n°16/2021; PORTARIA n°140; DE 21 DE MARCO DE 2022; PORTARIA Nº 515; TOR Erzeuger Typ A; TOR Erzeuger Typ B; TOR Erzeuger Typ C; TOR Erzeuger Typ D; TOR Stromerzeugungsanlagen Typ A; TOR Stromerzeugungsanlagen Typ B; TOR Stromerzeugungsanlagen Typ C; TOR Stromerzeugungsanlagen Typ D; RKS-AT: Typ B; RKS-AT: Typ C; RKS-AT: Typ D; Technical regulation 3.2.1; Technical regulation 3.2.2; Technical regulation 3.3.1; Technical requirements for connection of power-generating plants to the low-voltage grid (≤1 kV) Type A and B

EN 50549-10Name not checked yet
As written on the certificate · Line 2 (A2LA 5200.02)

EN 61727; EN 62116; EN 61683; EN 50438; EN 50549-1; EN 50549-2; EN 50549-10; EN 50530; EN 50530/A1; AS/NZS 4777.1; AS/NZS 4777.2; VDE-AR-N 4105; VDE AR-N 4110; VDE AR-N 4120; VDE AR-N 4130; VDE AR-E 2510-2; NRS 097-2-1; NRS 097-2-3; NRS 097-2-1:2024 Edition 3; NRS 097-2-3:2023 Edition 2; G98/2; G98/1-4; G98_NI; G98; G99/2; G99/1-6, G; G99/1-7; G99/1-8; G99; G99_N1; G100/1, G100/1-1; G100/1-2; UTE-C15-400; UTE-C15-712-1; UTE-C15-712-2; XP C15-712-3; ERDF-NOI-RES_10E; ERDF-NOI-RES_13E; ENEDIS-NOI- RES_13E + ENEDIS-NOI-RES_18E; Enedis-PRO-RES_64E; RD 1699/RD 661; RD 413, RD 244; RD 647; Orden TED/749/2020; BOE-A-2020-8965; UNE 206006; UNE 206007-1; UNE 217001 IN; UNE 217001; UNE 217002; P.O. 12.2; P.O. 12.3; PVVC Revision 9; PVVC Revision 10; SI 4777.2; SI 4777.3; ABNT NBR 16149; ABNT NBR 16150; Ordinance INMETRO n°004; Ordinance INMETRO n°357; Ordinance INMETRO n°16/2021; PORTARIA n°140; DE 21 DE MARCO DE 2022; PORTARIA Nº 515; TOR Erzeuger Typ A; TOR Erzeuger Typ B; TOR Erzeuger Typ C; TOR Erzeuger Typ D; TOR Stromerzeugungsanlagen Typ A; TOR Stromerzeugungsanlagen Typ B; TOR Stromerzeugungsanlagen Typ C; TOR Stromerzeugungsanlagen Typ D; RKS-AT: Typ B; RKS-AT: Typ C; RKS-AT: Typ D; Technical regulation 3.2.1; Technical regulation 3.2.2; Technical regulation 3.3.1; Technical requirements for connection of power-generating plants to the low-voltage grid (≤1 kV) Type A and B

Other standards

EN 50438Name not checked yet
As written on the certificate · Line 2 (A2LA 5200.02)

EN 61727; EN 62116; EN 61683; EN 50438; EN 50549-1; EN 50549-2; EN 50549-10; EN 50530; EN 50530/A1; AS/NZS 4777.1; AS/NZS 4777.2; VDE-AR-N 4105; VDE AR-N 4110; VDE AR-N 4120; VDE AR-N 4130; VDE AR-E 2510-2; NRS 097-2-1; NRS 097-2-3; NRS 097-2-1:2024 Edition 3; NRS 097-2-3:2023 Edition 2; G98/2; G98/1-4; G98_NI; G98; G99/2; G99/1-6, G; G99/1-7; G99/1-8; G99; G99_N1; G100/1, G100/1-1; G100/1-2; UTE-C15-400; UTE-C15-712-1; UTE-C15-712-2; XP C15-712-3; ERDF-NOI-RES_10E; ERDF-NOI-RES_13E; ENEDIS-NOI- RES_13E + ENEDIS-NOI-RES_18E; Enedis-PRO-RES_64E; RD 1699/RD 661; RD 413, RD 244; RD 647; Orden TED/749/2020; BOE-A-2020-8965; UNE 206006; UNE 206007-1; UNE 217001 IN; UNE 217001; UNE 217002; P.O. 12.2; P.O. 12.3; PVVC Revision 9; PVVC Revision 10; SI 4777.2; SI 4777.3; ABNT NBR 16149; ABNT NBR 16150; Ordinance INMETRO n°004; Ordinance INMETRO n°357; Ordinance INMETRO n°16/2021; PORTARIA n°140; DE 21 DE MARCO DE 2022; PORTARIA Nº 515; TOR Erzeuger Typ A; TOR Erzeuger Typ B; TOR Erzeuger Typ C; TOR Erzeuger Typ D; TOR Stromerzeugungsanlagen Typ A; TOR Stromerzeugungsanlagen Typ B; TOR Stromerzeugungsanlagen Typ C; TOR Stromerzeugungsanlagen Typ D; RKS-AT: Typ B; RKS-AT: Typ C; RKS-AT: Typ D; Technical regulation 3.2.1; Technical regulation 3.2.2; Technical regulation 3.3.1; Technical requirements for connection of power-generating plants to the low-voltage grid (≤1 kV) Type A and B

EN 50530Name not checked yet
As written on the certificate · Line 2 (A2LA 5200.02)

EN 61727; EN 62116; EN 61683; EN 50438; EN 50549-1; EN 50549-2; EN 50549-10; EN 50530; EN 50530/A1; AS/NZS 4777.1; AS/NZS 4777.2; VDE-AR-N 4105; VDE AR-N 4110; VDE AR-N 4120; VDE AR-N 4130; VDE AR-E 2510-2; NRS 097-2-1; NRS 097-2-3; NRS 097-2-1:2024 Edition 3; NRS 097-2-3:2023 Edition 2; G98/2; G98/1-4; G98_NI; G98; G99/2; G99/1-6, G; G99/1-7; G99/1-8; G99; G99_N1; G100/1, G100/1-1; G100/1-2; UTE-C15-400; UTE-C15-712-1; UTE-C15-712-2; XP C15-712-3; ERDF-NOI-RES_10E; ERDF-NOI-RES_13E; ENEDIS-NOI- RES_13E + ENEDIS-NOI-RES_18E; Enedis-PRO-RES_64E; RD 1699/RD 661; RD 413, RD 244; RD 647; Orden TED/749/2020; BOE-A-2020-8965; UNE 206006; UNE 206007-1; UNE 217001 IN; UNE 217001; UNE 217002; P.O. 12.2; P.O. 12.3; PVVC Revision 9; PVVC Revision 10; SI 4777.2; SI 4777.3; ABNT NBR 16149; ABNT NBR 16150; Ordinance INMETRO n°004; Ordinance INMETRO n°357; Ordinance INMETRO n°16/2021; PORTARIA n°140; DE 21 DE MARCO DE 2022; PORTARIA Nº 515; TOR Erzeuger Typ A; TOR Erzeuger Typ B; TOR Erzeuger Typ C; TOR Erzeuger Typ D; TOR Stromerzeugungsanlagen Typ A; TOR Stromerzeugungsanlagen Typ B; TOR Stromerzeugungsanlagen Typ C; TOR Stromerzeugungsanlagen Typ D; RKS-AT: Typ B; RKS-AT: Typ C; RKS-AT: Typ D; Technical regulation 3.2.1; Technical regulation 3.2.2; Technical regulation 3.3.1; Technical requirements for connection of power-generating plants to the low-voltage grid (≤1 kV) Type A and B

Scope as published by A2LA

4 lines
A2LA

ISO/IEC 17025

Active

5200.02

The scope document we hold says it is valid until 2027-09-30.

View scope

Accredited scope, certificate 5200.02

LineDisciplineMethodMatrixRange
1electricalIEC/TS 62910; IEEE Std 1547; IEEE Std 1547.1; IEEE Std 1547.2; UL 1699B; CEI 0-21; CEI 0-21: V1; CEI 0-16; CEI 0-16: V1; CEI0-21: V2; CEI0-16: V3; FGW TG3; FGW TG4; DIN V VDE V 0124-100; DIN V VDE V 0126-1-1; DIN V VDE V 0126-1-1/A1; Provincial Electricity Authority’s Regulation on the Power Network System Interconnection Code, PEA; Grid-connected Inverter Regulation Metropolitan Electricity Authority, MEA; MEA‘s Zero Export Controller List; OVE-Richtlinie R 25; IEC 61727; IEC 62116; IEC 61683; IEC 60730-1; IEC 62262; DIN IEC 62891; IEC/EN 61000-3-2; IEC/EN 61000-3-3; IEC/EN 61000-3-11; IEC/EN 61000-3-12; IEC 61000-4-21PV inverter-
2electricalEN 61727; EN 62116; EN 61683; EN 50438; EN 50549-1; EN 50549-2; EN 50549-10; EN 50530; EN 50530/A1; AS/NZS 4777.1; AS/NZS 4777.2; VDE-AR-N 4105; VDE AR-N 4110; VDE AR-N 4120; VDE AR-N 4130; VDE AR-E 2510-2; NRS 097-2-1; NRS 097-2-3; NRS 097-2-1:2024 Edition 3; NRS 097-2-3:2023 Edition 2; G98/2; G98/1-4; G98_NI; G98; G99/2; G99/1-6, G; G99/1-7; G99/1-8; G99; G99_N1; G100/1, G100/1-1; G100/1-2; UTE-C15-400; UTE-C15-712-1; UTE-C15-712-2; XP C15-712-3; ERDF-NOI-RES_10E; ERDF-NOI-RES_13E; ENEDIS-NOI- RES_13E + ENEDIS-NOI-RES_18E; Enedis-PRO-RES_64E; RD 1699/RD 661; RD 413, RD 244; RD 647; Orden TED/749/2020; BOE-A-2020-8965; UNE 206006; UNE 206007-1; UNE 217001 IN; UNE 217001; UNE 217002; P.O. 12.2; P.O. 12.3; PVVC Revision 9; PVVC Revision 10; SI 4777.2; SI 4777.3; ABNT NBR 16149; ABNT NBR 16150; Ordinance INMETRO n°004; Ordinance INMETRO n°357; Ordinance INMETRO n°16/2021; PORTARIA n°140; DE 21 DE MARCO DE 2022; PORTARIA Nº 515; TOR Erzeuger Typ A; TOR Erzeuger Typ B; TOR Erzeuger Typ C; TOR Erzeuger Typ D; TOR Stromerzeugungsanlagen Typ A; TOR Stromerzeugungsanlagen Typ B; TOR Stromerzeugungsanlagen Typ C; TOR Stromerzeugungsanlagen Typ D; RKS-AT: Typ B; RKS-AT: Typ C; RKS-AT: Typ D; Technical regulation 3.2.1; Technical regulation 3.2.2; Technical regulation 3.3.1; Technical requirements for connection of power-generating plants to the low-voltage grid (≤1 kV) Type A and BPhotovoltaics-
3electricalNC RfG, PTPiREE, PSE S.A.; IRR-DCC-MV; IRR-TIC; Central Electricity Authority (Technical standard for connectivity to the grid); PRAVIDLA PROVOZOVÁNÍ DISTRIBUČNÍCH SOUSTAV; PPDS; VJV2018; NA/EEA-NE7-CH 2020; EIFS 2018:2; NTS Version 2.1; NTS Versión 1.0; C10/11; (LV1, LV2, MV1); GCPP LV; GCPP MV HV; CQC3321; Gridcp (SSDG); Gridcp (MSDG); CEDROSOLAR:2017; MGC; PGC; ssPV; NVF 2021; COMMISSION REGULATION (EU) 2016/631; RENBLAD 342; DEWA; DRRG; Republic of the Philippines ENERGY REGULATORY COMMISSION, RESOLUTION NO.7, Series of 2013; NB/T 32004; IEC 63027; Decision RAE 1165/2020; Portaria no.73; Order no. 208; Ordin_3; 25_2016_TT_BCT; Conditions Governing the Connection and Operation of Mini Generation; Conditions Governing the Connection and Operation of Export Limiting Schemes at LV and MV; EirGrid Grid Code; Egyptian Transmission Grid Code; KNTGC; NERC-to 1 kV
4electrical
For the tests to which this accreditation applies, please refer to the laboratory’s Electrical Scope of Accreditation. Accredited Laboratory A2LA has accredited LYNS-TCI TECHNOLOGY GUANGDONG CO., LTD. Dongguan, People’s Republic of China for technical competence in the field of Electrical Testing This laboratory is accredited in accordance with the recognized International Standard ISO/IEC 17025:2017 General requirements for the competence of testing and calibration laboratories. This accreditation demonstrates technical competence for a defined scope and the operation of a laboratory quality management system (refer to joint ISO-ILAC-IAF Communiqué dated April 2017). Presented this 26th day of August 2025. _______________________ Vice President, Accreditation Services For the Accreditation Council Certificate Number 5200.02 Valid to September 30, 2027

Ranges are reproduced from the accredited scope document as published. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.

Labs with overlapping accredited scope in China

Accreditation data refreshed from the A2LA register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the A2LA entry linked above.