Registers refreshed 2026-11-08.See refresh dates
United States

A & T DESIGN GROUP

188-06 NORTHERN BLVD, 1FL, 11358, FLUSHING, NY, United States

A2LA 7316.01ISO/IEC 17020Register refreshed 2026-11-06
Scope lines
8
A2LA certificate
1
Site in our directory
1
A2LA accredited scope

What this lab is accredited for

We could not match the method references in this lab’s scope to published test standard numbers. The full scope as published is below.

Only this lab. Searches the method, matrix and range of each of the 8 scope lines.

A2LA certificate 7316.01 · 8 lines

LineMethodMatrixRange
1Rules of the City of New York, RCNY 101-06, Appendix A; New York City Building Codes; The International Building Codes (IBC) 2014; 2022 Building Code; NYC BC 1704.10 (2014); NYC BC 1705.20 (2022); In-House Procedure IHP-01; NYC BC 1704.13 (2014); In-House Procedure IHP-02; NYC BC 1705.16 (2022); In-House Procedure IHP-03; NYC BC 1704.26 (2014); NYC BC 1705.32 (2022); In-House Procedure IHP-04Wall Panels, Curtain Walls, and Veneers; Exterior Insulation and Finish Systems (EIFS); Combustible Exterior Wall Covering; Chimneys and Vents-
2NYC BC 1704.29 (2014); NYC BC 1705.35 (2022); NYC BC 1025.8 (2022); G105 (2014); In-House Procedure IHP-04; NYC BC 1704.30 (2014); NYC BC 1024.8 (2014); NYC BC 1705.35 (2022); NYC BC 1025.8 (2022); In-House Procedure IHP-05; NYC BC 1707.8 (2014); NYC BC 1705.12.5 (2022); In-House Procedure IHP-06; NYC BC 1704.3.1 (2014); NYC BC 1705.2.1 (2022); In-House Procedure IHP-008; NYC BC 1704.17 (2014); NYC BC 1704.19 (2014); NYC BC 1704.18 (2014); NYC BC 1705.23 (2022); NYC BC 1705.24 (2022); In-House Procedure IHP-009; NYC BC 1704.3.2 (2014); NYC BC 1705.2.2 (2022); In-House Procedure IHP-010; NYC BC 1704.3.3 (2014); NYC BC 1705.2.3 (2022); In-House Procedure IHP-011; NYC BC 1704.3.4 (2014); NYC BC 1705.2.6 (2022); In-House Procedure IHP-012; NYC BC 1704.28 (2014); NYC BC 1705.33 (2022); In-House Procedure IHP-013; NYC BC 1704.4 (2014); NYC BC 1705.3 (2022); In-House Procedure IHP-014Flood Zone Compliance; Luminous Exit Path Markings; Seismic Isolation Systems; Structural Steel – Welding; High-Pressure Steam Piping; Fuel Gas Piping; High Temperature Hot Water Piping; Structural Steel Details; Structural Steel – High Strength Bolting; Structural Cold-Formed Steel; Aluminum Constructions; Concrete-Cast-in-Place, Precast, and Prestressed-
3NYC BC 1704.5 (2014); NYC BC 1705.4 (2022); In-House Procedure IHP-015; NYC BC 1704.6.1 (2014); NYC BC 1704.6.2 (2014); NYC BC 1704.6.3 (2014); NYC BC 1705.5.1 (2022); NYC BC 1705.5.2 (2022); NYC BC 1705.5.3 (2022); In-House Procedure IHP-016; NYC BC 1704.7.1 (2014); NYC BC 1705.5 (2022); In-House Procedure IHP-017; NYC BC 1704.7.2 (2014); NYC BC 1704.7.3 (2014); NYC BC 1705.5 (2022); In-House Procedure IHP-018; NYC BC 1704.7.4 (2014); NYC BC 1705.6 (2022); In-House Procedure IHP-019; NYC BC 1704.8 (2014); NYC BC 1705.6 (2022); In-House Procedure IHP-020; NYC BC 1704.8.5 (2014); NYC BC 1705.9 (2022); In-House Procedure IHP-021; NYC BC 1704.9 (2014); NYC BC 1705.19 (2022); In-House Procedure IHP-022; NYC BC 1704.20.3 (2014); NYC BC 1814 (2014); NYC BC 1705.25.4; NYC BC 1817; In-House Procedure IHP-023; NYC BC 1704.20.1 (2014); NYC BC 1705.25.1 (2022); In-House Procedure IHP-024Masonry; Wood – High Load Diaphragms, Metal Plate Connected I-Joists, Prefabricated Joists; Subsurface Conditions – Subgrade Inspection; Soils & Site Prep; Subsurface Conditions – Fill Placement, In place Density; Subsurface/Soils Investigation (Boring/Test Pits); Deep Foundation/ Piles Elements; Helical Piles Foundation; Vertical Masonry Foundation Elements/Piers; Underpinning and Alternate Methods of Support of Buildings and Adjacent Property; Structural – Stability – Existing Buildings-
4NYC BC 1704.20.4 (2014); NYC BC 1704.20.5 (2014); NYC BC 1705.25.6 (2022); NYC BC 1705.25.5.1 (2022); In-House Procedure IHP-025; N YC BC 1705.25.2 (2022); In-House Procedure IHP-026; NYC BC 1704.20.2 (2014); NYC BC 1705.25.3 (2022); In-House Procedure IHP-027; NYC BC 1705.2.7 (2022); In-House Procedure IHP-028; NYC BC 1708.8 (2022); In-House Procedure IHP-029; NYC BC 1705.26 (2022); In-House Procedure IHP-020; NYC BC 1705.5.5 (2022); In-House Procedure IHP-031; NYC BC 1705.5.6 (2022); In-House Procedure IHP-032; NYC BC 1705.12.1 (2022); In-House Procedure IHP-033; NYC BC 1705.12.2 (2022); In-House Procedure IHP-034; NYC BC 1705.12.3 (2022); In-House Procedure IHP-035--
5NYC BC 1705.12.4 (2022); In-House Procedure IHP-036; NYC BC 1704.32 (2014), NYC BC 1705.37 (2022); In-House Procedure IHP-037; NYC BC 1704.21.1.2 (2014), NYC BC 1704.22 (2014), NYC BC 1705.27.1.2 (2022), NYC BC 1705.27.2 (2022), NYC BC 1705.28 (2022); In-House Procedure IHP-038; NYC BC 1705.38 (2022), In-House Procedure IHP-039; NYC BC 1704.25 (2014), NYC BC 1705.31 (2022), In-House Procedure IHP-040; NYC BC 1704.16 (2014), NYC BC 1705.21 (2022); In-House Procedure IHP-041; NYC BC 1705.39 (2022) In-House Procedure IHP-042; NYC BC 1704.17 (2014), NYC BC 1705.18 (2022) In-House Procedure IHP-043; NYC BC 1704.11, (2014), NYC BC 1704.12 (2014), NYC BC 1705.14 (2022), NYC BC 1705.15 (2022); In-House Procedure IHP-044Storage Racks; Post Installed Anchors; Private On-Site Storm Water Disposal Systems and Detention Facilities, and Individual On-Site Private Sewage Disposal Systems; Non-Potable Water Systems; Heating Systems; Mechanical Systems; Exhaust and Vent Systems in Plenums and Ducts; Fuel-Oil Storage and Fuel-Oil Piping Systems; Sprayed Fire-Resistant Materials and Mastic and Intumescent Fire-Resistant Coating-
6NYC BC 1704.15 (2014); NYC BC 1705.18 (2022); In-House Procedure IHP-045; NYC BC 1704.23 (2014); NYC BC 1704.24 (2014); NYC BC 1705.29 (2022); NYC BC 1705.30 (2022); In-House Procedure IHP-046; NYC BC 1704.27 (2014); NYC BC 1705.17 (2022); In-House Procedure IHP--047; NYC BC 1704.31 (2014); NYC BC 1705.36 (2022); In-House Procedure IHP-049; BC 1705.1.1 (2022); In-House Procedure IHP-049; BC 1704.14 (2014); BC 1705.1.1 (2022); In-House Procedure IHP-050; BC 1705.1.1 (2022); In-House Procedure IHP-051; BC 1705.1.1 (2022); In-House Procedure IHP-052; BC 1705.1.1 (2022); In-House Procedure IHP-053Smoke Control Systems; Sprinkler Systems and Standpipe System; Fire-resistant Penetrations and Joints; Emergency and Standby Power Systems (Generators); Adhesive-Based Solar Pedestal Bonding Systems; Alternative Materials - OTCR Buildings Bulletin; CPVC for water recycling distribution piping systems; Polypropylene (“PP”) Piping Systems; Post-installed Anchors in Masonry-
7BC 1705.1.1 (2022); BB # 2012-004; In-House Procedure IHP-054--
8ISO/IEC 17020:2012--

Ranges are reproduced from the accredited scope document as published, and only where we found that range printed in the document for the line. Otherwise the cell reads “See scope document”. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.

Location

188-06 NORTHERN BLVD, 1FL, FLUSHING, NY, 11358, US

40.76543, -73.81743

Open in Maps

Accreditation data refreshed from the A2LA register on .