Registers refreshed 2026-11-08.See refresh dates
Germany

PEHLA GmbH PEHLA-Prüffeld Frankfurt/Main

Carl-Benz-Straße 22, 60386, Frankfurt am Main, Germany

DAKKS D-PL-12072-01-00ISO/IEC 17025Register refreshed 2026-11-06

We check which accredited labs can do it, starting with this one, and send you a short comparison of time and rough cost within three working days.

  • Free. No lab gets your details until you choose.
Accredited standards
25
DAKKS certificate
1
Site in our directory
1
DAKKS accredited scope

What this lab is accredited for

Our reading of the DAKKS scope: each standard once, with its official name where we have checked it.

Only this lab. Searches the 25 standard numbers and the 8 official names we hold. When no standard matches, it searches the method text of every scope line.

IEC 62271 series10
IEC 62271-1
IEC 62271-100
IEC 62271-102
IEC 62271-103
IEC 62271-105
IEC 62271-106
IEC 62271-200
IEC 62271-201
IEC 62271-202
IEC 62271-213
IEC 60068 series8
IEC 60068-2-1Environmental testing - Part 2-1: Tests - Test A: Cold
IEC 60068-2-2Environmental testing - Part 2-2: Tests - Test B: Dry heat
IEC 60068-2-11Environmental testing - Part 2-11: Tests - Test Ka: Salt mist
IEC 60068-2-14Environmental testing - Part 2-14: Tests - Test N: Change of temperature
IEC 60068-2-17
IEC 60068-2-30Environmental testing - Part 2-30: Tests - Test Db: Damp heat, cyclic (12 h + 12 h cycle)
IEC 60068-2-52Environmental testing - Part 2-52: Tests - Test Kb: Salt mist, cyclic (sodium chloride solution)
IEC 60068-2-78Environmental testing - Part 2-78: Tests - Test Cab: Damp heat, steady state
IEC7
IEC 60060-1
IEC 60282-1
IEC 60529Degrees of protection provided by enclosures (IP Code)
IEC 61180
IEC 62262
IEC 62505-1
IEC 62505-2

Read from the scope as published by DAKKS. Register refreshed 2026-11-06.

Scope as published by DAKKS

6 lines
DAKKS

ISO/IEC 17025

Active

D-PL-12072-01-00

View scope

Accredited scope, certificate D-PL-12072-01-00

LineMethodMatrixRange
1DIN EN ISO/IEC 17025:2018High-voltage switchgear and equipment; Equipment for electrical power engineering; Environmental simulation-
2CSA C22.2 No 31:2018-01; CSA-C22.2 No. 58:1989-05; CSA C22.2 No. 193:1986-05; IEC 60060-1:2010-09; IEC 60068-2-1:2007-03; IEC 60068-2-11: 2021-03; IEC 60068-2-14:2009-01; IEC 60068-2-17:1994-07; IEC 60068-2-2:2007-07; IEC 60068-2-30:2005-08; IEC 60068-2-52: 2017-11; IEC 60068-2-78:2012-10; IEC 60282-1: 2020-04; IEC 60529:2013-08--
3IEC 61180:2016-06; IEC 62262: 2002-02 + AMD1: 2021-09; IEC 62271-1: 2017-07 + AMD1: 2021-10; IEC 62271-100: 2021-07; IEC 62271-102: 2018-05 + AMD1: 2022-04--
4IEC 62271-103: 2021-05; IEC 62271-105: 2021-06; IEC 62271-106: 2021-04; IEC 62271-200: 2021-05; IEC 62271-201:2014-03; IEC 62271-202:2014-03; IEC CDV 62271-207: 2022-03--
5IEC/TS 62271-210:2013-02; IEC 62271-213:2021-06; IEC/TS 62271-304:2019-03; IEC 62505-1:2016-02; IEC 62505-2:2016-02; IEEE C37.09:2018; IEEE C37.100.1:2018; IEEE C37.20.2:2015--
6IEEE C37.20.3:2013; IEEE C37.20.4:2013; IEEE C37.20.7: 2017; IEEE C37.20.9: 2019; NEMA C37.55: 2020; NEMA C37.57:2003; NEMA C37.58: 2020; NEMA/ANSI C37.54:2002--

Ranges are reproduced from the accredited scope document as published, and only where we found that range printed in the document for the line. Otherwise the cell reads “See scope document”. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.

Location

Carl-Benz-Straße 22, Frankfurt am Main, 60386, DE

50.11788, 8.75759

Open in Maps

Accreditation data refreshed from the DAKKS register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the DAKKS entry linked above.