FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
Germany

Audix Technology (Wujiang)

No. 1289, Unknown, Germany

DAKKS|D-PL-18968-01-00ISO/IEC 17025Register refreshed 2026-09-25
Certificates
1
Scope items
12
Standards
52
Locations
2
One of 2 locations. View the organization

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Contact this laboratory

No contact information available

Open DAKKS register entry
Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at Audix Technology (Wujiang)?

Claim this profile to keep it accurate.

Register record

DAKKSRefreshed
D-PL-18968-01-00Active

Accredited standards

52

Our reading of the DAKKS scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

IEC 61000 series

IEC 61000-3-2Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current ≤ 16 A per phase)
As written on the certificate · Line 2 (DAKKS D-PL-18968-01-00)

IEC 61000-3-2:2018; IEC 61000-3-2:2018+A1:2020; EN 61000-3-2:2014; EN IEC 61000-3-2:2019; EN IEC 61000-3-2:2019/A1:2021; BS EN IEC 61000-3-2:2019+A1:2021; AS/NZS 61000.3.2:2013; IEC61000-3-3:2013; IEC61000-3-3:2013+AMD1:2017; IEC 61000-3-3:2013+AMD1:2017+AMD2:2021; EN61000-3-3:2013; EN 61000-3-3:2013/A1:2019; EN 61000-3-3:2013/A2:2021; EN 61000-3-3:2013/A2:2021/AC:2022; BS EN 61000-3-3:2013+A2:2021; AS/NZS 61000.3.3:2012; IEC 61000-3-11:2000; IEC 61000-3-11:2017; EN 61000-3-11:2000; EN IEC 61000-3-11:2019; BS EN 61000-3-11:2001; BS EN IEC 61000-3-11:2019

IEC 61000-3-3Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤ 16 A per phase and not subject to conditional connection
As written on the certificate · Line 2 (DAKKS D-PL-18968-01-00)

IEC 61000-3-2:2018; IEC 61000-3-2:2018+A1:2020; EN 61000-3-2:2014; EN IEC 61000-3-2:2019; EN IEC 61000-3-2:2019/A1:2021; BS EN IEC 61000-3-2:2019+A1:2021; AS/NZS 61000.3.2:2013; IEC61000-3-3:2013; IEC61000-3-3:2013+AMD1:2017; IEC 61000-3-3:2013+AMD1:2017+AMD2:2021; EN61000-3-3:2013; EN 61000-3-3:2013/A1:2019; EN 61000-3-3:2013/A2:2021; EN 61000-3-3:2013/A2:2021/AC:2022; BS EN 61000-3-3:2013+A2:2021; AS/NZS 61000.3.3:2012; IEC 61000-3-11:2000; IEC 61000-3-11:2017; EN 61000-3-11:2000; EN IEC 61000-3-11:2019; BS EN 61000-3-11:2001; BS EN IEC 61000-3-11:2019

IEC 61000-3-11Electromagnetic compatibility (EMC) - Part 3-11: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems - Equipment with rated current ≤ 75 A and subject to conditional connection
As written on the certificate · Line 2 (DAKKS D-PL-18968-01-00)

IEC 61000-3-2:2018; IEC 61000-3-2:2018+A1:2020; EN 61000-3-2:2014; EN IEC 61000-3-2:2019; EN IEC 61000-3-2:2019/A1:2021; BS EN IEC 61000-3-2:2019+A1:2021; AS/NZS 61000.3.2:2013; IEC61000-3-3:2013; IEC61000-3-3:2013+AMD1:2017; IEC 61000-3-3:2013+AMD1:2017+AMD2:2021; EN61000-3-3:2013; EN 61000-3-3:2013/A1:2019; EN 61000-3-3:2013/A2:2021; EN 61000-3-3:2013/A2:2021/AC:2022; BS EN 61000-3-3:2013+A2:2021; AS/NZS 61000.3.3:2012; IEC 61000-3-11:2000; IEC 61000-3-11:2017; EN 61000-3-11:2000; EN IEC 61000-3-11:2019; BS EN 61000-3-11:2001; BS EN IEC 61000-3-11:2019

IEC 61000-3-12Electromagnetic compatibility (EMC) - Part 3-12: Limits - Limits for harmonic currents produced by equipment connected to public low-voltage systems with input current >16 A and ≤ 75 A per phaseCertificate says EN 61000-3-12. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (DAKKS D-PL-18968-01-00)

IEC 61000-3-12:2011; IEC 61000-3-12:2011+IS1:2012; IEC 61000-3-12:2011+AMD1:2021; EN 61000-3-12:2011; EN 61000-3-12:2011+AC:2013; BS EN 61000-3-12:2011; IEC61000-4-2:2008; EN61000-4-2:2009; BS EN 61000-4-2:2009; IEC 61000-4-3:2020; EN 61000-4-3:2006/A1:2008; EN 61000-4-3:2006/A2:2010; EN IEC 61000-4-3:2020; BS EN 61000-4-3:2006+A2:2010; BS EN IEC 61000-4-3:2020; IEC61000-4-4:2012; EN61000-4-4:2012; BS EN 61000-4-4:2012; IEC61000-4-5:2014+A1:2017; IEC 61000-4-5:2014; IEC 61000-4-5:2017; EN61000-4-5:2014+A1:2017; BS EN 61000-4-5:2014+A1:2017; IEC61000-4-6:2013; IEC61000-4-6:2013+COR1:2015; IEC 61000-4-6:2023; EN61000-4-6:2014; EN61000-4-6:2014+AC:2015; EN IEC 61000-4-6:2023; BS EN IEC 61000-4-6:2023; BS EN 61000-4-6:2014

IEC 61000-4-2Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
As written on the certificate · Line 3 (DAKKS D-PL-18968-01-00)

IEC 61000-3-12:2011; IEC 61000-3-12:2011+IS1:2012; IEC 61000-3-12:2011+AMD1:2021; EN 61000-3-12:2011; EN 61000-3-12:2011+AC:2013; BS EN 61000-3-12:2011; IEC61000-4-2:2008; EN61000-4-2:2009; BS EN 61000-4-2:2009; IEC 61000-4-3:2020; EN 61000-4-3:2006/A1:2008; EN 61000-4-3:2006/A2:2010; EN IEC 61000-4-3:2020; BS EN 61000-4-3:2006+A2:2010; BS EN IEC 61000-4-3:2020; IEC61000-4-4:2012; EN61000-4-4:2012; BS EN 61000-4-4:2012; IEC61000-4-5:2014+A1:2017; IEC 61000-4-5:2014; IEC 61000-4-5:2017; EN61000-4-5:2014+A1:2017; BS EN 61000-4-5:2014+A1:2017; IEC61000-4-6:2013; IEC61000-4-6:2013+COR1:2015; IEC 61000-4-6:2023; EN61000-4-6:2014; EN61000-4-6:2014+AC:2015; EN IEC 61000-4-6:2023; BS EN IEC 61000-4-6:2023; BS EN 61000-4-6:2014

IEC 61000-4-3Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity testCertificate says EN 61000-4-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (DAKKS D-PL-18968-01-00)

IEC 61000-3-12:2011; IEC 61000-3-12:2011+IS1:2012; IEC 61000-3-12:2011+AMD1:2021; EN 61000-3-12:2011; EN 61000-3-12:2011+AC:2013; BS EN 61000-3-12:2011; IEC61000-4-2:2008; EN61000-4-2:2009; BS EN 61000-4-2:2009; IEC 61000-4-3:2020; EN 61000-4-3:2006/A1:2008; EN 61000-4-3:2006/A2:2010; EN IEC 61000-4-3:2020; BS EN 61000-4-3:2006+A2:2010; BS EN IEC 61000-4-3:2020; IEC61000-4-4:2012; EN61000-4-4:2012; BS EN 61000-4-4:2012; IEC61000-4-5:2014+A1:2017; IEC 61000-4-5:2014; IEC 61000-4-5:2017; EN61000-4-5:2014+A1:2017; BS EN 61000-4-5:2014+A1:2017; IEC61000-4-6:2013; IEC61000-4-6:2013+COR1:2015; IEC 61000-4-6:2023; EN61000-4-6:2014; EN61000-4-6:2014+AC:2015; EN IEC 61000-4-6:2023; BS EN IEC 61000-4-6:2023; BS EN 61000-4-6:2014

IEC 61000-4-4Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
As written on the certificate · Line 3 (DAKKS D-PL-18968-01-00)

IEC 61000-3-12:2011; IEC 61000-3-12:2011+IS1:2012; IEC 61000-3-12:2011+AMD1:2021; EN 61000-3-12:2011; EN 61000-3-12:2011+AC:2013; BS EN 61000-3-12:2011; IEC61000-4-2:2008; EN61000-4-2:2009; BS EN 61000-4-2:2009; IEC 61000-4-3:2020; EN 61000-4-3:2006/A1:2008; EN 61000-4-3:2006/A2:2010; EN IEC 61000-4-3:2020; BS EN 61000-4-3:2006+A2:2010; BS EN IEC 61000-4-3:2020; IEC61000-4-4:2012; EN61000-4-4:2012; BS EN 61000-4-4:2012; IEC61000-4-5:2014+A1:2017; IEC 61000-4-5:2014; IEC 61000-4-5:2017; EN61000-4-5:2014+A1:2017; BS EN 61000-4-5:2014+A1:2017; IEC61000-4-6:2013; IEC61000-4-6:2013+COR1:2015; IEC 61000-4-6:2023; EN61000-4-6:2014; EN61000-4-6:2014+AC:2015; EN IEC 61000-4-6:2023; BS EN IEC 61000-4-6:2023; BS EN 61000-4-6:2014

IEC 61000-4-5Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test
As written on the certificate · Line 3 (DAKKS D-PL-18968-01-00)

IEC 61000-3-12:2011; IEC 61000-3-12:2011+IS1:2012; IEC 61000-3-12:2011+AMD1:2021; EN 61000-3-12:2011; EN 61000-3-12:2011+AC:2013; BS EN 61000-3-12:2011; IEC61000-4-2:2008; EN61000-4-2:2009; BS EN 61000-4-2:2009; IEC 61000-4-3:2020; EN 61000-4-3:2006/A1:2008; EN 61000-4-3:2006/A2:2010; EN IEC 61000-4-3:2020; BS EN 61000-4-3:2006+A2:2010; BS EN IEC 61000-4-3:2020; IEC61000-4-4:2012; EN61000-4-4:2012; BS EN 61000-4-4:2012; IEC61000-4-5:2014+A1:2017; IEC 61000-4-5:2014; IEC 61000-4-5:2017; EN61000-4-5:2014+A1:2017; BS EN 61000-4-5:2014+A1:2017; IEC61000-4-6:2013; IEC61000-4-6:2013+COR1:2015; IEC 61000-4-6:2023; EN61000-4-6:2014; EN61000-4-6:2014+AC:2015; EN IEC 61000-4-6:2023; BS EN IEC 61000-4-6:2023; BS EN 61000-4-6:2014

IEC 61000-4-6Electromagnetic compatibility (EMC) - Part 4-6: Testing and measurement techniques - Immunity to conducted disturbances, induced by radio-frequency fields
As written on the certificate · Line 3 (DAKKS D-PL-18968-01-00)

IEC 61000-3-12:2011; IEC 61000-3-12:2011+IS1:2012; IEC 61000-3-12:2011+AMD1:2021; EN 61000-3-12:2011; EN 61000-3-12:2011+AC:2013; BS EN 61000-3-12:2011; IEC61000-4-2:2008; EN61000-4-2:2009; BS EN 61000-4-2:2009; IEC 61000-4-3:2020; EN 61000-4-3:2006/A1:2008; EN 61000-4-3:2006/A2:2010; EN IEC 61000-4-3:2020; BS EN 61000-4-3:2006+A2:2010; BS EN IEC 61000-4-3:2020; IEC61000-4-4:2012; EN61000-4-4:2012; BS EN 61000-4-4:2012; IEC61000-4-5:2014+A1:2017; IEC 61000-4-5:2014; IEC 61000-4-5:2017; EN61000-4-5:2014+A1:2017; BS EN 61000-4-5:2014+A1:2017; IEC61000-4-6:2013; IEC61000-4-6:2013+COR1:2015; IEC 61000-4-6:2023; EN61000-4-6:2014; EN61000-4-6:2014+AC:2015; EN IEC 61000-4-6:2023; BS EN IEC 61000-4-6:2023; BS EN 61000-4-6:2014

IEC 61000-4-8Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
As written on the certificate · Line 4 (DAKKS D-PL-18968-01-00)

IEC61000-4-8:2009; EN61000-4-8:2010; BS EN 61000-4-8:2010; IEC61000-4-11:2004+A1:2017; IEC 61000-4-11:2020; IEC 61000-4-11:2020/COR1:2020; EN61000-4-11:2004+A1:2017; EN IEC 61000-4-11:2020; EN IEC 61000-4-11:2020/AC:2020; BS EN 61000-4-11:2004+A1:2017; BS EN IEC 61000-4-11:2020; IEC61000-4-12:2017; EN61000-4-12:2006; EN61000-4-12:2017; BS EN 61000-4-12:2017; IEC61000-6-1:2016; EN IEC 61000-6-1:2019; EN61000-6-1:2007; BS EN IEC 61000-6-1:2019; AS/NZS 61000.6.1:2006; EN61000-4-21; IEC61000-6-2:2016; EN61000-6-2:2005; EN 61000-6-2:2005/AC:2005; EN IEC 61000-6-2:2019; BS EN IEC 61000-6-2:2019; AS/NZS 61000.6.2:2022; EN61000-4-21

IEC 61000-4-11Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests for equipment with input current up to 16 A per phase
As written on the certificate · Line 4 (DAKKS D-PL-18968-01-00)

IEC61000-4-8:2009; EN61000-4-8:2010; BS EN 61000-4-8:2010; IEC61000-4-11:2004+A1:2017; IEC 61000-4-11:2020; IEC 61000-4-11:2020/COR1:2020; EN61000-4-11:2004+A1:2017; EN IEC 61000-4-11:2020; EN IEC 61000-4-11:2020/AC:2020; BS EN 61000-4-11:2004+A1:2017; BS EN IEC 61000-4-11:2020; IEC61000-4-12:2017; EN61000-4-12:2006; EN61000-4-12:2017; BS EN 61000-4-12:2017; IEC61000-6-1:2016; EN IEC 61000-6-1:2019; EN61000-6-1:2007; BS EN IEC 61000-6-1:2019; AS/NZS 61000.6.1:2006; EN61000-4-21; IEC61000-6-2:2016; EN61000-6-2:2005; EN 61000-6-2:2005/AC:2005; EN IEC 61000-6-2:2019; BS EN IEC 61000-6-2:2019; AS/NZS 61000.6.2:2022; EN61000-4-21

IEC 61000-4-12Electromagnetic Compatibility (EMC) - Part 4-12: Testing and measurement techniques - Ring wave immunity test
As written on the certificate · Line 4 (DAKKS D-PL-18968-01-00)

IEC61000-4-8:2009; EN61000-4-8:2010; BS EN 61000-4-8:2010; IEC61000-4-11:2004+A1:2017; IEC 61000-4-11:2020; IEC 61000-4-11:2020/COR1:2020; EN61000-4-11:2004+A1:2017; EN IEC 61000-4-11:2020; EN IEC 61000-4-11:2020/AC:2020; BS EN 61000-4-11:2004+A1:2017; BS EN IEC 61000-4-11:2020; IEC61000-4-12:2017; EN61000-4-12:2006; EN61000-4-12:2017; BS EN 61000-4-12:2017; IEC61000-6-1:2016; EN IEC 61000-6-1:2019; EN61000-6-1:2007; BS EN IEC 61000-6-1:2019; AS/NZS 61000.6.1:2006; EN61000-4-21; IEC61000-6-2:2016; EN61000-6-2:2005; EN 61000-6-2:2005/AC:2005; EN IEC 61000-6-2:2019; BS EN IEC 61000-6-2:2019; AS/NZS 61000.6.2:2022; EN61000-4-21

IEC 61000-6-1Electromagnetic compatibility (EMC) - Part 6-1: Generic standards - Immunity standard for residential, commercial and light-industrial environments
As written on the certificate · Line 4 (DAKKS D-PL-18968-01-00)

IEC61000-4-8:2009; EN61000-4-8:2010; BS EN 61000-4-8:2010; IEC61000-4-11:2004+A1:2017; IEC 61000-4-11:2020; IEC 61000-4-11:2020/COR1:2020; EN61000-4-11:2004+A1:2017; EN IEC 61000-4-11:2020; EN IEC 61000-4-11:2020/AC:2020; BS EN 61000-4-11:2004+A1:2017; BS EN IEC 61000-4-11:2020; IEC61000-4-12:2017; EN61000-4-12:2006; EN61000-4-12:2017; BS EN 61000-4-12:2017; IEC61000-6-1:2016; EN IEC 61000-6-1:2019; EN61000-6-1:2007; BS EN IEC 61000-6-1:2019; AS/NZS 61000.6.1:2006; EN61000-4-21; IEC61000-6-2:2016; EN61000-6-2:2005; EN 61000-6-2:2005/AC:2005; EN IEC 61000-6-2:2019; BS EN IEC 61000-6-2:2019; AS/NZS 61000.6.2:2022; EN61000-4-21

IEC 61000-6-2Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity standard for industrial environments
As written on the certificate · Line 4 (DAKKS D-PL-18968-01-00)

IEC61000-4-8:2009; EN61000-4-8:2010; BS EN 61000-4-8:2010; IEC61000-4-11:2004+A1:2017; IEC 61000-4-11:2020; IEC 61000-4-11:2020/COR1:2020; EN61000-4-11:2004+A1:2017; EN IEC 61000-4-11:2020; EN IEC 61000-4-11:2020/AC:2020; BS EN 61000-4-11:2004+A1:2017; BS EN IEC 61000-4-11:2020; IEC61000-4-12:2017; EN61000-4-12:2006; EN61000-4-12:2017; BS EN 61000-4-12:2017; IEC61000-6-1:2016; EN IEC 61000-6-1:2019; EN61000-6-1:2007; BS EN IEC 61000-6-1:2019; AS/NZS 61000.6.1:2006; EN61000-4-21; IEC61000-6-2:2016; EN61000-6-2:2005; EN 61000-6-2:2005/AC:2005; EN IEC 61000-6-2:2019; BS EN IEC 61000-6-2:2019; AS/NZS 61000.6.2:2022; EN61000-4-21

IEC 61000-6-3Electromagnetic compatibility (EMC) - Part 6-3: Generic standards - Emission standard for equipment in residential environmentsCertificate says EN 61000-6-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 5 (DAKKS D-PL-18968-01-00)

IEC 61000-6-3:2020; EN 61000-6-3:2007; EN 61000-6-3:2007/A1:2011/AC:2012; EN 61000-6-3:2007/A1:2011; EN IEC 61000-6-3:2021; BS EN 61000-6-3:2007+A1:2011; BS EN IEC 61000-6-3:2021; AS/NZS 61000.6.3:2021; IEC 61000-6-4:2018; EN 61000-6-4:2007; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; BS EN IEC 61000-6-4:2019; AS 61000.6.4:2020; IEC 61547:2020; EN61547:2009; BS EN 61547:2009; IEC62040-2:2016; EN 62040-2:2006/AC:2006; EN IEC 62040-2:2018; BS EN IEC 62040-2:2018

IEC 61000-6-4Electromagnetic compatibility (EMC) - Part 6-4: Generic standards - Emission standard for industrial environments
As written on the certificate · Line 5 (DAKKS D-PL-18968-01-00)

IEC 61000-6-3:2020; EN 61000-6-3:2007; EN 61000-6-3:2007/A1:2011/AC:2012; EN 61000-6-3:2007/A1:2011; EN IEC 61000-6-3:2021; BS EN 61000-6-3:2007+A1:2011; BS EN IEC 61000-6-3:2021; AS/NZS 61000.6.3:2021; IEC 61000-6-4:2018; EN 61000-6-4:2007; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; BS EN IEC 61000-6-4:2019; AS 61000.6.4:2020; IEC 61547:2020; EN61547:2009; BS EN 61547:2009; IEC62040-2:2016; EN 62040-2:2006/AC:2006; EN IEC 62040-2:2018; BS EN IEC 62040-2:2018

ETSI

ETSI EN 300 220-1Name not checked yet
As written on the certificate · Line 9 (DAKKS D-PL-18968-01-00)

ETSI EN 300 220-1 V3.1.1; ETSI EN 300 220-2 V3.2.1; ETSI EN 300 220-3-1 V2.2.1; ETSI EN 300 220-3-2:V1.1.1; ETSI EN 300 330 V2.1.1; ETSI EN 300 328 V2.2.2; ETSI EN 300 440 V2.2.1; ETSI EN 300 440 V2.1.1

ETSI EN 300 220-2Name not checked yet
As written on the certificate · Line 9 (DAKKS D-PL-18968-01-00)

ETSI EN 300 220-1 V3.1.1; ETSI EN 300 220-2 V3.2.1; ETSI EN 300 220-3-1 V2.2.1; ETSI EN 300 220-3-2:V1.1.1; ETSI EN 300 330 V2.1.1; ETSI EN 300 328 V2.2.2; ETSI EN 300 440 V2.2.1; ETSI EN 300 440 V2.1.1

ETSI EN 300 220-3-1Name not checked yet
As written on the certificate · Line 9 (DAKKS D-PL-18968-01-00)

ETSI EN 300 220-1 V3.1.1; ETSI EN 300 220-2 V3.2.1; ETSI EN 300 220-3-1 V2.2.1; ETSI EN 300 220-3-2:V1.1.1; ETSI EN 300 330 V2.1.1; ETSI EN 300 328 V2.2.2; ETSI EN 300 440 V2.2.1; ETSI EN 300 440 V2.1.1

ETSI EN 300 220-3-2Name not checked yet
As written on the certificate · Line 9 (DAKKS D-PL-18968-01-00)

ETSI EN 300 220-1 V3.1.1; ETSI EN 300 220-2 V3.2.1; ETSI EN 300 220-3-1 V2.2.1; ETSI EN 300 220-3-2:V1.1.1; ETSI EN 300 330 V2.1.1; ETSI EN 300 328 V2.2.2; ETSI EN 300 440 V2.2.1; ETSI EN 300 440 V2.1.1

ETSI EN 300 328Wideband transmission systems; Data transmission equipment operating in the 2,4 GHz band; Harmonised Standard for access to radio spectrum
As written on the certificate · Line 9 (DAKKS D-PL-18968-01-00)

ETSI EN 300 220-1 V3.1.1; ETSI EN 300 220-2 V3.2.1; ETSI EN 300 220-3-1 V2.2.1; ETSI EN 300 220-3-2:V1.1.1; ETSI EN 300 330 V2.1.1; ETSI EN 300 328 V2.2.2; ETSI EN 300 440 V2.2.1; ETSI EN 300 440 V2.1.1

ETSI EN 300 330Short Range Devices (SRD); Radio equipment in the frequency range 9 kHz to 25 MHz and inductive loop systems in the frequency range 9 kHz to 30 MHz; Harmonised Standard covering the essential requirements of article 3.2 of Directive 2014/53/EU
As written on the certificate · Line 9 (DAKKS D-PL-18968-01-00)

ETSI EN 300 220-1 V3.1.1; ETSI EN 300 220-2 V3.2.1; ETSI EN 300 220-3-1 V2.2.1; ETSI EN 300 220-3-2:V1.1.1; ETSI EN 300 330 V2.1.1; ETSI EN 300 328 V2.2.2; ETSI EN 300 440 V2.2.1; ETSI EN 300 440 V2.1.1

ETSI EN 300 386Name not checked yet
As written on the certificate · Line 8 (DAKKS D-PL-18968-01-00)

EN 50130-4:2011+A1:2014; BS EN 50130-4:2011+A1:2014; EN IEC 61326-1:2021; BS EN IEC 61326-1:2021; EN 55035:2017; EN 55035:2017/A11:2020; BS EN 55035:2017+A11:2020; CISPR 35:2016; ETSI EN 300 386 V1.6.1; ETSI EN 300 386 V2.1.1; ETSI EN 300 386 V2.2.1; IEC 61851-21-2:2018; EN IEC 61851-21-2:2021; BS EN IEC 61851-21-2:2021; IEC 62920:2017; IEC 62920:2017+AMD1:2021; EN 62920:2017; EN 62920:2017/A11:2020; EN 62920:2017/A1:2021; BS EN IEC 62920:2017+A1:2021; BS EN 62920:2017+A11:2020

ETSI EN 300 440Name not checked yet
As written on the certificate · Line 9 (DAKKS D-PL-18968-01-00)

ETSI EN 300 220-1 V3.1.1; ETSI EN 300 220-2 V3.2.1; ETSI EN 300 220-3-1 V2.2.1; ETSI EN 300 220-3-2:V1.1.1; ETSI EN 300 330 V2.1.1; ETSI EN 300 328 V2.2.2; ETSI EN 300 440 V2.2.1; ETSI EN 300 440 V2.1.1

ETSI EN 301 489-1Name not checked yet
As written on the certificate · Line 10 (DAKKS D-PL-18968-01-00)

ETSI EN 301 489-1 V2.2.3; ETSI EN 301 489-1 V2.2.2; ETSI EN 301 489-3 V2.1.1; ETSI EN 301 489-3 V2.3.2; ETSI EN 301 489-7 V1.3.1; ETSI EN 301 489-17 V3.2.4; FCC Part 15 Subpart B/C/E : 2022; ANSI C63.4:2014; ANSI C63.10:2020; EMC FCC Part 18:2022; EMC ICES-003 Issue 7:2020

ETSI EN 301 489-3Name not checked yet
As written on the certificate · Line 10 (DAKKS D-PL-18968-01-00)

ETSI EN 301 489-1 V2.2.3; ETSI EN 301 489-1 V2.2.2; ETSI EN 301 489-3 V2.1.1; ETSI EN 301 489-3 V2.3.2; ETSI EN 301 489-7 V1.3.1; ETSI EN 301 489-17 V3.2.4; FCC Part 15 Subpart B/C/E : 2022; ANSI C63.4:2014; ANSI C63.10:2020; EMC FCC Part 18:2022; EMC ICES-003 Issue 7:2020

ETSI EN 301 489-7Name not checked yet
As written on the certificate · Line 10 (DAKKS D-PL-18968-01-00)

ETSI EN 301 489-1 V2.2.3; ETSI EN 301 489-1 V2.2.2; ETSI EN 301 489-3 V2.1.1; ETSI EN 301 489-3 V2.3.2; ETSI EN 301 489-7 V1.3.1; ETSI EN 301 489-17 V3.2.4; FCC Part 15 Subpart B/C/E : 2022; ANSI C63.4:2014; ANSI C63.10:2020; EMC FCC Part 18:2022; EMC ICES-003 Issue 7:2020

ETSI EN 301 489-17Name not checked yet
As written on the certificate · Line 10 (DAKKS D-PL-18968-01-00)

ETSI EN 301 489-1 V2.2.3; ETSI EN 301 489-1 V2.2.2; ETSI EN 301 489-3 V2.1.1; ETSI EN 301 489-3 V2.3.2; ETSI EN 301 489-7 V1.3.1; ETSI EN 301 489-17 V3.2.4; FCC Part 15 Subpart B/C/E : 2022; ANSI C63.4:2014; ANSI C63.10:2020; EMC FCC Part 18:2022; EMC ICES-003 Issue 7:2020

ETSI EN 301 893Name not checked yet
As written on the certificate · Line 11 (DAKKS D-PL-18968-01-00)

ETSI EN 301 893 V2.1.1; ETSI EN 303 687 V1.1.1; RSS-248 Issue 2: (December 2022); RSS-247 Issue 3: (August 2023); AS/NZS 4268:2017; AS/NZS 4268:2017 Amd1:2021; EN IEC 62311:2020; BS EN IEC 62311:2020; EN 62479:2010; BS EN 62479:2010; EN 50665:2017; BS EN 50665:2017; EN 50663:2017; BS EN 50663:2017; EN IEC 60947-5-2:2020; EN IEC 60947-5-2:2020/A11:2022; BS EN IEC 60947-5-2:2020; BS EN IEC 60947-5-2:2020/A11:2022

ETSI EN 303 687Name not checked yet
As written on the certificate · Line 11 (DAKKS D-PL-18968-01-00)

ETSI EN 301 893 V2.1.1; ETSI EN 303 687 V1.1.1; RSS-248 Issue 2: (December 2022); RSS-247 Issue 3: (August 2023); AS/NZS 4268:2017; AS/NZS 4268:2017 Amd1:2021; EN IEC 62311:2020; BS EN IEC 62311:2020; EN 62479:2010; BS EN 62479:2010; EN 50665:2017; BS EN 50665:2017; EN 50663:2017; BS EN 50663:2017; EN IEC 60947-5-2:2020; EN IEC 60947-5-2:2020/A11:2022; BS EN IEC 60947-5-2:2020; BS EN IEC 60947-5-2:2020/A11:2022

IEC

IEC 60947-1Name not checked yet
As written on the certificate · Line 12 (DAKKS D-PL-18968-01-00)

EN IEC 60947-1:2021; EN IEC 60947-1:2021/AC:2023-01; EN 60947-1:2007; EN 60947-1:2007/A1:2011; EN 60947-1:2007/A2:2014; BS EN 60947-1:2007+A2:2014; BS EN IEC 60947-1:2021

IEC 60947-5-2Name not checked yet
As written on the certificate · Line 11 (DAKKS D-PL-18968-01-00)

ETSI EN 301 893 V2.1.1; ETSI EN 303 687 V1.1.1; RSS-248 Issue 2: (December 2022); RSS-247 Issue 3: (August 2023); AS/NZS 4268:2017; AS/NZS 4268:2017 Amd1:2021; EN IEC 62311:2020; BS EN IEC 62311:2020; EN 62479:2010; BS EN 62479:2010; EN 50665:2017; BS EN 50665:2017; EN 50663:2017; BS EN 50663:2017; EN IEC 60947-5-2:2020; EN IEC 60947-5-2:2020/A11:2022; BS EN IEC 60947-5-2:2020; BS EN IEC 60947-5-2:2020/A11:2022

IEC 61326-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
As written on the certificate · Line 8 (DAKKS D-PL-18968-01-00)

EN 50130-4:2011+A1:2014; BS EN 50130-4:2011+A1:2014; EN IEC 61326-1:2021; BS EN IEC 61326-1:2021; EN 55035:2017; EN 55035:2017/A11:2020; BS EN 55035:2017+A11:2020; CISPR 35:2016; ETSI EN 300 386 V1.6.1; ETSI EN 300 386 V2.1.1; ETSI EN 300 386 V2.2.1; IEC 61851-21-2:2018; EN IEC 61851-21-2:2021; BS EN IEC 61851-21-2:2021; IEC 62920:2017; IEC 62920:2017+AMD1:2021; EN 62920:2017; EN 62920:2017/A11:2020; EN 62920:2017/A1:2021; BS EN IEC 62920:2017+A1:2021; BS EN 62920:2017+A11:2020

IEC 61547Equipment for general lighting purposes - EMC immunity requirementsCertificate says EN 61547. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 5 (DAKKS D-PL-18968-01-00)

IEC 61000-6-3:2020; EN 61000-6-3:2007; EN 61000-6-3:2007/A1:2011/AC:2012; EN 61000-6-3:2007/A1:2011; EN IEC 61000-6-3:2021; BS EN 61000-6-3:2007+A1:2011; BS EN IEC 61000-6-3:2021; AS/NZS 61000.6.3:2021; IEC 61000-6-4:2018; EN 61000-6-4:2007; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; BS EN IEC 61000-6-4:2019; AS 61000.6.4:2020; IEC 61547:2020; EN61547:2009; BS EN 61547:2009; IEC62040-2:2016; EN 62040-2:2006/AC:2006; EN IEC 62040-2:2018; BS EN IEC 62040-2:2018

IEC 61851-21-2Name not checked yet
As written on the certificate · Line 8 (DAKKS D-PL-18968-01-00)

EN 50130-4:2011+A1:2014; BS EN 50130-4:2011+A1:2014; EN IEC 61326-1:2021; BS EN IEC 61326-1:2021; EN 55035:2017; EN 55035:2017/A11:2020; BS EN 55035:2017+A11:2020; CISPR 35:2016; ETSI EN 300 386 V1.6.1; ETSI EN 300 386 V2.1.1; ETSI EN 300 386 V2.2.1; IEC 61851-21-2:2018; EN IEC 61851-21-2:2021; BS EN IEC 61851-21-2:2021; IEC 62920:2017; IEC 62920:2017+AMD1:2021; EN 62920:2017; EN 62920:2017/A11:2020; EN 62920:2017/A1:2021; BS EN IEC 62920:2017+A1:2021; BS EN 62920:2017+A11:2020

IEC 62040-2Uninterruptible power systems (UPS) - Part 2: Electromagnetic compatibility (EMC) requirements
As written on the certificate · Line 5 (DAKKS D-PL-18968-01-00)

IEC 61000-6-3:2020; EN 61000-6-3:2007; EN 61000-6-3:2007/A1:2011/AC:2012; EN 61000-6-3:2007/A1:2011; EN IEC 61000-6-3:2021; BS EN 61000-6-3:2007+A1:2011; BS EN IEC 61000-6-3:2021; AS/NZS 61000.6.3:2021; IEC 61000-6-4:2018; EN 61000-6-4:2007; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; BS EN IEC 61000-6-4:2019; AS 61000.6.4:2020; IEC 61547:2020; EN61547:2009; BS EN 61547:2009; IEC62040-2:2016; EN 62040-2:2006/AC:2006; EN IEC 62040-2:2018; BS EN IEC 62040-2:2018

IEC 62311Assessment of electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (0 Hz to 300 GHz)Certificate says EN 62311. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 11 (DAKKS D-PL-18968-01-00)

ETSI EN 301 893 V2.1.1; ETSI EN 303 687 V1.1.1; RSS-248 Issue 2: (December 2022); RSS-247 Issue 3: (August 2023); AS/NZS 4268:2017; AS/NZS 4268:2017 Amd1:2021; EN IEC 62311:2020; BS EN IEC 62311:2020; EN 62479:2010; BS EN 62479:2010; EN 50665:2017; BS EN 50665:2017; EN 50663:2017; BS EN 50663:2017; EN IEC 60947-5-2:2020; EN IEC 60947-5-2:2020/A11:2022; BS EN IEC 60947-5-2:2020; BS EN IEC 60947-5-2:2020/A11:2022

IEC 62479Assessment of the compliance of low power electronic and electrical equipment with the basic restrictions related to human exposure to electromagnetic fields (10 MHz to 300 GHz)
As written on the certificate · Line 11 (DAKKS D-PL-18968-01-00)

ETSI EN 301 893 V2.1.1; ETSI EN 303 687 V1.1.1; RSS-248 Issue 2: (December 2022); RSS-247 Issue 3: (August 2023); AS/NZS 4268:2017; AS/NZS 4268:2017 Amd1:2021; EN IEC 62311:2020; BS EN IEC 62311:2020; EN 62479:2010; BS EN 62479:2010; EN 50665:2017; BS EN 50665:2017; EN 50663:2017; BS EN 50663:2017; EN IEC 60947-5-2:2020; EN IEC 60947-5-2:2020/A11:2022; BS EN IEC 60947-5-2:2020; BS EN IEC 60947-5-2:2020/A11:2022

IEC 62920Name not checked yet
As written on the certificate · Line 8 (DAKKS D-PL-18968-01-00)

EN 50130-4:2011+A1:2014; BS EN 50130-4:2011+A1:2014; EN IEC 61326-1:2021; BS EN IEC 61326-1:2021; EN 55035:2017; EN 55035:2017/A11:2020; BS EN 55035:2017+A11:2020; CISPR 35:2016; ETSI EN 300 386 V1.6.1; ETSI EN 300 386 V2.1.1; ETSI EN 300 386 V2.2.1; IEC 61851-21-2:2018; EN IEC 61851-21-2:2021; BS EN IEC 61851-21-2:2021; IEC 62920:2017; IEC 62920:2017+AMD1:2021; EN 62920:2017; EN 62920:2017/A11:2020; EN 62920:2017/A1:2021; BS EN IEC 62920:2017+A1:2021; BS EN 62920:2017+A11:2020

CISPR

CISPR 13Sound and television broadcast receivers and associated equipment - Radio disturbance characteristics - Limits and methods of measurementCertificate says EN 55013. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 6 (DAKKS D-PL-18968-01-00)

CISPR11:2015+A1:2016+A2:2019; CISPR11:2019; EN55011:2016; EN55011:2016/A1:2017; EN55011:2016/A11:2020; EN55011:2016/A2:2021; BS EN55011:2016+A1:2017; BS EN55011:2016+A11:2020; BS EN55011:2016+A2:2021; AS/NZS CISPR11:2011; CISPR 13:2009+A1:2015; EN 55013:2013+A1:2016; AS/NZS CISPR13:2012; CISPR 14-1:2020; EN 55014-1:2017; EN 55014-1:2017/A11:2020; EN IEC 55014-1:2021; BS EN 55014-1:2017+ A11:2020; BS EN 55014-1:2017; BS EN IEC 55014-1:2021; AS/NZS CISPR14.1:2013; CISPR 14-2:2020; EN 55014-2:2015; EN IEC 55014-2:2021; BS EN 55014-2:2015; BS EN IEC 55014-2:2021

CISPR 14-1Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1: EmissionCertificate says EN 55014-1, IEC 55014-1. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 6 (DAKKS D-PL-18968-01-00)

CISPR11:2015+A1:2016+A2:2019; CISPR11:2019; EN55011:2016; EN55011:2016/A1:2017; EN55011:2016/A11:2020; EN55011:2016/A2:2021; BS EN55011:2016+A1:2017; BS EN55011:2016+A11:2020; BS EN55011:2016+A2:2021; AS/NZS CISPR11:2011; CISPR 13:2009+A1:2015; EN 55013:2013+A1:2016; AS/NZS CISPR13:2012; CISPR 14-1:2020; EN 55014-1:2017; EN 55014-1:2017/A11:2020; EN IEC 55014-1:2021; BS EN 55014-1:2017+ A11:2020; BS EN 55014-1:2017; BS EN IEC 55014-1:2021; AS/NZS CISPR14.1:2013; CISPR 14-2:2020; EN 55014-2:2015; EN IEC 55014-2:2021; BS EN 55014-2:2015; BS EN IEC 55014-2:2021

CISPR 14-2Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 2: Immunity - Product family standardCertificate says EN 55014-2, IEC 55014-2. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 6 (DAKKS D-PL-18968-01-00)

CISPR11:2015+A1:2016+A2:2019; CISPR11:2019; EN55011:2016; EN55011:2016/A1:2017; EN55011:2016/A11:2020; EN55011:2016/A2:2021; BS EN55011:2016+A1:2017; BS EN55011:2016+A11:2020; BS EN55011:2016+A2:2021; AS/NZS CISPR11:2011; CISPR 13:2009+A1:2015; EN 55013:2013+A1:2016; AS/NZS CISPR13:2012; CISPR 14-1:2020; EN 55014-1:2017; EN 55014-1:2017/A11:2020; EN IEC 55014-1:2021; BS EN 55014-1:2017+ A11:2020; BS EN 55014-1:2017; BS EN IEC 55014-1:2021; AS/NZS CISPR14.1:2013; CISPR 14-2:2020; EN 55014-2:2015; EN IEC 55014-2:2021; BS EN 55014-2:2015; BS EN IEC 55014-2:2021

CISPR 15Limits and methods of measurement of radio disturbance characteristics of electrical lighting and similar equipmentCertificate says IEC 55015. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 7 (DAKKS D-PL-18968-01-00)

CISPR15:2018; EN55015:2013+A1:2015; EN IEC 55015:2019; EN IEC 55015:2019/A11:2020; BS EN IEC 55015:2019; BS EN IEC 55015:2019+ A11:2020; BS EN IEC 55015:2013+ A1:2015; AS/NZS CISPR 15:2011; CISPR 20:2006+A1:2013; EN 55020:2007+A12:2016; CISPR22 :2008; CISPR 32:2015; CISPR 32:2015+AMD1:2019; EN 55032:2015; EN 55032:2015/A11:2020; EN 55032:2015/A1:2020; EN 55032:2015/AC:2016; BS EN55032:2015+A11:2020; BS EN55032:2015; BS EN55032:2015+A1:2020; AS/NZS CISPR 32:2015; VCCI-CISPR32:2016; CISPR 24:2010+A1:2015; EN 55024:2010

CISPR 20Name not checked yetCertificate says EN 55020. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 7 (DAKKS D-PL-18968-01-00)

CISPR15:2018; EN55015:2013+A1:2015; EN IEC 55015:2019; EN IEC 55015:2019/A11:2020; BS EN IEC 55015:2019; BS EN IEC 55015:2019+ A11:2020; BS EN IEC 55015:2013+ A1:2015; AS/NZS CISPR 15:2011; CISPR 20:2006+A1:2013; EN 55020:2007+A12:2016; CISPR22 :2008; CISPR 32:2015; CISPR 32:2015+AMD1:2019; EN 55032:2015; EN 55032:2015/A11:2020; EN 55032:2015/A1:2020; EN 55032:2015/AC:2016; BS EN55032:2015+A11:2020; BS EN55032:2015; BS EN55032:2015+A1:2020; AS/NZS CISPR 32:2015; VCCI-CISPR32:2016; CISPR 24:2010+A1:2015; EN 55024:2010

CISPR 24Information technology equipment - Immunity characteristics - Limits and methods of measurementCertificate says EN 55024. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 7 (DAKKS D-PL-18968-01-00)

CISPR15:2018; EN55015:2013+A1:2015; EN IEC 55015:2019; EN IEC 55015:2019/A11:2020; BS EN IEC 55015:2019; BS EN IEC 55015:2019+ A11:2020; BS EN IEC 55015:2013+ A1:2015; AS/NZS CISPR 15:2011; CISPR 20:2006+A1:2013; EN 55020:2007+A12:2016; CISPR22 :2008; CISPR 32:2015; CISPR 32:2015+AMD1:2019; EN 55032:2015; EN 55032:2015/A11:2020; EN 55032:2015/A1:2020; EN 55032:2015/AC:2016; BS EN55032:2015+A11:2020; BS EN55032:2015; BS EN55032:2015+A1:2020; AS/NZS CISPR 32:2015; VCCI-CISPR32:2016; CISPR 24:2010+A1:2015; EN 55024:2010

CISPR 32Electromagnetic compatibility of multimedia equipment - Emission requirementsCertificate says EN 55032. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 7 (DAKKS D-PL-18968-01-00)

CISPR15:2018; EN55015:2013+A1:2015; EN IEC 55015:2019; EN IEC 55015:2019/A11:2020; BS EN IEC 55015:2019; BS EN IEC 55015:2019+ A11:2020; BS EN IEC 55015:2013+ A1:2015; AS/NZS CISPR 15:2011; CISPR 20:2006+A1:2013; EN 55020:2007+A12:2016; CISPR22 :2008; CISPR 32:2015; CISPR 32:2015+AMD1:2019; EN 55032:2015; EN 55032:2015/A11:2020; EN 55032:2015/A1:2020; EN 55032:2015/AC:2016; BS EN55032:2015+A11:2020; BS EN55032:2015; BS EN55032:2015+A1:2020; AS/NZS CISPR 32:2015; VCCI-CISPR32:2016; CISPR 24:2010+A1:2015; EN 55024:2010

CISPR 35Electromagnetic compatibility of multimedia equipment - Immunity requirementsCertificate says EN 55035. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 8 (DAKKS D-PL-18968-01-00)

EN 50130-4:2011+A1:2014; BS EN 50130-4:2011+A1:2014; EN IEC 61326-1:2021; BS EN IEC 61326-1:2021; EN 55035:2017; EN 55035:2017/A11:2020; BS EN 55035:2017+A11:2020; CISPR 35:2016; ETSI EN 300 386 V1.6.1; ETSI EN 300 386 V2.1.1; ETSI EN 300 386 V2.2.1; IEC 61851-21-2:2018; EN IEC 61851-21-2:2021; BS EN IEC 61851-21-2:2021; IEC 62920:2017; IEC 62920:2017+AMD1:2021; EN 62920:2017; EN 62920:2017/A11:2020; EN 62920:2017/A1:2021; BS EN IEC 62920:2017+A1:2021; BS EN 62920:2017+A11:2020

EN

EN 50130-4Alarm systems - Part 4: Electromagnetic compatibility - Product family standard: Immunity requirements for components of fire, intruder, hold up, CCTV, access control and social alarm systems
As written on the certificate · Line 8 (DAKKS D-PL-18968-01-00)

EN 50130-4:2011+A1:2014; BS EN 50130-4:2011+A1:2014; EN IEC 61326-1:2021; BS EN IEC 61326-1:2021; EN 55035:2017; EN 55035:2017/A11:2020; BS EN 55035:2017+A11:2020; CISPR 35:2016; ETSI EN 300 386 V1.6.1; ETSI EN 300 386 V2.1.1; ETSI EN 300 386 V2.2.1; IEC 61851-21-2:2018; EN IEC 61851-21-2:2021; BS EN IEC 61851-21-2:2021; IEC 62920:2017; IEC 62920:2017+AMD1:2021; EN 62920:2017; EN 62920:2017/A11:2020; EN 62920:2017/A1:2021; BS EN IEC 62920:2017+A1:2021; BS EN 62920:2017+A11:2020

EN 50663Generic standard for assessment of low power electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (10 MHz - 300 GHz)
As written on the certificate · Line 11 (DAKKS D-PL-18968-01-00)

ETSI EN 301 893 V2.1.1; ETSI EN 303 687 V1.1.1; RSS-248 Issue 2: (December 2022); RSS-247 Issue 3: (August 2023); AS/NZS 4268:2017; AS/NZS 4268:2017 Amd1:2021; EN IEC 62311:2020; BS EN IEC 62311:2020; EN 62479:2010; BS EN 62479:2010; EN 50665:2017; BS EN 50665:2017; EN 50663:2017; BS EN 50663:2017; EN IEC 60947-5-2:2020; EN IEC 60947-5-2:2020/A11:2022; BS EN IEC 60947-5-2:2020; BS EN IEC 60947-5-2:2020/A11:2022

EN 50665Name not checked yet
As written on the certificate · Line 11 (DAKKS D-PL-18968-01-00)

ETSI EN 301 893 V2.1.1; ETSI EN 303 687 V1.1.1; RSS-248 Issue 2: (December 2022); RSS-247 Issue 3: (August 2023); AS/NZS 4268:2017; AS/NZS 4268:2017 Amd1:2021; EN IEC 62311:2020; BS EN IEC 62311:2020; EN 62479:2010; BS EN 62479:2010; EN 50665:2017; BS EN 50665:2017; EN 50663:2017; BS EN 50663:2017; EN IEC 60947-5-2:2020; EN IEC 60947-5-2:2020/A11:2022; BS EN IEC 60947-5-2:2020; BS EN IEC 60947-5-2:2020/A11:2022

Other standards

ANSI C63.4American National Standard for Methods of Measurement of Radio-Noise Emissions from Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz
As written on the certificate · Line 10 (DAKKS D-PL-18968-01-00)

ETSI EN 301 489-1 V2.2.3; ETSI EN 301 489-1 V2.2.2; ETSI EN 301 489-3 V2.1.1; ETSI EN 301 489-3 V2.3.2; ETSI EN 301 489-7 V1.3.1; ETSI EN 301 489-17 V3.2.4; FCC Part 15 Subpart B/C/E : 2022; ANSI C63.4:2014; ANSI C63.10:2020; EMC FCC Part 18:2022; EMC ICES-003 Issue 7:2020

FCC PART 15Radio Frequency Devices
As written on the certificate · Line 10 (DAKKS D-PL-18968-01-00)

ETSI EN 301 489-1 V2.2.3; ETSI EN 301 489-1 V2.2.2; ETSI EN 301 489-3 V2.1.1; ETSI EN 301 489-3 V2.3.2; ETSI EN 301 489-7 V1.3.1; ETSI EN 301 489-17 V3.2.4; FCC Part 15 Subpart B/C/E : 2022; ANSI C63.4:2014; ANSI C63.10:2020; EMC FCC Part 18:2022; EMC ICES-003 Issue 7:2020

Scope as published by DAKKS

12 lines
DAKKS

ISO/IEC 17025

Active

D-PL-18968-01-00

View scope

Location

No. 1289, Unknown, DE

51.97829, 7.61534

Open in Maps

Other Locations

1 other site in this organization

Accreditation data refreshed from the DAKKS register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the DAKKS entry linked above.