FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
France

TUV RHEINLAND FRANCE LABORATOIRE

TUV RHEINLAND FRANCE LABORATOIRE, Unknown, France

COFRAC|1-1902ISO/IEC 17025Register refreshed 2026-09-25
Certificates
1
Scope items
7
Standards
15
Locations
1

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Contact this laboratory

No contact information available

Open COFRAC register entry
Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at TUV RHEINLAND FRANCE LABORATOIRE?

Claim this profile to keep it accurate.

Register record

COFRACRefreshed
1-1902Active

Accredited standards

15

Our reading of the COFRAC scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

IEC 60598 series

IEC 60598-1Luminaires - Part 1: General requirements and tests
As written on the certificate · Line 2 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1

As written on the certificate · Line 3 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1

As written on the certificate · Line 4 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; EN 60529

As written on the certificate · Line 5 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN/CEI 60664-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 62368-1; EN/CEI 60695-2-11; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC 60990; IEC/EN 62368-1

As written on the certificate · Line 6 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN 60529; IEC/EN 62368-1

IEC 60598-2-1Name not checked yet
As written on the certificate · Line 7 (COFRAC 1-1902)

IEC/EN 60335-2-6; IEC/EN 60335-2-23; IEC/EN 60335-2-32; IEC/EN 60335-2-60; EN60335-2-41; EN60335-2-15; EN60335-2-14; EN60335-2-64; IEC/EN 60598-2-1; IEC/EN 60598-2-3; IEC/EN 60598-2-4; IEC/EN 60598-2-5; EN 60598-2-20

IEC 60598-2-3Name not checked yet
As written on the certificate · Line 7 (COFRAC 1-1902)

IEC/EN 60335-2-6; IEC/EN 60335-2-23; IEC/EN 60335-2-32; IEC/EN 60335-2-60; EN60335-2-41; EN60335-2-15; EN60335-2-14; EN60335-2-64; IEC/EN 60598-2-1; IEC/EN 60598-2-3; IEC/EN 60598-2-4; IEC/EN 60598-2-5; EN 60598-2-20

IEC 60598-2-4Name not checked yet
As written on the certificate · Line 7 (COFRAC 1-1902)

IEC/EN 60335-2-6; IEC/EN 60335-2-23; IEC/EN 60335-2-32; IEC/EN 60335-2-60; EN60335-2-41; EN60335-2-15; EN60335-2-14; EN60335-2-64; IEC/EN 60598-2-1; IEC/EN 60598-2-3; IEC/EN 60598-2-4; IEC/EN 60598-2-5; EN 60598-2-20

IEC 60598-2-5Name not checked yet
As written on the certificate · Line 7 (COFRAC 1-1902)

IEC/EN 60335-2-6; IEC/EN 60335-2-23; IEC/EN 60335-2-32; IEC/EN 60335-2-60; EN60335-2-41; EN60335-2-15; EN60335-2-14; EN60335-2-64; IEC/EN 60598-2-1; IEC/EN 60598-2-3; IEC/EN 60598-2-4; IEC/EN 60598-2-5; EN 60598-2-20

IEC 60598-2-20Name not checked yet
As written on the certificate · Line 7 (COFRAC 1-1902)

IEC/EN 60335-2-6; IEC/EN 60335-2-23; IEC/EN 60335-2-32; IEC/EN 60335-2-60; EN60335-2-41; EN60335-2-15; EN60335-2-14; EN60335-2-64; IEC/EN 60598-2-1; IEC/EN 60598-2-3; IEC/EN 60598-2-4; IEC/EN 60598-2-5; EN 60598-2-20

IEC 60335 series

IEC 60335-1Household and similar electrical appliances - Safety - Part 1: General requirements
As written on the certificate · Line 2 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1

As written on the certificate · Line 3 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1

As written on the certificate · Line 4 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; EN 60529

As written on the certificate · Line 5 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN/CEI 60664-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 62368-1; EN/CEI 60695-2-11; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC 60990; IEC/EN 62368-1

As written on the certificate · Line 6 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN 60529; IEC/EN 62368-1

IEC 60335-2-6Name not checked yet
As written on the certificate · Line 7 (COFRAC 1-1902)

IEC/EN 60335-2-6; IEC/EN 60335-2-23; IEC/EN 60335-2-32; IEC/EN 60335-2-60; EN60335-2-41; EN60335-2-15; EN60335-2-14; EN60335-2-64; IEC/EN 60598-2-1; IEC/EN 60598-2-3; IEC/EN 60598-2-4; IEC/EN 60598-2-5; EN 60598-2-20

IEC 60335-2-23Name not checked yet
As written on the certificate · Line 7 (COFRAC 1-1902)

IEC/EN 60335-2-6; IEC/EN 60335-2-23; IEC/EN 60335-2-32; IEC/EN 60335-2-60; EN60335-2-41; EN60335-2-15; EN60335-2-14; EN60335-2-64; IEC/EN 60598-2-1; IEC/EN 60598-2-3; IEC/EN 60598-2-4; IEC/EN 60598-2-5; EN 60598-2-20

IEC 60335-2-32Name not checked yet
As written on the certificate · Line 7 (COFRAC 1-1902)

IEC/EN 60335-2-6; IEC/EN 60335-2-23; IEC/EN 60335-2-32; IEC/EN 60335-2-60; EN60335-2-41; EN60335-2-15; EN60335-2-14; EN60335-2-64; IEC/EN 60598-2-1; IEC/EN 60598-2-3; IEC/EN 60598-2-4; IEC/EN 60598-2-5; EN 60598-2-20

IEC 60335-2-60Name not checked yet
As written on the certificate · Line 7 (COFRAC 1-1902)

IEC/EN 60335-2-6; IEC/EN 60335-2-23; IEC/EN 60335-2-32; IEC/EN 60335-2-60; EN60335-2-41; EN60335-2-15; EN60335-2-14; EN60335-2-64; IEC/EN 60598-2-1; IEC/EN 60598-2-3; IEC/EN 60598-2-4; IEC/EN 60598-2-5; EN 60598-2-20

IEC

IEC 60529Degrees of protection provided by enclosures (IP Code)Certificate says EN 60529. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 4 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; EN 60529

As written on the certificate · Line 6 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN 60529; IEC/EN 62368-1

IEC 60950-1Information technology equipment - Safety - Part 1: General requirements
As written on the certificate · Line 2 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1

As written on the certificate · Line 3 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1

As written on the certificate · Line 4 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; EN 60529

As written on the certificate · Line 5 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN/CEI 60664-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 62368-1; EN/CEI 60695-2-11; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC 60990; IEC/EN 62368-1

As written on the certificate · Line 6 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN 60529; IEC/EN 62368-1

IEC 60990Name not checked yet
As written on the certificate · Line 5 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN/CEI 60664-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 62368-1; EN/CEI 60695-2-11; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC 60990; IEC/EN 62368-1

IEC 62368-1Audio/video, information and communication technology equipment - Part 1: Safety requirements
As written on the certificate · Line 2 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1

As written on the certificate · Line 3 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1

As written on the certificate · Line 4 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; EN 60529

As written on the certificate · Line 5 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN/CEI 60664-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 62368-1; EN/CEI 60695-2-11; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC 60990; IEC/EN 62368-1

As written on the certificate · Line 6 (COFRAC 1-1902)

IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN 60529; IEC/EN 62368-1

Scope as published by COFRAC

7 lines
COFRAC

ISO/IEC 17025

Active

1-1902

View scope

Accredited scope, certificate 1-1902

LineDisciplineMethodMatrixRange
1electricalNF EN ISO/IEC 17025CONSUMER PRODUCTS, SPORTS AND LEISURE ACTIVITIES / LAMPS - HOUSEHOLD ELECTRICAL APPLIANCES; ELECTRONIC, COMPUTING AND TELECOMMUNICATIONS / DATA PROCESSING DEVICES AND AUDIO VIDEO APPARATUS-
2electricalIEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1Electrical appliancesto 0.8 m
3electricalIEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1Electrical appliancesto 25 A
4electricalIEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; EN 60529Electrical appliances-
5electricalIEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN/CEI 60664-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC/EN 62368-1; IEC/EN 60335-1; IEC/EN 62368-1; EN/CEI 60695-2-11; IEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; IEC 60990; IEC/EN 62368-1Electrical appliances-
6electricalIEC/EN 60335-1; IEC/EN 60598-1; EN 60950-1; EN 60529; IEC/EN 62368-1Electrical appliances-
7electricalIEC/EN 60335-2-6; IEC/EN 60335-2-23; IEC/EN 60335-2-32; IEC/EN 60335-2-60; EN60335-2-41; EN60335-2-15; EN60335-2-14; EN60335-2-64; IEC/EN 60598-2-1; IEC/EN 60598-2-3; IEC/EN 60598-2-4; IEC/EN 60598-2-5; EN 60598-2-20--

Ranges are reproduced from the accredited scope document as published. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.

Location

TUV RHEINLAND FRANCE LABORATOIRE, Unknown, FR

48.82963, 2.37704

Open in Maps

Accreditation data refreshed from the COFRAC register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the COFRAC entry linked above.