Registers refreshed 2026-11-08.See refresh dates
Chile

Ecoingen Fiscalización Ambiental

Joaquin Prieto 1170, Concepción, Concepción, 4090010, Chile, Concepción, Chile

Visit website
A2LA 6155.01ISO/IEC 17025Register refreshed 2026-11-06

We check which accredited labs can do it, starting with this one, and send you a short comparison of time and rough cost within three working days.

  • Free. No lab gets your details until you choose.
Accredited standards
8
A2LA certificate
1
Site in our directory
1
A2LA accredited scope

What this lab is accredited for

Our reading of the A2LA scope: each standard once, with its official name where we have checked it.

Only this lab. Searches the 8 standard numbers and the 0 official names we hold. When no standard matches, it searches the method text of every scope line.

EPA 1
EPA 2
EPA 3
EPA 4
EPA 5
EPA 6
EPA 7
EPA 10

Read from the A2LA scope document we downloaded on 2026-03-14. Register refreshed 2026-11-06.

Scope as published by A2LA

5 lines
A2LA

ISO/IEC 17025

Active

6155.01

The scope document we hold says it is valid until 2027-07-31.

View scope

Accredited scope, certificate 6155.01

LineMethodMatrixRange
1EPA 5; EPA 1; EPA 1A; CH-5:2020; CH-1:1996; CH-1A:1996; CH-2:1996Particulate Matter; Gases-
2EPA 2A; EPA 2D; EPA 2C; EPA 3; EPA 3A; EPA 3B; EPA 4; EPA 6C; EPA 7E; EPA 10; EPA Method 5. CFR 40-PART60; EPA: 2023 Code of Federal Regulations of the United States of America (CFR) Field measurement method for generator sets. Title 40 CFR Part 60 subpart IIII 60.4213 June 28, 2011, amendment included in CFR July 1, 2023Gases – Particulate Matter; Particulate Matter-
3EPA Method 6C. CFR 40 - PART 60; EPA: 2023 Code of Federal Regulations of the United States of America (CFR) Field measurement method for generator sets. Title 40 CFR Part 60 subpart IIII 60.4213 June 28, 2011, amendment included in CFR July 1, 2023; EPA Method 7E. CFR 40 - PART 60; EPA: 2023 Code of Federal Regulations of the United States of America (CFR) Field measurement method for generator sets. Title 40 CFR Part 60 subpart IIII 60.4213 June 28, 2011, amendment included in CFR July 1, 2023; EPA Method 3A. CFR 40 - PART 60; EPA: 2023 Code of Federal Regulations of the United States of America (CFR) Field measurement method for generator sets. Title 40 CFR Part 60 subpart IIII 60.4213 June 28, 2011, amendment included in CFR July 1, 2023; EPA Method 10. CFR 40 - PART 60; EPA: 2023 Code of Federal Regulations of the United States of America (CFR) Field measurement method for generator sets. Title 40 CFR Part 60 subpart IIII 60.4213 June 28, 2011, amendment included in CFR July 1, 2023Gases-
4Decreto N°38/2011. Establece norma de emisión de ruidos, del Ministerio de Medio Ambiente de Chile, version 2011--
5

Extracted from the scope document; tables may not line up. View scope for the original.

For the tests to which this accreditation applies, please refer to the laboratory’s Environmental«field» Scope of Accreditation. Accredited Laboratory A2LA has accredited ECOINGEN FISCALIZACIÓN AMBIENTAL SPA Concepción, CHILE for technical competence in the field of Environmental Testing This laboratory is accredited in accordance with the recognized International Standard ISO/IEC 17025:2017 General requirements for the competence of testing and calibration laboratories. This laboratory also meets the A2LA R219 - Specific Requirements - TNI Field Sampling and Measurement Organization Accreditation Program. This accreditation demonstrates technical competence for a defined scope and the operation of a laboratory quality management system (refer to joint ISO-ILAC-IAF Communiqué dated April 2017). Presented this 24th day of November 2025. _______________________ Mr. Trace McInturff, Vice President, Accreditation Services For the Accreditation Council Certificate Number 6155.01 Valid to July 31, 2027

Ranges are reproduced from the accredited scope document as published, and only where we found that range printed in the document for the line. Otherwise the cell reads “See scope document”. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.

Location

Joaquin Prieto 1170, Concepción, Concepción, 4090010, Chile, Concepción, CL

-36.94928, -73.01435

Open in Maps

Accreditation data refreshed from the A2LA register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the A2LA entry linked above.