FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
China

Shenzhen Tiansu Calibration and Testing Co.,

Building 8, Changjiang Cable Industrial Park, 56 Xinwang Road, Longgang District, Shenzhen, Guangdong, 518116, People's Republic of China, Shenzhen, Guangdong, China

A2LA|7587.01ISO/IEC 17025Register refreshed 2026-09-25
Certificates
1
Scope items
6
Locations
1

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at Shenzhen Tiansu Calibration and Testing Co.,?

Claim this profile to keep it accurate.

Register record

A2LARefreshed
7587.01Active

Certificates and scope

1
A2LA

ISO/IEC 17025

Active

7587.01

The scope document we hold says it is valid until 2027-12-31.

View scope

Accredited scope, certificate 7587.01

LineDisciplineMethodMatrixRange
1electricalISO/IEC 17025:2017; CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; ANSI C63.4a:2017; CFR 47, FCC Part 18; MP-5:1986; ICES-GEN; ICES-001; ICES-002; ICES-003; CISPR 11; BS EN/EN 55011; AS/NZS CISPR 11; J 55011; CISPR 32; BS EN/EN 55032; AS/NZS CISPR 32; J 55032; IEC 61000-3-2; BS EN IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-12; EN IEC 61000-3-12; BS EN IEC 61000-3-12; IEC 61000-3-3; EN 61000-3-3; BS EN 61000-3-3; IEC 61000-3-11; EN IEC 61000-3-11; BS EN IEC 61000-3-11; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-3; EN IEC 61000-4-3; BS EN IEC 61000-4-3-to 40 GHz
2electricalIEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5; IEC 61000-4-6; EN IEC 61000-4-6; BS EN IEC 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; BS EN IEC 61000-4-11; EN IEC 61000-4-11; BS EN 61000-4-29; IEC 61000-4-29; EN 61000-4-29; IEC 61000-6-1; BS EN/EN 61000-6-1; BS EN/EN IEC 61000-6-1; IEC 61000-6-2; BS EN/EN 61000-6-2; BS EN/EN IEC 61000-6-2; IEC 61000-6-3; BS EN/EN 61000-6-3; BS EN/EN IEC 61000-6-3; IEC 61000-6-4; BS EN/EN 61000-6-4; BS EN/EN IEC 61000-6-4; AS/NZS 61000.6.1; AS/NZS 61000.6.2; AS/NZS 61000.6.3; AS/NZS 61000.6.4; CISPR 35; BS EN/EN 55035; IEC 61326-1; BS EN/EN 61326-1; BS EN/EN IEC 61326-1; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-17; ETSI EN 301 489-19; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 303 687; ETSI EN 302 502; ETSI EN 300 220-1; ETSI EN 300 330; ETSI EN 300 440; ETSI EN 303 413; ETSI EN 303 417; ETSI EN 303 345-1; CFR 47, FCC Part 15, Subparts C and E; ANSI C63.10:2020; KDB 905462 D02 (v02), April 8, 2016; RSS GEN; RSS-210; RSS-247; RSS-248; ANSI C63.10-2020+Cor. 1-2023+C63.10a-2024-to 40 GHz
3electricalAS/NZS 4268; ARIB STD-T33; ARIB STD-T66; ARIB STD-T71; IEC 62479; EN 62479; BS EN 62479; IEC 62311; EN 62311; EN IEC 62311; BS EN IEC 62311; AS/NZS 2772.1; AS/NZS 2772.2; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; ETSI TS 103 701 V1.1.1 (2021-08); EN 18031-1:2024; EN 18031-2:2024; EN 18031-3:2024--
4electricalIEC 62368-1--
5electricalANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2020; FCC KDB 905462 D02 (v02), April 8, 2016-to 40000 MHz
6electrical---

Ranges are reproduced from the accredited scope document as published. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.

Accreditation data refreshed from the A2LA register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the A2LA entry linked above.