FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
Germany

SGS Germany

Benzstraße 26/28, 82178, Puchheim, Germany

DAKKS|D-PL-11020-03-02DAKKS|D-PL-11020-03-00DAKKS|D-PL-11020-03-01DAKKS|D-PL-11020-03-03DAKKS|D-PL-11020-03-04DAKKS|D-PL-11020-03-05ISO/IEC 17025Register refreshed 2026-09-25
Certificates
6
Scope items
154
Standards
345
Locations
2
One of 2 locations. View the organization

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at SGS Germany?

Claim this profile to keep it accurate.

Register record

DAKKSRefreshed
D-PL-11020-03-02Active
D-PL-11020-03-00Active
D-PL-11020-03-01Active
D-PL-11020-03-03Active
D-PL-11020-03-04Active
D-PL-11020-03-05Active

Accredited standards

345

Our reading of the DAKKS scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

IEC 60512 series

IEC 60512-1-1Name not checked yet
As written on the certificate · Line 95 (DAKKS D-PL-11020-03-01)

IEC 60512-1-1; IEC 60512-1-2; IEC 60512-1-3; IEC 60512-1-4; IEC 60512-2-1; IEC 60512-2-2; IEC 60512-2-3; IEC 60512-2-5; IEC 60512-2-6; IEC 60512-3-1; IEC 60512-4-1

IEC 60512-1-2Name not checked yet
As written on the certificate · Line 95 (DAKKS D-PL-11020-03-01)

IEC 60512-1-1; IEC 60512-1-2; IEC 60512-1-3; IEC 60512-1-4; IEC 60512-2-1; IEC 60512-2-2; IEC 60512-2-3; IEC 60512-2-5; IEC 60512-2-6; IEC 60512-3-1; IEC 60512-4-1

As written on the certificate · Line 101 (DAKKS D-PL-11020-03-01)

VW 75174:2018; IEC 60512-1-2; MBN 10384:2010; GS 95006-7-1:2021; VW 75174-2:2020; MBN 10384-2:2007; GS 95006-7-2:2018

IEC 60512-1-3Name not checked yet
As written on the certificate · Line 95 (DAKKS D-PL-11020-03-01)

IEC 60512-1-1; IEC 60512-1-2; IEC 60512-1-3; IEC 60512-1-4; IEC 60512-2-1; IEC 60512-2-2; IEC 60512-2-3; IEC 60512-2-5; IEC 60512-2-6; IEC 60512-3-1; IEC 60512-4-1

IEC 60512-1-4Name not checked yet
As written on the certificate · Line 95 (DAKKS D-PL-11020-03-01)

IEC 60512-1-1; IEC 60512-1-2; IEC 60512-1-3; IEC 60512-1-4; IEC 60512-2-1; IEC 60512-2-2; IEC 60512-2-3; IEC 60512-2-5; IEC 60512-2-6; IEC 60512-3-1; IEC 60512-4-1

IEC 60512-2-1Name not checked yet
As written on the certificate · Line 95 (DAKKS D-PL-11020-03-01)

IEC 60512-1-1; IEC 60512-1-2; IEC 60512-1-3; IEC 60512-1-4; IEC 60512-2-1; IEC 60512-2-2; IEC 60512-2-3; IEC 60512-2-5; IEC 60512-2-6; IEC 60512-3-1; IEC 60512-4-1

IEC 60512-2-2Name not checked yet
As written on the certificate · Line 95 (DAKKS D-PL-11020-03-01)

IEC 60512-1-1; IEC 60512-1-2; IEC 60512-1-3; IEC 60512-1-4; IEC 60512-2-1; IEC 60512-2-2; IEC 60512-2-3; IEC 60512-2-5; IEC 60512-2-6; IEC 60512-3-1; IEC 60512-4-1

IEC 60512-2-3Name not checked yet
As written on the certificate · Line 95 (DAKKS D-PL-11020-03-01)

IEC 60512-1-1; IEC 60512-1-2; IEC 60512-1-3; IEC 60512-1-4; IEC 60512-2-1; IEC 60512-2-2; IEC 60512-2-3; IEC 60512-2-5; IEC 60512-2-6; IEC 60512-3-1; IEC 60512-4-1

IEC 60512-2-5Name not checked yet
As written on the certificate · Line 95 (DAKKS D-PL-11020-03-01)

IEC 60512-1-1; IEC 60512-1-2; IEC 60512-1-3; IEC 60512-1-4; IEC 60512-2-1; IEC 60512-2-2; IEC 60512-2-3; IEC 60512-2-5; IEC 60512-2-6; IEC 60512-3-1; IEC 60512-4-1

IEC 60512-2-6Name not checked yet
As written on the certificate · Line 95 (DAKKS D-PL-11020-03-01)

IEC 60512-1-1; IEC 60512-1-2; IEC 60512-1-3; IEC 60512-1-4; IEC 60512-2-1; IEC 60512-2-2; IEC 60512-2-3; IEC 60512-2-5; IEC 60512-2-6; IEC 60512-3-1; IEC 60512-4-1

IEC 60512-3-1Name not checked yet
As written on the certificate · Line 95 (DAKKS D-PL-11020-03-01)

IEC 60512-1-1; IEC 60512-1-2; IEC 60512-1-3; IEC 60512-1-4; IEC 60512-2-1; IEC 60512-2-2; IEC 60512-2-3; IEC 60512-2-5; IEC 60512-2-6; IEC 60512-3-1; IEC 60512-4-1

IEC 60512-4-1Name not checked yet
As written on the certificate · Line 95 (DAKKS D-PL-11020-03-01)

IEC 60512-1-1; IEC 60512-1-2; IEC 60512-1-3; IEC 60512-1-4; IEC 60512-2-1; IEC 60512-2-2; IEC 60512-2-3; IEC 60512-2-5; IEC 60512-2-6; IEC 60512-3-1; IEC 60512-4-1

IEC 60512-4-3Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-5-1Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-5-2Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-6-2Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-6-3Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-6-4Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-6-5Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-8-1Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-8-2Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-8-3Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-9-1Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-9-2Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-9-3Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-9-4Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-9-5Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-10-4Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-11-1Name not checked yet
As written on the certificate · Line 96 (DAKKS D-PL-11020-03-01)

IEC 60512-4-3 (2002-02); IEC 60512-5-1 (2002-02); IEC 60512-5-2 (2002-02); IEC 60512-6-2 (2002-02); IEC 60512-6-3 (2002-02); IEC 60512-6-4 (2002-02); IEC 60512-6-5 (1997-10); IEC 60512-8-1 (2010-06); IEC 60512-8-2 (2011-04); IEC 60512-8-3 (2018-01); IEC 60512-9-1 (2010-03); IEC 60512-9-2 (2011-11); IEC 60512-9-3 (2011-06); IEC 60512-9-4 (2011-04); IEC 60512-9-5 (2020-06); IEC 60512-10-4 (2003-08); IEC 60512-11-1 (2019-05)

IEC 60512-11-3Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-11-4Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-11-6Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-11-7Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-11-9Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-11-10Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-11-11Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-11-12Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-11-13Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-11-14Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-13-1Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-13-2Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-13-5Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-14-4Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-14-5Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-14-6Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-14-7Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-15-1Name not checked yet
As written on the certificate · Line 97 (DAKKS D-PL-11020-03-01)

IEC 60512-11-3 (2002-02); IEC 60512-11-4 (2002-02); IEC 60512 -11 -6 (2002 -02); IEC 60512-11-7 (2003-05); IEC 60512-11-9 (2002-02); IEC 60512-11-10(2002-02); IEC 60512-11-11(2002-02); IEC 60512-11-12(2002-02); IEC 60512-11-13(2002-02); IEC 60512-11-14(2003-07); IEC 60512-13-1 (2006-02); IEC 60512-13-2 (2006-02); IEC 60512-13-5 (2006-02); IEC 60512-14-4 (2006-03); IEC 60512-14-5 (2006-03); IEC 60512-14-6 (2006-03); IEC 60512-14-7 (1997-10); IEC 60512-15-1 (2008-05)

IEC 60512-15-2Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-15-3Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-15-4Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-15-5Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-15-6Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-15-7Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-15-8Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-16-1Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-16-2Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-16-3Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-16-4Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-16-5Name not checked yet
As written on the certificate · Line 98 (DAKKS D-PL-11020-03-01)

IEC 60512-15-2 (2018-01); IEC 60512-15-3 (2008-05); IEC 60512-15-4 (2008-05); IEC 60512-15-5 (2008-05); IEC 60512-15-6 (2008-05); IEC 60512-15-7 (2008-05); IEC 60512-15-8 (1995-11); IEC 60512-16-1 (2008-06); IEC 60512-16-2 (2008-06); IEC 60512-16-3 (2008-07); IEC 60512-16-4 (2008-06); IEC 60512-16-5 (2008-07)

IEC 60512-16-6Name not checked yet
As written on the certificate · Line 99 (DAKKS D-PL-11020-03-01)

IEC 60512-16-6; IEC 60512-16-7; IEC 60512-16-8; IEC 60512-16-9; IEC 60512-16-11; IEC 60512-16-13; IEC 60512-16-14; IEC 60512-16-16; IEC 60512-16-17; IEC 60512-16-18

IEC 60512-16-7Name not checked yet
As written on the certificate · Line 99 (DAKKS D-PL-11020-03-01)

IEC 60512-16-6; IEC 60512-16-7; IEC 60512-16-8; IEC 60512-16-9; IEC 60512-16-11; IEC 60512-16-13; IEC 60512-16-14; IEC 60512-16-16; IEC 60512-16-17; IEC 60512-16-18

IEC 60512-16-8Name not checked yet
As written on the certificate · Line 99 (DAKKS D-PL-11020-03-01)

IEC 60512-16-6; IEC 60512-16-7; IEC 60512-16-8; IEC 60512-16-9; IEC 60512-16-11; IEC 60512-16-13; IEC 60512-16-14; IEC 60512-16-16; IEC 60512-16-17; IEC 60512-16-18

IEC 60512-16-9Name not checked yet
As written on the certificate · Line 99 (DAKKS D-PL-11020-03-01)

IEC 60512-16-6; IEC 60512-16-7; IEC 60512-16-8; IEC 60512-16-9; IEC 60512-16-11; IEC 60512-16-13; IEC 60512-16-14; IEC 60512-16-16; IEC 60512-16-17; IEC 60512-16-18

IEC 60512-16-11Name not checked yet
As written on the certificate · Line 99 (DAKKS D-PL-11020-03-01)

IEC 60512-16-6; IEC 60512-16-7; IEC 60512-16-8; IEC 60512-16-9; IEC 60512-16-11; IEC 60512-16-13; IEC 60512-16-14; IEC 60512-16-16; IEC 60512-16-17; IEC 60512-16-18

IEC 60512-16-13Name not checked yet
As written on the certificate · Line 99 (DAKKS D-PL-11020-03-01)

IEC 60512-16-6; IEC 60512-16-7; IEC 60512-16-8; IEC 60512-16-9; IEC 60512-16-11; IEC 60512-16-13; IEC 60512-16-14; IEC 60512-16-16; IEC 60512-16-17; IEC 60512-16-18

IEC 60512-16-14Name not checked yet
As written on the certificate · Line 99 (DAKKS D-PL-11020-03-01)

IEC 60512-16-6; IEC 60512-16-7; IEC 60512-16-8; IEC 60512-16-9; IEC 60512-16-11; IEC 60512-16-13; IEC 60512-16-14; IEC 60512-16-16; IEC 60512-16-17; IEC 60512-16-18

IEC 60512-16-16Name not checked yet
As written on the certificate · Line 99 (DAKKS D-PL-11020-03-01)

IEC 60512-16-6; IEC 60512-16-7; IEC 60512-16-8; IEC 60512-16-9; IEC 60512-16-11; IEC 60512-16-13; IEC 60512-16-14; IEC 60512-16-16; IEC 60512-16-17; IEC 60512-16-18

IEC 60512-16-17Name not checked yet
As written on the certificate · Line 99 (DAKKS D-PL-11020-03-01)

IEC 60512-16-6; IEC 60512-16-7; IEC 60512-16-8; IEC 60512-16-9; IEC 60512-16-11; IEC 60512-16-13; IEC 60512-16-14; IEC 60512-16-16; IEC 60512-16-17; IEC 60512-16-18

IEC 60512-16-18Name not checked yet
As written on the certificate · Line 99 (DAKKS D-PL-11020-03-01)

IEC 60512-16-6; IEC 60512-16-7; IEC 60512-16-8; IEC 60512-16-9; IEC 60512-16-11; IEC 60512-16-13; IEC 60512-16-14; IEC 60512-16-16; IEC 60512-16-17; IEC 60512-16-18

IEC 60512-16-20Name not checked yet
As written on the certificate · Line 100 (DAKKS D-PL-11020-03-01)

IEC 60512-16-20; IEC 60512-16-21; IEC 60512-17-1; IEC 60512-17-2; IEC 60512-17-3; IEC 60512-17-4; IEC 60512-19-1; IEC 60512-19-3; IEC 60352-2; IEC 60352-5; IPC-9797A; HELLA Norm HN28100-01

IEC 60512-16-21Name not checked yet
As written on the certificate · Line 100 (DAKKS D-PL-11020-03-01)

IEC 60512-16-20; IEC 60512-16-21; IEC 60512-17-1; IEC 60512-17-2; IEC 60512-17-3; IEC 60512-17-4; IEC 60512-19-1; IEC 60512-19-3; IEC 60352-2; IEC 60352-5; IPC-9797A; HELLA Norm HN28100-01

IEC 60512-17-1Name not checked yet
As written on the certificate · Line 100 (DAKKS D-PL-11020-03-01)

IEC 60512-16-20; IEC 60512-16-21; IEC 60512-17-1; IEC 60512-17-2; IEC 60512-17-3; IEC 60512-17-4; IEC 60512-19-1; IEC 60512-19-3; IEC 60352-2; IEC 60352-5; IPC-9797A; HELLA Norm HN28100-01

IEC 60512-17-2Name not checked yet
As written on the certificate · Line 100 (DAKKS D-PL-11020-03-01)

IEC 60512-16-20; IEC 60512-16-21; IEC 60512-17-1; IEC 60512-17-2; IEC 60512-17-3; IEC 60512-17-4; IEC 60512-19-1; IEC 60512-19-3; IEC 60352-2; IEC 60352-5; IPC-9797A; HELLA Norm HN28100-01

IEC 60512-17-3Name not checked yet
As written on the certificate · Line 100 (DAKKS D-PL-11020-03-01)

IEC 60512-16-20; IEC 60512-16-21; IEC 60512-17-1; IEC 60512-17-2; IEC 60512-17-3; IEC 60512-17-4; IEC 60512-19-1; IEC 60512-19-3; IEC 60352-2; IEC 60352-5; IPC-9797A; HELLA Norm HN28100-01

IEC 60512-17-4Name not checked yet
As written on the certificate · Line 100 (DAKKS D-PL-11020-03-01)

IEC 60512-16-20; IEC 60512-16-21; IEC 60512-17-1; IEC 60512-17-2; IEC 60512-17-3; IEC 60512-17-4; IEC 60512-19-1; IEC 60512-19-3; IEC 60352-2; IEC 60352-5; IPC-9797A; HELLA Norm HN28100-01

IEC 60512-19-1Name not checked yet
As written on the certificate · Line 100 (DAKKS D-PL-11020-03-01)

IEC 60512-16-20; IEC 60512-16-21; IEC 60512-17-1; IEC 60512-17-2; IEC 60512-17-3; IEC 60512-17-4; IEC 60512-19-1; IEC 60512-19-3; IEC 60352-2; IEC 60352-5; IPC-9797A; HELLA Norm HN28100-01

IEC 60512-19-3Name not checked yet
As written on the certificate · Line 100 (DAKKS D-PL-11020-03-01)

IEC 60512-16-20; IEC 60512-16-21; IEC 60512-17-1; IEC 60512-17-2; IEC 60512-17-3; IEC 60512-17-4; IEC 60512-19-1; IEC 60512-19-3; IEC 60352-2; IEC 60352-5; IPC-9797A; HELLA Norm HN28100-01

IEC

IEC 55036Name not checked yet
As written on the certificate · Line 17 (DAKKS D-PL-11020-03-01)

CISPR 36:2020 + AMD1:2023; DIN EN IEC 55036:2021; DIN EN 55103-1:2013; DIN EN 55103-2:2010; IEC 60146-1-1:2009; DIN EN 60146-1-1: 2011; IEC 60335-1:2020; IEC 61000-3-2: 2018 + AMD1:2020 +AMD2:2024

IEC 60086-4Name not checked yet
As written on the certificate · Line 78 (DAKKS D-PL-11020-03-01)

DIN EN 50178:1998; IEC 62477-1:2022 + COR1:2024; DIN EN IEC 62477-1:2024; IEC 60255-27: 2013; DIN EN IEC 60255-27: 2026-04; IEC 60730-1:2013, modifiziert + COR1:2014 + A1:2015 + A2:2020; DIN EN 60730-1:2025; IEC 60086-4:2019; DIN EN IEC 60086-4:2020; UL 60086-4: 2015

IEC 60112Name not checked yet
As written on the certificate · Line 77 (DAKKS D-PL-11020-03-01)

ISO 3795:1989; IEC 60112:2020; DIN EN IEC 60112:2022; EN IEC 60112:2016-10:2020; IEC 61800-5-1:2022; COR1:2023; DIN EN IEC 61800-5-1:2024; EN IEC 61800-5-1:2023; UL 61800-5-1:2012; ANSI/UL 61800-5-1: 2017

IEC 60146-1-1Name not checked yet
As written on the certificate · Line 17 (DAKKS D-PL-11020-03-01)

CISPR 36:2020 + AMD1:2023; DIN EN IEC 55036:2021; DIN EN 55103-1:2013; DIN EN 55103-2:2010; IEC 60146-1-1:2009; DIN EN 60146-1-1: 2011; IEC 60335-1:2020; IEC 61000-3-2: 2018 + AMD1:2020 +AMD2:2024

IEC 60204-1Safety of machinery - Electrical equipment of machines - Part 1: General requirements
As written on the certificate · Line 84 (DAKKS D-PL-11020-03-01)

IEC 60204-1:2016/AMD:2021; DIN EN 60204-1:2019-06; IEC 61496-1:2020; DIN EN IEC 61496-1:2021-06; IEC TS 61496-4-2:2014; DIN IEC/TS 61496-4-2: 2015-06; IEC 60664-1:2020; DIN EN IEC 60664-1:2022-07; IEC 62262:2021 + AMD1:2021

IEC 60215Name not checked yet
As written on the certificate · Line 59 (DAKKS D-PL-11020-03-01)

CAN/CSA-C22.2 NO. 60950-22:2017; DIN EN 41003:2009 + BEIBLATT 1: 2006; IEC 62911:2016; IEC 60215:2016; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019, IEC 61010-1 Ed. 3.1: 2017; DIN EN 61010-1:2020 (EN 61010-1:2010 + A1:2019 + A1:2019/AC:2019)

IEC 60255-27Name not checked yet
As written on the certificate · Line 78 (DAKKS D-PL-11020-03-01)

DIN EN 50178:1998; IEC 62477-1:2022 + COR1:2024; DIN EN IEC 62477-1:2024; IEC 60255-27: 2013; DIN EN IEC 60255-27: 2026-04; IEC 60730-1:2013, modifiziert + COR1:2014 + A1:2015 + A2:2020; DIN EN 60730-1:2025; IEC 60086-4:2019; DIN EN IEC 60086-4:2020; UL 60086-4: 2015

IEC 60335-1Household and similar electrical appliances - Safety - Part 1: General requirements
As written on the certificate · Line 17 (DAKKS D-PL-11020-03-01)

CISPR 36:2020 + AMD1:2023; DIN EN IEC 55036:2021; DIN EN 55103-1:2013; DIN EN 55103-2:2010; IEC 60146-1-1:2009; DIN EN 60146-1-1: 2011; IEC 60335-1:2020; IEC 61000-3-2: 2018 + AMD1:2020 +AMD2:2024

IEC 60352-2Name not checked yet
As written on the certificate · Line 100 (DAKKS D-PL-11020-03-01)

IEC 60512-16-20; IEC 60512-16-21; IEC 60512-17-1; IEC 60512-17-2; IEC 60512-17-3; IEC 60512-17-4; IEC 60512-19-1; IEC 60512-19-3; IEC 60352-2; IEC 60352-5; IPC-9797A; HELLA Norm HN28100-01

IEC 60352-5Name not checked yet
As written on the certificate · Line 100 (DAKKS D-PL-11020-03-01)

IEC 60512-16-20; IEC 60512-16-21; IEC 60512-17-1; IEC 60512-17-2; IEC 60512-17-3; IEC 60512-17-4; IEC 60512-19-1; IEC 60512-19-3; IEC 60352-2; IEC 60352-5; IPC-9797A; HELLA Norm HN28100-01

IEC 60529Degrees of protection provided by enclosures (IP Code)
As written on the certificate · Line 81 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-3 V2.2.1 (2021-07); DIN EN 300 132-3-0:2013; DIN EN 300 132-3-1: 2013; IEC 60529:1989/A2:2013 /COR1:2019; DIN EN 60529:2014; CAN/CSA -C22.2 NO. 60529: 2016; Telcordia GR-3108-CORE; Telcordia GR-63-Core; Telcordia GR-1089-Core; IEC 60884-1:2022

As written on the certificate · Line 91 (DAKKS D-PL-11020-03-01)

IEC 60529:2013; ISO 20653:2013; JESD22-B103:2016; JESD22-B104:2004; IEC 61373:2010; EN 50155 (2021-07); ISO 16750-3:2023; ISO 16750-4:2023; ISO 16750-5:2023

IEC 60533Name not checked yet
As written on the certificate · Line 49 (DAKKS D-PL-11020-03-01)

36-00-808/--N: 2016; ES 96200-00, L 2014-06; STD 515-0003 2017-02; TB1901 2016-05; 2017-10; VDA 320: 2014; 28401NDS02-8: 2016-03; CS.00054: 2018-01; IEC 60533: 2015; IEC 60945:2002

IEC 60664-1Name not checked yet
As written on the certificate · Line 84 (DAKKS D-PL-11020-03-01)

IEC 60204-1:2016/AMD:2021; DIN EN 60204-1:2019-06; IEC 61496-1:2020; DIN EN IEC 61496-1:2021-06; IEC TS 61496-4-2:2014; DIN IEC/TS 61496-4-2: 2015-06; IEC 60664-1:2020; DIN EN IEC 60664-1:2022-07; IEC 62262:2021 + AMD1:2021

IEC 60730-1Automatic electrical controls - Part 1: General requirements
As written on the certificate · Line 78 (DAKKS D-PL-11020-03-01)

DIN EN 50178:1998; IEC 62477-1:2022 + COR1:2024; DIN EN IEC 62477-1:2024; IEC 60255-27: 2013; DIN EN IEC 60255-27: 2026-04; IEC 60730-1:2013, modifiziert + COR1:2014 + A1:2015 + A2:2020; DIN EN 60730-1:2025; IEC 60086-4:2019; DIN EN IEC 60086-4:2020; UL 60086-4: 2015

IEC 60825-1Name not checked yet
As written on the certificate · Line 73 (DAKKS D-PL-11020-03-01)

ANSI/UL 61010-2-201: 2017; UL 61010-2-201:2018; CAN/CSA-C22.2 No. 61010-2-201:2018; IEC 61010-2-202:2020; DIN EN IEC 61010-2-202:2022; EN IEC 61010-2-202:2021; CAN/CSA-C22.2 No. 61010-2-202:2018; IEC 60825-1:2014; DIN EN 60825-1:2022; EN 60825-1:2014 + AC:2017 + A11:2021 + A11:2021/AC:2022; CAN/CSA-E60825-1: 2015; IEC 60825-2:2004 + A1:2006 + A2:2010; IEC 60825-2:2021

IEC 60825-2Name not checked yet
As written on the certificate · Line 73 (DAKKS D-PL-11020-03-01)

ANSI/UL 61010-2-201: 2017; UL 61010-2-201:2018; CAN/CSA-C22.2 No. 61010-2-201:2018; IEC 61010-2-202:2020; DIN EN IEC 61010-2-202:2022; EN IEC 61010-2-202:2021; CAN/CSA-C22.2 No. 61010-2-202:2018; IEC 60825-1:2014; DIN EN 60825-1:2022; EN 60825-1:2014 + AC:2017 + A11:2021 + A11:2021/AC:2022; CAN/CSA-E60825-1: 2015; IEC 60825-2:2004 + A1:2006 + A2:2010; IEC 60825-2:2021

As written on the certificate · Line 74 (DAKKS D-PL-11020-03-01)

DIN EN 60825 -2:2011 -06; BEIBLATT 1: 2008; BEIBLATT 2: 2019; EN 60825-2:2004 + A1:2007 + A2:2010; IEC 60825-2:2004 + A1:2006 + A2:2010; IEC 60695-2-10:2021; DIN EN IEC 60695-2-10:2023; EN IEC 60695-2-10:2021; IEC 60695-2-11:2021; DIN EN IEC 60695-2-11:2022; EN IEC 60695-2-11:2021; IEC 60695-10-2:2014; DIN EN 60695-10-2:2016; EN 60695-10-2: 2014; IEC 60695-11-3:2012; DIN EN 60695-11-3:2014; EN 60695-11-3:2012

IEC 60884-1Name not checked yet
As written on the certificate · Line 81 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-3 V2.2.1 (2021-07); DIN EN 300 132-3-0:2013; DIN EN 300 132-3-1: 2013; IEC 60529:1989/A2:2013 /COR1:2019; DIN EN 60529:2014; CAN/CSA -C22.2 NO. 60529: 2016; Telcordia GR-3108-CORE; Telcordia GR-63-Core; Telcordia GR-1089-Core; IEC 60884-1:2022

IEC 60884-2-5Name not checked yet
As written on the certificate · Line 82 (DAKKS D-PL-11020-03-01)

IEC 60884-2-5: 2017; BS 1363-1+A4: 1995; BS 1363-2: 1999; BS 1363-2+A1:2016; DIN VDE 0620-101:1992; EN 50075: 1990; IEC 62196-1:2022; DIN EN IEC 62196-1:2023; EN IEC 62196-1: 2022; IEC 61851-1: 2017; DIN EN IEC 61851-1:2019; EN IEC 61851-1: 2019

IEC 60945Maritime navigation and radiocommunication equipment and systems - General requirements - Methods of testing and required test results
As written on the certificate · Line 49 (DAKKS D-PL-11020-03-01)

36-00-808/--N: 2016; ES 96200-00, L 2014-06; STD 515-0003 2017-02; TB1901 2016-05; 2017-10; VDA 320: 2014; 28401NDS02-8: 2016-03; CS.00054: 2018-01; IEC 60533: 2015; IEC 60945:2002

As written on the certificate · Line 50 (DAKKS D-PL-11020-03-01)

DIN EN 60945: 2003; RTCA/DO-160D Section 15; RTCA/DO-160D Section 16; RTCA/DO-160D Section 17; RTCA/DO-160D Section 18; RTCA/DO-160D Section 19; RTCA/DO-160D Section 20; RTCA/DO-160D Section 21; RTCA/DO-160D Section 25; RTCA/DO-160E Section 15; RTCA/DO-160E Section 16

IEC 60950-22Name not checked yet
As written on the certificate · Line 58 (DAKKS D-PL-11020-03-01)

UL 62368-1:2025; UL 62368-1:2019; UL 62368-1:2014; CAN/CSA-C22.2 NO. 62368-1-14:2014; CAN/CSA C22.2 No. 62368-1:19; IEC 62368-3:2017; DIN EN IEC 62368-3:2020; IEC 60950-22:2016; DIN EN 60950-22:2017; ANSI/UL 60950-22: 2011; ANSI/UL 60950-22:2017; UL 60950-22:2017

IEC 61131-2Name not checked yet
As written on the certificate · Line 19 (DAKKS D-PL-11020-03-01)

IEC 61000-3-12:2011 + AMD:2021; DIN EN 61000-3-12:2012; IEC 61000-5-7: 2001; DIN EN 61000-5-7: 2001; IEC 61131-2:2017; DIN EN 61131-2:2008; IEC 61204-3:2016; DIN EN IEC 61204-3: 2018

IEC 61204-3Name not checked yet
As written on the certificate · Line 19 (DAKKS D-PL-11020-03-01)

IEC 61000-3-12:2011 + AMD:2021; DIN EN 61000-3-12:2012; IEC 61000-5-7: 2001; DIN EN 61000-5-7: 2001; IEC 61131-2:2017; DIN EN 61131-2:2008; IEC 61204-3:2016; DIN EN IEC 61204-3: 2018

IEC 61341Name not checked yet
As written on the certificate · Line 2 (DAKKS D-PL-11020-03-05)

IEC 62471:2006; DIN EN 62471:2009; IEC/TR 62778 Ed. 2.0:2014; DIN IEC/TR 62778:2014; DIN EN 13032 -1:2012; DIN EN 13032 -4:2019; IEC/TR 61341:2010; DIN EN 61341:2012 -08; DIN EN 502 85: 1999 -06; IEC 62612:2013 +A1:2015 +A2:2018

IEC 61373Railway applications - Rolling stock equipment - Shock and vibration tests
As written on the certificate · Line 91 (DAKKS D-PL-11020-03-01)

IEC 60529:2013; ISO 20653:2013; JESD22-B103:2016; JESD22-B104:2004; IEC 61373:2010; EN 50155 (2021-07); ISO 16750-3:2023; ISO 16750-4:2023; ISO 16750-5:2023

IEC 61439-1Name not checked yet
As written on the certificate · Line 83 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61851-21-2:2021; DIN EN 61851-22: 2002; IEC 61851-22: 2001; DIN EN 61851-22:2002; IEC 61439-1:2020; DIN EN IEC 61439-1:2021; DIN EN IEC 61439-7: 2024-07; DIN EN ISO 12100: 2011 + Berichtigung1:2013

IEC 61439-7Name not checked yet
As written on the certificate · Line 83 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61851-21-2:2021; DIN EN 61851-22: 2002; IEC 61851-22: 2001; DIN EN 61851-22:2002; IEC 61439-1:2020; DIN EN IEC 61439-1:2021; DIN EN IEC 61439-7: 2024-07; DIN EN ISO 12100: 2011 + Berichtigung1:2013

IEC 61496-1Name not checked yet
As written on the certificate · Line 22 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61326-2-5:2022; EN IEC 61326-2-5:2021; IEC 61326-3-1:2017; DIN EN 61326-3-1: 2018; EN 61326-3-1:2017; IEC 61326-3-2:2017; DIN EN IEC 61326-3-2: 2019; EN IEC 61326-3-2:2018; IEC 61496-1:2020

As written on the certificate · Line 23 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61496-1:2021; EN IEC 61496-1:2020; IEC 61547:2020; DIN EN IEC 61547:2023; EN IEC 61547:2023; IEC 61587-3:2013; DIN EN 61587-3:2013; EN 61587-3:2013; IEC 61800-3:2022; DIN EN IEC 61800-3:2024; EN IEC 61800-3:2023; IEC 61850-3:2014; DIN EN 61850-3:2014; EN 61850-3:2014; IEC 61851-1:2010

As written on the certificate · Line 84 (DAKKS D-PL-11020-03-01)

IEC 60204-1:2016/AMD:2021; DIN EN 60204-1:2019-06; IEC 61496-1:2020; DIN EN IEC 61496-1:2021-06; IEC TS 61496-4-2:2014; DIN IEC/TS 61496-4-2: 2015-06; IEC 60664-1:2020; DIN EN IEC 60664-1:2022-07; IEC 62262:2021 + AMD1:2021

IEC 61547Equipment for general lighting purposes - EMC immunity requirementsCertificate says EN 61547. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 23 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61496-1:2021; EN IEC 61496-1:2020; IEC 61547:2020; DIN EN IEC 61547:2023; EN IEC 61547:2023; IEC 61587-3:2013; DIN EN 61587-3:2013; EN 61587-3:2013; IEC 61800-3:2022; DIN EN IEC 61800-3:2024; EN IEC 61800-3:2023; IEC 61850-3:2014; DIN EN 61850-3:2014; EN 61850-3:2014; IEC 61851-1:2010

IEC 61587-3Name not checked yet
As written on the certificate · Line 23 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61496-1:2021; EN IEC 61496-1:2020; IEC 61547:2020; DIN EN IEC 61547:2023; EN IEC 61547:2023; IEC 61587-3:2013; DIN EN 61587-3:2013; EN 61587-3:2013; IEC 61800-3:2022; DIN EN IEC 61800-3:2024; EN IEC 61800-3:2023; IEC 61850-3:2014; DIN EN 61850-3:2014; EN 61850-3:2014; IEC 61851-1:2010

IEC 61800-3Adjustable speed electrical power drive systems - Part 3: EMC requirements and specific test methods for PDS and machine tools
As written on the certificate · Line 23 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61496-1:2021; EN IEC 61496-1:2020; IEC 61547:2020; DIN EN IEC 61547:2023; EN IEC 61547:2023; IEC 61587-3:2013; DIN EN 61587-3:2013; EN 61587-3:2013; IEC 61800-3:2022; DIN EN IEC 61800-3:2024; EN IEC 61800-3:2023; IEC 61850-3:2014; DIN EN 61850-3:2014; EN 61850-3:2014; IEC 61851-1:2010

IEC 61800-5-1Name not checked yet
As written on the certificate · Line 77 (DAKKS D-PL-11020-03-01)

ISO 3795:1989; IEC 60112:2020; DIN EN IEC 60112:2022; EN IEC 60112:2016-10:2020; IEC 61800-5-1:2022; COR1:2023; DIN EN IEC 61800-5-1:2024; EN IEC 61800-5-1:2023; UL 61800-5-1:2012; ANSI/UL 61800-5-1: 2017

IEC 61850-3Name not checked yet
As written on the certificate · Line 23 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61496-1:2021; EN IEC 61496-1:2020; IEC 61547:2020; DIN EN IEC 61547:2023; EN IEC 61547:2023; IEC 61587-3:2013; DIN EN 61587-3:2013; EN 61587-3:2013; IEC 61800-3:2022; DIN EN IEC 61800-3:2024; EN IEC 61800-3:2023; IEC 61850-3:2014; DIN EN 61850-3:2014; EN 61850-3:2014; IEC 61851-1:2010

IEC 62133-1Name not checked yet
As written on the certificate · Line 79 (DAKKS D-PL-11020-03-01)

UL 62133: 2017; CAN/CSA-E62133-13: 2013; CAN/CSA-C22.2 NO. 62133:2017; IEC 62133-1: 2017; DIN EN 62133-1:2017; IEC 62133-2: 2017; DIN EN 62133-2:2022

IEC 62133-2Secondary cells and batteries containing alkaline or other non-acid electrolytes - Safety requirements for portable sealed secondary cells, and for batteries made from them, for use in portable applications - Part 2: Lithium systems
As written on the certificate · Line 79 (DAKKS D-PL-11020-03-01)

UL 62133: 2017; CAN/CSA-E62133-13: 2013; CAN/CSA-C22.2 NO. 62133:2017; IEC 62133-1: 2017; DIN EN 62133-1:2017; IEC 62133-2: 2017; DIN EN 62133-2:2022

As written on the certificate · Line 94 (DAKKS D-PL-11020-03-01)

MIL-STD-883; RTCA DO-160; UN ST/SG/AC.10/11 Rev 8; IEC 62133-2:2022; IEC 62619:2022

IEC 62196-1Name not checked yet
As written on the certificate · Line 82 (DAKKS D-PL-11020-03-01)

IEC 60884-2-5: 2017; BS 1363-1+A4: 1995; BS 1363-2: 1999; BS 1363-2+A1:2016; DIN VDE 0620-101:1992; EN 50075: 1990; IEC 62196-1:2022; DIN EN IEC 62196-1:2023; EN IEC 62196-1: 2022; IEC 61851-1: 2017; DIN EN IEC 61851-1:2019; EN IEC 61851-1: 2019

IEC 62233Measurement methods for electromagnetic fields of household appliances and similar apparatus with regard to human exposure
As written on the certificate · Line 35 (DAKKS D-PL-11020-03-01)

DIN EN 50663:2017; DIN EN 50665:2019; DIN EN 62233:2008; IEC 62493:2015 + AMD1:2022

IEC 62236-3-2Name not checked yet
As written on the certificate · Line 38 (DAKKS D-PL-11020-03-01)

DIN EN 50155:2022; IEC 62236-3-2 :2018; EMV Regelung Nr. EMV 06:2019; DIN EN 12895: 2020; DIN EN 13309:2010; DIN EN 15194:2024; ISO 13766-1: 2018; DIN EN ISO 13766-1:2019; ISO 13766-2:2018

IEC 62262Name not checked yet
As written on the certificate · Line 84 (DAKKS D-PL-11020-03-01)

IEC 60204-1:2016/AMD:2021; DIN EN 60204-1:2019-06; IEC 61496-1:2020; DIN EN IEC 61496-1:2021-06; IEC TS 61496-4-2:2014; DIN IEC/TS 61496-4-2: 2015-06; IEC 60664-1:2020; DIN EN IEC 60664-1:2022-07; IEC 62262:2021 + AMD1:2021

As written on the certificate · Line 85 (DAKKS D-PL-11020-03-01)

DIN EN 62262:2022-02; EN 62262:2002 + A1:2021; IEC 62262:2021 + AMD1:2021; UL 1740:2018; UL 508A:2018; NFPA 79:2015; NFPA 79:2021; IEC 62040-1:2017+ CORRIGENDUM 1:2019; IEC 62477-1:2012; DIN EN IEC 62040-1:2020; EN IEC 62040-1:2019; IEC 62040 -3: 2011 + CORRIGENDUM 1:2011; DIN EN 62040-3:2011; EN 62040-3:2011; IEC 62040-4: 2013; DIN EN 62040-4:2014; EN 62040-4:2013

IEC 62301Name not checked yet
As written on the certificate · Line 25 (DAKKS D-PL-11020-03-01)

IEC 61851-22:2001; DIN EN 61851-22:2002; IEC 62040-2:2016; DIN EN IEC 62040:2019; IEC 62301:2011; ITU-T K.20:2019-11; ITU-T K.21: 2019 + A1:2020; ITU-T K.43:2009; ITU-T K.44:2019

IEC 62311Assessment of electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (0 Hz to 300 GHz)Certificate says EN 62311. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 36 (DAKKS D-PL-11020-03-01)

DIN EN 62493:2024; EN 62493:2015 + A1:2022; IEC 62311:2020; DIN EN IEC 62311:2020; EN IEC 62311:2020; IEC 62369-1: 2008

IEC 62368-1Audio/video, information and communication technology equipment - Part 1: Safety requirements
As written on the certificate · Line 57 (DAKKS D-PL-11020-03-01)

RSS-139 Issue 3; RSS-142 Issue 5; RSS-194 Issue 1; RSS-199 Issue 3; RSS-210 Issue 10; RSS-213 Issue 3; RSS-216 Issue 2; RSS-310 Issue 5; IEC 62368-1:2023; IEC 62368-1:2018; IEC 62368-1:2014; DIN EN IEC 62368-1:2025; DIN EN 62368-3:2020

IEC 62368-3Name not checked yet
As written on the certificate · Line 57 (DAKKS D-PL-11020-03-01)

RSS-139 Issue 3; RSS-142 Issue 5; RSS-194 Issue 1; RSS-199 Issue 3; RSS-210 Issue 10; RSS-213 Issue 3; RSS-216 Issue 2; RSS-310 Issue 5; IEC 62368-1:2023; IEC 62368-1:2018; IEC 62368-1:2014; DIN EN IEC 62368-1:2025; DIN EN 62368-3:2020

As written on the certificate · Line 58 (DAKKS D-PL-11020-03-01)

UL 62368-1:2025; UL 62368-1:2019; UL 62368-1:2014; CAN/CSA-C22.2 NO. 62368-1-14:2014; CAN/CSA C22.2 No. 62368-1:19; IEC 62368-3:2017; DIN EN IEC 62368-3:2020; IEC 60950-22:2016; DIN EN 60950-22:2017; ANSI/UL 60950-22: 2011; ANSI/UL 60950-22:2017; UL 60950-22:2017

IEC 62369-1Name not checked yet
As written on the certificate · Line 34 (DAKKS D-PL-11020-03-01)

ETSI EN 303 417 V1.1.1:2017; BGV B 11 DGUV VORSCHRIFT 15:2001; DIN EN 50413:2020; EN 50413:2019; DIN EN 50364:2019; EN 50364:2018; EN 62369-1:2009

As written on the certificate · Line 36 (DAKKS D-PL-11020-03-01)

DIN EN 62493:2024; EN 62493:2015 + A1:2022; IEC 62311:2020; DIN EN IEC 62311:2020; EN IEC 62311:2020; IEC 62369-1: 2008

As written on the certificate · Line 37 (DAKKS D-PL-11020-03-01)

DIN EN 62369-1:2010; IEC 62479:2010; DIN EN 62479:2011; DIN EN 50121-3-2:2016 + A1:2020; DIN EN 50121-4:2017 +A1:2020; DIN EN 50121-5:2017 + A1:2020

IEC 62471Photobiological safety of lamps and lamp systems
As written on the certificate · Line 2 (DAKKS D-PL-11020-03-05)

IEC 62471:2006; DIN EN 62471:2009; IEC/TR 62778 Ed. 2.0:2014; DIN IEC/TR 62778:2014; DIN EN 13032 -1:2012; DIN EN 13032 -4:2019; IEC/TR 61341:2010; DIN EN 61341:2012 -08; DIN EN 502 85: 1999 -06; IEC 62612:2013 +A1:2015 +A2:2018

IEC 62477-1Name not checked yet
As written on the certificate · Line 78 (DAKKS D-PL-11020-03-01)

DIN EN 50178:1998; IEC 62477-1:2022 + COR1:2024; DIN EN IEC 62477-1:2024; IEC 60255-27: 2013; DIN EN IEC 60255-27: 2026-04; IEC 60730-1:2013, modifiziert + COR1:2014 + A1:2015 + A2:2020; DIN EN 60730-1:2025; IEC 60086-4:2019; DIN EN IEC 60086-4:2020; UL 60086-4: 2015

As written on the certificate · Line 85 (DAKKS D-PL-11020-03-01)

DIN EN 62262:2022-02; EN 62262:2002 + A1:2021; IEC 62262:2021 + AMD1:2021; UL 1740:2018; UL 508A:2018; NFPA 79:2015; NFPA 79:2021; IEC 62040-1:2017+ CORRIGENDUM 1:2019; IEC 62477-1:2012; DIN EN IEC 62040-1:2020; EN IEC 62040-1:2019; IEC 62040 -3: 2011 + CORRIGENDUM 1:2011; DIN EN 62040-3:2011; EN 62040-3:2011; IEC 62040-4: 2013; DIN EN 62040-4:2014; EN 62040-4:2013

IEC 62479Assessment of the compliance of low power electronic and electrical equipment with the basic restrictions related to human exposure to electromagnetic fields (10 MHz to 300 GHz)
As written on the certificate · Line 37 (DAKKS D-PL-11020-03-01)

DIN EN 62369-1:2010; IEC 62479:2010; DIN EN 62479:2011; DIN EN 50121-3-2:2016 + A1:2020; DIN EN 50121-4:2017 +A1:2020; DIN EN 50121-5:2017 + A1:2020

IEC 62493Name not checked yet
As written on the certificate · Line 35 (DAKKS D-PL-11020-03-01)

DIN EN 50663:2017; DIN EN 50665:2019; DIN EN 62233:2008; IEC 62493:2015 + AMD1:2022

As written on the certificate · Line 36 (DAKKS D-PL-11020-03-01)

DIN EN 62493:2024; EN 62493:2015 + A1:2022; IEC 62311:2020; DIN EN IEC 62311:2020; EN IEC 62311:2020; IEC 62369-1: 2008

IEC 62612Name not checked yet
As written on the certificate · Line 2 (DAKKS D-PL-11020-03-05)

IEC 62471:2006; DIN EN 62471:2009; IEC/TR 62778 Ed. 2.0:2014; DIN IEC/TR 62778:2014; DIN EN 13032 -1:2012; DIN EN 13032 -4:2019; IEC/TR 61341:2010; DIN EN 61341:2012 -08; DIN EN 502 85: 1999 -06; IEC 62612:2013 +A1:2015 +A2:2018

As written on the certificate · Line 3 (DAKKS D-PL-11020-03-05)

DIN EN 62612:2019-04; EN 62612:2013 + A1:2017 + A2:2018; IEC 62612:2013 +A1:2015 +A2:2018; IEC 62717:2014+AMD1:2015 +AMD2:2019; DIN EN 62717:2019-12; EN 62717:2017+A2:2019; IEC 62717:2014; IEC 62717:2015; IEC 62717:2019

IEC 62619Secondary cells and batteries containing alkaline or other non-acid electrolytes - Safety requirements for secondary lithium cells and batteries, for use in industrial applications
As written on the certificate · Line 80 (DAKKS D-PL-11020-03-01)

IEC 62619:2017; DIN EN 62619:2017; Battery Association of Japan Manual for transport of lithium / lithium ion batteries; UN ST/SG/ AC.10/11 Rev 5 AMD1, 2013 Rev 6, 2015 + Amendment 1; DIN ETS 300 132-1: 2005; ETS 300132-1: 1996; ETSI EN 300 132 -2 V2.7.1 (2022-09); DIN EN 300132-2:2017

As written on the certificate · Line 94 (DAKKS D-PL-11020-03-01)

MIL-STD-883; RTCA DO-160; UN ST/SG/AC.10/11 Rev 8; IEC 62133-2:2022; IEC 62619:2022

IEC 62717Name not checked yet
As written on the certificate · Line 3 (DAKKS D-PL-11020-03-05)

DIN EN 62612:2019-04; EN 62612:2013 + A1:2017 + A2:2018; IEC 62612:2013 +A1:2015 +A2:2018; IEC 62717:2014+AMD1:2015 +AMD2:2019; DIN EN 62717:2019-12; EN 62717:2017+A2:2019; IEC 62717:2014; IEC 62717:2015; IEC 62717:2019

IEC 62911Name not checked yet
As written on the certificate · Line 59 (DAKKS D-PL-11020-03-01)

CAN/CSA-C22.2 NO. 60950-22:2017; DIN EN 41003:2009 + BEIBLATT 1: 2006; IEC 62911:2016; IEC 60215:2016; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019, IEC 61010-1 Ed. 3.1: 2017; DIN EN 61010-1:2020 (EN 61010-1:2010 + A1:2019 + A1:2019/AC:2019)

ETSI

ETSI EN 300 019-2-1Name not checked yet
As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

ETSI EN 300 019-2-2Name not checked yet
As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

ETSI EN 300 019-2-3Name not checked yet
As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

ETSI EN 300 019-2-4Name not checked yet
As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

ETSI EN 300 019-2-5Name not checked yet
As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

ETSI EN 300 019-2-6Name not checked yet
As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

ETSI EN 300 019-2-7Name not checked yet
As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

ETSI EN 300 132-1Name not checked yet
As written on the certificate · Line 12 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-1 V2.2.1 (2022-11); ETSI EN 300 132-2 V2.7.1 (2022-09); ETSI EN 300 132-3-0 V2.1.1 (2012-02); ETSI EN 300 132-3-1 V2.1.1 (2012-10); ETSI EN 300 386 V2.2.1 (2022-09); DIN EN 50090-2-2:2007 (EN 50090-2-2: 1996 +A1:2002+A2:2007); DIN EN 50090-8: 2001 (EN 50090-8: 2000); DIN EN 50130-4: 2015 (EN 50130-4: 2011+A1:2014)

ETSI EN 300 132-2Name not checked yet
As written on the certificate · Line 12 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-1 V2.2.1 (2022-11); ETSI EN 300 132-2 V2.7.1 (2022-09); ETSI EN 300 132-3-0 V2.1.1 (2012-02); ETSI EN 300 132-3-1 V2.1.1 (2012-10); ETSI EN 300 386 V2.2.1 (2022-09); DIN EN 50090-2-2:2007 (EN 50090-2-2: 1996 +A1:2002+A2:2007); DIN EN 50090-8: 2001 (EN 50090-8: 2000); DIN EN 50130-4: 2015 (EN 50130-4: 2011+A1:2014)

As written on the certificate · Line 80 (DAKKS D-PL-11020-03-01)

IEC 62619:2017; DIN EN 62619:2017; Battery Association of Japan Manual for transport of lithium / lithium ion batteries; UN ST/SG/ AC.10/11 Rev 5 AMD1, 2013 Rev 6, 2015 + Amendment 1; DIN ETS 300 132-1: 2005; ETS 300132-1: 1996; ETSI EN 300 132 -2 V2.7.1 (2022-09); DIN EN 300132-2:2017

ETSI EN 300 132-3-0Name not checked yet
As written on the certificate · Line 12 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-1 V2.2.1 (2022-11); ETSI EN 300 132-2 V2.7.1 (2022-09); ETSI EN 300 132-3-0 V2.1.1 (2012-02); ETSI EN 300 132-3-1 V2.1.1 (2012-10); ETSI EN 300 386 V2.2.1 (2022-09); DIN EN 50090-2-2:2007 (EN 50090-2-2: 1996 +A1:2002+A2:2007); DIN EN 50090-8: 2001 (EN 50090-8: 2000); DIN EN 50130-4: 2015 (EN 50130-4: 2011+A1:2014)

As written on the certificate · Line 81 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-3 V2.2.1 (2021-07); DIN EN 300 132-3-0:2013; DIN EN 300 132-3-1: 2013; IEC 60529:1989/A2:2013 /COR1:2019; DIN EN 60529:2014; CAN/CSA -C22.2 NO. 60529: 2016; Telcordia GR-3108-CORE; Telcordia GR-63-Core; Telcordia GR-1089-Core; IEC 60884-1:2022

ETSI EN 300 132-3-1Name not checked yet
As written on the certificate · Line 12 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-1 V2.2.1 (2022-11); ETSI EN 300 132-2 V2.7.1 (2022-09); ETSI EN 300 132-3-0 V2.1.1 (2012-02); ETSI EN 300 132-3-1 V2.1.1 (2012-10); ETSI EN 300 386 V2.2.1 (2022-09); DIN EN 50090-2-2:2007 (EN 50090-2-2: 1996 +A1:2002+A2:2007); DIN EN 50090-8: 2001 (EN 50090-8: 2000); DIN EN 50130-4: 2015 (EN 50130-4: 2011+A1:2014)

As written on the certificate · Line 81 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-3 V2.2.1 (2021-07); DIN EN 300 132-3-0:2013; DIN EN 300 132-3-1: 2013; IEC 60529:1989/A2:2013 /COR1:2019; DIN EN 60529:2014; CAN/CSA -C22.2 NO. 60529: 2016; Telcordia GR-3108-CORE; Telcordia GR-63-Core; Telcordia GR-1089-Core; IEC 60884-1:2022

ETSI EN 300 220-1Name not checked yet
As written on the certificate · Line 30 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-50 V2.3.1: 2021; ETSI EN 301 489-51 V2.1.1: 2019; ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 303 687 V1.1.1 (2023-06); ETSI EN 300 220-1 V3.1.1: 2017

ETSI EN 300 220-2Name not checked yet
As written on the certificate · Line 31 (DAKKS D-PL-11020-03-01)

ETSI EN 300 220-2 V3.2.1: 2018; ETSI EN 300 220-2 V3.1.1: 2017; ETSI EN 300 220-3-1 V2.1.1: 2016; ETSI EN 300 220-3-2 V1.1.1: 2017; ETSI EN 300 220-4 V1.1.1: 2017

ETSI EN 300 220-3-1Name not checked yet
As written on the certificate · Line 31 (DAKKS D-PL-11020-03-01)

ETSI EN 300 220-2 V3.2.1: 2018; ETSI EN 300 220-2 V3.1.1: 2017; ETSI EN 300 220-3-1 V2.1.1: 2016; ETSI EN 300 220-3-2 V1.1.1: 2017; ETSI EN 300 220-4 V1.1.1: 2017

ETSI EN 300 220-3-2Name not checked yet
As written on the certificate · Line 31 (DAKKS D-PL-11020-03-01)

ETSI EN 300 220-2 V3.2.1: 2018; ETSI EN 300 220-2 V3.1.1: 2017; ETSI EN 300 220-3-1 V2.1.1: 2016; ETSI EN 300 220-3-2 V1.1.1: 2017; ETSI EN 300 220-4 V1.1.1: 2017

ETSI EN 300 220-4Name not checked yet
As written on the certificate · Line 31 (DAKKS D-PL-11020-03-01)

ETSI EN 300 220-2 V3.2.1: 2018; ETSI EN 300 220-2 V3.1.1: 2017; ETSI EN 300 220-3-1 V2.1.1: 2016; ETSI EN 300 220-3-2 V1.1.1: 2017; ETSI EN 300 220-4 V1.1.1: 2017

ETSI EN 300 328Wideband transmission systems; Data transmission equipment operating in the 2,4 GHz band; Harmonised Standard for access to radio spectrum
As written on the certificate · Line 32 (DAKKS D-PL-11020-03-01)

ETSI EN 300 328 V2.1.1:2016; ETSI EN 300 328 V2.2.2:2019; ETSI EN 300 330 V2.1.1:2017; ETSI EN 300 440 V2.2.1:2018; ETSI EN 300 440 V2.1.1:2017; ETSI EN 301 406 V2.2.2:2016; ETSI EN 301 502 V12.5.2:2017

ETSI EN 300 330Short Range Devices (SRD); Radio equipment in the frequency range 9 kHz to 25 MHz and inductive loop systems in the frequency range 9 kHz to 30 MHz; Harmonised Standard covering the essential requirements of article 3.2 of Directive 2014/53/EU
As written on the certificate · Line 32 (DAKKS D-PL-11020-03-01)

ETSI EN 300 328 V2.1.1:2016; ETSI EN 300 328 V2.2.2:2019; ETSI EN 300 330 V2.1.1:2017; ETSI EN 300 440 V2.2.1:2018; ETSI EN 300 440 V2.1.1:2017; ETSI EN 301 406 V2.2.2:2016; ETSI EN 301 502 V12.5.2:2017

ETSI EN 300 386Name not checked yet
As written on the certificate · Line 12 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-1 V2.2.1 (2022-11); ETSI EN 300 132-2 V2.7.1 (2022-09); ETSI EN 300 132-3-0 V2.1.1 (2012-02); ETSI EN 300 132-3-1 V2.1.1 (2012-10); ETSI EN 300 386 V2.2.1 (2022-09); DIN EN 50090-2-2:2007 (EN 50090-2-2: 1996 +A1:2002+A2:2007); DIN EN 50090-8: 2001 (EN 50090-8: 2000); DIN EN 50130-4: 2015 (EN 50130-4: 2011+A1:2014)

ETSI EN 300 440Name not checked yet
As written on the certificate · Line 32 (DAKKS D-PL-11020-03-01)

ETSI EN 300 328 V2.1.1:2016; ETSI EN 300 328 V2.2.2:2019; ETSI EN 300 330 V2.1.1:2017; ETSI EN 300 440 V2.2.1:2018; ETSI EN 300 440 V2.1.1:2017; ETSI EN 301 406 V2.2.2:2016; ETSI EN 301 502 V12.5.2:2017

ETSI EN 301 406Name not checked yet
As written on the certificate · Line 32 (DAKKS D-PL-11020-03-01)

ETSI EN 300 328 V2.1.1:2016; ETSI EN 300 328 V2.2.2:2019; ETSI EN 300 330 V2.1.1:2017; ETSI EN 300 440 V2.2.1:2018; ETSI EN 300 440 V2.1.1:2017; ETSI EN 301 406 V2.2.2:2016; ETSI EN 301 502 V12.5.2:2017

ETSI EN 301 489-1Name not checked yet
As written on the certificate · Line 26 (DAKKS D-PL-11020-03-01)

ITU-T K.45:2019 +A1:2020; ITU-T K.48:2006; ITU-T K.54:2004; VdS 2110:2017; VdS 2115:2015; VdS 2195 :2001; ETSI EN 301 489-1 V2.1.1: 2017; ETSI EN 301 489-1 V2.2.3: 2019

ETSI EN 301 489-3Name not checked yet
As written on the certificate · Line 27 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-3 V2.1.1: 2019; ETSI EN 301 489-4 V3.2.1: 2019; ETSI EN 301 489-4 V3.3.1: 2021; ETSI EN 301 489-6 V2.2.1: 2019; ETSI EN 301 489-7 V1.3.1: 2005

ETSI EN 301 489-4Name not checked yet
As written on the certificate · Line 27 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-3 V2.1.1: 2019; ETSI EN 301 489-4 V3.2.1: 2019; ETSI EN 301 489-4 V3.3.1: 2021; ETSI EN 301 489-6 V2.2.1: 2019; ETSI EN 301 489-7 V1.3.1: 2005

ETSI EN 301 489-6Name not checked yet
As written on the certificate · Line 27 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-3 V2.1.1: 2019; ETSI EN 301 489-4 V3.2.1: 2019; ETSI EN 301 489-4 V3.3.1: 2021; ETSI EN 301 489-6 V2.2.1: 2019; ETSI EN 301 489-7 V1.3.1: 2005

ETSI EN 301 489-7Name not checked yet
As written on the certificate · Line 27 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-3 V2.1.1: 2019; ETSI EN 301 489-4 V3.2.1: 2019; ETSI EN 301 489-4 V3.3.1: 2021; ETSI EN 301 489-6 V2.2.1: 2019; ETSI EN 301 489-7 V1.3.1: 2005

ETSI EN 301 489-17Name not checked yet
As written on the certificate · Line 28 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-17 V3.1.1: 2017; ETSI EN 301 489-17 V3.2.4: 2020; ETSI EN 301 489-19 V2.1.1: 2019; ETSI EN 301 489-24 V1.5.1: 2019; ETSI EN 301 489-25 V2.3.2: 2005

ETSI EN 301 489-19Name not checked yet
As written on the certificate · Line 28 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-17 V3.1.1: 2017; ETSI EN 301 489-17 V3.2.4: 2020; ETSI EN 301 489-19 V2.1.1: 2019; ETSI EN 301 489-24 V1.5.1: 2019; ETSI EN 301 489-25 V2.3.2: 2005

ETSI EN 301 489-24Name not checked yet
As written on the certificate · Line 28 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-17 V3.1.1: 2017; ETSI EN 301 489-17 V3.2.4: 2020; ETSI EN 301 489-19 V2.1.1: 2019; ETSI EN 301 489-24 V1.5.1: 2019; ETSI EN 301 489-25 V2.3.2: 2005

ETSI EN 301 489-25Name not checked yet
As written on the certificate · Line 28 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-17 V3.1.1: 2017; ETSI EN 301 489-17 V3.2.4: 2020; ETSI EN 301 489-19 V2.1.1: 2019; ETSI EN 301 489-24 V1.5.1: 2019; ETSI EN 301 489-25 V2.3.2: 2005

ETSI EN 301 489-34Name not checked yet
As written on the certificate · Line 29 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-34 V1.4.1: 2013; ETSI EN 301 489-34 V2.1.1: 2019; ETSI EN 301 489-35 V2.2.1: 2019; ETSI EN 301 489-50 V2.2.1: 2019

ETSI EN 301 489-35Name not checked yet
As written on the certificate · Line 29 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-34 V1.4.1: 2013; ETSI EN 301 489-34 V2.1.1: 2019; ETSI EN 301 489-35 V2.2.1: 2019; ETSI EN 301 489-50 V2.2.1: 2019

ETSI EN 301 489-50Name not checked yet
As written on the certificate · Line 29 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-34 V1.4.1: 2013; ETSI EN 301 489-34 V2.1.1: 2019; ETSI EN 301 489-35 V2.2.1: 2019; ETSI EN 301 489-50 V2.2.1: 2019

As written on the certificate · Line 30 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-50 V2.3.1: 2021; ETSI EN 301 489-51 V2.1.1: 2019; ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 303 687 V1.1.1 (2023-06); ETSI EN 300 220-1 V3.1.1: 2017

ETSI EN 301 489-51Name not checked yet
As written on the certificate · Line 30 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-50 V2.3.1: 2021; ETSI EN 301 489-51 V2.1.1: 2019; ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 303 687 V1.1.1 (2023-06); ETSI EN 300 220-1 V3.1.1: 2017

ETSI EN 301 489-52Name not checked yet
As written on the certificate · Line 30 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-50 V2.3.1: 2021; ETSI EN 301 489-51 V2.1.1: 2019; ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 303 687 V1.1.1 (2023-06); ETSI EN 300 220-1 V3.1.1: 2017

ETSI EN 301 502Name not checked yet
As written on the certificate · Line 32 (DAKKS D-PL-11020-03-01)

ETSI EN 300 328 V2.1.1:2016; ETSI EN 300 328 V2.2.2:2019; ETSI EN 300 330 V2.1.1:2017; ETSI EN 300 440 V2.2.1:2018; ETSI EN 300 440 V2.1.1:2017; ETSI EN 301 406 V2.2.2:2016; ETSI EN 301 502 V12.5.2:2017

ETSI EN 301 511Global System for Mobile communications (GSM); Mobile Stations (MS) equipment; Harmonised Standard covering the essential requirements of article 3.2 of Directive 2014/53/EU
As written on the certificate · Line 33 (DAKKS D-PL-11020-03-01)

ETSI EN 301 511 V12.5.1:2017; ETSI EN 301 893 V2.1.1:2017; ETSI EN 301 908-1 V13.1.1: 2019; ETSI EN 301 908-1 V15.1.1: 2021; ETSI EN 302 208 V3.1.1:2016; ETSI EN 302 208 V3.3.1:2020; ETSI EN 303 413 V1.1.1:2017

ETSI EN 301 893Name not checked yet
As written on the certificate · Line 33 (DAKKS D-PL-11020-03-01)

ETSI EN 301 511 V12.5.1:2017; ETSI EN 301 893 V2.1.1:2017; ETSI EN 301 908-1 V13.1.1: 2019; ETSI EN 301 908-1 V15.1.1: 2021; ETSI EN 302 208 V3.1.1:2016; ETSI EN 302 208 V3.3.1:2020; ETSI EN 303 413 V1.1.1:2017

ETSI EN 301 908-1Name not checked yet
As written on the certificate · Line 33 (DAKKS D-PL-11020-03-01)

ETSI EN 301 511 V12.5.1:2017; ETSI EN 301 893 V2.1.1:2017; ETSI EN 301 908-1 V13.1.1: 2019; ETSI EN 301 908-1 V15.1.1: 2021; ETSI EN 302 208 V3.1.1:2016; ETSI EN 302 208 V3.3.1:2020; ETSI EN 303 413 V1.1.1:2017

ETSI EN 302 208Name not checked yet
As written on the certificate · Line 33 (DAKKS D-PL-11020-03-01)

ETSI EN 301 511 V12.5.1:2017; ETSI EN 301 893 V2.1.1:2017; ETSI EN 301 908-1 V13.1.1: 2019; ETSI EN 301 908-1 V15.1.1: 2021; ETSI EN 302 208 V3.1.1:2016; ETSI EN 302 208 V3.3.1:2020; ETSI EN 303 413 V1.1.1:2017

ETSI EN 303 413Satellite Earth Stations and Systems (SES); Global Navigation Satellite System (GNSS) receivers; Radio equipment operating in the 1 164 MHz to 1 300 MHz and 1 559 MHz to 1 610 MHz frequency bands; Harmonised Standard for access to radio spectrum
As written on the certificate · Line 33 (DAKKS D-PL-11020-03-01)

ETSI EN 301 511 V12.5.1:2017; ETSI EN 301 893 V2.1.1:2017; ETSI EN 301 908-1 V13.1.1: 2019; ETSI EN 301 908-1 V15.1.1: 2021; ETSI EN 302 208 V3.1.1:2016; ETSI EN 302 208 V3.3.1:2020; ETSI EN 303 413 V1.1.1:2017

ETSI EN 303 417Name not checked yet
As written on the certificate · Line 34 (DAKKS D-PL-11020-03-01)

ETSI EN 303 417 V1.1.1:2017; BGV B 11 DGUV VORSCHRIFT 15:2001; DIN EN 50413:2020; EN 50413:2019; DIN EN 50364:2019; EN 50364:2018; EN 62369-1:2009

ETSI EN 303 687Name not checked yet
As written on the certificate · Line 30 (DAKKS D-PL-11020-03-01)

ETSI EN 301 489-50 V2.3.1: 2021; ETSI EN 301 489-51 V2.1.1: 2019; ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 303 687 V1.1.1 (2023-06); ETSI EN 300 220-1 V3.1.1: 2017

ETSI ETS 300 132-1Name not checked yet
As written on the certificate · Line 80 (DAKKS D-PL-11020-03-01)

IEC 62619:2017; DIN EN 62619:2017; Battery Association of Japan Manual for transport of lithium / lithium ion batteries; UN ST/SG/ AC.10/11 Rev 5 AMD1, 2013 Rev 6, 2015 + Amendment 1; DIN ETS 300 132-1: 2005; ETS 300132-1: 1996; ETSI EN 300 132 -2 V2.7.1 (2022-09); DIN EN 300132-2:2017

IEC 61000 series

IEC 61000-3-2Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current ≤ 16 A per phase)
As written on the certificate · Line 17 (DAKKS D-PL-11020-03-01)

CISPR 36:2020 + AMD1:2023; DIN EN IEC 55036:2021; DIN EN 55103-1:2013; DIN EN 55103-2:2010; IEC 60146-1-1:2009; DIN EN 60146-1-1: 2011; IEC 60335-1:2020; IEC 61000-3-2: 2018 + AMD1:2020 +AMD2:2024

As written on the certificate · Line 18 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-3-2:2023; EN IEC 61000-3-2:2019 + A1:2021; IEC 61000-3-2:2018+A1:2020+ ISH1:2021; IEC 61000-3-3:2013+ A1:2017+A2:2021; DIN EN 61000-3-3:2023; EN 61000-3-3:2013 + A1:2019 + A2:2021 + A2:2021/AC:2022; IEC 61000-3-3:2013 + A1:2017 + A2:2021+A2:2021/COR1:2022; IEC 61000-3-11: 2017; DIN EN IEC 61000-3-11:2021; EN IEC 61000-3-11: 2019; IEC 61000-3-11:2017

IEC 61000-3-3Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤ 16 A per phase and not subject to conditional connection
As written on the certificate · Line 18 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-3-2:2023; EN IEC 61000-3-2:2019 + A1:2021; IEC 61000-3-2:2018+A1:2020+ ISH1:2021; IEC 61000-3-3:2013+ A1:2017+A2:2021; DIN EN 61000-3-3:2023; EN 61000-3-3:2013 + A1:2019 + A2:2021 + A2:2021/AC:2022; IEC 61000-3-3:2013 + A1:2017 + A2:2021+A2:2021/COR1:2022; IEC 61000-3-11: 2017; DIN EN IEC 61000-3-11:2021; EN IEC 61000-3-11: 2019; IEC 61000-3-11:2017

IEC 61000-3-11Electromagnetic compatibility (EMC) - Part 3-11: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems - Equipment with rated current ≤ 75 A and subject to conditional connection
As written on the certificate · Line 18 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-3-2:2023; EN IEC 61000-3-2:2019 + A1:2021; IEC 61000-3-2:2018+A1:2020+ ISH1:2021; IEC 61000-3-3:2013+ A1:2017+A2:2021; DIN EN 61000-3-3:2023; EN 61000-3-3:2013 + A1:2019 + A2:2021 + A2:2021/AC:2022; IEC 61000-3-3:2013 + A1:2017 + A2:2021+A2:2021/COR1:2022; IEC 61000-3-11: 2017; DIN EN IEC 61000-3-11:2021; EN IEC 61000-3-11: 2019; IEC 61000-3-11:2017

IEC 61000-3-12Electromagnetic compatibility (EMC) - Part 3-12: Limits - Limits for harmonic currents produced by equipment connected to public low-voltage systems with input current >16 A and ≤ 75 A per phaseCertificate says EN 61000-3-12. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 19 (DAKKS D-PL-11020-03-01)

IEC 61000-3-12:2011 + AMD:2021; DIN EN 61000-3-12:2012; IEC 61000-5-7: 2001; DIN EN 61000-5-7: 2001; IEC 61131-2:2017; DIN EN 61131-2:2008; IEC 61204-3:2016; DIN EN IEC 61204-3: 2018

IEC 61000-4-2Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
As written on the certificate · Line 3 (DAKKS D-PL-11020-03-01)

IEC 61000-4-2:2008; IEC 61000-4-2:2025

As written on the certificate · Line 4 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-2:2009; EN 61000-4-2: 2009; IEC 61000-4-2:2008; IEC 61000-4-3: 2006 +A1:2008 +A2:2010; IEC 61000-4-3:2020; DIN EN IEC 61000-4-3:2021; EN IEC 61000-4-3:2020; IEC 61000-4-4:2012; DIN EN 61000-4-4:2013; EN 61000-4-4:2012; IEC 61000-4-4:2012; IEC 61000-4-5:2014 + A1:2017; DIN EN 61000-4-5:2019; EN 61000-4-5: 2014 + A1:2017; IEC 61000-4-5:2014 + A1:2017; IEC 61000-4-6:2013; IEC 61000-4-6:2023

IEC 61000-4-3Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity testCertificate says EN 61000-4-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 4 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-2:2009; EN 61000-4-2: 2009; IEC 61000-4-2:2008; IEC 61000-4-3: 2006 +A1:2008 +A2:2010; IEC 61000-4-3:2020; DIN EN IEC 61000-4-3:2021; EN IEC 61000-4-3:2020; IEC 61000-4-4:2012; DIN EN 61000-4-4:2013; EN 61000-4-4:2012; IEC 61000-4-4:2012; IEC 61000-4-5:2014 + A1:2017; DIN EN 61000-4-5:2019; EN 61000-4-5: 2014 + A1:2017; IEC 61000-4-5:2014 + A1:2017; IEC 61000-4-6:2013; IEC 61000-4-6:2023

IEC 61000-4-4Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
As written on the certificate · Line 4 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-2:2009; EN 61000-4-2: 2009; IEC 61000-4-2:2008; IEC 61000-4-3: 2006 +A1:2008 +A2:2010; IEC 61000-4-3:2020; DIN EN IEC 61000-4-3:2021; EN IEC 61000-4-3:2020; IEC 61000-4-4:2012; DIN EN 61000-4-4:2013; EN 61000-4-4:2012; IEC 61000-4-4:2012; IEC 61000-4-5:2014 + A1:2017; DIN EN 61000-4-5:2019; EN 61000-4-5: 2014 + A1:2017; IEC 61000-4-5:2014 + A1:2017; IEC 61000-4-6:2013; IEC 61000-4-6:2023

As written on the certificate · Line 44 (DAKKS D-PL-11020-03-01)

GS 95024-2-2: 2011-02; GS 95025-1: 2012-05; EN 61000-4-4; GS 95024-2: 2021-03; VW 80000: 2022-12; VW 82148: 2013-09

IEC 61000-4-5Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test
As written on the certificate · Line 4 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-2:2009; EN 61000-4-2: 2009; IEC 61000-4-2:2008; IEC 61000-4-3: 2006 +A1:2008 +A2:2010; IEC 61000-4-3:2020; DIN EN IEC 61000-4-3:2021; EN IEC 61000-4-3:2020; IEC 61000-4-4:2012; DIN EN 61000-4-4:2013; EN 61000-4-4:2012; IEC 61000-4-4:2012; IEC 61000-4-5:2014 + A1:2017; DIN EN 61000-4-5:2019; EN 61000-4-5: 2014 + A1:2017; IEC 61000-4-5:2014 + A1:2017; IEC 61000-4-6:2013; IEC 61000-4-6:2023

IEC 61000-4-6Electromagnetic compatibility (EMC) - Part 4-6: Testing and measurement techniques - Immunity to conducted disturbances, induced by radio-frequency fields
As written on the certificate · Line 4 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-2:2009; EN 61000-4-2: 2009; IEC 61000-4-2:2008; IEC 61000-4-3: 2006 +A1:2008 +A2:2010; IEC 61000-4-3:2020; DIN EN IEC 61000-4-3:2021; EN IEC 61000-4-3:2020; IEC 61000-4-4:2012; DIN EN 61000-4-4:2013; EN 61000-4-4:2012; IEC 61000-4-4:2012; IEC 61000-4-5:2014 + A1:2017; DIN EN 61000-4-5:2019; EN 61000-4-5: 2014 + A1:2017; IEC 61000-4-5:2014 + A1:2017; IEC 61000-4-6:2013; IEC 61000-4-6:2023

As written on the certificate · Line 5 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-6:2014; IEC 61000-4-8:2009; DIN EN 61000-4-8:2010; IEC 61000-4-9:2016; DIN EN 61000-4-9:2017

IEC 61000-4-8Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
As written on the certificate · Line 5 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-6:2014; IEC 61000-4-8:2009; DIN EN 61000-4-8:2010; IEC 61000-4-9:2016; DIN EN 61000-4-9:2017

IEC 61000-4-9Electromagnetic compatibility (EMC) - Part 4-9: Testing and measurement techniques - Impulse magnetic field immunity test
As written on the certificate · Line 5 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-6:2014; IEC 61000-4-8:2009; DIN EN 61000-4-8:2010; IEC 61000-4-9:2016; DIN EN 61000-4-9:2017

IEC 61000-4-10Name not checked yet
As written on the certificate · Line 6 (DAKKS D-PL-11020-03-01)

IEC 61000-4-10:2016; DIN EN 61000-4-10:2018; EN 61000-4-10:2017; IEC 61000-4-11: 2004 +A1:2017; IEC 61000-4-11:2020; DIN EN IEC 61000-4-11:2021; EN IEC 61000-4-11:2020+AC2020; IEC 61000-4-13: 2002 +A1:2009 +A2:2015; DIN EN 61000-4-13:2016; EN 61000-4-13: 2002 +A1:2009 +A2:2016

IEC 61000-4-11Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests for equipment with input current up to 16 A per phase
As written on the certificate · Line 6 (DAKKS D-PL-11020-03-01)

IEC 61000-4-10:2016; DIN EN 61000-4-10:2018; EN 61000-4-10:2017; IEC 61000-4-11: 2004 +A1:2017; IEC 61000-4-11:2020; DIN EN IEC 61000-4-11:2021; EN IEC 61000-4-11:2020+AC2020; IEC 61000-4-13: 2002 +A1:2009 +A2:2015; DIN EN 61000-4-13:2016; EN 61000-4-13: 2002 +A1:2009 +A2:2016

IEC 61000-4-13Electromagnetic compatibility (EMC) - Part 4-13: Testing and measurement techniques - Harmonics and interharmonics including mains signalling at a.c. power port, low frequency immunity tests
As written on the certificate · Line 6 (DAKKS D-PL-11020-03-01)

IEC 61000-4-10:2016; DIN EN 61000-4-10:2018; EN 61000-4-10:2017; IEC 61000-4-11: 2004 +A1:2017; IEC 61000-4-11:2020; DIN EN IEC 61000-4-11:2021; EN IEC 61000-4-11:2020+AC2020; IEC 61000-4-13: 2002 +A1:2009 +A2:2015; DIN EN 61000-4-13:2016; EN 61000-4-13: 2002 +A1:2009 +A2:2016

IEC 61000-4-14Name not checked yet
As written on the certificate · Line 7 (DAKKS D-PL-11020-03-01)

IEC 61000-4-14:2009; DIN EN 61000-4-14:2010; EN 61000-4-14: 1999 +A1:2004 +A2:2009; IEC 61000-4-16:2015; DIN EN 61000-4-16:2016; EN 61000-4-16:2016; IEC 61000-4-17:2009; DIN EN 61000-4-17/A2:2009; EN 61000-4-17:1999 +A1 :2004 +A2 :2009; IEC 61000-4-18:2019

IEC 61000-4-16Name not checked yet
As written on the certificate · Line 7 (DAKKS D-PL-11020-03-01)

IEC 61000-4-14:2009; DIN EN 61000-4-14:2010; EN 61000-4-14: 1999 +A1:2004 +A2:2009; IEC 61000-4-16:2015; DIN EN 61000-4-16:2016; EN 61000-4-16:2016; IEC 61000-4-17:2009; DIN EN 61000-4-17/A2:2009; EN 61000-4-17:1999 +A1 :2004 +A2 :2009; IEC 61000-4-18:2019

IEC 61000-4-17Name not checked yet
As written on the certificate · Line 7 (DAKKS D-PL-11020-03-01)

IEC 61000-4-14:2009; DIN EN 61000-4-14:2010; EN 61000-4-14: 1999 +A1:2004 +A2:2009; IEC 61000-4-16:2015; DIN EN 61000-4-16:2016; EN 61000-4-16:2016; IEC 61000-4-17:2009; DIN EN 61000-4-17/A2:2009; EN 61000-4-17:1999 +A1 :2004 +A2 :2009; IEC 61000-4-18:2019

IEC 61000-4-18Name not checked yet
As written on the certificate · Line 7 (DAKKS D-PL-11020-03-01)

IEC 61000-4-14:2009; DIN EN 61000-4-14:2010; EN 61000-4-14: 1999 +A1:2004 +A2:2009; IEC 61000-4-16:2015; DIN EN 61000-4-16:2016; EN 61000-4-16:2016; IEC 61000-4-17:2009; DIN EN 61000-4-17/A2:2009; EN 61000-4-17:1999 +A1 :2004 +A2 :2009; IEC 61000-4-18:2019

As written on the certificate · Line 8 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-4-18:2020; VDE 0847-4-18:2020; EN IEC 61000-4-18: 2019; IEC 61000-4-27:2000 +A1:2009; DIN EN 61000-4-27:2009; EN 61000-4-27: 2000 A1:2009; IEC 61000-4-28:2000 +A1:2004 +A2:2009; DIN EN 61000-4-28:2009; EN 61000-4-28: 2000 +A1:2004+A2:2009; IEC 61000-4-29:2000

IEC 61000-4-27Name not checked yet
As written on the certificate · Line 8 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-4-18:2020; VDE 0847-4-18:2020; EN IEC 61000-4-18: 2019; IEC 61000-4-27:2000 +A1:2009; DIN EN 61000-4-27:2009; EN 61000-4-27: 2000 A1:2009; IEC 61000-4-28:2000 +A1:2004 +A2:2009; DIN EN 61000-4-28:2009; EN 61000-4-28: 2000 +A1:2004+A2:2009; IEC 61000-4-29:2000

IEC 61000-4-28Name not checked yet
As written on the certificate · Line 8 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-4-18:2020; VDE 0847-4-18:2020; EN IEC 61000-4-18: 2019; IEC 61000-4-27:2000 +A1:2009; DIN EN 61000-4-27:2009; EN 61000-4-27: 2000 A1:2009; IEC 61000-4-28:2000 +A1:2004 +A2:2009; DIN EN 61000-4-28:2009; EN 61000-4-28: 2000 +A1:2004+A2:2009; IEC 61000-4-29:2000

IEC 61000-4-29Electromagnetic compatibility (EMC) - Part 4-29: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations on d.c. input power port immunity tests
As written on the certificate · Line 8 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-4-18:2020; VDE 0847-4-18:2020; EN IEC 61000-4-18: 2019; IEC 61000-4-27:2000 +A1:2009; DIN EN 61000-4-27:2009; EN 61000-4-27: 2000 A1:2009; IEC 61000-4-28:2000 +A1:2004 +A2:2009; DIN EN 61000-4-28:2009; EN 61000-4-28: 2000 +A1:2004+A2:2009; IEC 61000-4-29:2000

As written on the certificate · Line 9 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-29:2001; IEC 61000-4-34:2005 + A1:2009; DIN EN 61000-4-34:2010; IEC 61000-4-39:2017; DIN EN 61000-4-39:2019; IEC 61000-6-1:2016

IEC 61000-4-34Name not checked yet
As written on the certificate · Line 9 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-29:2001; IEC 61000-4-34:2005 + A1:2009; DIN EN 61000-4-34:2010; IEC 61000-4-39:2017; DIN EN 61000-4-39:2019; IEC 61000-6-1:2016

IEC 61000-4-39Electromagnetic compatibility (EMC) - Part 4-39: Testing and measurement techniques - Radiated fields in close proximity - Immunity test
As written on the certificate · Line 9 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-29:2001; IEC 61000-4-34:2005 + A1:2009; DIN EN 61000-4-34:2010; IEC 61000-4-39:2017; DIN EN 61000-4-39:2019; IEC 61000-6-1:2016

IEC 61000-5-7Name not checked yet
As written on the certificate · Line 19 (DAKKS D-PL-11020-03-01)

IEC 61000-3-12:2011 + AMD:2021; DIN EN 61000-3-12:2012; IEC 61000-5-7: 2001; DIN EN 61000-5-7: 2001; IEC 61131-2:2017; DIN EN 61131-2:2008; IEC 61204-3:2016; DIN EN IEC 61204-3: 2018

IEC 61000-6-1Electromagnetic compatibility (EMC) - Part 6-1: Generic standards - Immunity standard for residential, commercial and light-industrial environments
As written on the certificate · Line 9 (DAKKS D-PL-11020-03-01)

DIN EN 61000-4-29:2001; IEC 61000-4-34:2005 + A1:2009; DIN EN 61000-4-34:2010; IEC 61000-4-39:2017; DIN EN 61000-4-39:2019; IEC 61000-6-1:2016

As written on the certificate · Line 10 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-6-1:2019; IEC 61000-6-2:2016; DIN EN IEC 61000-6-2:2019; IEC 61000-6-3:2020; DIN EN IEC 61000-6-3:2022; IEC 61000-6-4:2018; DIN EN IEC 61000-6-4:2020; IEC 61000-6-5:2015; DIN EN 61000-6-5:2016

IEC 61000-6-2Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity standard for industrial environments
As written on the certificate · Line 10 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-6-1:2019; IEC 61000-6-2:2016; DIN EN IEC 61000-6-2:2019; IEC 61000-6-3:2020; DIN EN IEC 61000-6-3:2022; IEC 61000-6-4:2018; DIN EN IEC 61000-6-4:2020; IEC 61000-6-5:2015; DIN EN 61000-6-5:2016

IEC 61000-6-3Electromagnetic compatibility (EMC) - Part 6-3: Generic standards - Emission standard for equipment in residential environmentsCertificate says EN 61000-6-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 10 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-6-1:2019; IEC 61000-6-2:2016; DIN EN IEC 61000-6-2:2019; IEC 61000-6-3:2020; DIN EN IEC 61000-6-3:2022; IEC 61000-6-4:2018; DIN EN IEC 61000-6-4:2020; IEC 61000-6-5:2015; DIN EN 61000-6-5:2016

IEC 61000-6-4Electromagnetic compatibility (EMC) - Part 6-4: Generic standards - Emission standard for industrial environments
As written on the certificate · Line 10 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-6-1:2019; IEC 61000-6-2:2016; DIN EN IEC 61000-6-2:2019; IEC 61000-6-3:2020; DIN EN IEC 61000-6-3:2022; IEC 61000-6-4:2018; DIN EN IEC 61000-6-4:2020; IEC 61000-6-5:2015; DIN EN 61000-6-5:2016

IEC 61000-6-5Name not checked yet
As written on the certificate · Line 10 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61000-6-1:2019; IEC 61000-6-2:2016; DIN EN IEC 61000-6-2:2019; IEC 61000-6-3:2020; DIN EN IEC 61000-6-3:2022; IEC 61000-6-4:2018; DIN EN IEC 61000-6-4:2020; IEC 61000-6-5:2015; DIN EN 61000-6-5:2016

IEC 61000-6-7Name not checked yet
As written on the certificate · Line 11 (DAKKS D-PL-11020-03-01)

IEC 61000-6-7:2014; DIN EN 61000-6-7:2015; IEC 61000-6-8:2020; DIN EN IEC 61000-6-8:2022; TR 9:2016; DIN EN 12015:2021; DIN EN 12016:2013

IEC 61000-6-8Name not checked yet
As written on the certificate · Line 11 (DAKKS D-PL-11020-03-01)

IEC 61000-6-7:2014; DIN EN 61000-6-7:2015; IEC 61000-6-8:2020; DIN EN IEC 61000-6-8:2022; TR 9:2016; DIN EN 12015:2021; DIN EN 12016:2013

IEC 60068 series

IEC 60068-2-1Environmental testing - Part 2-1: Tests - Test A: Cold
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 87 (DAKKS D-PL-11020-03-01)

IEC 60068-2-11; IEC 60068-2-52; ISO 9227 (NSS); MIL-STD-810; RTCA DO-160; IEC 60068-2-27; JESD22-B104; Mil-STD-883; IEC 60068-2-1/-2/-14; IEC 60068-2-6/-27/-64; IEC 60068-2-53; ISO 16750-3; IEC 60068-2-60; GR-63-CORE; IEC 60068-2-42; IEC 60068-2-43

As written on the certificate · Line 88 (DAKKS D-PL-11020-03-01)

IEC 60068-2-74; MIL-STD-810 (504); RTCA DO-160 (11); ISO 16750-5; IEC 60068-2-1:2025; IEC 60068-2-2:2025; IEC 60068-2-6:2007; IEC 60068-2-11: 2021; IEC 60068-2-13:2021; IEC 60068-2-14:2023

IEC 60068-2-2Environmental testing - Part 2-2: Tests - Test B: Dry heat
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 88 (DAKKS D-PL-11020-03-01)

IEC 60068-2-74; MIL-STD-810 (504); RTCA DO-160 (11); ISO 16750-5; IEC 60068-2-1:2025; IEC 60068-2-2:2025; IEC 60068-2-6:2007; IEC 60068-2-11: 2021; IEC 60068-2-13:2021; IEC 60068-2-14:2023

IEC 60068-2-6Environmental testing - Part 2-6: Tests - Test Fc: Vibration (sinusoidal)
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 87 (DAKKS D-PL-11020-03-01)

IEC 60068-2-11; IEC 60068-2-52; ISO 9227 (NSS); MIL-STD-810; RTCA DO-160; IEC 60068-2-27; JESD22-B104; Mil-STD-883; IEC 60068-2-1/-2/-14; IEC 60068-2-6/-27/-64; IEC 60068-2-53; ISO 16750-3; IEC 60068-2-60; GR-63-CORE; IEC 60068-2-42; IEC 60068-2-43

As written on the certificate · Line 88 (DAKKS D-PL-11020-03-01)

IEC 60068-2-74; MIL-STD-810 (504); RTCA DO-160 (11); ISO 16750-5; IEC 60068-2-1:2025; IEC 60068-2-2:2025; IEC 60068-2-6:2007; IEC 60068-2-11: 2021; IEC 60068-2-13:2021; IEC 60068-2-14:2023

IEC 60068-2-11Environmental testing - Part 2-11: Tests - Test Ka: Salt mist
As written on the certificate · Line 87 (DAKKS D-PL-11020-03-01)

IEC 60068-2-11; IEC 60068-2-52; ISO 9227 (NSS); MIL-STD-810; RTCA DO-160; IEC 60068-2-27; JESD22-B104; Mil-STD-883; IEC 60068-2-1/-2/-14; IEC 60068-2-6/-27/-64; IEC 60068-2-53; ISO 16750-3; IEC 60068-2-60; GR-63-CORE; IEC 60068-2-42; IEC 60068-2-43

As written on the certificate · Line 88 (DAKKS D-PL-11020-03-01)

IEC 60068-2-74; MIL-STD-810 (504); RTCA DO-160 (11); ISO 16750-5; IEC 60068-2-1:2025; IEC 60068-2-2:2025; IEC 60068-2-6:2007; IEC 60068-2-11: 2021; IEC 60068-2-13:2021; IEC 60068-2-14:2023

IEC 60068-2-13Name not checked yet
As written on the certificate · Line 88 (DAKKS D-PL-11020-03-01)

IEC 60068-2-74; MIL-STD-810 (504); RTCA DO-160 (11); ISO 16750-5; IEC 60068-2-1:2025; IEC 60068-2-2:2025; IEC 60068-2-6:2007; IEC 60068-2-11: 2021; IEC 60068-2-13:2021; IEC 60068-2-14:2023

IEC 60068-2-14Environmental testing - Part 2-14: Tests - Test N: Change of temperature
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 88 (DAKKS D-PL-11020-03-01)

IEC 60068-2-74; MIL-STD-810 (504); RTCA DO-160 (11); ISO 16750-5; IEC 60068-2-1:2025; IEC 60068-2-2:2025; IEC 60068-2-6:2007; IEC 60068-2-11: 2021; IEC 60068-2-13:2021; IEC 60068-2-14:2023

IEC 60068-2-18Name not checked yet
As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-21Name not checked yet
As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-27Environmental testing - Part 2-27: Tests - Test Ea and guidance: Shock
As written on the certificate · Line 87 (DAKKS D-PL-11020-03-01)

IEC 60068-2-11; IEC 60068-2-52; ISO 9227 (NSS); MIL-STD-810; RTCA DO-160; IEC 60068-2-27; JESD22-B104; Mil-STD-883; IEC 60068-2-1/-2/-14; IEC 60068-2-6/-27/-64; IEC 60068-2-53; ISO 16750-3; IEC 60068-2-60; GR-63-CORE; IEC 60068-2-42; IEC 60068-2-43

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-30Environmental testing - Part 2-30: Tests - Test Db: Damp heat, cyclic (12 h + 12 h cycle)
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-31Environmental testing - Part 2-31: Tests - Test Ec: Rough handling shocks, primarily for equipment-type specimens
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-38Environmental testing - Part 2-38: Tests - Test Z/AD: Composite temperature/humidity cyclic test
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-40Name not checked yet
As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-41Name not checked yet
As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-42Name not checked yet
As written on the certificate · Line 87 (DAKKS D-PL-11020-03-01)

IEC 60068-2-11; IEC 60068-2-52; ISO 9227 (NSS); MIL-STD-810; RTCA DO-160; IEC 60068-2-27; JESD22-B104; Mil-STD-883; IEC 60068-2-1/-2/-14; IEC 60068-2-6/-27/-64; IEC 60068-2-53; ISO 16750-3; IEC 60068-2-60; GR-63-CORE; IEC 60068-2-42; IEC 60068-2-43

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-43Name not checked yet
As written on the certificate · Line 87 (DAKKS D-PL-11020-03-01)

IEC 60068-2-11; IEC 60068-2-52; ISO 9227 (NSS); MIL-STD-810; RTCA DO-160; IEC 60068-2-27; JESD22-B104; Mil-STD-883; IEC 60068-2-1/-2/-14; IEC 60068-2-6/-27/-64; IEC 60068-2-53; ISO 16750-3; IEC 60068-2-60; GR-63-CORE; IEC 60068-2-42; IEC 60068-2-43

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-52Environmental testing - Part 2-52: Tests - Test Kb: Salt mist, cyclic (sodium chloride solution)
As written on the certificate · Line 87 (DAKKS D-PL-11020-03-01)

IEC 60068-2-11; IEC 60068-2-52; ISO 9227 (NSS); MIL-STD-810; RTCA DO-160; IEC 60068-2-27; JESD22-B104; Mil-STD-883; IEC 60068-2-1/-2/-14; IEC 60068-2-6/-27/-64; IEC 60068-2-53; ISO 16750-3; IEC 60068-2-60; GR-63-CORE; IEC 60068-2-42; IEC 60068-2-43

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-53Name not checked yet
As written on the certificate · Line 87 (DAKKS D-PL-11020-03-01)

IEC 60068-2-11; IEC 60068-2-52; ISO 9227 (NSS); MIL-STD-810; RTCA DO-160; IEC 60068-2-27; JESD22-B104; Mil-STD-883; IEC 60068-2-1/-2/-14; IEC 60068-2-6/-27/-64; IEC 60068-2-53; ISO 16750-3; IEC 60068-2-60; GR-63-CORE; IEC 60068-2-42; IEC 60068-2-43

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-55Name not checked yet
As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-60Name not checked yet
As written on the certificate · Line 87 (DAKKS D-PL-11020-03-01)

IEC 60068-2-11; IEC 60068-2-52; ISO 9227 (NSS); MIL-STD-810; RTCA DO-160; IEC 60068-2-27; JESD22-B104; Mil-STD-883; IEC 60068-2-1/-2/-14; IEC 60068-2-6/-27/-64; IEC 60068-2-53; ISO 16750-3; IEC 60068-2-60; GR-63-CORE; IEC 60068-2-42; IEC 60068-2-43

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-61Name not checked yet
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-64Environmental testing - Part 2-64: Tests - Test Fh: Vibration, broadband random and guidanceCertificate says EN 60068-2-64. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-67Name not checked yet
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-74Environmental testing - Part 2-74: Tests - Test Xc: Fluid contamination
As written on the certificate · Line 88 (DAKKS D-PL-11020-03-01)

IEC 60068-2-74; MIL-STD-810 (504); RTCA DO-160 (11); ISO 16750-5; IEC 60068-2-1:2025; IEC 60068-2-2:2025; IEC 60068-2-6:2007; IEC 60068-2-11: 2021; IEC 60068-2-13:2021; IEC 60068-2-14:2023

As written on the certificate · Line 89 (DAKKS D-PL-11020-03-01)

IEC 60068-2-18:2017; IEC 60068-2-21:2021; IEC 60068-2-27:2008; IEC 60068-2-30:2025; IEC 60068-2-31:2008; IEC 60068-2-38:2021; IEC 60068-2-40:1976+ AMD1 1983; IEC 60068-2-41:1976+ AMD1 1983; IEC 60068-2-42:2003; IEC 60068-2-43:2003; IEC 60068-2-52:2017; IEC 60068-2-53:2010; IEC 60068-2-55:2013; IEC 60068-2-60:2015; IEC 60068-2-61:1991; IEC 60068-2-64:2019; IEC 60068-2-67:1995+ AMD1 2019; IEC 60068-2-74:1999+ AMD1 2018

IEC 60068-2-78Environmental testing - Part 2-78: Tests - Test Cab: Damp heat, steady state
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

IEC 60068-2-80Environmental testing - Part 2-80: Tests - Test Fi: Vibration - Mixed mode
As written on the certificate · Line 86 (DAKKS D-PL-11020-03-01)

Telcordia GR-63-CORE (2012-04); IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-14 (Nb); IEC 60068-2-30; IEC 60068-2-38; IEC 60068-2-61; IEC 60068-2-67; IEC 60068-2-78; MIL STD 810 (501,502, 507); RTCA DO-160 (4, 5, 6); GR-63-CORE (5.1.1/2/4/5); IEC 60068-2-14; MIL-STD-810 (503); IEC 60068-2-6; IEC 60068-2-64; IEC 60068-2-80; JESD22-B103; MIL-STD-810 (514 Procedure I); RTCA DO-160 (8); GR-63-CORE (5.4.2/3); IEC 60068-2-31; GR-63-CORE

As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

IEC 60068-2-82Name not checked yet
As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

EN

EN 502Name not checked yet
As written on the certificate · Line 2 (DAKKS D-PL-11020-03-05)

IEC 62471:2006; DIN EN 62471:2009; IEC/TR 62778 Ed. 2.0:2014; DIN IEC/TR 62778:2014; DIN EN 13032 -1:2012; DIN EN 13032 -4:2019; IEC/TR 61341:2010; DIN EN 61341:2012 -08; DIN EN 502 85: 1999 -06; IEC 62612:2013 +A1:2015 +A2:2018

EN 12015Electromagnetic compatibility - Product family standard for lifts, escalators and moving walks - Emission
As written on the certificate · Line 11 (DAKKS D-PL-11020-03-01)

IEC 61000-6-7:2014; DIN EN 61000-6-7:2015; IEC 61000-6-8:2020; DIN EN IEC 61000-6-8:2022; TR 9:2016; DIN EN 12015:2021; DIN EN 12016:2013

EN 12016Name not checked yet
As written on the certificate · Line 11 (DAKKS D-PL-11020-03-01)

IEC 61000-6-7:2014; DIN EN 61000-6-7:2015; IEC 61000-6-8:2020; DIN EN IEC 61000-6-8:2022; TR 9:2016; DIN EN 12015:2021; DIN EN 12016:2013

EN 12895Name not checked yet
As written on the certificate · Line 38 (DAKKS D-PL-11020-03-01)

DIN EN 50155:2022; IEC 62236-3-2 :2018; EMV Regelung Nr. EMV 06:2019; DIN EN 12895: 2020; DIN EN 13309:2010; DIN EN 15194:2024; ISO 13766-1: 2018; DIN EN ISO 13766-1:2019; ISO 13766-2:2018

EN 13032-1Name not checked yet
As written on the certificate · Line 2 (DAKKS D-PL-11020-03-05)

IEC 62471:2006; DIN EN 62471:2009; IEC/TR 62778 Ed. 2.0:2014; DIN IEC/TR 62778:2014; DIN EN 13032 -1:2012; DIN EN 13032 -4:2019; IEC/TR 61341:2010; DIN EN 61341:2012 -08; DIN EN 502 85: 1999 -06; IEC 62612:2013 +A1:2015 +A2:2018

EN 13032-4Name not checked yet
As written on the certificate · Line 2 (DAKKS D-PL-11020-03-05)

IEC 62471:2006; DIN EN 62471:2009; IEC/TR 62778 Ed. 2.0:2014; DIN IEC/TR 62778:2014; DIN EN 13032 -1:2012; DIN EN 13032 -4:2019; IEC/TR 61341:2010; DIN EN 61341:2012 -08; DIN EN 502 85: 1999 -06; IEC 62612:2013 +A1:2015 +A2:2018

EN 13309Name not checked yet
As written on the certificate · Line 38 (DAKKS D-PL-11020-03-01)

DIN EN 50155:2022; IEC 62236-3-2 :2018; EMV Regelung Nr. EMV 06:2019; DIN EN 12895: 2020; DIN EN 13309:2010; DIN EN 15194:2024; ISO 13766-1: 2018; DIN EN ISO 13766-1:2019; ISO 13766-2:2018

EN 15194Name not checked yet
As written on the certificate · Line 38 (DAKKS D-PL-11020-03-01)

DIN EN 50155:2022; IEC 62236-3-2 :2018; EMV Regelung Nr. EMV 06:2019; DIN EN 12895: 2020; DIN EN 13309:2010; DIN EN 15194:2024; ISO 13766-1: 2018; DIN EN ISO 13766-1:2019; ISO 13766-2:2018

EN 41003Name not checked yet
As written on the certificate · Line 59 (DAKKS D-PL-11020-03-01)

CAN/CSA-C22.2 NO. 60950-22:2017; DIN EN 41003:2009 + BEIBLATT 1: 2006; IEC 62911:2016; IEC 60215:2016; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019, IEC 61010-1 Ed. 3.1: 2017; DIN EN 61010-1:2020 (EN 61010-1:2010 + A1:2019 + A1:2019/AC:2019)

EN 50075Name not checked yet
As written on the certificate · Line 82 (DAKKS D-PL-11020-03-01)

IEC 60884-2-5: 2017; BS 1363-1+A4: 1995; BS 1363-2: 1999; BS 1363-2+A1:2016; DIN VDE 0620-101:1992; EN 50075: 1990; IEC 62196-1:2022; DIN EN IEC 62196-1:2023; EN IEC 62196-1: 2022; IEC 61851-1: 2017; DIN EN IEC 61851-1:2019; EN IEC 61851-1: 2019

EN 50090-2-2Name not checked yet
As written on the certificate · Line 12 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-1 V2.2.1 (2022-11); ETSI EN 300 132-2 V2.7.1 (2022-09); ETSI EN 300 132-3-0 V2.1.1 (2012-02); ETSI EN 300 132-3-1 V2.1.1 (2012-10); ETSI EN 300 386 V2.2.1 (2022-09); DIN EN 50090-2-2:2007 (EN 50090-2-2: 1996 +A1:2002+A2:2007); DIN EN 50090-8: 2001 (EN 50090-8: 2000); DIN EN 50130-4: 2015 (EN 50130-4: 2011+A1:2014)

EN 50090-8Name not checked yet
As written on the certificate · Line 12 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-1 V2.2.1 (2022-11); ETSI EN 300 132-2 V2.7.1 (2022-09); ETSI EN 300 132-3-0 V2.1.1 (2012-02); ETSI EN 300 132-3-1 V2.1.1 (2012-10); ETSI EN 300 386 V2.2.1 (2022-09); DIN EN 50090-2-2:2007 (EN 50090-2-2: 1996 +A1:2002+A2:2007); DIN EN 50090-8: 2001 (EN 50090-8: 2000); DIN EN 50130-4: 2015 (EN 50130-4: 2011+A1:2014)

EN 50130-4Alarm systems - Part 4: Electromagnetic compatibility - Product family standard: Immunity requirements for components of fire, intruder, hold up, CCTV, access control and social alarm systems
As written on the certificate · Line 12 (DAKKS D-PL-11020-03-01)

ETSI EN 300 132-1 V2.2.1 (2022-11); ETSI EN 300 132-2 V2.7.1 (2022-09); ETSI EN 300 132-3-0 V2.1.1 (2012-02); ETSI EN 300 132-3-1 V2.1.1 (2012-10); ETSI EN 300 386 V2.2.1 (2022-09); DIN EN 50090-2-2:2007 (EN 50090-2-2: 1996 +A1:2002+A2:2007); DIN EN 50090-8: 2001 (EN 50090-8: 2000); DIN EN 50130-4: 2015 (EN 50130-4: 2011+A1:2014)

EN 50155Railway applications - Rolling stock - Electronic equipment
As written on the certificate · Line 38 (DAKKS D-PL-11020-03-01)

DIN EN 50155:2022; IEC 62236-3-2 :2018; EMV Regelung Nr. EMV 06:2019; DIN EN 12895: 2020; DIN EN 13309:2010; DIN EN 15194:2024; ISO 13766-1: 2018; DIN EN ISO 13766-1:2019; ISO 13766-2:2018

As written on the certificate · Line 91 (DAKKS D-PL-11020-03-01)

IEC 60529:2013; ISO 20653:2013; JESD22-B103:2016; JESD22-B104:2004; IEC 61373:2010; EN 50155 (2021-07); ISO 16750-3:2023; ISO 16750-4:2023; ISO 16750-5:2023

EN 50178Name not checked yet
As written on the certificate · Line 78 (DAKKS D-PL-11020-03-01)

DIN EN 50178:1998; IEC 62477-1:2022 + COR1:2024; DIN EN IEC 62477-1:2024; IEC 60255-27: 2013; DIN EN IEC 60255-27: 2026-04; IEC 60730-1:2013, modifiziert + COR1:2014 + A1:2015 + A2:2020; DIN EN 60730-1:2025; IEC 60086-4:2019; DIN EN IEC 60086-4:2020; UL 60086-4: 2015

EN 50293Name not checked yet
As written on the certificate · Line 13 (DAKKS D-PL-11020-03-01)

DIN EN 50293: 2013; DIN EN 50412-2-1:2006; DIN EN 50491-5-1:2010; DIN EN 50491-5-2: 2010; DIN EN 50491-5-3: 2010; DIN EN 50561-1: 2014; CISPR 11:2016 +A1:2017 +A2:2019; CISPR 11:2024

EN 50364Name not checked yet
As written on the certificate · Line 34 (DAKKS D-PL-11020-03-01)

ETSI EN 303 417 V1.1.1:2017; BGV B 11 DGUV VORSCHRIFT 15:2001; DIN EN 50413:2020; EN 50413:2019; DIN EN 50364:2019; EN 50364:2018; EN 62369-1:2009

EN 50412-2-1Name not checked yet
As written on the certificate · Line 13 (DAKKS D-PL-11020-03-01)

DIN EN 50293: 2013; DIN EN 50412-2-1:2006; DIN EN 50491-5-1:2010; DIN EN 50491-5-2: 2010; DIN EN 50491-5-3: 2010; DIN EN 50561-1: 2014; CISPR 11:2016 +A1:2017 +A2:2019; CISPR 11:2024

EN 50413Name not checked yet
As written on the certificate · Line 34 (DAKKS D-PL-11020-03-01)

ETSI EN 303 417 V1.1.1:2017; BGV B 11 DGUV VORSCHRIFT 15:2001; DIN EN 50413:2020; EN 50413:2019; DIN EN 50364:2019; EN 50364:2018; EN 62369-1:2009

EN 50498Electromagnetic compatibility (EMC) - Product family standard for aftermarket electronic equipment in vehicles
As written on the certificate · Line 39 (DAKKS D-PL-11020-03-01)

DIN EN ISO 13766-2:2018; ISO 14982:1998; DIN EN ISO 14982:2009; ISO/FDIS 14982-1:2025; ISO/FDIS 14982-2:2025; CISPR 12:2001 + A1:2005; CISPR 12:2007 + A1:2009; DIN EN 55012:2010; DIN EN 50498:2011

EN 50561-1Name not checked yet
As written on the certificate · Line 13 (DAKKS D-PL-11020-03-01)

DIN EN 50293: 2013; DIN EN 50412-2-1:2006; DIN EN 50491-5-1:2010; DIN EN 50491-5-2: 2010; DIN EN 50491-5-3: 2010; DIN EN 50561-1: 2014; CISPR 11:2016 +A1:2017 +A2:2019; CISPR 11:2024

EN 50663Generic standard for assessment of low power electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (10 MHz - 300 GHz)
As written on the certificate · Line 35 (DAKKS D-PL-11020-03-01)

DIN EN 50663:2017; DIN EN 50665:2019; DIN EN 62233:2008; IEC 62493:2015 + AMD1:2022

EN 50665Name not checked yet
As written on the certificate · Line 35 (DAKKS D-PL-11020-03-01)

DIN EN 50663:2017; DIN EN 50665:2019; DIN EN 62233:2008; IEC 62493:2015 + AMD1:2022

EN 55103-1Name not checked yet
As written on the certificate · Line 17 (DAKKS D-PL-11020-03-01)

CISPR 36:2020 + AMD1:2023; DIN EN IEC 55036:2021; DIN EN 55103-1:2013; DIN EN 55103-2:2010; IEC 60146-1-1:2009; DIN EN 60146-1-1: 2011; IEC 60335-1:2020; IEC 61000-3-2: 2018 + AMD1:2020 +AMD2:2024

EN 55103-2Name not checked yet
As written on the certificate · Line 17 (DAKKS D-PL-11020-03-01)

CISPR 36:2020 + AMD1:2023; DIN EN IEC 55036:2021; DIN EN 55103-1:2013; DIN EN 55103-2:2010; IEC 60146-1-1:2009; DIN EN 60146-1-1: 2011; IEC 60335-1:2020; IEC 61000-3-2: 2018 + AMD1:2020 +AMD2:2024

IEC 61010 series

IEC 61010-1Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 1: General requirements
As written on the certificate · Line 59 (DAKKS D-PL-11020-03-01)

CAN/CSA-C22.2 NO. 60950-22:2017; DIN EN 41003:2009 + BEIBLATT 1: 2006; IEC 62911:2016; IEC 60215:2016; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019, IEC 61010-1 Ed. 3.1: 2017; DIN EN 61010-1:2020 (EN 61010-1:2010 + A1:2019 + A1:2019/AC:2019)

IEC 61010-2-010Name not checked yet
As written on the certificate · Line 60 (DAKKS D-PL-11020-03-01)

ANSI/UL 61010-1: 2016; UL 61010-1 (3rd Ed.):2019; CAN/CSA C22.2 NO. 61010-1-12: 2012; CAN/CSA-C22.2 No 61010-1 + Amd 1:2018; IEC 61010-2-010:2019; DIN EN IEC 61010-2-010:2022; ANSI/UL 61010-2-010: 2015; CSA C22.2 NO. 61010-2-010:2019

IEC 61010-2-011Name not checked yet
As written on the certificate · Line 61 (DAKKS D-PL-11020-03-01)

IEC 61010-2-011:2019; DIN EN IEC 61010-2-011:2023; ANSI/UL 61010-2-011:2017-01-31; UL 61010-2-011:2021-05-13; CAN/CSA-C22.2 No. 61010-2-011:2017; CSA C22.2 No. 61010-2-011:2019; IEC 61010-2-012:2019; DIN EN IEC 61010-2-012:2023

IEC 61010-2-012Name not checked yet
As written on the certificate · Line 61 (DAKKS D-PL-11020-03-01)

IEC 61010-2-011:2019; DIN EN IEC 61010-2-011:2023; ANSI/UL 61010-2-011:2017-01-31; UL 61010-2-011:2021-05-13; CAN/CSA-C22.2 No. 61010-2-011:2017; CSA C22.2 No. 61010-2-011:2019; IEC 61010-2-012:2019; DIN EN IEC 61010-2-012:2023

IEC 61010-2-020Name not checked yet
As written on the certificate · Line 62 (DAKKS D-PL-11020-03-01)

UL 61010-2-012:2017-02-20; CAN/CSA-C22.2 No. 61010-2-012:2017; CSA-C22.2 No. 61010-2-012:2019-11-01; IEC 61010-2-020:2016; DIN EN 61010-2-020:2017

IEC 61010-2-030Name not checked yet
As written on the certificate · Line 63 (DAKKS D-PL-11020-03-01)

ANSI/ UL 61010-2-020: 2016-12-15; CAN/CSA-C22.2 No. 61010-2-020:2017-05-01; IEC 61010-2-030:2023; IEC 61010-2-030:2017; DIN EN IEC 61010-2-030:2022; ANSI/UL 61010-2-030: 2012; UL 61010-2-030:2018

IEC 61010-2-032Name not checked yet
As written on the certificate · Line 65 (DAKKS D-PL-11020-03-01)

CAN/CSA-C22.2 NO. 61010-031: 2010; CAN/CSA-C22.2 NO. 61010-031: 2017-01-01; IEC 61010-2-032:2019 + COR1:2020; DIN EN IEC 61010-2-032:2023; ANSI/UL 61010-2-032: 2014; UL 61010-2-032:2020

IEC 61010-2-033Name not checked yet
As written on the certificate · Line 66 (DAKKS D-PL-11020-03-01)

CSA-C22.2 No. 61010-2-032: 2020; IEC 61010-2-033:2023; IEC 61010-2-033:2019; DIN EN IEC 61010-2-033:2023; EN IEC 61010-2-033:2021 + A11:2021

IEC 61010-2-034Name not checked yet
As written on the certificate · Line 67 (DAKKS D-PL-11020-03-01)

ANSI/UL 61010-2-033: 2014; UL 61010-2-033:2020; CSA-C22.2 No. 61010-2-033: 2020; IEC 61010-2-034: 2017

As written on the certificate · Line 68 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61010-2-034:2022; EN IEC 61010-2-034:2021/A11:2021; UL 61010-2-034:2020; CAN/CSA-C22.2 No. 61010-2-034:2018; IEC 61010-2-040:2020; DIN EN IEC 61010-2-040:2023; EN IEC 61010-2-040:2021

IEC 61010-2-040Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 2-040: Particular requirements for sterilizers and washer-disinfectors used to treat medical materials
As written on the certificate · Line 68 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61010-2-034:2022; EN IEC 61010-2-034:2021/A11:2021; UL 61010-2-034:2020; CAN/CSA-C22.2 No. 61010-2-034:2018; IEC 61010-2-040:2020; DIN EN IEC 61010-2-040:2023; EN IEC 61010-2-040:2021

IEC 61010-2-045Name not checked yet
As written on the certificate · Line 69 (DAKKS D-PL-11020-03-01)

ANSI/UL 61010-2-040:2016; UL 61010-2-040:2021; CAN/CSA-C22.2 NO. 61010-2-040-07: 2007; CAN/CSA-C22.2 NO. 61010-2-040: 2016; CAN/CSA-C22.2 NO. 61010-2-040: 2021; IEC 61010-2-045:2000; IEC 61010-2-051:2018; DIN EN IEC 61010-2-051:2023

IEC 61010-2-051Name not checked yet
As written on the certificate · Line 69 (DAKKS D-PL-11020-03-01)

ANSI/UL 61010-2-040:2016; UL 61010-2-040:2021; CAN/CSA-C22.2 NO. 61010-2-040-07: 2007; CAN/CSA-C22.2 NO. 61010-2-040: 2016; CAN/CSA-C22.2 NO. 61010-2-040: 2021; IEC 61010-2-045:2000; IEC 61010-2-051:2018; DIN EN IEC 61010-2-051:2023

IEC 61010-2-061Name not checked yet
As written on the certificate · Line 70 (DAKKS D-PL-11020-03-01)

ANSI/UL 61010-2-051:2015; UL 61010-2-051:2019; CAN/CSA-C22.2 No. 61010-2-051:2015; CSA-C22.2 No. 61010-2-051:2019; IEC 61010-2-061:2018; DIN EN IEC 61010-2-061:2023; EN IEC 61010-2-061:2021 + A11:2021; ANSI/ UL 61010-2-061:2015; UL 61010-2-061:2019; CAN/CSA-C22.2 No. 61010-2-061:2015-11-01; CSA C22.2 No. 61010-2-061:2019

IEC 61010-2-081Name not checked yet
As written on the certificate · Line 71 (DAKKS D-PL-11020-03-01)

IEC 61010-2-081:2019; DIN EN IEC 61010-2-081: 2022; ANSI/UL 61010-2-081: 2015; UL 61010-2-081:2019; CAN/CSA-C22.2 NO. 61010-2-081:2019; IEC 61010-2-091:2019; DIN EN IEC 61010-2-091: 2023

IEC 61010-2-091Name not checked yet
As written on the certificate · Line 71 (DAKKS D-PL-11020-03-01)

IEC 61010-2-081:2019; DIN EN IEC 61010-2-081: 2022; ANSI/UL 61010-2-081: 2015; UL 61010-2-081:2019; CAN/CSA-C22.2 NO. 61010-2-081:2019; IEC 61010-2-091:2019; DIN EN IEC 61010-2-091: 2023

IEC 61010-2-120Name not checked yet
As written on the certificate · Line 72 (DAKKS D-PL-11020-03-01)

ANSI/UL 61010-2-091: 2014; UL 61010-2-91:2019; CSA-C22.2 No. 61010-2-091: 2019; DIN EN IEC 61010-2-120: 2019; IEC 61010-2-120: 2019; IEC 61010-2-130: 2021; DIN EN IEC 61010-2-130:2023; IEC 61010-2-201:2024; DIN EN IEC 61010-2-201: 2025

IEC 61010-2-130Name not checked yet
As written on the certificate · Line 72 (DAKKS D-PL-11020-03-01)

ANSI/UL 61010-2-091: 2014; UL 61010-2-91:2019; CSA-C22.2 No. 61010-2-091: 2019; DIN EN IEC 61010-2-120: 2019; IEC 61010-2-120: 2019; IEC 61010-2-130: 2021; DIN EN IEC 61010-2-130:2023; IEC 61010-2-201:2024; DIN EN IEC 61010-2-201: 2025

IEC 61010-2-201Name not checked yet
As written on the certificate · Line 72 (DAKKS D-PL-11020-03-01)

ANSI/UL 61010-2-091: 2014; UL 61010-2-91:2019; CSA-C22.2 No. 61010-2-091: 2019; DIN EN IEC 61010-2-120: 2019; IEC 61010-2-120: 2019; IEC 61010-2-130: 2021; DIN EN IEC 61010-2-130:2023; IEC 61010-2-201:2024; DIN EN IEC 61010-2-201: 2025

IEC 61010-2-202Name not checked yet
As written on the certificate · Line 73 (DAKKS D-PL-11020-03-01)

ANSI/UL 61010-2-201: 2017; UL 61010-2-201:2018; CAN/CSA-C22.2 No. 61010-2-201:2018; IEC 61010-2-202:2020; DIN EN IEC 61010-2-202:2022; EN IEC 61010-2-202:2021; CAN/CSA-C22.2 No. 61010-2-202:2018; IEC 60825-1:2014; DIN EN 60825-1:2022; EN 60825-1:2014 + AC:2017 + A11:2021 + A11:2021/AC:2022; CAN/CSA-E60825-1: 2015; IEC 60825-2:2004 + A1:2006 + A2:2010; IEC 60825-2:2021

IEC 61010-031Name not checked yet
As written on the certificate · Line 64 (DAKKS D-PL-11020-03-01)

CAN/CSA-C22.2 NO. 61010-2-030:2018; IEC 61010-031:2022; DIN EN IEC 61010-031:2024; ANSI/UL 61010-031: 2010; UL 61010-031: 2017

ISO

ISO 3795Road vehicles, and tractors and machinery for agriculture and forestry - Determination of burning behaviour of interior materials
As written on the certificate · Line 77 (DAKKS D-PL-11020-03-01)

ISO 3795:1989; IEC 60112:2020; DIN EN IEC 60112:2022; EN IEC 60112:2016-10:2020; IEC 61800-5-1:2022; COR1:2023; DIN EN IEC 61800-5-1:2024; EN IEC 61800-5-1:2023; UL 61800-5-1:2012; ANSI/UL 61800-5-1: 2017

ISO 6988Metallic and other non organic coatings - Sulfur dioxide test with general condensation of moisture
As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

ISO 7637-2Road vehicles - Electrical disturbances from conduction and coupling - Part 2: Electrical transient conduction along supply lines only
As written on the certificate · Line 41 (DAKKS D-PL-11020-03-01)

VO (EU) 2018/829; ISO 7637-2:2004; ISO 7637-2:2011; ISO 7637-3:2016; ISO/DTS 7637-4:2020-01; ISO 10605:2008 + Corr 1:2010 + AMD1:2014; ISO 10605:2023; ISO 11451-2:2015; ISO 11451-4:2013

ISO 7637-3Road vehicles - Electrical disturbances from conduction and coupling - Part 3: Electrical transient transmission by capacitive and inductive coupling via lines other than supply lines
As written on the certificate · Line 41 (DAKKS D-PL-11020-03-01)

VO (EU) 2018/829; ISO 7637-2:2004; ISO 7637-2:2011; ISO 7637-3:2016; ISO/DTS 7637-4:2020-01; ISO 10605:2008 + Corr 1:2010 + AMD1:2014; ISO 10605:2023; ISO 11451-2:2015; ISO 11451-4:2013

ISO 9227Corrosion tests in artificial atmospheres - Salt spray tests
As written on the certificate · Line 87 (DAKKS D-PL-11020-03-01)

IEC 60068-2-11; IEC 60068-2-52; ISO 9227 (NSS); MIL-STD-810; RTCA DO-160; IEC 60068-2-27; JESD22-B104; Mil-STD-883; IEC 60068-2-1/-2/-14; IEC 60068-2-6/-27/-64; IEC 60068-2-53; ISO 16750-3; IEC 60068-2-60; GR-63-CORE; IEC 60068-2-42; IEC 60068-2-43

As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

ISO 10605Road vehicles - Test methods for electrical disturbances from electrostatic discharge
As written on the certificate · Line 41 (DAKKS D-PL-11020-03-01)

VO (EU) 2018/829; ISO 7637-2:2004; ISO 7637-2:2011; ISO 7637-3:2016; ISO/DTS 7637-4:2020-01; ISO 10605:2008 + Corr 1:2010 + AMD1:2014; ISO 10605:2023; ISO 11451-2:2015; ISO 11451-4:2013

ISO 11451-2Road vehicles - Vehicle test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 2: Off-vehicle radiation sources
As written on the certificate · Line 41 (DAKKS D-PL-11020-03-01)

VO (EU) 2018/829; ISO 7637-2:2004; ISO 7637-2:2011; ISO 7637-3:2016; ISO/DTS 7637-4:2020-01; ISO 10605:2008 + Corr 1:2010 + AMD1:2014; ISO 10605:2023; ISO 11451-2:2015; ISO 11451-4:2013

ISO 11451-4Road vehicles - Vehicle test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 4: Harness excitation methods
As written on the certificate · Line 41 (DAKKS D-PL-11020-03-01)

VO (EU) 2018/829; ISO 7637-2:2004; ISO 7637-2:2011; ISO 7637-3:2016; ISO/DTS 7637-4:2020-01; ISO 10605:2008 + Corr 1:2010 + AMD1:2014; ISO 10605:2023; ISO 11451-2:2015; ISO 11451-4:2013

As written on the certificate · Line 42 (DAKKS D-PL-11020-03-01)

ISO 11451-4:2022; ISO 11452-2: 2004; ISO 11452-2:2019; ISO 11452-3:2024; ISO 11452-4:2011; ISO 11452-4:2020; ISO 11452-5:2002; ISO 11452-8:2015

ISO 12100Safety of machinery - General principles for design - Risk assessment and risk reduction
As written on the certificate · Line 83 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61851-21-2:2021; DIN EN 61851-22: 2002; IEC 61851-22: 2001; DIN EN 61851-22:2002; IEC 61439-1:2020; DIN EN IEC 61439-1:2021; DIN EN IEC 61439-7: 2024-07; DIN EN ISO 12100: 2011 + Berichtigung1:2013

ISO 13766-1Earth-moving and building construction machinery - Electromagnetic compatibility (EMC) of machines with internal electrical power supply - Part 1: General EMC requirements under typical electromagnetic environmental conditions
As written on the certificate · Line 38 (DAKKS D-PL-11020-03-01)

DIN EN 50155:2022; IEC 62236-3-2 :2018; EMV Regelung Nr. EMV 06:2019; DIN EN 12895: 2020; DIN EN 13309:2010; DIN EN 15194:2024; ISO 13766-1: 2018; DIN EN ISO 13766-1:2019; ISO 13766-2:2018

ISO 13766-2Earth-moving and building construction machinery - Electromagnetic compatibility (EMC) of machines with internal electrical power supply - Part 2: Additional EMC requirements for functional safety
As written on the certificate · Line 38 (DAKKS D-PL-11020-03-01)

DIN EN 50155:2022; IEC 62236-3-2 :2018; EMV Regelung Nr. EMV 06:2019; DIN EN 12895: 2020; DIN EN 13309:2010; DIN EN 15194:2024; ISO 13766-1: 2018; DIN EN ISO 13766-1:2019; ISO 13766-2:2018

As written on the certificate · Line 39 (DAKKS D-PL-11020-03-01)

DIN EN ISO 13766-2:2018; ISO 14982:1998; DIN EN ISO 14982:2009; ISO/FDIS 14982-1:2025; ISO/FDIS 14982-2:2025; CISPR 12:2001 + A1:2005; CISPR 12:2007 + A1:2009; DIN EN 55012:2010; DIN EN 50498:2011

ISO 14982Agricultural and forestry machinery - Electromagnetic compatibility - Test methods and acceptance criteria
As written on the certificate · Line 39 (DAKKS D-PL-11020-03-01)

DIN EN ISO 13766-2:2018; ISO 14982:1998; DIN EN ISO 14982:2009; ISO/FDIS 14982-1:2025; ISO/FDIS 14982-2:2025; CISPR 12:2001 + A1:2005; CISPR 12:2007 + A1:2009; DIN EN 55012:2010; DIN EN 50498:2011

ISO 20567-1Paints and varnishes - Determination of stone-chip resistance of coatings - Part 1: Multi-impact testing
As written on the certificate · Line 93 (DAKKS D-PL-11020-03-01)

MBN 10 305-1 (2008-06); FCA CS.00056 (2018-12); ISO 20567-1 (2017-01); Telcordia GR-63-CORE:2017; Telcordia GR-3108-CORE Issue 5 2022; MIL-STD-810 G 2008-10 G w/Change 1 2014-04 H 2019-01 H w/Change 1 2022-05

ISO 20653Road vehicles - Degrees of protection (IP code) - Protection of electrical equipment against foreign objects, water and access
As written on the certificate · Line 91 (DAKKS D-PL-11020-03-01)

IEC 60529:2013; ISO 20653:2013; JESD22-B103:2016; JESD22-B104:2004; IEC 61373:2010; EN 50155 (2021-07); ISO 16750-3:2023; ISO 16750-4:2023; ISO 16750-5:2023

CISPR

CISPR 11Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurementCertificate says EN 55011. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 14 (DAKKS D-PL-11020-03-01)

DIN EN 55011:2022; EN 55011:2016 + A1:2017 + A11:2020 + A2:2021; CISPR 11:2015,modifiziert+ A1:2016 + A2:2019; CISPR 14-1:2020; DIN EN IEC 55014-1:2022; EN IEC 55014-1:2021; CISPR 14-1:2020; CISPR 14-2:2020; DIN EN IEC 55014-2:2022; EN IEC 55014-2:2021; CISPR 14-2:2020; CISPR 15:2018+ ISH1:2019 + AMD1:2024; DIN EN IEC 55015:2020; EN IEC 55015:2019 +A11:2020; CISPR 15:2018 + ISH1:2019; CISPR 16-2-1:2014 + AMD1:2017

CISPR 12Vehicles, boats and devices with internal combustion engines or traction batteries - Radio disturbance characteristics - Limits and methods of measurement for the protection of off-board receiversCertificate says EN 55012. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 39 (DAKKS D-PL-11020-03-01)

DIN EN ISO 13766-2:2018; ISO 14982:1998; DIN EN ISO 14982:2009; ISO/FDIS 14982-1:2025; ISO/FDIS 14982-2:2025; CISPR 12:2001 + A1:2005; CISPR 12:2007 + A1:2009; DIN EN 55012:2010; DIN EN 50498:2011

CISPR 14-1Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1: EmissionCertificate says IEC 55014-1. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 14 (DAKKS D-PL-11020-03-01)

DIN EN 55011:2022; EN 55011:2016 + A1:2017 + A11:2020 + A2:2021; CISPR 11:2015,modifiziert+ A1:2016 + A2:2019; CISPR 14-1:2020; DIN EN IEC 55014-1:2022; EN IEC 55014-1:2021; CISPR 14-1:2020; CISPR 14-2:2020; DIN EN IEC 55014-2:2022; EN IEC 55014-2:2021; CISPR 14-2:2020; CISPR 15:2018+ ISH1:2019 + AMD1:2024; DIN EN IEC 55015:2020; EN IEC 55015:2019 +A11:2020; CISPR 15:2018 + ISH1:2019; CISPR 16-2-1:2014 + AMD1:2017

CISPR 14-2Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 2: Immunity - Product family standardCertificate says IEC 55014-2. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 14 (DAKKS D-PL-11020-03-01)

DIN EN 55011:2022; EN 55011:2016 + A1:2017 + A11:2020 + A2:2021; CISPR 11:2015,modifiziert+ A1:2016 + A2:2019; CISPR 14-1:2020; DIN EN IEC 55014-1:2022; EN IEC 55014-1:2021; CISPR 14-1:2020; CISPR 14-2:2020; DIN EN IEC 55014-2:2022; EN IEC 55014-2:2021; CISPR 14-2:2020; CISPR 15:2018+ ISH1:2019 + AMD1:2024; DIN EN IEC 55015:2020; EN IEC 55015:2019 +A11:2020; CISPR 15:2018 + ISH1:2019; CISPR 16-2-1:2014 + AMD1:2017

CISPR 15Limits and methods of measurement of radio disturbance characteristics of electrical lighting and similar equipmentCertificate says IEC 55015. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 14 (DAKKS D-PL-11020-03-01)

DIN EN 55011:2022; EN 55011:2016 + A1:2017 + A11:2020 + A2:2021; CISPR 11:2015,modifiziert+ A1:2016 + A2:2019; CISPR 14-1:2020; DIN EN IEC 55014-1:2022; EN IEC 55014-1:2021; CISPR 14-1:2020; CISPR 14-2:2020; DIN EN IEC 55014-2:2022; EN IEC 55014-2:2021; CISPR 14-2:2020; CISPR 15:2018+ ISH1:2019 + AMD1:2024; DIN EN IEC 55015:2020; EN IEC 55015:2019 +A11:2020; CISPR 15:2018 + ISH1:2019; CISPR 16-2-1:2014 + AMD1:2017

CISPR 16-2-3Specification for radio disturbance and immunity measuring apparatus and methods - Part 2-3: Methods of measurement of disturbances and immunity - Radiated disturbance measurementsCertificate says EN 55016-2-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 15 (DAKKS D-PL-11020-03-01)

CISPR 16-2-3:2016 + A1:2019 + AMD2:2023; DIN EN 55016-2-3:2020 (EN 55016-2-3: 2017 + A1:2019); CISPR 22:2008; DIN EN 55022:2011 (EN 55022:2010); CISPR 24:2010 + Cor.:2011 + A1:2015; DIN EN 55024:2016 (EN 55024:2010 +A1:2015); CISPR 25:2002 + Corr 2004; CISPR 25, Ed.4.0:2016 +COR1:2017

CISPR 22Information technology equipment - Radio disturbance characteristics - Limits and methods of measurementCertificate says EN 55022. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 15 (DAKKS D-PL-11020-03-01)

CISPR 16-2-3:2016 + A1:2019 + AMD2:2023; DIN EN 55016-2-3:2020 (EN 55016-2-3: 2017 + A1:2019); CISPR 22:2008; DIN EN 55022:2011 (EN 55022:2010); CISPR 24:2010 + Cor.:2011 + A1:2015; DIN EN 55024:2016 (EN 55024:2010 +A1:2015); CISPR 25:2002 + Corr 2004; CISPR 25, Ed.4.0:2016 +COR1:2017

CISPR 24Information technology equipment - Immunity characteristics - Limits and methods of measurementCertificate says EN 55024. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 15 (DAKKS D-PL-11020-03-01)

CISPR 16-2-3:2016 + A1:2019 + AMD2:2023; DIN EN 55016-2-3:2020 (EN 55016-2-3: 2017 + A1:2019); CISPR 22:2008; DIN EN 55022:2011 (EN 55022:2010); CISPR 24:2010 + Cor.:2011 + A1:2015; DIN EN 55024:2016 (EN 55024:2010 +A1:2015); CISPR 25:2002 + Corr 2004; CISPR 25, Ed.4.0:2016 +COR1:2017

CISPR 25Vehicles, boats and internal combustion engines - Radio disturbance characteristics - Limits and methods of measurement for the protection of on-board receiversCertificate says IEC 55025. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 16 (DAKKS D-PL-11020-03-01)

CISPR 25:2021; DIN EN IEC 55025:2023; CISPR 32:2015 + COR1:2016 + A1:2019; DIN EN 55032:2022; CISPR 35:2016; DIN EN 55035:2018

CISPR 32Electromagnetic compatibility of multimedia equipment - Emission requirementsCertificate says EN 55032. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 16 (DAKKS D-PL-11020-03-01)

CISPR 25:2021; DIN EN IEC 55025:2023; CISPR 32:2015 + COR1:2016 + A1:2019; DIN EN 55032:2022; CISPR 35:2016; DIN EN 55035:2018

CISPR 35Electromagnetic compatibility of multimedia equipment - Immunity requirementsCertificate says EN 55035. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 16 (DAKKS D-PL-11020-03-01)

CISPR 25:2021; DIN EN IEC 55025:2023; CISPR 32:2015 + COR1:2016 + A1:2019; DIN EN 55032:2022; CISPR 35:2016; DIN EN 55035:2018

IEC 60695 series

IEC 60695-2-10Name not checked yet
As written on the certificate · Line 74 (DAKKS D-PL-11020-03-01)

DIN EN 60825 -2:2011 -06; BEIBLATT 1: 2008; BEIBLATT 2: 2019; EN 60825-2:2004 + A1:2007 + A2:2010; IEC 60825-2:2004 + A1:2006 + A2:2010; IEC 60695-2-10:2021; DIN EN IEC 60695-2-10:2023; EN IEC 60695-2-10:2021; IEC 60695-2-11:2021; DIN EN IEC 60695-2-11:2022; EN IEC 60695-2-11:2021; IEC 60695-10-2:2014; DIN EN 60695-10-2:2016; EN 60695-10-2: 2014; IEC 60695-11-3:2012; DIN EN 60695-11-3:2014; EN 60695-11-3:2012

IEC 60695-2-11Name not checked yet
As written on the certificate · Line 74 (DAKKS D-PL-11020-03-01)

DIN EN 60825 -2:2011 -06; BEIBLATT 1: 2008; BEIBLATT 2: 2019; EN 60825-2:2004 + A1:2007 + A2:2010; IEC 60825-2:2004 + A1:2006 + A2:2010; IEC 60695-2-10:2021; DIN EN IEC 60695-2-10:2023; EN IEC 60695-2-10:2021; IEC 60695-2-11:2021; DIN EN IEC 60695-2-11:2022; EN IEC 60695-2-11:2021; IEC 60695-10-2:2014; DIN EN 60695-10-2:2016; EN 60695-10-2: 2014; IEC 60695-11-3:2012; DIN EN 60695-11-3:2014; EN 60695-11-3:2012

IEC 60695-2-12Name not checked yet
As written on the certificate · Line 75 (DAKKS D-PL-11020-03-01)

IEC 60695-11-5:2016; DIN EN 60695-11-5:2017; IEC 60695-11-10:2013 + CORRIGENDUM 1: 2014; DIN EN 60695-11-10:2014; IEC 60695-11-20:2015 + COR1:2016; DIN EN 60695-11-20:2016; IEC 60695-2-12:2021; DIN EN IEC 60695-2-12:2022

IEC 60695-2-13Name not checked yet
As written on the certificate · Line 76 (DAKKS D-PL-11020-03-01)

IEC 60695-2-13:2021; DIN EN IEC 60695-2-13:2022; ANSI/UL 94:2018; UL 94 Ed. 6:2020; UL 94 Ed. 7:2023; ANSI/UL 94A (2015-01); ANSI/UL 94B: 2015; ANSI/UL 1581: 2017; ANSI/UL 1581A:2020; ANSI/UL 158:2022; ANSI/UL 158:2023; UL 2556: 2015; UL 2556:2021; ANSI/UL 2556: 2015; ANSI/UL 2556A: 2013; DIN 75200:1980; FMVSS 571.302 STANDARD NO. 302:2013; ECE-R118

IEC 60695-10-2Fire hazard testing - Part 10-2: Abnormal heat - Ball pressure test method
As written on the certificate · Line 74 (DAKKS D-PL-11020-03-01)

DIN EN 60825 -2:2011 -06; BEIBLATT 1: 2008; BEIBLATT 2: 2019; EN 60825-2:2004 + A1:2007 + A2:2010; IEC 60825-2:2004 + A1:2006 + A2:2010; IEC 60695-2-10:2021; DIN EN IEC 60695-2-10:2023; EN IEC 60695-2-10:2021; IEC 60695-2-11:2021; DIN EN IEC 60695-2-11:2022; EN IEC 60695-2-11:2021; IEC 60695-10-2:2014; DIN EN 60695-10-2:2016; EN 60695-10-2: 2014; IEC 60695-11-3:2012; DIN EN 60695-11-3:2014; EN 60695-11-3:2012

IEC 60695-11-3Name not checked yet
As written on the certificate · Line 74 (DAKKS D-PL-11020-03-01)

DIN EN 60825 -2:2011 -06; BEIBLATT 1: 2008; BEIBLATT 2: 2019; EN 60825-2:2004 + A1:2007 + A2:2010; IEC 60825-2:2004 + A1:2006 + A2:2010; IEC 60695-2-10:2021; DIN EN IEC 60695-2-10:2023; EN IEC 60695-2-10:2021; IEC 60695-2-11:2021; DIN EN IEC 60695-2-11:2022; EN IEC 60695-2-11:2021; IEC 60695-10-2:2014; DIN EN 60695-10-2:2016; EN 60695-10-2: 2014; IEC 60695-11-3:2012; DIN EN 60695-11-3:2014; EN 60695-11-3:2012

IEC 60695-11-5Name not checked yet
As written on the certificate · Line 75 (DAKKS D-PL-11020-03-01)

IEC 60695-11-5:2016; DIN EN 60695-11-5:2017; IEC 60695-11-10:2013 + CORRIGENDUM 1: 2014; DIN EN 60695-11-10:2014; IEC 60695-11-20:2015 + COR1:2016; DIN EN 60695-11-20:2016; IEC 60695-2-12:2021; DIN EN IEC 60695-2-12:2022

IEC 60695-11-10Name not checked yet
As written on the certificate · Line 75 (DAKKS D-PL-11020-03-01)

IEC 60695-11-5:2016; DIN EN 60695-11-5:2017; IEC 60695-11-10:2013 + CORRIGENDUM 1: 2014; DIN EN 60695-11-10:2014; IEC 60695-11-20:2015 + COR1:2016; DIN EN 60695-11-20:2016; IEC 60695-2-12:2021; DIN EN IEC 60695-2-12:2022

IEC 60695-11-20Name not checked yet
As written on the certificate · Line 75 (DAKKS D-PL-11020-03-01)

IEC 60695-11-5:2016; DIN EN 60695-11-5:2017; IEC 60695-11-10:2013 + CORRIGENDUM 1: 2014; DIN EN 60695-11-10:2014; IEC 60695-11-20:2015 + COR1:2016; DIN EN 60695-11-20:2016; IEC 60695-2-12:2021; DIN EN IEC 60695-2-12:2022

IEC 61326 series

IEC 61326-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
As written on the certificate · Line 20 (DAKKS D-PL-11020-03-01)

IEC 61326-1:2020; DIN EN IEC 61326-1:2022; EN IEC 61326-1:2021; IEC 61326-2-1:2020; DIN EN IEC 61326-2-1:2022; EN IEC 61326-2-1:2021; IEC 61326-2-2:2020; DIN EN IEC 61326-2-2:2022; EN IEC 61326-2-2:2021

IEC 61326-2-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-1: Particular requirements - Test configurations, operational conditions and performance criteria for sensitive test and measurement equipment for EMC unprotected applications
As written on the certificate · Line 20 (DAKKS D-PL-11020-03-01)

IEC 61326-1:2020; DIN EN IEC 61326-1:2022; EN IEC 61326-1:2021; IEC 61326-2-1:2020; DIN EN IEC 61326-2-1:2022; EN IEC 61326-2-1:2021; IEC 61326-2-2:2020; DIN EN IEC 61326-2-2:2022; EN IEC 61326-2-2:2021

IEC 61326-2-2Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-2: Particular requirements - Test configurations, operational conditions and performance criteria for portable testing, measuring and monitoring equipment used in low-voltage distribution systems
As written on the certificate · Line 20 (DAKKS D-PL-11020-03-01)

IEC 61326-1:2020; DIN EN IEC 61326-1:2022; EN IEC 61326-1:2021; IEC 61326-2-1:2020; DIN EN IEC 61326-2-1:2022; EN IEC 61326-2-1:2021; IEC 61326-2-2:2020; DIN EN IEC 61326-2-2:2022; EN IEC 61326-2-2:2021

IEC 61326-2-3Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-3: Particular requirements - Test configuration, operational conditions and performance criteria for transducers with integrated or remote signal conditioning
As written on the certificate · Line 21 (DAKKS D-PL-11020-03-01)

IEC 61326-2-3:2020; DIN EN IEC 61326-2-3:2022; EN IEC 61326-2-3:2021; IEC 61326-2-4:2020; DIN EN IEC 61326-2-4:2022; EN IEC 61326-2-4:2021; IEC 61326-2-5:2020

IEC 61326-2-4Name not checked yet
As written on the certificate · Line 21 (DAKKS D-PL-11020-03-01)

IEC 61326-2-3:2020; DIN EN IEC 61326-2-3:2022; EN IEC 61326-2-3:2021; IEC 61326-2-4:2020; DIN EN IEC 61326-2-4:2022; EN IEC 61326-2-4:2021; IEC 61326-2-5:2020

IEC 61326-2-5Name not checked yet
As written on the certificate · Line 21 (DAKKS D-PL-11020-03-01)

IEC 61326-2-3:2020; DIN EN IEC 61326-2-3:2022; EN IEC 61326-2-3:2021; IEC 61326-2-4:2020; DIN EN IEC 61326-2-4:2022; EN IEC 61326-2-4:2021; IEC 61326-2-5:2020

As written on the certificate · Line 22 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61326-2-5:2022; EN IEC 61326-2-5:2021; IEC 61326-3-1:2017; DIN EN 61326-3-1: 2018; EN 61326-3-1:2017; IEC 61326-3-2:2017; DIN EN IEC 61326-3-2: 2019; EN IEC 61326-3-2:2018; IEC 61496-1:2020

IEC 61326-3-1Name not checked yet
As written on the certificate · Line 22 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61326-2-5:2022; EN IEC 61326-2-5:2021; IEC 61326-3-1:2017; DIN EN 61326-3-1: 2018; EN 61326-3-1:2017; IEC 61326-3-2:2017; DIN EN IEC 61326-3-2: 2019; EN IEC 61326-3-2:2018; IEC 61496-1:2020

IEC 61326-3-2Name not checked yet
As written on the certificate · Line 22 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61326-2-5:2022; EN IEC 61326-2-5:2021; IEC 61326-3-1:2017; DIN EN 61326-3-1: 2018; EN 61326-3-1:2017; IEC 61326-3-2:2017; DIN EN IEC 61326-3-2: 2019; EN IEC 61326-3-2:2018; IEC 61496-1:2020

ISO 11452 series

ISO 11452-2Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 2: Absorber-lined shielded enclosure
As written on the certificate · Line 42 (DAKKS D-PL-11020-03-01)

ISO 11451-4:2022; ISO 11452-2: 2004; ISO 11452-2:2019; ISO 11452-3:2024; ISO 11452-4:2011; ISO 11452-4:2020; ISO 11452-5:2002; ISO 11452-8:2015

ISO 11452-3Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 3: Transverse electromagnetic (TEM) cell
As written on the certificate · Line 42 (DAKKS D-PL-11020-03-01)

ISO 11451-4:2022; ISO 11452-2: 2004; ISO 11452-2:2019; ISO 11452-3:2024; ISO 11452-4:2011; ISO 11452-4:2020; ISO 11452-5:2002; ISO 11452-8:2015

ISO 11452-4Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 4: Harness excitation methods
As written on the certificate · Line 42 (DAKKS D-PL-11020-03-01)

ISO 11451-4:2022; ISO 11452-2: 2004; ISO 11452-2:2019; ISO 11452-3:2024; ISO 11452-4:2011; ISO 11452-4:2020; ISO 11452-5:2002; ISO 11452-8:2015

ISO 11452-5Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 5: Stripline
As written on the certificate · Line 42 (DAKKS D-PL-11020-03-01)

ISO 11451-4:2022; ISO 11452-2: 2004; ISO 11452-2:2019; ISO 11452-3:2024; ISO 11452-4:2011; ISO 11452-4:2020; ISO 11452-5:2002; ISO 11452-8:2015

ISO 11452-8Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 8: Immunity to magnetic fields
As written on the certificate · Line 42 (DAKKS D-PL-11020-03-01)

ISO 11451-4:2022; ISO 11452-2: 2004; ISO 11452-2:2019; ISO 11452-3:2024; ISO 11452-4:2011; ISO 11452-4:2020; ISO 11452-5:2002; ISO 11452-8:2015

ISO 11452-9Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 9: Portable transmitters
As written on the certificate · Line 43 (DAKKS D-PL-11020-03-01)

ISO 11452-9:2021; ISO 11452-10:2009; ISO 16750-2:2023; LV124:2013; LV148:2013; GS 95002-2: 2021-05; GS 95002-3: 2015-12; GS 95002-5: 2015-03; GS 95024-2-1: 2010-01

ISO 11452-10Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 10: Immunity to conducted disturbances in the extended audio frequency range
As written on the certificate · Line 43 (DAKKS D-PL-11020-03-01)

ISO 11452-9:2021; ISO 11452-10:2009; ISO 16750-2:2023; LV124:2013; LV148:2013; GS 95002-2: 2021-05; GS 95002-3: 2015-12; GS 95002-5: 2015-03; GS 95024-2-1: 2010-01

IEC 61851 series

IEC 61851-1Name not checked yet
As written on the certificate · Line 23 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61496-1:2021; EN IEC 61496-1:2020; IEC 61547:2020; DIN EN IEC 61547:2023; EN IEC 61547:2023; IEC 61587-3:2013; DIN EN 61587-3:2013; EN 61587-3:2013; IEC 61800-3:2022; DIN EN IEC 61800-3:2024; EN IEC 61800-3:2023; IEC 61850-3:2014; DIN EN 61850-3:2014; EN 61850-3:2014; IEC 61851-1:2010

As written on the certificate · Line 24 (DAKKS D-PL-11020-03-01)

DIN EN 61851-1:2012; IEC 61851-21:2001; DIN EN 61851-21:2002; IEC 61851-21-1:2017; DIN EN 61851-21-1: 2018; IEC 61851-21-2:2018; DIN EN IEC 61851-21-2:2021

As written on the certificate · Line 82 (DAKKS D-PL-11020-03-01)

IEC 60884-2-5: 2017; BS 1363-1+A4: 1995; BS 1363-2: 1999; BS 1363-2+A1:2016; DIN VDE 0620-101:1992; EN 50075: 1990; IEC 62196-1:2022; DIN EN IEC 62196-1:2023; EN IEC 62196-1: 2022; IEC 61851-1: 2017; DIN EN IEC 61851-1:2019; EN IEC 61851-1: 2019

IEC 61851-21-1Name not checked yet
As written on the certificate · Line 24 (DAKKS D-PL-11020-03-01)

DIN EN 61851-1:2012; IEC 61851-21:2001; DIN EN 61851-21:2002; IEC 61851-21-1:2017; DIN EN 61851-21-1: 2018; IEC 61851-21-2:2018; DIN EN IEC 61851-21-2:2021

IEC 61851-21-2Name not checked yet
As written on the certificate · Line 24 (DAKKS D-PL-11020-03-01)

DIN EN 61851-1:2012; IEC 61851-21:2001; DIN EN 61851-21:2002; IEC 61851-21-1:2017; DIN EN 61851-21-1: 2018; IEC 61851-21-2:2018; DIN EN IEC 61851-21-2:2021

As written on the certificate · Line 83 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61851-21-2:2021; DIN EN 61851-22: 2002; IEC 61851-22: 2001; DIN EN 61851-22:2002; IEC 61439-1:2020; DIN EN IEC 61439-1:2021; DIN EN IEC 61439-7: 2024-07; DIN EN ISO 12100: 2011 + Berichtigung1:2013

IEC 61851-22Name not checked yet
As written on the certificate · Line 25 (DAKKS D-PL-11020-03-01)

IEC 61851-22:2001; DIN EN 61851-22:2002; IEC 62040-2:2016; DIN EN IEC 62040:2019; IEC 62301:2011; ITU-T K.20:2019-11; ITU-T K.21: 2019 + A1:2020; ITU-T K.43:2009; ITU-T K.44:2019

As written on the certificate · Line 83 (DAKKS D-PL-11020-03-01)

DIN EN IEC 61851-21-2:2021; DIN EN 61851-22: 2002; IEC 61851-22: 2001; DIN EN 61851-22:2002; IEC 61439-1:2020; DIN EN IEC 61439-1:2021; DIN EN IEC 61439-7: 2024-07; DIN EN ISO 12100: 2011 + Berichtigung1:2013

IEC 62040 series

IEC 62040-1Name not checked yet
As written on the certificate · Line 85 (DAKKS D-PL-11020-03-01)

DIN EN 62262:2022-02; EN 62262:2002 + A1:2021; IEC 62262:2021 + AMD1:2021; UL 1740:2018; UL 508A:2018; NFPA 79:2015; NFPA 79:2021; IEC 62040-1:2017+ CORRIGENDUM 1:2019; IEC 62477-1:2012; DIN EN IEC 62040-1:2020; EN IEC 62040-1:2019; IEC 62040 -3: 2011 + CORRIGENDUM 1:2011; DIN EN 62040-3:2011; EN 62040-3:2011; IEC 62040-4: 2013; DIN EN 62040-4:2014; EN 62040-4:2013

IEC 62040-2Uninterruptible power systems (UPS) - Part 2: Electromagnetic compatibility (EMC) requirements
As written on the certificate · Line 25 (DAKKS D-PL-11020-03-01)

IEC 61851-22:2001; DIN EN 61851-22:2002; IEC 62040-2:2016; DIN EN IEC 62040:2019; IEC 62301:2011; ITU-T K.20:2019-11; ITU-T K.21: 2019 + A1:2020; ITU-T K.43:2009; ITU-T K.44:2019

IEC 62040-3Name not checked yet
As written on the certificate · Line 85 (DAKKS D-PL-11020-03-01)

DIN EN 62262:2022-02; EN 62262:2002 + A1:2021; IEC 62262:2021 + AMD1:2021; UL 1740:2018; UL 508A:2018; NFPA 79:2015; NFPA 79:2021; IEC 62040-1:2017+ CORRIGENDUM 1:2019; IEC 62477-1:2012; DIN EN IEC 62040-1:2020; EN IEC 62040-1:2019; IEC 62040 -3: 2011 + CORRIGENDUM 1:2011; DIN EN 62040-3:2011; EN 62040-3:2011; IEC 62040-4: 2013; DIN EN 62040-4:2014; EN 62040-4:2013

IEC 62040-4Name not checked yet
As written on the certificate · Line 85 (DAKKS D-PL-11020-03-01)

DIN EN 62262:2022-02; EN 62262:2002 + A1:2021; IEC 62262:2021 + AMD1:2021; UL 1740:2018; UL 508A:2018; NFPA 79:2015; NFPA 79:2021; IEC 62040-1:2017+ CORRIGENDUM 1:2019; IEC 62477-1:2012; DIN EN IEC 62040-1:2020; EN IEC 62040-1:2019; IEC 62040 -3: 2011 + CORRIGENDUM 1:2011; DIN EN 62040-3:2011; EN 62040-3:2011; IEC 62040-4: 2013; DIN EN 62040-4:2014; EN 62040-4:2013

ISO 16750 series

ISO 16750-2Road vehicles - Environmental conditions and testing for electrical and electronic equipment - Part 2: Electrical loads
As written on the certificate · Line 43 (DAKKS D-PL-11020-03-01)

ISO 11452-9:2021; ISO 11452-10:2009; ISO 16750-2:2023; LV124:2013; LV148:2013; GS 95002-2: 2021-05; GS 95002-3: 2015-12; GS 95002-5: 2015-03; GS 95024-2-1: 2010-01

ISO 16750-3Road vehicles - Environmental conditions and testing for electrical and electronic equipment - Part 3: Mechanical loads
As written on the certificate · Line 87 (DAKKS D-PL-11020-03-01)

IEC 60068-2-11; IEC 60068-2-52; ISO 9227 (NSS); MIL-STD-810; RTCA DO-160; IEC 60068-2-27; JESD22-B104; Mil-STD-883; IEC 60068-2-1/-2/-14; IEC 60068-2-6/-27/-64; IEC 60068-2-53; ISO 16750-3; IEC 60068-2-60; GR-63-CORE; IEC 60068-2-42; IEC 60068-2-43

As written on the certificate · Line 91 (DAKKS D-PL-11020-03-01)

IEC 60529:2013; ISO 20653:2013; JESD22-B103:2016; JESD22-B104:2004; IEC 61373:2010; EN 50155 (2021-07); ISO 16750-3:2023; ISO 16750-4:2023; ISO 16750-5:2023

ISO 16750-4Road vehicles - Environmental conditions and testing for electrical and electronic equipment - Part 4: Climatic loads
As written on the certificate · Line 91 (DAKKS D-PL-11020-03-01)

IEC 60529:2013; ISO 20653:2013; JESD22-B103:2016; JESD22-B104:2004; IEC 61373:2010; EN 50155 (2021-07); ISO 16750-3:2023; ISO 16750-4:2023; ISO 16750-5:2023

ISO 16750-5Road vehicles - Environmental conditions and testing for electrical and electronic equipment - Part 5: Chemical loads
As written on the certificate · Line 88 (DAKKS D-PL-11020-03-01)

IEC 60068-2-74; MIL-STD-810 (504); RTCA DO-160 (11); ISO 16750-5; IEC 60068-2-1:2025; IEC 60068-2-2:2025; IEC 60068-2-6:2007; IEC 60068-2-11: 2021; IEC 60068-2-13:2021; IEC 60068-2-14:2023

As written on the certificate · Line 91 (DAKKS D-PL-11020-03-01)

IEC 60529:2013; ISO 20653:2013; JESD22-B103:2016; JESD22-B104:2004; IEC 61373:2010; EN 50155 (2021-07); ISO 16750-3:2023; ISO 16750-4:2023; ISO 16750-5:2023

EN 50121 series

EN 50121-3-2Railway applications - Electromagnetic compatibility - Part 3-2: Rolling stock - Apparatus
As written on the certificate · Line 37 (DAKKS D-PL-11020-03-01)

DIN EN 62369-1:2010; IEC 62479:2010; DIN EN 62479:2011; DIN EN 50121-3-2:2016 + A1:2020; DIN EN 50121-4:2017 +A1:2020; DIN EN 50121-5:2017 + A1:2020

EN 50121-4Railway applications - Electromagnetic compatibility - Part 4: Emission and immunity of the signalling and telecommunications apparatus
As written on the certificate · Line 37 (DAKKS D-PL-11020-03-01)

DIN EN 62369-1:2010; IEC 62479:2010; DIN EN 62479:2011; DIN EN 50121-3-2:2016 + A1:2020; DIN EN 50121-4:2017 +A1:2020; DIN EN 50121-5:2017 + A1:2020

EN 50121-5Name not checked yet
As written on the certificate · Line 37 (DAKKS D-PL-11020-03-01)

DIN EN 62369-1:2010; IEC 62479:2010; DIN EN 62479:2011; DIN EN 50121-3-2:2016 + A1:2020; DIN EN 50121-4:2017 +A1:2020; DIN EN 50121-5:2017 + A1:2020

EN 50491 series

EN 50491-5-1Name not checked yet
As written on the certificate · Line 13 (DAKKS D-PL-11020-03-01)

DIN EN 50293: 2013; DIN EN 50412-2-1:2006; DIN EN 50491-5-1:2010; DIN EN 50491-5-2: 2010; DIN EN 50491-5-3: 2010; DIN EN 50561-1: 2014; CISPR 11:2016 +A1:2017 +A2:2019; CISPR 11:2024

EN 50491-5-2Name not checked yet
As written on the certificate · Line 13 (DAKKS D-PL-11020-03-01)

DIN EN 50293: 2013; DIN EN 50412-2-1:2006; DIN EN 50491-5-1:2010; DIN EN 50491-5-2: 2010; DIN EN 50491-5-3: 2010; DIN EN 50561-1: 2014; CISPR 11:2016 +A1:2017 +A2:2019; CISPR 11:2024

EN 50491-5-3Name not checked yet
As written on the certificate · Line 13 (DAKKS D-PL-11020-03-01)

DIN EN 50293: 2013; DIN EN 50412-2-1:2006; DIN EN 50491-5-1:2010; DIN EN 50491-5-2: 2010; DIN EN 50491-5-3: 2010; DIN EN 50561-1: 2014; CISPR 11:2016 +A1:2017 +A2:2019; CISPR 11:2024

Other standards

ASTM B117Standard Practice for Operating Salt Spray (Fog) Apparatus
As written on the certificate · Line 90 (DAKKS D-PL-11020-03-01)

IEC 60068-2-78:2025; IEC 60068-2-80:2005; IEC 60068-2-82:2019; ETSI EN 300 019 -2-1 V2.3.1 (2017-11); ETSI EN 300 019 -2-2 V2.4.1 (2017-11); ETSI EN 300 019 -2-3 V2.5.1 (2020-10); ETSI EN 300 019 -2-4 V2.5.1 (2018-07); ETSI EN 300 019 -2-5 V3.1.1 (2021-09); ETSI EN 300 019 -2-6 V3.1.1 (2023-10); ETSI EN 300 019 -2-7 V3.0.1 (2003-04); ISO 9227 :2022; ASTM B 117:2019; DIN 50018:2013; ISO 6988:1985

ASTM D4935Name not checked yet
As written on the certificate · Line 54 (DAKKS D-PL-11020-03-01)

VG 95373-14: 2008; VG 95373 Part 15:2005; VG 96903 Part 76:2021; ANSI C 63.4-2014 + ANSI C63.4a:2017; ASTM D4935-18: 2018; ATIS-0600315: 2013; GR-1089-CORE Issue 8:2022; GR-3108-CORE: 2022; CAN/CSA-CEI/IEC CISPR 11 :04 2013

FCC PART 15Radio Frequency Devices
As written on the certificate · Line 55 (DAKKS D-PL-11020-03-01)

CAN/CSA-CISPR 12-10:2010; ICES-001 Issue 5: 2020; ICES-002 Issue 7: 2020; ICES 003 Issue 7: 2020; ICES 005: 2018; ICES Gen Issue 2 :2023; IEEE Std 299: 2006; NSA 65-6 :1964; ANSI C 63.10-2013; ANSI C63.10-2020; ANSI C 63.17-2013; FCC MP-5:1986; 47 CFR Part 2; 47 CFR Part 15

VDA 320Name not checked yet
As written on the certificate · Line 49 (DAKKS D-PL-11020-03-01)

36-00-808/--N: 2016; ES 96200-00, L 2014-06; STD 515-0003 2017-02; TB1901 2016-05; 2017-10; VDA 320: 2014; 28401NDS02-8: 2016-03; CS.00054: 2018-01; IEC 60533: 2015; IEC 60945:2002

Scope as published by DAKKS

154 lines
DAKKS

ISO/IEC 17025

Active

D-PL-11020-03-02

View scope
DAKKS

ISO/IEC 17025

Active

D-PL-11020-03-00

View scope
DAKKS

ISO/IEC 17025

Active

D-PL-11020-03-01

View scope
DAKKS

ISO/IEC 17025

Active

D-PL-11020-03-03

View scope
DAKKS

ISO/IEC 17025

Active

D-PL-11020-03-04

View scope
DAKKS

ISO/IEC 17025

Active

D-PL-11020-03-05

View scope

Location

Benzstraße 26/28, Puchheim, 82178, DE

48.16898, 11.36679

Open in Maps

Other Locations

1 other site in this organization

Accreditation data refreshed from the DAKKS register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the DAKKS entry linked above.