FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
Italy

Nemko S.p.A. a socio unico

Via del Carroccio, 4, 20853, Biassono, Italy

ACCREDIA|00036ISO/IEC 17025Register refreshed 2026-09-25
Certificates
1
Scope items
40
Standards
113
Locations
2
One of 2 locations. View the organization

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at Nemko S.p.A. a socio unico?

Claim this profile to keep it accurate.

Register record

ACCREDIARefreshed
00036Active

Accredited standards

113

Our reading of the ACCREDIA scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

IEC 60335 series

IEC 60335-1Household and similar electrical appliances - Safety - Part 1: General requirements
As written on the certificate · Line 34 (ACCREDIA 00036)

CEI EN IEC 60335-1:2024/A11:2024; EN IEC 60335-1:2023/A11:2023; IEC 60335-1:2020/COR1:2021

IEC 60335-2-2Household and similar electrical appliances - Safety - Part 2-2: Particular requirements for vacuum cleaners and water-suction cleaning appliances
As written on the certificate · Line 20 (ACCREDIA 00036)

CEI EN 60335-2-49:2003/A1:2009/A11:2012/A2:2020/A2:2022; EN 60335-2-49:2003/Cor:2007/A1:2008/A11:2012/A2:2019; EN 60335-2-49:2003/Cor:2007/A1:2008/A11:2012/A2:2019/A12:2024; IEC 60335-2-49:2002/AMD1:2008/AMD2:2017; CEI EN 60335-2-2:2011/A11:2013/EC:2014/A1:2014; EN 60335-2-2:2003/A1:2004/A2:2006/A11:2010/A11:2010/AC:2012; EN 60335-2-2:2010/A11:2012/A1:2013; EN IEC 60335-2-2:2023/A11:2023; IEC 60335-2-2:2009/AMD1:2012/AMD2:2016; IEC 60335-2-2:2019

IEC 60335-2-3Household and similar electrical appliances - Safety - Part 2-3: Particular requirements for electric irons
As written on the certificate · Line 27 (ACCREDIA 00036)

CEI EN 60335-2-3:2018/A1:2021; EN 60335-2-3:2016/A1:2020; IEC 60335-2-3:2012/AMD1:2015; IEC 60335-2-3:2022

IEC 60335-2-6Name not checked yet
As written on the certificate · Line 24 (ACCREDIA 00036)

EN 60335-2-29:2021/A1:2021; EN 60335-2-29:2021/A1:2021/A11:2024; IEC 60335-2-29:2016/AMD1:2019; CEI EN 60335-2-6:2016/A1:2020/A11:2020; EN 60335-2-6:2015/A1:2020/A11:2020; IEC 60335-2-6:2014/AMD1:2018

As written on the certificate · Line 25 (ACCREDIA 00036)

IEC 60335-2-6:2024; CEI EN 60335-2-36:2003/A1:2005/A2:2008/A11:2012; EN 60335-2-36:2002/A1:2004/Cor:2007/A2:2008/A11:2012; IEC 60335-2-36:2002/AMD1:2004/AMD2:2008; IEC 60335-2-36:2017

IEC 60335-2-9Household and similar electrical appliances - Safety - Part 2-9: Particular requirements for grills, toasters and similar portable cooking appliances
As written on the certificate · Line 29 (ACCREDIA 00036)

CEI EN 60335-2-9:2007/A12:2008/A13:2012/EC:2018; CEI EN IEC 60335-2-9:2023; EN 60335-2-9:2003/A1:2004/A2:2006/A12:2007/A13:2010/AC:2011/AC:2012; EN IEC 60335-2-9:2023/A11:2023; IEC 60335-2-9:2002/AMD1:2004/AMD2:2006; IEC 60335-2-9:2008/AMD1:2012/COR1:2013/AMD2:2016; IEC 60335-2-9:2019; CEI EN 60335-2-58:2008/A1:2009/A11:2010/A2/A12:2016; EN 60335-2-58:2005/Cor:2007/A1:2008/A11:2010/A2:2015/A12:2016; IEC 60335-2-58:2002/AMD1:2008/AMD2:2015; IEC 60335-2-58:2017

IEC 60335-2-14Name not checked yet
As written on the certificate · Line 15 (ACCREDIA 00036)

CEI EN 60335-2-72:2014; EN 60335-2-72:2012; IEC 60335-2-72:2012; IEC 60335-2-72:2016; CEI EN 60335-2-14:2007/A1:2009/A11:2012/EC:2013/A12:2016; CEI EN IEC 60335-2-14:2024; EN 60335-2-14:2006/Cor:2007/A1:2008/A11:2012/AC:2016/A12:2016; EN IEC 60335-2-14:2023/A1:2023/A11:2023; IEC 60335-2-14:2006/AMD1:2008/AMD2:2012; IEC 60335-2-14:2016/AMD1:2019

IEC 60335-2-15Name not checked yet
As written on the certificate · Line 18 (ACCREDIA 00036)

IEC 60335-2-15:2024; CEI EN 60335-2-15:2016/A11:2018/A1:2022/A 2:2022/A12:2022; EN 60335-2-15:2016/A11:2018/A1:2021/A 2:2021/A12:2021; IEC 60335-2-15:2012/AMD1:2016/AMD2:2 018

IEC 60335-2-23Name not checked yet
As written on the certificate · Line 19 (ACCREDIA 00036)

CEI EN 60335-2-23:2004/A1:2009/A11:2011/EC:2012/A2:2016; EN 60335-2-23:2003/A1:2008/A11:2010/AC:2012/A2:2015; EN IEC 60335-2-23:2023/A11:2023/A1:2023; IEC 60335-2-23:2016/AMD1:2019; IEC 60335-2-49:2021

IEC 60335-2-24Name not checked yet
As written on the certificate · Line 17 (ACCREDIA 00036)

CEI EN 60335-2-24:2011/A1:2019/A2:2019/A11:2021; EN 60335-2-24:2010/A1:2019/A2:2019/A11:2020; EN IEC 60335-2-24:2022/A11:2022; IEC 60335-2-24:2010/AMD1:2012/AMD2:2017; IEC 60335-2-24:2020/COR1:2021; CEI EN 60335-2-30:2011/A11:2013/EC:2016/A1:2020/A12:2021; EN 60335-2-30:2009/Cor1:2010/A11:2012/AC:2014/A1:2020/A12:2020; EN 60335-2-30:2009/Cor1:2010/A11:2012/AC:2014/A1:2020/A12:2020/A2:2022/A13:2022; IEC 60335-2-30:2009/COR1:2014/AMD1:2016/AMD2:2021

IEC 60335-2-29Name not checked yet
As written on the certificate · Line 24 (ACCREDIA 00036)

EN 60335-2-29:2021/A1:2021; EN 60335-2-29:2021/A1:2021/A11:2024; IEC 60335-2-29:2016/AMD1:2019; CEI EN 60335-2-6:2016/A1:2020/A11:2020; EN 60335-2-6:2015/A1:2020/A11:2020; IEC 60335-2-6:2014/AMD1:2018

IEC 60335-2-30Name not checked yet
As written on the certificate · Line 17 (ACCREDIA 00036)

CEI EN 60335-2-24:2011/A1:2019/A2:2019/A11:2021; EN 60335-2-24:2010/A1:2019/A2:2019/A11:2020; EN IEC 60335-2-24:2022/A11:2022; IEC 60335-2-24:2010/AMD1:2012/AMD2:2017; IEC 60335-2-24:2020/COR1:2021; CEI EN 60335-2-30:2011/A11:2013/EC:2016/A1:2020/A12:2021; EN 60335-2-30:2009/Cor1:2010/A11:2012/AC:2014/A1:2020/A12:2020; EN 60335-2-30:2009/Cor1:2010/A11:2012/AC:2014/A1:2020/A12:2020/A2:2022/A13:2022; IEC 60335-2-30:2009/COR1:2014/AMD1:2016/AMD2:2021

IEC 60335-2-31Name not checked yet
As written on the certificate · Line 23 (ACCREDIA 00036)

CEI EN 60335-2-31:2016; CEI EN 60335-2-31:2016/A1:2023/A2:2023/A11:2023; EN 60335-2-31:2014; EN 60335-2-31:2014/A1:2023/A11:2023/A2:2023; IEC 60335-2-31:2012/AMD1:2016/AMD2:2018; IEC 60335-2-31:2024

IEC 60335-2-36Name not checked yet
As written on the certificate · Line 25 (ACCREDIA 00036)

IEC 60335-2-6:2024; CEI EN 60335-2-36:2003/A1:2005/A2:2008/A11:2012; EN 60335-2-36:2002/A1:2004/Cor:2007/A2:2008/A11:2012; IEC 60335-2-36:2002/AMD1:2004/AMD2:2008; IEC 60335-2-36:2017

As written on the certificate · Line 26 (ACCREDIA 00036)

IEC 60335-2-36:2021; EN IEC 60335-2-75:2023/A11:2023/A1:2023/A2:2023; IEC 60335-2-75:2012/AMD1:2015/AMD2:2018

IEC 60335-2-42Name not checked yet
As written on the certificate · Line 28 (ACCREDIA 00036)

IEC 60335-2-42:2021; CEI EN 60335-2-42:2003/A1:2009/A11:2012; EN 60335-2-42:2003/Cor:2007/A1:2008/A 11:2012; EN 60335-2-42:2003/Cor:2007/A1:2008/A 11:2012/A2:2024/A12:2024; IEC 60335-2-42:2002/AMD1:2008/AMD2:2 017

IEC 60335-2-44Name not checked yet
As written on the certificate · Line 31 (ACCREDIA 00036)

IEC 60335-2-44:2021; CEI EN 60335-2-98:2005/A2:2010/A11:2020; EN 60335-2-98:2003/A1:2005/A2:2008/A11:2019; IEC 60335-2-98:2002/AMD1:2004/AMD2:2008

IEC 60335-2-49Name not checked yet
As written on the certificate · Line 19 (ACCREDIA 00036)

CEI EN 60335-2-23:2004/A1:2009/A11:2011/EC:2012/A2:2016; EN 60335-2-23:2003/A1:2008/A11:2010/AC:2012/A2:2015; EN IEC 60335-2-23:2023/A11:2023/A1:2023; IEC 60335-2-23:2016/AMD1:2019; IEC 60335-2-49:2021

As written on the certificate · Line 20 (ACCREDIA 00036)

CEI EN 60335-2-49:2003/A1:2009/A11:2012/A2:2020/A2:2022; EN 60335-2-49:2003/Cor:2007/A1:2008/A11:2012/A2:2019; EN 60335-2-49:2003/Cor:2007/A1:2008/A11:2012/A2:2019/A12:2024; IEC 60335-2-49:2002/AMD1:2008/AMD2:2017; CEI EN 60335-2-2:2011/A11:2013/EC:2014/A1:2014; EN 60335-2-2:2003/A1:2004/A2:2006/A11:2010/A11:2010/AC:2012; EN 60335-2-2:2010/A11:2012/A1:2013; EN IEC 60335-2-2:2023/A11:2023; IEC 60335-2-2:2009/AMD1:2012/AMD2:2016; IEC 60335-2-2:2019

IEC 60335-2-50Name not checked yet
As written on the certificate · Line 21 (ACCREDIA 00036)

IEC 60335-2-50:2021; CEI EN 60335-2-50:2003/A1:2009; EN 60335-2-50:2003/Cor2007/A1:2008; IEC 60335-2-50:2002/AMD1:2007/AMD2:2017

IEC 60335-2-54Name not checked yet
As written on the certificate · Line 16 (ACCREDIA 00036)

CEI EN 60335-2-54:2009/A11:2013/A1:2016/EC:2016; EN 60335-2-54:2008/A11:2012/AC:2015/A1:2015/A2:2021/A12:2021; IEC 60335-2-54:2008/AMD1:2015/AMD2:2019; IEC 60335-2-54:2022; UNI CEI EN ISO/IEC 17025:2018

IEC 60335-2-58Name not checked yet
As written on the certificate · Line 29 (ACCREDIA 00036)

CEI EN 60335-2-9:2007/A12:2008/A13:2012/EC:2018; CEI EN IEC 60335-2-9:2023; EN 60335-2-9:2003/A1:2004/A2:2006/A12:2007/A13:2010/AC:2011/AC:2012; EN IEC 60335-2-9:2023/A11:2023; IEC 60335-2-9:2002/AMD1:2004/AMD2:2006; IEC 60335-2-9:2008/AMD1:2012/COR1:2013/AMD2:2016; IEC 60335-2-9:2019; CEI EN 60335-2-58:2008/A1:2009/A11:2010/A2/A12:2016; EN 60335-2-58:2005/Cor:2007/A1:2008/A11:2010/A2:2015/A12:2016; IEC 60335-2-58:2002/AMD1:2008/AMD2:2015; IEC 60335-2-58:2017

IEC 60335-2-60Name not checked yet
As written on the certificate · Line 32 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; IEC 60335-2-98:2023; IEC 60335-2-60:2023

As written on the certificate · Line 33 (ACCREDIA 00036)

CEI EN 60335-2-60:2006/A2:2009/A11/A12:20 10; CEI EN IEC 60335-2-60:2024; EN 60335-2-60:2003/A1:2005/A2:2008/A1 1:2010/A12:2010; EN IEC 60335-2-60:2023/A11:2023; IEC 60335-2-60:2002/AMD1:2004/AMD2:2 008; IEC 60335-2-60:2017; UNI CEI EN ISO/IEC 17025:2018

IEC 60335-2-64Name not checked yet
As written on the certificate · Line 30 (ACCREDIA 00036)

CEI EN 60335-2-64:2000/A1:2004; EN 60335-2-64:2000/COR:2002/A1:2002; IEC 60335-2-64:1997/AMD1:2000; IEC 60335-2-64:2002/AMD1:2007/AMD2:2017; IEC 60335-2-64:2021; IEC 60335-2-64:2021/AMD1:2024

IEC 60335-2-72Name not checked yet
As written on the certificate · Line 14 (ACCREDIA 00036)

ICES-003 Issue 7:2020; CEI EN 62233:2009; EN 62233:2008/COR:2008; IEC 62233:2005; CEI EN 55014-1:2008/A1:2010/A2:2012; CEI EN 55014-1:2019/A11:2020; CEI EN 55014-1:2021; CISPR 14-1:2005/A1:2008/A2:2011; CISPR 14-1:2016/Cor1:2016; CISPR 14-1:2020; EN 55014-1:2006/A1:2009/A2:2011; EN 55014-1:2017/A11:2020; EN IEC 55014-1:2021; CEI EN 55014-2:2016; CEI EN IEC 55014-2:2021; CISPR 14-2:2015; CISPR 14-2:2020; EN 55014-2:2015; EN IEC 55014-2:2021; IEC 60335-2-72:2021

As written on the certificate · Line 15 (ACCREDIA 00036)

CEI EN 60335-2-72:2014; EN 60335-2-72:2012; IEC 60335-2-72:2012; IEC 60335-2-72:2016; CEI EN 60335-2-14:2007/A1:2009/A11:2012/EC:2013/A12:2016; CEI EN IEC 60335-2-14:2024; EN 60335-2-14:2006/Cor:2007/A1:2008/A11:2012/AC:2016/A12:2016; EN IEC 60335-2-14:2023/A1:2023/A11:2023; IEC 60335-2-14:2006/AMD1:2008/AMD2:2012; IEC 60335-2-14:2016/AMD1:2019

IEC 60335-2-75Name not checked yet
As written on the certificate · Line 26 (ACCREDIA 00036)

IEC 60335-2-36:2021; EN IEC 60335-2-75:2023/A11:2023/A1:2023/A2:2023; IEC 60335-2-75:2012/AMD1:2015/AMD2:2018

IEC 60335-2-98Name not checked yet
As written on the certificate · Line 31 (ACCREDIA 00036)

IEC 60335-2-44:2021; CEI EN 60335-2-98:2005/A2:2010/A11:2020; EN 60335-2-98:2003/A1:2005/A2:2008/A11:2019; IEC 60335-2-98:2002/AMD1:2004/AMD2:2008

As written on the certificate · Line 32 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; IEC 60335-2-98:2023; IEC 60335-2-60:2023

IEC 60335-2-102Name not checked yet
As written on the certificate · Line 22 (ACCREDIA 00036)

CEI EN 60335-2-102:2019; EN 60335-2-102:2016; EN IEC 60335-2-102:2024/A11:2024; IEC 60335-2-102:2017; EN IEC 60335-2-105:2021/A11:2021/A1:2021; IEC 60335-2-105:2016/AMD1:2019

IEC 60335-2-105Name not checked yet
As written on the certificate · Line 22 (ACCREDIA 00036)

CEI EN 60335-2-102:2019; EN 60335-2-102:2016; EN IEC 60335-2-102:2024/A11:2024; IEC 60335-2-102:2017; EN IEC 60335-2-105:2021/A11:2021/A1:2021; IEC 60335-2-105:2016/AMD1:2019

ETSI

ETSI EN 300 220-2Name not checked yet
As written on the certificate · Line 12 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; RSS-119 Issue 12:2015 + ANSI C63.26:2015; RSS-119 Issue 12:2022 + ANSI C63.26:2015; ISO 11452-3:2001; ISO 11452-3:2016; ISO 11452-3:2024; ETSI EN 300 330 V2.1.1 2017; ETSI EN 300 220-2 V3.2.1 2018; ETSI EN 300 220-3-2 V1.1.1 2017; ETSI EN 300 220-3-1 V2.1.1 2016

ETSI EN 300 220-3-1Name not checked yet
As written on the certificate · Line 12 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; RSS-119 Issue 12:2015 + ANSI C63.26:2015; RSS-119 Issue 12:2022 + ANSI C63.26:2015; ISO 11452-3:2001; ISO 11452-3:2016; ISO 11452-3:2024; ETSI EN 300 330 V2.1.1 2017; ETSI EN 300 220-2 V3.2.1 2018; ETSI EN 300 220-3-2 V1.1.1 2017; ETSI EN 300 220-3-1 V2.1.1 2016

ETSI EN 300 220-3-2Name not checked yet
As written on the certificate · Line 12 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; RSS-119 Issue 12:2015 + ANSI C63.26:2015; RSS-119 Issue 12:2022 + ANSI C63.26:2015; ISO 11452-3:2001; ISO 11452-3:2016; ISO 11452-3:2024; ETSI EN 300 330 V2.1.1 2017; ETSI EN 300 220-2 V3.2.1 2018; ETSI EN 300 220-3-2 V1.1.1 2017; ETSI EN 300 220-3-1 V2.1.1 2016

ETSI EN 300 328Wideband transmission systems; Data transmission equipment operating in the 2,4 GHz band; Harmonised Standard for access to radio spectrum
As written on the certificate · Line 39 (ACCREDIA 00036)

ETSI EN 300 328 V2.2.2 2019; RSS-247 Issue 3:2023 + ANSI C63.10:2020; RSS-247 Issue 3:2023 + ANSI C63.10:2020/Cor1:2023; RSS-247 Issue 3:2023 + IEEE C63.10:2020/a:2024; RSS-247 Issue 4:2025 + ANSI C63.10-2020/Cor1-2023/a-2024; CEI EN 60870-2-1:1997; EN 60870-2-1:1996; IEC 60870-2-1:1995; EN 50364:2010; EN 50364:2018; RSS-132 Issue 4:2023 + ANSI C63.26:2015; ETSI EN 301 489-50 V2.3.1:2021; ETSI EN 303 413 V1.2.1 2021; ETSI EN 301 489-53 V1.1.1 2019

ETSI EN 300 330Short Range Devices (SRD); Radio equipment in the frequency range 9 kHz to 25 MHz and inductive loop systems in the frequency range 9 kHz to 30 MHz; Harmonised Standard covering the essential requirements of article 3.2 of Directive 2014/53/EU
As written on the certificate · Line 12 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; RSS-119 Issue 12:2015 + ANSI C63.26:2015; RSS-119 Issue 12:2022 + ANSI C63.26:2015; ISO 11452-3:2001; ISO 11452-3:2016; ISO 11452-3:2024; ETSI EN 300 330 V2.1.1 2017; ETSI EN 300 220-2 V3.2.1 2018; ETSI EN 300 220-3-2 V1.1.1 2017; ETSI EN 300 220-3-1 V2.1.1 2016

ETSI EN 300 440Name not checked yet
As written on the certificate · Line 38 (ACCREDIA 00036)

ANSI C63.26:2015; FCC 47 CFR - Part 96 2015; ETSI EN 300 440 V2.2.1 2018; ETSI EN 302 065-4 V1.1.1 2016; ETSI EN 302 065-3 V2.1.1 2016; ETSI EN 302 065-2 V2.1.1 2016; ETSI EN 302 065-1 V2.1.1 2016; EN 60825-1:2014/AC:2017/A11:2021/AC:2

ETSI EN 301 489-4Name not checked yet
As written on the certificate · Line 35 (ACCREDIA 00036)

CEI EN 60204-1:2018; CEI EN 60204-1:2018/EC:2019/EC:2022-10/EC:2022; EN 60204-1:2018; EN 60204-1:2018/A1:2025; IEC 60204-1:2016/AMD1:2021; AS/NSZ CISPR 12:2013; CAN/CSA CISPR 12:2018; CEI EN 55012:2003/A1:2005; CEI EN 55012:2009/A1:2010; CISPR 12:2001; CISPR 12:2007/Amd 1:2009; EN 55012:2002/A1:2005; EN 55012:2007/A1:2009; RSS-131 Issue 4:2022 + ANSI C63.26:2015; ETSI EN 301 489-4 V3.3.1 2021; ANSI C63.10:2013; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart F 1989; IEEE C63.10:2020/a:2024; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart G 1989; IEEE C63.10:2020/a:2024; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart C 1989; IEEE C63.10:2020/a:2024; ANSI C63.4:2014; ANSI C63.4a:2017; FCC 47 CFR - Part 15 Subpart B 1989; FCC 47 CFR - Part 15 Subpart E 1989

ETSI EN 301 489-5Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

ETSI EN 301 489-6Name not checked yet
As written on the certificate · Line 2 (ACCREDIA 00036)

CEI EN 62368-1:2016/A11:2017/EC:2018; CEI EN IEC 62368-1:2020; EN 62368-1:2014/AC:2015/A11:2017/AC:2017; EN IEC 62368-1:2020/A11:2020/AC:2020; EN IEC 62368-1:2024/A11:2024; IEC 62368-1:2014/Cor1:2015/Cor2:2015; IEC 62368-1:2018/Cor1:2020; IEC 62368-1:2023; ETSI EN 301 489-6 V2.2.1 2019

ETSI EN 301 489-7Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

ETSI EN 301 489-50Name not checked yet
As written on the certificate · Line 39 (ACCREDIA 00036)

ETSI EN 300 328 V2.2.2 2019; RSS-247 Issue 3:2023 + ANSI C63.10:2020; RSS-247 Issue 3:2023 + ANSI C63.10:2020/Cor1:2023; RSS-247 Issue 3:2023 + IEEE C63.10:2020/a:2024; RSS-247 Issue 4:2025 + ANSI C63.10-2020/Cor1-2023/a-2024; CEI EN 60870-2-1:1997; EN 60870-2-1:1996; IEC 60870-2-1:1995; EN 50364:2010; EN 50364:2018; RSS-132 Issue 4:2023 + ANSI C63.26:2015; ETSI EN 301 489-50 V2.3.1:2021; ETSI EN 303 413 V1.2.1 2021; ETSI EN 301 489-53 V1.1.1 2019

ETSI EN 301 489-53Name not checked yet
As written on the certificate · Line 39 (ACCREDIA 00036)

ETSI EN 300 328 V2.2.2 2019; RSS-247 Issue 3:2023 + ANSI C63.10:2020; RSS-247 Issue 3:2023 + ANSI C63.10:2020/Cor1:2023; RSS-247 Issue 3:2023 + IEEE C63.10:2020/a:2024; RSS-247 Issue 4:2025 + ANSI C63.10-2020/Cor1-2023/a-2024; CEI EN 60870-2-1:1997; EN 60870-2-1:1996; IEC 60870-2-1:1995; EN 50364:2010; EN 50364:2018; RSS-132 Issue 4:2023 + ANSI C63.26:2015; ETSI EN 301 489-50 V2.3.1:2021; ETSI EN 303 413 V1.2.1 2021; ETSI EN 301 489-53 V1.1.1 2019

ETSI EN 301 893Name not checked yet
As written on the certificate · Line 37 (ACCREDIA 00036)

ETSI EN 303 345-2 V1.2.1 2021; ETSI EN 303 345-4 V1.1.1 2021; ETSI EN 303 345-5 V1.2.1 2021; ETSI EN 303 345-3 V1.1.1 2021; ETSI EN 301 893 V2.1.1 2017; ETSI EN 301 893 V2.2.1 2024; RSS-133 Issue 6:2018 + ANSI C63.26:2015; RSS-133 Issue 7:2024 + ANSI C63.26:2015; RSS-134 Issue 2:2016 + ANSI C63.26:2015; ANSI C63.26:2015; FCC 47 CFR - Part 73; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 101 1996; FCC 47 CFR - Part 25; FCC 47 CFR - Part 30 2016; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 90 1978; FCC 47 CFR - Part 95 2017; FCC 47 CFR - Part 97 1998; FCC 47 CFR - Part 22 1994; FCC 47 CFR - Part 24 1994; FCC 47 CFR - Part 25; FCC 47 CFR - Part 27 1997

ETSI EN 301 908-1Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

ETSI EN 301 908-3Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

ETSI EN 301 908-13Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

ETSI EN 302 065-1Name not checked yet
As written on the certificate · Line 38 (ACCREDIA 00036)

ANSI C63.26:2015; FCC 47 CFR - Part 96 2015; ETSI EN 300 440 V2.2.1 2018; ETSI EN 302 065-4 V1.1.1 2016; ETSI EN 302 065-3 V2.1.1 2016; ETSI EN 302 065-2 V2.1.1 2016; ETSI EN 302 065-1 V2.1.1 2016; EN 60825-1:2014/AC:2017/A11:2021/AC:2

ETSI EN 302 065-2Name not checked yet
As written on the certificate · Line 38 (ACCREDIA 00036)

ANSI C63.26:2015; FCC 47 CFR - Part 96 2015; ETSI EN 300 440 V2.2.1 2018; ETSI EN 302 065-4 V1.1.1 2016; ETSI EN 302 065-3 V2.1.1 2016; ETSI EN 302 065-2 V2.1.1 2016; ETSI EN 302 065-1 V2.1.1 2016; EN 60825-1:2014/AC:2017/A11:2021/AC:2

ETSI EN 302 065-3Name not checked yet
As written on the certificate · Line 38 (ACCREDIA 00036)

ANSI C63.26:2015; FCC 47 CFR - Part 96 2015; ETSI EN 300 440 V2.2.1 2018; ETSI EN 302 065-4 V1.1.1 2016; ETSI EN 302 065-3 V2.1.1 2016; ETSI EN 302 065-2 V2.1.1 2016; ETSI EN 302 065-1 V2.1.1 2016; EN 60825-1:2014/AC:2017/A11:2021/AC:2

ETSI EN 302 065-4Name not checked yet
As written on the certificate · Line 38 (ACCREDIA 00036)

ANSI C63.26:2015; FCC 47 CFR - Part 96 2015; ETSI EN 300 440 V2.2.1 2018; ETSI EN 302 065-4 V1.1.1 2016; ETSI EN 302 065-3 V2.1.1 2016; ETSI EN 302 065-2 V2.1.1 2016; ETSI EN 302 065-1 V2.1.1 2016; EN 60825-1:2014/AC:2017/A11:2021/AC:2

ETSI EN 303 345-2Name not checked yet
As written on the certificate · Line 37 (ACCREDIA 00036)

ETSI EN 303 345-2 V1.2.1 2021; ETSI EN 303 345-4 V1.1.1 2021; ETSI EN 303 345-5 V1.2.1 2021; ETSI EN 303 345-3 V1.1.1 2021; ETSI EN 301 893 V2.1.1 2017; ETSI EN 301 893 V2.2.1 2024; RSS-133 Issue 6:2018 + ANSI C63.26:2015; RSS-133 Issue 7:2024 + ANSI C63.26:2015; RSS-134 Issue 2:2016 + ANSI C63.26:2015; ANSI C63.26:2015; FCC 47 CFR - Part 73; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 101 1996; FCC 47 CFR - Part 25; FCC 47 CFR - Part 30 2016; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 90 1978; FCC 47 CFR - Part 95 2017; FCC 47 CFR - Part 97 1998; FCC 47 CFR - Part 22 1994; FCC 47 CFR - Part 24 1994; FCC 47 CFR - Part 25; FCC 47 CFR - Part 27 1997

ETSI EN 303 345-3Name not checked yet
As written on the certificate · Line 37 (ACCREDIA 00036)

ETSI EN 303 345-2 V1.2.1 2021; ETSI EN 303 345-4 V1.1.1 2021; ETSI EN 303 345-5 V1.2.1 2021; ETSI EN 303 345-3 V1.1.1 2021; ETSI EN 301 893 V2.1.1 2017; ETSI EN 301 893 V2.2.1 2024; RSS-133 Issue 6:2018 + ANSI C63.26:2015; RSS-133 Issue 7:2024 + ANSI C63.26:2015; RSS-134 Issue 2:2016 + ANSI C63.26:2015; ANSI C63.26:2015; FCC 47 CFR - Part 73; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 101 1996; FCC 47 CFR - Part 25; FCC 47 CFR - Part 30 2016; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 90 1978; FCC 47 CFR - Part 95 2017; FCC 47 CFR - Part 97 1998; FCC 47 CFR - Part 22 1994; FCC 47 CFR - Part 24 1994; FCC 47 CFR - Part 25; FCC 47 CFR - Part 27 1997

ETSI EN 303 345-4Name not checked yet
As written on the certificate · Line 37 (ACCREDIA 00036)

ETSI EN 303 345-2 V1.2.1 2021; ETSI EN 303 345-4 V1.1.1 2021; ETSI EN 303 345-5 V1.2.1 2021; ETSI EN 303 345-3 V1.1.1 2021; ETSI EN 301 893 V2.1.1 2017; ETSI EN 301 893 V2.2.1 2024; RSS-133 Issue 6:2018 + ANSI C63.26:2015; RSS-133 Issue 7:2024 + ANSI C63.26:2015; RSS-134 Issue 2:2016 + ANSI C63.26:2015; ANSI C63.26:2015; FCC 47 CFR - Part 73; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 101 1996; FCC 47 CFR - Part 25; FCC 47 CFR - Part 30 2016; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 90 1978; FCC 47 CFR - Part 95 2017; FCC 47 CFR - Part 97 1998; FCC 47 CFR - Part 22 1994; FCC 47 CFR - Part 24 1994; FCC 47 CFR - Part 25; FCC 47 CFR - Part 27 1997

ETSI EN 303 345-5Name not checked yet
As written on the certificate · Line 37 (ACCREDIA 00036)

ETSI EN 303 345-2 V1.2.1 2021; ETSI EN 303 345-4 V1.1.1 2021; ETSI EN 303 345-5 V1.2.1 2021; ETSI EN 303 345-3 V1.1.1 2021; ETSI EN 301 893 V2.1.1 2017; ETSI EN 301 893 V2.2.1 2024; RSS-133 Issue 6:2018 + ANSI C63.26:2015; RSS-133 Issue 7:2024 + ANSI C63.26:2015; RSS-134 Issue 2:2016 + ANSI C63.26:2015; ANSI C63.26:2015; FCC 47 CFR - Part 73; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 101 1996; FCC 47 CFR - Part 25; FCC 47 CFR - Part 30 2016; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 90 1978; FCC 47 CFR - Part 95 2017; FCC 47 CFR - Part 97 1998; FCC 47 CFR - Part 22 1994; FCC 47 CFR - Part 24 1994; FCC 47 CFR - Part 25; FCC 47 CFR - Part 27 1997

ETSI EN 303 413Satellite Earth Stations and Systems (SES); Global Navigation Satellite System (GNSS) receivers; Radio equipment operating in the 1 164 MHz to 1 300 MHz and 1 559 MHz to 1 610 MHz frequency bands; Harmonised Standard for access to radio spectrum
As written on the certificate · Line 39 (ACCREDIA 00036)

ETSI EN 300 328 V2.2.2 2019; RSS-247 Issue 3:2023 + ANSI C63.10:2020; RSS-247 Issue 3:2023 + ANSI C63.10:2020/Cor1:2023; RSS-247 Issue 3:2023 + IEEE C63.10:2020/a:2024; RSS-247 Issue 4:2025 + ANSI C63.10-2020/Cor1-2023/a-2024; CEI EN 60870-2-1:1997; EN 60870-2-1:1996; IEC 60870-2-1:1995; EN 50364:2010; EN 50364:2018; RSS-132 Issue 4:2023 + ANSI C63.26:2015; ETSI EN 301 489-50 V2.3.1:2021; ETSI EN 303 413 V1.2.1 2021; ETSI EN 301 489-53 V1.1.1 2019

IEC

IEC 60204-1Safety of machinery - Electrical equipment of machines - Part 1: General requirements
As written on the certificate · Line 35 (ACCREDIA 00036)

CEI EN 60204-1:2018; CEI EN 60204-1:2018/EC:2019/EC:2022-10/EC:2022; EN 60204-1:2018; EN 60204-1:2018/A1:2025; IEC 60204-1:2016/AMD1:2021; AS/NSZ CISPR 12:2013; CAN/CSA CISPR 12:2018; CEI EN 55012:2003/A1:2005; CEI EN 55012:2009/A1:2010; CISPR 12:2001; CISPR 12:2007/Amd 1:2009; EN 55012:2002/A1:2005; EN 55012:2007/A1:2009; RSS-131 Issue 4:2022 + ANSI C63.26:2015; ETSI EN 301 489-4 V3.3.1 2021; ANSI C63.10:2013; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart F 1989; IEEE C63.10:2020/a:2024; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart G 1989; IEEE C63.10:2020/a:2024; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart C 1989; IEEE C63.10:2020/a:2024; ANSI C63.4:2014; ANSI C63.4a:2017; FCC 47 CFR - Part 15 Subpart B 1989; FCC 47 CFR - Part 15 Subpart E 1989

IEC 60601-1Medical electrical equipment - Part 1: General requirements for basic safety and essential performance
As written on the certificate · Line 9 (ACCREDIA 00036)

EN IEC 80601-2-60:2020; IEC 80601-2-60:2019; CEI EN 60601-1:2007/EC:2010/A11:2012/EC:2014/A1:2014/A12:2015; CEI EN 60601-1:2007/EC:2010/A11:2012/EC:2014/A1:2014/A12:2015/A2:2022; CEI EN 60601-1:2007/EC:2010/A11:2012/EC:2014/A1:2014/A12:2015/A2:2022/A13:2024; EN 60601-1:2006/Cor1:2010/A1:2013/AC:2014/A12:2014/A2:2021

IEC 60601-2-22Name not checked yet
As written on the certificate · Line 8 (ACCREDIA 00036)

CEI EN 60068-2-1:2007; EN 60068-2-1:1993/A1:1993/A2:1994; EN 60068-2-1:2007; IEC 60068-2-1:1974/A1:1983; IEC 60068-2-1:1990/A1:1993/A2:1994; IEC 60068-2-1:2007; CEI EN 60068-2-2:2008; EN 60068-2-2:1993/A1:1993/A2:1994; EN 60068-2-2:2007; IEC 60068-2-2:1974/A1:1993/A2:1994/Suppl 2A:1976; IEC 60068-2-2:2007; IACS UR E10 1991 Rev 7:2018; IACS UR E10 1991 Rev 8:2021/Corr1:2022; CEI EN IEC 60601-2-22:2021; EN IEC 60601-2-22:2020; IEC 60601-2-22:2019

IEC 60825-1Name not checked yet
As written on the certificate · Line 38 (ACCREDIA 00036)

ANSI C63.26:2015; FCC 47 CFR - Part 96 2015; ETSI EN 300 440 V2.2.1 2018; ETSI EN 302 065-4 V1.1.1 2016; ETSI EN 302 065-3 V2.1.1 2016; ETSI EN 302 065-2 V2.1.1 2016; ETSI EN 302 065-1 V2.1.1 2016; EN 60825-1:2014/AC:2017/A11:2021/AC:2

IEC 60870-2-1Name not checked yet
As written on the certificate · Line 39 (ACCREDIA 00036)

ETSI EN 300 328 V2.2.2 2019; RSS-247 Issue 3:2023 + ANSI C63.10:2020; RSS-247 Issue 3:2023 + ANSI C63.10:2020/Cor1:2023; RSS-247 Issue 3:2023 + IEEE C63.10:2020/a:2024; RSS-247 Issue 4:2025 + ANSI C63.10-2020/Cor1-2023/a-2024; CEI EN 60870-2-1:1997; EN 60870-2-1:1996; IEC 60870-2-1:1995; EN 50364:2010; EN 50364:2018; RSS-132 Issue 4:2023 + ANSI C63.26:2015; ETSI EN 301 489-50 V2.3.1:2021; ETSI EN 303 413 V1.2.1 2021; ETSI EN 301 489-53 V1.1.1 2019

IEC 60945Maritime navigation and radiocommunication equipment and systems - General requirements - Methods of testing and required test results
As written on the certificate · Line 3 (ACCREDIA 00036)

CEI EN 61000-4-29:2001; EN 61000-4-29:2000; IEC 61000-4-29:2000; CEI EN 60945:2003; EN 60945:2002; IEC 60945:2002/COR1:2008; CEI EN 55015:2008/A2:2009; CEI EN 55015:2014/A1:2016; CEI EN IEC 55015:2020; CEI EN IEC 55015:2020/A11:2020; CISPR 15:2005/A1:2006/A2:2008; CISPR 15:2013/A1:2015; CISPR 15:2018; CISPR 15:2018/AMD1:2024; EN 55015:2006/A1:2007/A2:2009; EN 55015:2013/A1:2015; EN IEC 55015:2019/A11:2020; CEI EN 61547:2010; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61547:2023; IEC 61547:2020; CEI EN 60068-2-11:2000; CEI EN IEC 60068-2-11:2022; EN 60068-2-11:1999; EN IEC 60068-2-11:2021; IEC 60068-2-11:1981/COR1:1999; IEC 60068-2-11:2021; CEI EN 60068-2-52:1997; CEI EN IEC 60068-2-52:2019; EN 60068-2-52:1996; EN IEC 60068-2-52:2018; IEC 60068-2-52:1996; IEC 60068-2-52:2017; CEI EN 61000-6-4:2007/A1:2013; CEI EN 61000-6-4:2020; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; IEC 61000-6-4:2006/A1:2010; IEC 61000-6-4:2018; CEI EN 61000-6-2:2006; CEI EN IEC 61000-6-2:2019; EN 61000-6-2:2005; EN 61000-6-2:2005/Cor1:2005; EN IEC 61000-6-2:2019; IEC 61000-6-2:2005; IEC 61000-6-2:2016

IEC 60950-1Information technology equipment - Safety - Part 1: General requirements
As written on the certificate · Line 11 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 60950-1:2007/A11:2010/A1:2012/A12:2012/A2:2014; EN 60950-1:2006/A11:2009/A1:2010/AC:2011/A12:2011/A2:2013; IEC 60950-1:2005/Cor1:2006/A1:2009/Cor1:2012/A2:2013/Cor2:2013; CEI EN 55022:20014; CISPR 22:2008; EN 55022:2010/AC:2011; CEI EN 55024:2013/A1:2016; CISPR 24:2010/COR1:2011/AMD1:2015; EN 55024:2010/A1:2015; RSS-102 Issue 6:2023; RSS-102 Issue 6:2023 + RSS-102.NS.MEAS Issue 1:2023; RSS-195 Issue 2:2014 + ANSI C63.26:2015; RSS-199 Issue 3:2016 + ANSI C63.26:2015; RSS-199 Issue 4:2023 + ANSI C63.26:2015; RSS-139 Issue 3:2015 + ANSI C63.26:2015; RSS-139 Issue 4:2022 + ANSI C63.26:2015; RSS-236 Issue 1:2012 + ANSI C63.26:2015; RSS-236 Issue 2:2022 + ANSI C63.26:2015

IEC 60950-22Name not checked yet
As written on the certificate · Line 10 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 55011:2018/A1:2019/A11:2020/A2:2021; CISPR 11:2003/A1:2004/A2:2006; CISPR 11:2009/A1:2010; CISPR 11:2015/AMD1:2016/AMD2:2019; CISPR 11:2024; EN 55011:2009/A1:2010; EN 55011:2016/A1:2017/A11:2020/A2:2021; CEI EN 55032:2015/EC:2018/A1:2021/A11:2020; CISPR 32:2015/Cor1:2016/AMD1:2019; EN 55032:2015/AC:2016/A1:2020/A11:2020; CEI EN 55035:2018/A11:2021; CISPR 35:2016; EN 55035:2017/A11:2020; KN 35:2015; RSS-130 Issue 2:2019 + ANSI C63.26:2015; RSS-140 Issue 1:2018 + ANSI C63.26:2015; CEI EN 50121-4:2017/A1:2019; EN 50121-4:2016/A1:2019; CEI EN 50121-3-2:2017/A1:2019; EN 50121-3-2:2016/A1:2019; CEI EN 60950-22:2017; EN 60950-22:2017; IEC 60950-22:2016

IEC 61326-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
As written on the certificate · Line 7 (ACCREDIA 00036)

CEI EN IEC 61010-2-010:2021; EN IEC 61010-2-010:2020; IEC 61010-2-010:2019; CEI EN 61010-1:2013/EC1:2017/A1:2019; EN 61010-1:2010/A1:2019/AC:2019; IEC 61010-1:2010/COR1:2011/COR2:2013/AMD1:2016/COR1:2019; CEI EN 61326-1:2013; CEI EN IEC 61326-1:2022; EN 61326-1:2013; EN IEC 61326-1:2021; IEC 61326-1:2012; IEC 61326-1:2020

IEC 61326-2-6Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular requirements - In vitro diagnostic (IVD) medical electrical equipment
As written on the certificate · Line 1 (ACCREDIA 00036)

ANSI C63.26:2015; FCC 47 CFR - Part 20 - Section 90.219 1994; RSS-GEN Issue 5:2021; CEI EN 61010-2-101:2017; EN 61010-2-101:2017; EN IEC 61010-2-101:2022/A11:2022; IEC 61010-2-101:2018; EN 61326-2-6:2013; EN IEC 61326-2-6:2021; IEC 61326-2-6:2012; IEC 61326-2-6:2020; ICES-001 Issue 5:2020; RSS-111 Issue 5:2014 + ANSI C63.26:2015

IEC 61547Equipment for general lighting purposes - EMC immunity requirementsCertificate says EN 61547. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (ACCREDIA 00036)

CEI EN 61000-4-29:2001; EN 61000-4-29:2000; IEC 61000-4-29:2000; CEI EN 60945:2003; EN 60945:2002; IEC 60945:2002/COR1:2008; CEI EN 55015:2008/A2:2009; CEI EN 55015:2014/A1:2016; CEI EN IEC 55015:2020; CEI EN IEC 55015:2020/A11:2020; CISPR 15:2005/A1:2006/A2:2008; CISPR 15:2013/A1:2015; CISPR 15:2018; CISPR 15:2018/AMD1:2024; EN 55015:2006/A1:2007/A2:2009; EN 55015:2013/A1:2015; EN IEC 55015:2019/A11:2020; CEI EN 61547:2010; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61547:2023; IEC 61547:2020; CEI EN 60068-2-11:2000; CEI EN IEC 60068-2-11:2022; EN 60068-2-11:1999; EN IEC 60068-2-11:2021; IEC 60068-2-11:1981/COR1:1999; IEC 60068-2-11:2021; CEI EN 60068-2-52:1997; CEI EN IEC 60068-2-52:2019; EN 60068-2-52:1996; EN IEC 60068-2-52:2018; IEC 60068-2-52:1996; IEC 60068-2-52:2017; CEI EN 61000-6-4:2007/A1:2013; CEI EN 61000-6-4:2020; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; IEC 61000-6-4:2006/A1:2010; IEC 61000-6-4:2018; CEI EN 61000-6-2:2006; CEI EN IEC 61000-6-2:2019; EN 61000-6-2:2005; EN 61000-6-2:2005/Cor1:2005; EN IEC 61000-6-2:2019; IEC 61000-6-2:2005; IEC 61000-6-2:2016

IEC 62233Measurement methods for electromagnetic fields of household appliances and similar apparatus with regard to human exposure
As written on the certificate · Line 14 (ACCREDIA 00036)

ICES-003 Issue 7:2020; CEI EN 62233:2009; EN 62233:2008/COR:2008; IEC 62233:2005; CEI EN 55014-1:2008/A1:2010/A2:2012; CEI EN 55014-1:2019/A11:2020; CEI EN 55014-1:2021; CISPR 14-1:2005/A1:2008/A2:2011; CISPR 14-1:2016/Cor1:2016; CISPR 14-1:2020; EN 55014-1:2006/A1:2009/A2:2011; EN 55014-1:2017/A11:2020; EN IEC 55014-1:2021; CEI EN 55014-2:2016; CEI EN IEC 55014-2:2021; CISPR 14-2:2015; CISPR 14-2:2020; EN 55014-2:2015; EN IEC 55014-2:2021; IEC 60335-2-72:2021

IEC 62368-1Audio/video, information and communication technology equipment - Part 1: Safety requirements
As written on the certificate · Line 2 (ACCREDIA 00036)

CEI EN 62368-1:2016/A11:2017/EC:2018; CEI EN IEC 62368-1:2020; EN 62368-1:2014/AC:2015/A11:2017/AC:2017; EN IEC 62368-1:2020/A11:2020/AC:2020; EN IEC 62368-1:2024/A11:2024; IEC 62368-1:2014/Cor1:2015/Cor2:2015; IEC 62368-1:2018/Cor1:2020; IEC 62368-1:2023; ETSI EN 301 489-6 V2.2.1 2019

IEC 80601-2-60Name not checked yet
As written on the certificate · Line 9 (ACCREDIA 00036)

EN IEC 80601-2-60:2020; IEC 80601-2-60:2019; CEI EN 60601-1:2007/EC:2010/A11:2012/EC:2014/A1:2014/A12:2015; CEI EN 60601-1:2007/EC:2010/A11:2012/EC:2014/A1:2014/A12:2015/A2:2022; CEI EN 60601-1:2007/EC:2010/A11:2012/EC:2014/A1:2014/A12:2015/A2:2022/A13:2024; EN 60601-1:2006/Cor1:2010/A1:2013/AC:2014/A12:2014/A2:2021

CISPR

CISPR 11Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurementCertificate says EN 55011. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 10 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 55011:2018/A1:2019/A11:2020/A2:2021; CISPR 11:2003/A1:2004/A2:2006; CISPR 11:2009/A1:2010; CISPR 11:2015/AMD1:2016/AMD2:2019; CISPR 11:2024; EN 55011:2009/A1:2010; EN 55011:2016/A1:2017/A11:2020/A2:2021; CEI EN 55032:2015/EC:2018/A1:2021/A11:2020; CISPR 32:2015/Cor1:2016/AMD1:2019; EN 55032:2015/AC:2016/A1:2020/A11:2020; CEI EN 55035:2018/A11:2021; CISPR 35:2016; EN 55035:2017/A11:2020; KN 35:2015; RSS-130 Issue 2:2019 + ANSI C63.26:2015; RSS-140 Issue 1:2018 + ANSI C63.26:2015; CEI EN 50121-4:2017/A1:2019; EN 50121-4:2016/A1:2019; CEI EN 50121-3-2:2017/A1:2019; EN 50121-3-2:2016/A1:2019; CEI EN 60950-22:2017; EN 60950-22:2017; IEC 60950-22:2016

CISPR 12Vehicles, boats and devices with internal combustion engines or traction batteries - Radio disturbance characteristics - Limits and methods of measurement for the protection of off-board receiversCertificate says EN 55012. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 35 (ACCREDIA 00036)

CEI EN 60204-1:2018; CEI EN 60204-1:2018/EC:2019/EC:2022-10/EC:2022; EN 60204-1:2018; EN 60204-1:2018/A1:2025; IEC 60204-1:2016/AMD1:2021; AS/NSZ CISPR 12:2013; CAN/CSA CISPR 12:2018; CEI EN 55012:2003/A1:2005; CEI EN 55012:2009/A1:2010; CISPR 12:2001; CISPR 12:2007/Amd 1:2009; EN 55012:2002/A1:2005; EN 55012:2007/A1:2009; RSS-131 Issue 4:2022 + ANSI C63.26:2015; ETSI EN 301 489-4 V3.3.1 2021; ANSI C63.10:2013; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart F 1989; IEEE C63.10:2020/a:2024; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart G 1989; IEEE C63.10:2020/a:2024; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart C 1989; IEEE C63.10:2020/a:2024; ANSI C63.4:2014; ANSI C63.4a:2017; FCC 47 CFR - Part 15 Subpart B 1989; FCC 47 CFR - Part 15 Subpart E 1989

CISPR 14-1Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1: EmissionCertificate says EN 55014-1, IEC 55014-1. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 14 (ACCREDIA 00036)

ICES-003 Issue 7:2020; CEI EN 62233:2009; EN 62233:2008/COR:2008; IEC 62233:2005; CEI EN 55014-1:2008/A1:2010/A2:2012; CEI EN 55014-1:2019/A11:2020; CEI EN 55014-1:2021; CISPR 14-1:2005/A1:2008/A2:2011; CISPR 14-1:2016/Cor1:2016; CISPR 14-1:2020; EN 55014-1:2006/A1:2009/A2:2011; EN 55014-1:2017/A11:2020; EN IEC 55014-1:2021; CEI EN 55014-2:2016; CEI EN IEC 55014-2:2021; CISPR 14-2:2015; CISPR 14-2:2020; EN 55014-2:2015; EN IEC 55014-2:2021; IEC 60335-2-72:2021

CISPR 14-2Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 2: Immunity - Product family standardCertificate says EN 55014-2, IEC 55014-2. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 14 (ACCREDIA 00036)

ICES-003 Issue 7:2020; CEI EN 62233:2009; EN 62233:2008/COR:2008; IEC 62233:2005; CEI EN 55014-1:2008/A1:2010/A2:2012; CEI EN 55014-1:2019/A11:2020; CEI EN 55014-1:2021; CISPR 14-1:2005/A1:2008/A2:2011; CISPR 14-1:2016/Cor1:2016; CISPR 14-1:2020; EN 55014-1:2006/A1:2009/A2:2011; EN 55014-1:2017/A11:2020; EN IEC 55014-1:2021; CEI EN 55014-2:2016; CEI EN IEC 55014-2:2021; CISPR 14-2:2015; CISPR 14-2:2020; EN 55014-2:2015; EN IEC 55014-2:2021; IEC 60335-2-72:2021

CISPR 15Limits and methods of measurement of radio disturbance characteristics of electrical lighting and similar equipmentCertificate says EN 55015, IEC 55015. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (ACCREDIA 00036)

CEI EN 61000-4-29:2001; EN 61000-4-29:2000; IEC 61000-4-29:2000; CEI EN 60945:2003; EN 60945:2002; IEC 60945:2002/COR1:2008; CEI EN 55015:2008/A2:2009; CEI EN 55015:2014/A1:2016; CEI EN IEC 55015:2020; CEI EN IEC 55015:2020/A11:2020; CISPR 15:2005/A1:2006/A2:2008; CISPR 15:2013/A1:2015; CISPR 15:2018; CISPR 15:2018/AMD1:2024; EN 55015:2006/A1:2007/A2:2009; EN 55015:2013/A1:2015; EN IEC 55015:2019/A11:2020; CEI EN 61547:2010; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61547:2023; IEC 61547:2020; CEI EN 60068-2-11:2000; CEI EN IEC 60068-2-11:2022; EN 60068-2-11:1999; EN IEC 60068-2-11:2021; IEC 60068-2-11:1981/COR1:1999; IEC 60068-2-11:2021; CEI EN 60068-2-52:1997; CEI EN IEC 60068-2-52:2019; EN 60068-2-52:1996; EN IEC 60068-2-52:2018; IEC 60068-2-52:1996; IEC 60068-2-52:2017; CEI EN 61000-6-4:2007/A1:2013; CEI EN 61000-6-4:2020; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; IEC 61000-6-4:2006/A1:2010; IEC 61000-6-4:2018; CEI EN 61000-6-2:2006; CEI EN IEC 61000-6-2:2019; EN 61000-6-2:2005; EN 61000-6-2:2005/Cor1:2005; EN IEC 61000-6-2:2019; IEC 61000-6-2:2005; IEC 61000-6-2:2016

CISPR 22Information technology equipment - Radio disturbance characteristics - Limits and methods of measurementCertificate says EN 55022. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 11 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 60950-1:2007/A11:2010/A1:2012/A12:2012/A2:2014; EN 60950-1:2006/A11:2009/A1:2010/AC:2011/A12:2011/A2:2013; IEC 60950-1:2005/Cor1:2006/A1:2009/Cor1:2012/A2:2013/Cor2:2013; CEI EN 55022:20014; CISPR 22:2008; EN 55022:2010/AC:2011; CEI EN 55024:2013/A1:2016; CISPR 24:2010/COR1:2011/AMD1:2015; EN 55024:2010/A1:2015; RSS-102 Issue 6:2023; RSS-102 Issue 6:2023 + RSS-102.NS.MEAS Issue 1:2023; RSS-195 Issue 2:2014 + ANSI C63.26:2015; RSS-199 Issue 3:2016 + ANSI C63.26:2015; RSS-199 Issue 4:2023 + ANSI C63.26:2015; RSS-139 Issue 3:2015 + ANSI C63.26:2015; RSS-139 Issue 4:2022 + ANSI C63.26:2015; RSS-236 Issue 1:2012 + ANSI C63.26:2015; RSS-236 Issue 2:2022 + ANSI C63.26:2015

CISPR 24Information technology equipment - Immunity characteristics - Limits and methods of measurementCertificate says EN 55024. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 11 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 60950-1:2007/A11:2010/A1:2012/A12:2012/A2:2014; EN 60950-1:2006/A11:2009/A1:2010/AC:2011/A12:2011/A2:2013; IEC 60950-1:2005/Cor1:2006/A1:2009/Cor1:2012/A2:2013/Cor2:2013; CEI EN 55022:20014; CISPR 22:2008; EN 55022:2010/AC:2011; CEI EN 55024:2013/A1:2016; CISPR 24:2010/COR1:2011/AMD1:2015; EN 55024:2010/A1:2015; RSS-102 Issue 6:2023; RSS-102 Issue 6:2023 + RSS-102.NS.MEAS Issue 1:2023; RSS-195 Issue 2:2014 + ANSI C63.26:2015; RSS-199 Issue 3:2016 + ANSI C63.26:2015; RSS-199 Issue 4:2023 + ANSI C63.26:2015; RSS-139 Issue 3:2015 + ANSI C63.26:2015; RSS-139 Issue 4:2022 + ANSI C63.26:2015; RSS-236 Issue 1:2012 + ANSI C63.26:2015; RSS-236 Issue 2:2022 + ANSI C63.26:2015

CISPR 25Vehicles, boats and internal combustion engines - Radio disturbance characteristics - Limits and methods of measurement for the protection of on-board receiversCertificate says EN 55025, IEC 55025. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 13 (ACCREDIA 00036)

UNECE 10R06/01 (2020); UNECE 10R06/02 (2022); UNECE 10R06/03 (2024); CEI EN 55025:2017/EC:2018; CISPR 25:2002/Cor 1:2004; CISPR 25:2008/Cor 1:2009; CISPR 25:2016/Cor 1:2017; CISPR 25:2021; EN 55025:2008; EN 55025:2017/AC1:2017; EN IEC 55025:2022; ISO 7637-2:2004/Amd1:2008; ISO 7637-2:2011; ISO 11452-4:2005/Cor.1:2009; ISO 11452-4:2011; ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 11451-2:2015; RSS-216 Issue 2:2020; RSS-216 Issue 3:2024

CISPR 32Electromagnetic compatibility of multimedia equipment - Emission requirementsCertificate says EN 55032. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 10 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 55011:2018/A1:2019/A11:2020/A2:2021; CISPR 11:2003/A1:2004/A2:2006; CISPR 11:2009/A1:2010; CISPR 11:2015/AMD1:2016/AMD2:2019; CISPR 11:2024; EN 55011:2009/A1:2010; EN 55011:2016/A1:2017/A11:2020/A2:2021; CEI EN 55032:2015/EC:2018/A1:2021/A11:2020; CISPR 32:2015/Cor1:2016/AMD1:2019; EN 55032:2015/AC:2016/A1:2020/A11:2020; CEI EN 55035:2018/A11:2021; CISPR 35:2016; EN 55035:2017/A11:2020; KN 35:2015; RSS-130 Issue 2:2019 + ANSI C63.26:2015; RSS-140 Issue 1:2018 + ANSI C63.26:2015; CEI EN 50121-4:2017/A1:2019; EN 50121-4:2016/A1:2019; CEI EN 50121-3-2:2017/A1:2019; EN 50121-3-2:2016/A1:2019; CEI EN 60950-22:2017; EN 60950-22:2017; IEC 60950-22:2016

CISPR 35Electromagnetic compatibility of multimedia equipment - Immunity requirementsCertificate says EN 55035. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 10 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 55011:2018/A1:2019/A11:2020/A2:2021; CISPR 11:2003/A1:2004/A2:2006; CISPR 11:2009/A1:2010; CISPR 11:2015/AMD1:2016/AMD2:2019; CISPR 11:2024; EN 55011:2009/A1:2010; EN 55011:2016/A1:2017/A11:2020/A2:2021; CEI EN 55032:2015/EC:2018/A1:2021/A11:2020; CISPR 32:2015/Cor1:2016/AMD1:2019; EN 55032:2015/AC:2016/A1:2020/A11:2020; CEI EN 55035:2018/A11:2021; CISPR 35:2016; EN 55035:2017/A11:2020; KN 35:2015; RSS-130 Issue 2:2019 + ANSI C63.26:2015; RSS-140 Issue 1:2018 + ANSI C63.26:2015; CEI EN 50121-4:2017/A1:2019; EN 50121-4:2016/A1:2019; CEI EN 50121-3-2:2017/A1:2019; EN 50121-3-2:2016/A1:2019; CEI EN 60950-22:2017; EN 60950-22:2017; IEC 60950-22:2016

IEC 61000 series

IEC 61000-3-2Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current ≤ 16 A per phase)
As written on the certificate · Line 4 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 61000-6-1:2007; CEI EN IEC 61000-6-1:2019; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2005; IEC 61000-6-1:2016; CEI EN 61000-6-3:2007/A1:2013; CEI EN IEC 61000-6-3:2021; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; CEI EN 61000-4-8:2013; EN 61000-4-8:1993/A1:2001; EN 61000-4-8:2010; IEC 61000-4-8:1993/AMD1:2000; IEC 61000-4-8:2009; CEI EN 61000-4-16:1999/A1:2005/A2:2011; CEI EN 61000-4-16:2016; EN 61000-4-16:1998/A1:2004/A2:2011; EN 61000-4-16:2016; IEC 61000-4-16:1998/AMD1:2001/AMD2:2009; IEC 61000-4-16:2015; CEI EN 61000-3-2:2015; CEI EN IEC 61000-3-2:2019/A1:2021; EN 61000-3-2:2014; EN IEC 61000-3-2:2019

IEC 61000-4-3Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity testCertificate says EN 61000-4-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 5 (ACCREDIA 00036)

CEI EN 61000-4-5:2016/A1:2018; EN 61000-4-5:1995/A1:2001; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:1995/COR1:1995/AMD1:2000; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; CEI EN 61000-4-3:2007/A1:2009/A2:2011; CEI EN IEC 61000-4-3:2021; EN 61000-4-3:2002/A1:2002; EN 61000-4-3:2006/A1:2008/A2:2010; EN IEC 61000-4-3:2020; IEC 61000-4-3:2002/Amd1:2002

IEC 61000-4-5Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test
As written on the certificate · Line 5 (ACCREDIA 00036)

CEI EN 61000-4-5:2016/A1:2018; EN 61000-4-5:1995/A1:2001; EN 61000-4-5:2006; EN 61000-4-5:2014/A1:2017; IEC 61000-4-5:1995/COR1:1995/AMD1:2000; IEC 61000-4-5:2005/COR1:2009; IEC 61000-4-5:2014/AMD1:2017; CEI EN 61000-4-3:2007/A1:2009/A2:2011; CEI EN IEC 61000-4-3:2021; EN 61000-4-3:2002/A1:2002; EN 61000-4-3:2006/A1:2008/A2:2010; EN IEC 61000-4-3:2020; IEC 61000-4-3:2002/Amd1:2002

IEC 61000-4-8Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
As written on the certificate · Line 4 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 61000-6-1:2007; CEI EN IEC 61000-6-1:2019; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2005; IEC 61000-6-1:2016; CEI EN 61000-6-3:2007/A1:2013; CEI EN IEC 61000-6-3:2021; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; CEI EN 61000-4-8:2013; EN 61000-4-8:1993/A1:2001; EN 61000-4-8:2010; IEC 61000-4-8:1993/AMD1:2000; IEC 61000-4-8:2009; CEI EN 61000-4-16:1999/A1:2005/A2:2011; CEI EN 61000-4-16:2016; EN 61000-4-16:1998/A1:2004/A2:2011; EN 61000-4-16:2016; IEC 61000-4-16:1998/AMD1:2001/AMD2:2009; IEC 61000-4-16:2015; CEI EN 61000-3-2:2015; CEI EN IEC 61000-3-2:2019/A1:2021; EN 61000-3-2:2014; EN IEC 61000-3-2:2019

IEC 61000-4-16Name not checked yet
As written on the certificate · Line 4 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 61000-6-1:2007; CEI EN IEC 61000-6-1:2019; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2005; IEC 61000-6-1:2016; CEI EN 61000-6-3:2007/A1:2013; CEI EN IEC 61000-6-3:2021; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; CEI EN 61000-4-8:2013; EN 61000-4-8:1993/A1:2001; EN 61000-4-8:2010; IEC 61000-4-8:1993/AMD1:2000; IEC 61000-4-8:2009; CEI EN 61000-4-16:1999/A1:2005/A2:2011; CEI EN 61000-4-16:2016; EN 61000-4-16:1998/A1:2004/A2:2011; EN 61000-4-16:2016; IEC 61000-4-16:1998/AMD1:2001/AMD2:2009; IEC 61000-4-16:2015; CEI EN 61000-3-2:2015; CEI EN IEC 61000-3-2:2019/A1:2021; EN 61000-3-2:2014; EN IEC 61000-3-2:2019

IEC 61000-4-29Electromagnetic compatibility (EMC) - Part 4-29: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations on d.c. input power port immunity tests
As written on the certificate · Line 3 (ACCREDIA 00036)

CEI EN 61000-4-29:2001; EN 61000-4-29:2000; IEC 61000-4-29:2000; CEI EN 60945:2003; EN 60945:2002; IEC 60945:2002/COR1:2008; CEI EN 55015:2008/A2:2009; CEI EN 55015:2014/A1:2016; CEI EN IEC 55015:2020; CEI EN IEC 55015:2020/A11:2020; CISPR 15:2005/A1:2006/A2:2008; CISPR 15:2013/A1:2015; CISPR 15:2018; CISPR 15:2018/AMD1:2024; EN 55015:2006/A1:2007/A2:2009; EN 55015:2013/A1:2015; EN IEC 55015:2019/A11:2020; CEI EN 61547:2010; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61547:2023; IEC 61547:2020; CEI EN 60068-2-11:2000; CEI EN IEC 60068-2-11:2022; EN 60068-2-11:1999; EN IEC 60068-2-11:2021; IEC 60068-2-11:1981/COR1:1999; IEC 60068-2-11:2021; CEI EN 60068-2-52:1997; CEI EN IEC 60068-2-52:2019; EN 60068-2-52:1996; EN IEC 60068-2-52:2018; IEC 60068-2-52:1996; IEC 60068-2-52:2017; CEI EN 61000-6-4:2007/A1:2013; CEI EN 61000-6-4:2020; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; IEC 61000-6-4:2006/A1:2010; IEC 61000-6-4:2018; CEI EN 61000-6-2:2006; CEI EN IEC 61000-6-2:2019; EN 61000-6-2:2005; EN 61000-6-2:2005/Cor1:2005; EN IEC 61000-6-2:2019; IEC 61000-6-2:2005; IEC 61000-6-2:2016

IEC 61000-6-1Electromagnetic compatibility (EMC) - Part 6-1: Generic standards - Immunity standard for residential, commercial and light-industrial environments
As written on the certificate · Line 4 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 61000-6-1:2007; CEI EN IEC 61000-6-1:2019; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2005; IEC 61000-6-1:2016; CEI EN 61000-6-3:2007/A1:2013; CEI EN IEC 61000-6-3:2021; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; CEI EN 61000-4-8:2013; EN 61000-4-8:1993/A1:2001; EN 61000-4-8:2010; IEC 61000-4-8:1993/AMD1:2000; IEC 61000-4-8:2009; CEI EN 61000-4-16:1999/A1:2005/A2:2011; CEI EN 61000-4-16:2016; EN 61000-4-16:1998/A1:2004/A2:2011; EN 61000-4-16:2016; IEC 61000-4-16:1998/AMD1:2001/AMD2:2009; IEC 61000-4-16:2015; CEI EN 61000-3-2:2015; CEI EN IEC 61000-3-2:2019/A1:2021; EN 61000-3-2:2014; EN IEC 61000-3-2:2019

IEC 61000-6-2Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity standard for industrial environments
As written on the certificate · Line 3 (ACCREDIA 00036)

CEI EN 61000-4-29:2001; EN 61000-4-29:2000; IEC 61000-4-29:2000; CEI EN 60945:2003; EN 60945:2002; IEC 60945:2002/COR1:2008; CEI EN 55015:2008/A2:2009; CEI EN 55015:2014/A1:2016; CEI EN IEC 55015:2020; CEI EN IEC 55015:2020/A11:2020; CISPR 15:2005/A1:2006/A2:2008; CISPR 15:2013/A1:2015; CISPR 15:2018; CISPR 15:2018/AMD1:2024; EN 55015:2006/A1:2007/A2:2009; EN 55015:2013/A1:2015; EN IEC 55015:2019/A11:2020; CEI EN 61547:2010; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61547:2023; IEC 61547:2020; CEI EN 60068-2-11:2000; CEI EN IEC 60068-2-11:2022; EN 60068-2-11:1999; EN IEC 60068-2-11:2021; IEC 60068-2-11:1981/COR1:1999; IEC 60068-2-11:2021; CEI EN 60068-2-52:1997; CEI EN IEC 60068-2-52:2019; EN 60068-2-52:1996; EN IEC 60068-2-52:2018; IEC 60068-2-52:1996; IEC 60068-2-52:2017; CEI EN 61000-6-4:2007/A1:2013; CEI EN 61000-6-4:2020; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; IEC 61000-6-4:2006/A1:2010; IEC 61000-6-4:2018; CEI EN 61000-6-2:2006; CEI EN IEC 61000-6-2:2019; EN 61000-6-2:2005; EN 61000-6-2:2005/Cor1:2005; EN IEC 61000-6-2:2019; IEC 61000-6-2:2005; IEC 61000-6-2:2016

IEC 61000-6-3Electromagnetic compatibility (EMC) - Part 6-3: Generic standards - Emission standard for equipment in residential environmentsCertificate says EN 61000-6-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 4 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 61000-6-1:2007; CEI EN IEC 61000-6-1:2019; EN 61000-6-1:2007; EN IEC 61000-6-1:2019; IEC 61000-6-1:2005; IEC 61000-6-1:2016; CEI EN 61000-6-3:2007/A1:2013; CEI EN IEC 61000-6-3:2021; EN 61000-6-3:2007/A1:2011/AC:2012; EN IEC 61000-6-3:2021; IEC 61000-6-3:2006/A1:2010; IEC 61000-6-3:2020; CEI EN 61000-4-8:2013; EN 61000-4-8:1993/A1:2001; EN 61000-4-8:2010; IEC 61000-4-8:1993/AMD1:2000; IEC 61000-4-8:2009; CEI EN 61000-4-16:1999/A1:2005/A2:2011; CEI EN 61000-4-16:2016; EN 61000-4-16:1998/A1:2004/A2:2011; EN 61000-4-16:2016; IEC 61000-4-16:1998/AMD1:2001/AMD2:2009; IEC 61000-4-16:2015; CEI EN 61000-3-2:2015; CEI EN IEC 61000-3-2:2019/A1:2021; EN 61000-3-2:2014; EN IEC 61000-3-2:2019

IEC 61000-6-4Electromagnetic compatibility (EMC) - Part 6-4: Generic standards - Emission standard for industrial environments
As written on the certificate · Line 3 (ACCREDIA 00036)

CEI EN 61000-4-29:2001; EN 61000-4-29:2000; IEC 61000-4-29:2000; CEI EN 60945:2003; EN 60945:2002; IEC 60945:2002/COR1:2008; CEI EN 55015:2008/A2:2009; CEI EN 55015:2014/A1:2016; CEI EN IEC 55015:2020; CEI EN IEC 55015:2020/A11:2020; CISPR 15:2005/A1:2006/A2:2008; CISPR 15:2013/A1:2015; CISPR 15:2018; CISPR 15:2018/AMD1:2024; EN 55015:2006/A1:2007/A2:2009; EN 55015:2013/A1:2015; EN IEC 55015:2019/A11:2020; CEI EN 61547:2010; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61547:2023; IEC 61547:2020; CEI EN 60068-2-11:2000; CEI EN IEC 60068-2-11:2022; EN 60068-2-11:1999; EN IEC 60068-2-11:2021; IEC 60068-2-11:1981/COR1:1999; IEC 60068-2-11:2021; CEI EN 60068-2-52:1997; CEI EN IEC 60068-2-52:2019; EN 60068-2-52:1996; EN IEC 60068-2-52:2018; IEC 60068-2-52:1996; IEC 60068-2-52:2017; CEI EN 61000-6-4:2007/A1:2013; CEI EN 61000-6-4:2020; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; IEC 61000-6-4:2006/A1:2010; IEC 61000-6-4:2018; CEI EN 61000-6-2:2006; CEI EN IEC 61000-6-2:2019; EN 61000-6-2:2005; EN 61000-6-2:2005/Cor1:2005; EN IEC 61000-6-2:2019; IEC 61000-6-2:2005; IEC 61000-6-2:2016

IEC 60255 series

IEC 60255-22-1Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

IEC 60255-22-2Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

IEC 60255-22-3Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

IEC 60255-22-4Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

IEC 60255-22-5Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

IEC 60255-22-6Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

IEC 60255-25Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

IEC 60255-26Name not checked yet
As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

IEC 61010 series

IEC 61010-1Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 1: General requirements
As written on the certificate · Line 7 (ACCREDIA 00036)

CEI EN IEC 61010-2-010:2021; EN IEC 61010-2-010:2020; IEC 61010-2-010:2019; CEI EN 61010-1:2013/EC1:2017/A1:2019; EN 61010-1:2010/A1:2019/AC:2019; IEC 61010-1:2010/COR1:2011/COR2:2013/AMD1:2016/COR1:2019; CEI EN 61326-1:2013; CEI EN IEC 61326-1:2022; EN 61326-1:2013; EN IEC 61326-1:2021; IEC 61326-1:2012; IEC 61326-1:2020

IEC 61010-2-010Name not checked yet
As written on the certificate · Line 7 (ACCREDIA 00036)

CEI EN IEC 61010-2-010:2021; EN IEC 61010-2-010:2020; IEC 61010-2-010:2019; CEI EN 61010-1:2013/EC1:2017/A1:2019; EN 61010-1:2010/A1:2019/AC:2019; IEC 61010-1:2010/COR1:2011/COR2:2013/AMD1:2016/COR1:2019; CEI EN 61326-1:2013; CEI EN IEC 61326-1:2022; EN 61326-1:2013; EN IEC 61326-1:2021; IEC 61326-1:2012; IEC 61326-1:2020

IEC 61010-2-030Name not checked yet
As written on the certificate · Line 6 (ACCREDIA 00036)

EN IEC 61010-2-030:2021/A11:2021; IEC 61010-2-030:2017; IEC 61010-2-030:2023; CEI EN IEC 61010-2-081:2021; EN IEC 61010-2-081:2020; IEC 61010-2-081:2019

IEC 61010-2-081Name not checked yet
As written on the certificate · Line 6 (ACCREDIA 00036)

EN IEC 61010-2-030:2021/A11:2021; IEC 61010-2-030:2017; IEC 61010-2-030:2023; CEI EN IEC 61010-2-081:2021; EN IEC 61010-2-081:2020; IEC 61010-2-081:2019

IEC 61010-2-101Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 2-101: Particular requirements for in vitro diagnostic (IVD) medical equipment
As written on the certificate · Line 1 (ACCREDIA 00036)

ANSI C63.26:2015; FCC 47 CFR - Part 20 - Section 90.219 1994; RSS-GEN Issue 5:2021; CEI EN 61010-2-101:2017; EN 61010-2-101:2017; EN IEC 61010-2-101:2022/A11:2022; IEC 61010-2-101:2018; EN 61326-2-6:2013; EN IEC 61326-2-6:2021; IEC 61326-2-6:2012; IEC 61326-2-6:2020; ICES-001 Issue 5:2020; RSS-111 Issue 5:2014 + ANSI C63.26:2015

IEC 60068 series

IEC 60068-2-1Environmental testing - Part 2-1: Tests - Test A: Cold
As written on the certificate · Line 8 (ACCREDIA 00036)

CEI EN 60068-2-1:2007; EN 60068-2-1:1993/A1:1993/A2:1994; EN 60068-2-1:2007; IEC 60068-2-1:1974/A1:1983; IEC 60068-2-1:1990/A1:1993/A2:1994; IEC 60068-2-1:2007; CEI EN 60068-2-2:2008; EN 60068-2-2:1993/A1:1993/A2:1994; EN 60068-2-2:2007; IEC 60068-2-2:1974/A1:1993/A2:1994/Suppl 2A:1976; IEC 60068-2-2:2007; IACS UR E10 1991 Rev 7:2018; IACS UR E10 1991 Rev 8:2021/Corr1:2022; CEI EN IEC 60601-2-22:2021; EN IEC 60601-2-22:2020; IEC 60601-2-22:2019

IEC 60068-2-2Environmental testing - Part 2-2: Tests - Test B: Dry heat
As written on the certificate · Line 8 (ACCREDIA 00036)

CEI EN 60068-2-1:2007; EN 60068-2-1:1993/A1:1993/A2:1994; EN 60068-2-1:2007; IEC 60068-2-1:1974/A1:1983; IEC 60068-2-1:1990/A1:1993/A2:1994; IEC 60068-2-1:2007; CEI EN 60068-2-2:2008; EN 60068-2-2:1993/A1:1993/A2:1994; EN 60068-2-2:2007; IEC 60068-2-2:1974/A1:1993/A2:1994/Suppl 2A:1976; IEC 60068-2-2:2007; IACS UR E10 1991 Rev 7:2018; IACS UR E10 1991 Rev 8:2021/Corr1:2022; CEI EN IEC 60601-2-22:2021; EN IEC 60601-2-22:2020; IEC 60601-2-22:2019

IEC 60068-2-11Environmental testing - Part 2-11: Tests - Test Ka: Salt mist
As written on the certificate · Line 3 (ACCREDIA 00036)

CEI EN 61000-4-29:2001; EN 61000-4-29:2000; IEC 61000-4-29:2000; CEI EN 60945:2003; EN 60945:2002; IEC 60945:2002/COR1:2008; CEI EN 55015:2008/A2:2009; CEI EN 55015:2014/A1:2016; CEI EN IEC 55015:2020; CEI EN IEC 55015:2020/A11:2020; CISPR 15:2005/A1:2006/A2:2008; CISPR 15:2013/A1:2015; CISPR 15:2018; CISPR 15:2018/AMD1:2024; EN 55015:2006/A1:2007/A2:2009; EN 55015:2013/A1:2015; EN IEC 55015:2019/A11:2020; CEI EN 61547:2010; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61547:2023; IEC 61547:2020; CEI EN 60068-2-11:2000; CEI EN IEC 60068-2-11:2022; EN 60068-2-11:1999; EN IEC 60068-2-11:2021; IEC 60068-2-11:1981/COR1:1999; IEC 60068-2-11:2021; CEI EN 60068-2-52:1997; CEI EN IEC 60068-2-52:2019; EN 60068-2-52:1996; EN IEC 60068-2-52:2018; IEC 60068-2-52:1996; IEC 60068-2-52:2017; CEI EN 61000-6-4:2007/A1:2013; CEI EN 61000-6-4:2020; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; IEC 61000-6-4:2006/A1:2010; IEC 61000-6-4:2018; CEI EN 61000-6-2:2006; CEI EN IEC 61000-6-2:2019; EN 61000-6-2:2005; EN 61000-6-2:2005/Cor1:2005; EN IEC 61000-6-2:2019; IEC 61000-6-2:2005; IEC 61000-6-2:2016

IEC 60068-2-52Environmental testing - Part 2-52: Tests - Test Kb: Salt mist, cyclic (sodium chloride solution)
As written on the certificate · Line 3 (ACCREDIA 00036)

CEI EN 61000-4-29:2001; EN 61000-4-29:2000; IEC 61000-4-29:2000; CEI EN 60945:2003; EN 60945:2002; IEC 60945:2002/COR1:2008; CEI EN 55015:2008/A2:2009; CEI EN 55015:2014/A1:2016; CEI EN IEC 55015:2020; CEI EN IEC 55015:2020/A11:2020; CISPR 15:2005/A1:2006/A2:2008; CISPR 15:2013/A1:2015; CISPR 15:2018; CISPR 15:2018/AMD1:2024; EN 55015:2006/A1:2007/A2:2009; EN 55015:2013/A1:2015; EN IEC 55015:2019/A11:2020; CEI EN 61547:2010; EN 61547:2009; IEC 61547:2009/Cor1:2010; EN IEC 61547:2023; IEC 61547:2020; CEI EN 60068-2-11:2000; CEI EN IEC 60068-2-11:2022; EN 60068-2-11:1999; EN IEC 60068-2-11:2021; IEC 60068-2-11:1981/COR1:1999; IEC 60068-2-11:2021; CEI EN 60068-2-52:1997; CEI EN IEC 60068-2-52:2019; EN 60068-2-52:1996; EN IEC 60068-2-52:2018; IEC 60068-2-52:1996; IEC 60068-2-52:2017; CEI EN 61000-6-4:2007/A1:2013; CEI EN 61000-6-4:2020; EN 61000-6-4:2007/A1:2011; EN IEC 61000-6-4:2019; IEC 61000-6-4:2006/A1:2010; IEC 61000-6-4:2018; CEI EN 61000-6-2:2006; CEI EN IEC 61000-6-2:2019; EN 61000-6-2:2005; EN 61000-6-2:2005/Cor1:2005; EN IEC 61000-6-2:2019; IEC 61000-6-2:2005; IEC 61000-6-2:2016

EN

EN 50121-3-2Railway applications - Electromagnetic compatibility - Part 3-2: Rolling stock - Apparatus
As written on the certificate · Line 10 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 55011:2018/A1:2019/A11:2020/A2:2021; CISPR 11:2003/A1:2004/A2:2006; CISPR 11:2009/A1:2010; CISPR 11:2015/AMD1:2016/AMD2:2019; CISPR 11:2024; EN 55011:2009/A1:2010; EN 55011:2016/A1:2017/A11:2020/A2:2021; CEI EN 55032:2015/EC:2018/A1:2021/A11:2020; CISPR 32:2015/Cor1:2016/AMD1:2019; EN 55032:2015/AC:2016/A1:2020/A11:2020; CEI EN 55035:2018/A11:2021; CISPR 35:2016; EN 55035:2017/A11:2020; KN 35:2015; RSS-130 Issue 2:2019 + ANSI C63.26:2015; RSS-140 Issue 1:2018 + ANSI C63.26:2015; CEI EN 50121-4:2017/A1:2019; EN 50121-4:2016/A1:2019; CEI EN 50121-3-2:2017/A1:2019; EN 50121-3-2:2016/A1:2019; CEI EN 60950-22:2017; EN 60950-22:2017; IEC 60950-22:2016

EN 50121-4Railway applications - Electromagnetic compatibility - Part 4: Emission and immunity of the signalling and telecommunications apparatus
As written on the certificate · Line 10 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; CEI EN 55011:2018/A1:2019/A11:2020/A2:2021; CISPR 11:2003/A1:2004/A2:2006; CISPR 11:2009/A1:2010; CISPR 11:2015/AMD1:2016/AMD2:2019; CISPR 11:2024; EN 55011:2009/A1:2010; EN 55011:2016/A1:2017/A11:2020/A2:2021; CEI EN 55032:2015/EC:2018/A1:2021/A11:2020; CISPR 32:2015/Cor1:2016/AMD1:2019; EN 55032:2015/AC:2016/A1:2020/A11:2020; CEI EN 55035:2018/A11:2021; CISPR 35:2016; EN 55035:2017/A11:2020; KN 35:2015; RSS-130 Issue 2:2019 + ANSI C63.26:2015; RSS-140 Issue 1:2018 + ANSI C63.26:2015; CEI EN 50121-4:2017/A1:2019; EN 50121-4:2016/A1:2019; CEI EN 50121-3-2:2017/A1:2019; EN 50121-3-2:2016/A1:2019; CEI EN 60950-22:2017; EN 60950-22:2017; IEC 60950-22:2016

EN 50364Name not checked yet
As written on the certificate · Line 39 (ACCREDIA 00036)

ETSI EN 300 328 V2.2.2 2019; RSS-247 Issue 3:2023 + ANSI C63.10:2020; RSS-247 Issue 3:2023 + ANSI C63.10:2020/Cor1:2023; RSS-247 Issue 3:2023 + IEEE C63.10:2020/a:2024; RSS-247 Issue 4:2025 + ANSI C63.10-2020/Cor1-2023/a-2024; CEI EN 60870-2-1:1997; EN 60870-2-1:1996; IEC 60870-2-1:1995; EN 50364:2010; EN 50364:2018; RSS-132 Issue 4:2023 + ANSI C63.26:2015; ETSI EN 301 489-50 V2.3.1:2021; ETSI EN 303 413 V1.2.1 2021; ETSI EN 301 489-53 V1.1.1 2019

ISO 11452 series

ISO 11452-2Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 2: Absorber-lined shielded enclosure
As written on the certificate · Line 13 (ACCREDIA 00036)

UNECE 10R06/01 (2020); UNECE 10R06/02 (2022); UNECE 10R06/03 (2024); CEI EN 55025:2017/EC:2018; CISPR 25:2002/Cor 1:2004; CISPR 25:2008/Cor 1:2009; CISPR 25:2016/Cor 1:2017; CISPR 25:2021; EN 55025:2008; EN 55025:2017/AC1:2017; EN IEC 55025:2022; ISO 7637-2:2004/Amd1:2008; ISO 7637-2:2011; ISO 11452-4:2005/Cor.1:2009; ISO 11452-4:2011; ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 11451-2:2015; RSS-216 Issue 2:2020; RSS-216 Issue 3:2024

ISO 11452-3Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 3: Transverse electromagnetic (TEM) cell
As written on the certificate · Line 12 (ACCREDIA 00036)

UNI CEI EN ISO/IEC 17025:2018; RSS-119 Issue 12:2015 + ANSI C63.26:2015; RSS-119 Issue 12:2022 + ANSI C63.26:2015; ISO 11452-3:2001; ISO 11452-3:2016; ISO 11452-3:2024; ETSI EN 300 330 V2.1.1 2017; ETSI EN 300 220-2 V3.2.1 2018; ETSI EN 300 220-3-2 V1.1.1 2017; ETSI EN 300 220-3-1 V2.1.1 2016

ISO 11452-4Road vehicles - Component test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 4: Harness excitation methods
As written on the certificate · Line 13 (ACCREDIA 00036)

UNECE 10R06/01 (2020); UNECE 10R06/02 (2022); UNECE 10R06/03 (2024); CEI EN 55025:2017/EC:2018; CISPR 25:2002/Cor 1:2004; CISPR 25:2008/Cor 1:2009; CISPR 25:2016/Cor 1:2017; CISPR 25:2021; EN 55025:2008; EN 55025:2017/AC1:2017; EN IEC 55025:2022; ISO 7637-2:2004/Amd1:2008; ISO 7637-2:2011; ISO 11452-4:2005/Cor.1:2009; ISO 11452-4:2011; ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 11451-2:2015; RSS-216 Issue 2:2020; RSS-216 Issue 3:2024

Other standards

ANSI C63.10Name not checked yet
As written on the certificate · Line 35 (ACCREDIA 00036)

CEI EN 60204-1:2018; CEI EN 60204-1:2018/EC:2019/EC:2022-10/EC:2022; EN 60204-1:2018; EN 60204-1:2018/A1:2025; IEC 60204-1:2016/AMD1:2021; AS/NSZ CISPR 12:2013; CAN/CSA CISPR 12:2018; CEI EN 55012:2003/A1:2005; CEI EN 55012:2009/A1:2010; CISPR 12:2001; CISPR 12:2007/Amd 1:2009; EN 55012:2002/A1:2005; EN 55012:2007/A1:2009; RSS-131 Issue 4:2022 + ANSI C63.26:2015; ETSI EN 301 489-4 V3.3.1 2021; ANSI C63.10:2013; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart F 1989; IEEE C63.10:2020/a:2024; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart G 1989; IEEE C63.10:2020/a:2024; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart C 1989; IEEE C63.10:2020/a:2024; ANSI C63.4:2014; ANSI C63.4a:2017; FCC 47 CFR - Part 15 Subpart B 1989; FCC 47 CFR - Part 15 Subpart E 1989

As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

ANSI C63.26Name not checked yet
As written on the certificate · Line 1 (ACCREDIA 00036)

ANSI C63.26:2015; FCC 47 CFR - Part 20 - Section 90.219 1994; RSS-GEN Issue 5:2021; CEI EN 61010-2-101:2017; EN 61010-2-101:2017; EN IEC 61010-2-101:2022/A11:2022; IEC 61010-2-101:2018; EN 61326-2-6:2013; EN IEC 61326-2-6:2021; IEC 61326-2-6:2012; IEC 61326-2-6:2020; ICES-001 Issue 5:2020; RSS-111 Issue 5:2014 + ANSI C63.26:2015

As written on the certificate · Line 37 (ACCREDIA 00036)

ETSI EN 303 345-2 V1.2.1 2021; ETSI EN 303 345-4 V1.1.1 2021; ETSI EN 303 345-5 V1.2.1 2021; ETSI EN 303 345-3 V1.1.1 2021; ETSI EN 301 893 V2.1.1 2017; ETSI EN 301 893 V2.2.1 2024; RSS-133 Issue 6:2018 + ANSI C63.26:2015; RSS-133 Issue 7:2024 + ANSI C63.26:2015; RSS-134 Issue 2:2016 + ANSI C63.26:2015; ANSI C63.26:2015; FCC 47 CFR - Part 73; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 101 1996; FCC 47 CFR - Part 25; FCC 47 CFR - Part 30 2016; FCC 47 CFR - Part 74 1999; FCC 47 CFR - Part 90 1978; FCC 47 CFR - Part 95 2017; FCC 47 CFR - Part 97 1998; FCC 47 CFR - Part 22 1994; FCC 47 CFR - Part 24 1994; FCC 47 CFR - Part 25; FCC 47 CFR - Part 27 1997

As written on the certificate · Line 38 (ACCREDIA 00036)

ANSI C63.26:2015; FCC 47 CFR - Part 96 2015; ETSI EN 300 440 V2.2.1 2018; ETSI EN 302 065-4 V1.1.1 2016; ETSI EN 302 065-3 V2.1.1 2016; ETSI EN 302 065-2 V2.1.1 2016; ETSI EN 302 065-1 V2.1.1 2016; EN 60825-1:2014/AC:2017/A11:2021/AC:2

FCC PART 15Radio Frequency Devices
As written on the certificate · Line 35 (ACCREDIA 00036)

CEI EN 60204-1:2018; CEI EN 60204-1:2018/EC:2019/EC:2022-10/EC:2022; EN 60204-1:2018; EN 60204-1:2018/A1:2025; IEC 60204-1:2016/AMD1:2021; AS/NSZ CISPR 12:2013; CAN/CSA CISPR 12:2018; CEI EN 55012:2003/A1:2005; CEI EN 55012:2009/A1:2010; CISPR 12:2001; CISPR 12:2007/Amd 1:2009; EN 55012:2002/A1:2005; EN 55012:2007/A1:2009; RSS-131 Issue 4:2022 + ANSI C63.26:2015; ETSI EN 301 489-4 V3.3.1 2021; ANSI C63.10:2013; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart F 1989; IEEE C63.10:2020/a:2024; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart G 1989; IEEE C63.10:2020/a:2024; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart C 1989; IEEE C63.10:2020/a:2024; ANSI C63.4:2014; ANSI C63.4a:2017; FCC 47 CFR - Part 15 Subpart B 1989; FCC 47 CFR - Part 15 Subpart E 1989

As written on the certificate · Line 36 (ACCREDIA 00036)

ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.10:2020/Cor1:2023; FCC 47 CFR - Part 15 Subpart E 1989; IEEE C63.10:2020/a:2024; ETSI EN 301 489-5 V2.2.1:2019; ETSI EN 301 489-7 V1.3.1 2005; EN 60255-22-5:2002; EN 60255-22-5:2011; IEC 60255-22-5:2002; IEC 60255-22-5:2008; CEI EN 60255-25:2001; EN 60255-25:2000; IEC 60255-25:2000; CEI EN 60255-26:2015; EN 60255-26:2013/AC:2013; IEC 60255-26:2013; IEC 60255-26:2023; CEI EN 60255-22-1:2008; EN 60255-22-1:2005; EN 60255-22-1:2008; IEC 60255-22-1:1988; IEC 60255-22-1:2005; EN 60255-22-3:2008; IEC 60255-22-3:2007; EN 60255-22-6:2001; IEC 60255-22-6:2001; CEI EN 60255-22-2:2009; EN 60255-22-2:2008; IEC 60255-22-2:2008; EN 60255-22-4:2008; IEC 60255-22-4:2008; ETSI EN 301 908-13 V.13.2.1 2022; ETSI EN 301 908-13 V13.3.1 2024; ETSI EN 301 908-1 V15.2.1 2023; ETSI EN 301 908-3 V13.1.1 (2019); ETSI EN 301 908-3 V15.1.1 (2024)

ISO 7637-2Road vehicles - Electrical disturbances from conduction and coupling - Part 2: Electrical transient conduction along supply lines only
As written on the certificate · Line 13 (ACCREDIA 00036)

UNECE 10R06/01 (2020); UNECE 10R06/02 (2022); UNECE 10R06/03 (2024); CEI EN 55025:2017/EC:2018; CISPR 25:2002/Cor 1:2004; CISPR 25:2008/Cor 1:2009; CISPR 25:2016/Cor 1:2017; CISPR 25:2021; EN 55025:2008; EN 55025:2017/AC1:2017; EN IEC 55025:2022; ISO 7637-2:2004/Amd1:2008; ISO 7637-2:2011; ISO 11452-4:2005/Cor.1:2009; ISO 11452-4:2011; ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 11451-2:2015; RSS-216 Issue 2:2020; RSS-216 Issue 3:2024

ISO 11451-2Road vehicles - Vehicle test methods for electrical disturbances from narrowband radiated electromagnetic energy - Part 2: Off-vehicle radiation sources
As written on the certificate · Line 13 (ACCREDIA 00036)

UNECE 10R06/01 (2020); UNECE 10R06/02 (2022); UNECE 10R06/03 (2024); CEI EN 55025:2017/EC:2018; CISPR 25:2002/Cor 1:2004; CISPR 25:2008/Cor 1:2009; CISPR 25:2016/Cor 1:2017; CISPR 25:2021; EN 55025:2008; EN 55025:2017/AC1:2017; EN IEC 55025:2022; ISO 7637-2:2004/Amd1:2008; ISO 7637-2:2011; ISO 11452-4:2005/Cor.1:2009; ISO 11452-4:2011; ISO 11452-4:2020; ISO 11452-2:2004; ISO 11452-2:2019; ISO 11451-2:2015; RSS-216 Issue 2:2020; RSS-216 Issue 3:2024

Scope as published by ACCREDIA

40 lines
ACCREDIA

ISO/IEC 17025

Active

00036

View scope

Location

Via del Carroccio, 4, Biassono, 20853, IT

45.63017, 9.26176

Open in Maps

Other Locations

1 other site in this organization

Accreditation data refreshed from the ACCREDIA register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the ACCREDIA entry linked above.