World Standardization Certification & Testing Group (Shenzhen) Co.,
Building D, Dongjiang Technology, Tangjia Community, Fenghuang Street, Guangming District,Shenzhen, Guangdong, China, Fenghuang Street, Guangming District, Shenzhen, People's Republic of China, Shenzhen, China
Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.
Only the laboratory you pick gets your contact details. We ask the others without them.
Contact this laboratory
Work at World Standardization Certification & Testing Group (Shenzhen) Co.,?
Claim this profile to keep it accurate.
Register record
- A2LARefreshed
- 5768.01Active
Accredited standards
101Our reading of the A2LA scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.
IEC
IEC 60598-1Luminaires - Part 1: General requirements and tests
IEC 60335-2-2; EN 60335-2-2; BS EN 60335-2-2; AS/NZS 60335.2.2; KS IEC 60335-2-2; GSO IEC 60335-2-2; CSA E60335-2-2; J60335-2-2; JIS C 9335-2-2; IEC 60335-2-54; EN 60335-2-54; BS EN 60335-2-54; AS/NZS 60335.2.54; KS IEC 60335-2-54; GSO IEC 60335-2-54; CSA E60335-2-54; J60335-2-54; JIS C 9335-2-54; IEC 60335-2-65; EN 60335-2-65; BS EN 60335-2-65; AS/NZS 60335.2.65; KS IEC 60335-2-65; GSO IEC 60335-2-65; EN 62233; IEC 60598-1; EN 60598-1; BS EN 60598-1; AS/NZS 60598.1; KS IEC 60598-1; GSO IEC 60598-1; J60598-1; JIS C 8105-1; IEC/EN 62368-1
IEC 60601-1-2Medical electrical equipment - Part 1-2: General requirements for basic safety and essential performance - Collateral Standard: Electromagnetic disturbances - Requirements and tests
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 60730-2-14Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61058-1-2Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61204-3Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61215-1Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 61251Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 61547Equipment for general lighting purposes - EMC immunity requirementsCertificate says EN 61547. Probably the same standard; not checked against the EN document.
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61683Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 61727Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 61730-1Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 61730-2Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62040-2Uninterruptible power systems (UPS) - Part 2: Electromagnetic compatibility (EMC) requirements
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 62109-1Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62109-2Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62116Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62209-1Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 62233Measurement methods for electromagnetic fields of household appliances and similar apparatus with regard to human exposureCertificate says EN 62233. Probably the same standard; not checked against the EN document.
IEC 60335-2-2; EN 60335-2-2; BS EN 60335-2-2; AS/NZS 60335.2.2; KS IEC 60335-2-2; GSO IEC 60335-2-2; CSA E60335-2-2; J60335-2-2; JIS C 9335-2-2; IEC 60335-2-54; EN 60335-2-54; BS EN 60335-2-54; AS/NZS 60335.2.54; KS IEC 60335-2-54; GSO IEC 60335-2-54; CSA E60335-2-54; J60335-2-54; JIS C 9335-2-54; IEC 60335-2-65; EN 60335-2-65; BS EN 60335-2-65; AS/NZS 60335.2.65; KS IEC 60335-2-65; GSO IEC 60335-2-65; EN 62233; IEC 60598-1; EN 60598-1; BS EN 60598-1; AS/NZS 60598.1; KS IEC 60598-1; GSO IEC 60598-1; J60598-1; JIS C 8105-1; IEC/EN 62368-1
IEC 62368-1Audio/video, information and communication technology equipment - Part 1: Safety requirements
IEC 60335-2-2; EN 60335-2-2; BS EN 60335-2-2; AS/NZS 60335.2.2; KS IEC 60335-2-2; GSO IEC 60335-2-2; CSA E60335-2-2; J60335-2-2; JIS C 9335-2-2; IEC 60335-2-54; EN 60335-2-54; BS EN 60335-2-54; AS/NZS 60335.2.54; KS IEC 60335-2-54; GSO IEC 60335-2-54; CSA E60335-2-54; J60335-2-54; JIS C 9335-2-54; IEC 60335-2-65; EN 60335-2-65; BS EN 60335-2-65; AS/NZS 60335.2.65; KS IEC 60335-2-65; GSO IEC 60335-2-65; EN 62233; IEC 60598-1; EN 60598-1; BS EN 60598-1; AS/NZS 60598.1; KS IEC 60598-1; GSO IEC 60598-1; J60598-1; JIS C 8105-1; IEC/EN 62368-1
IEC 62471Photobiological safety of lamps and lamp systems
IEC 62471:2006; EN 62471:2008; GB/T 20145-2006; IEC/EN/60065; IEC/EN/60950-1
IEC 62670-1Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62891Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62909-1Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62909-2Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62920Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
ETSI
ETSI EN 300 386Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
ETSI EN 302 502Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI EN 303 687Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 103 246-3Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 103 246-5Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 134 121-1Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 134 123-1Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 134 229-1Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 134 229-2Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 134 229-5Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 136 521-3Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 136 523-1Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 138 101-1Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 138 101-3Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 138 521-4Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 138 523-1Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 138 533Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 151 010-1Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 151 010-2Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
ETSI TS 151 010-4Name not checked yet
ETSI TS 103 246-3; ETSI TS 103 246-5; 3GPP TS 36.509; Delegated Regulation (EU) 2019/320; ETSI EN 302 502; ETSI EN 303 687; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 121-1; 3GPP TS 34.121-1; ETSI TS 136 521-3; 3GPP TS 36.521-3; ETSI TS 138 101-1; 3GPP TS 38.101-1; ETSI TS 138 101-3; 3GPP TS 38.101-3; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 138 533; 3GPP TS 38.533; ETSI TS 151 010-1; 3GPP TS 51.010-1; ETSI TS 151 010-2; 3GPP TS 51.010-2; ETSI TS 151 010-4; 3GPP TS 51.010-4; ETSI TS 134 123-1; 3GPP TS 34.123-1; ETSI TS 136 523-1; 3GPP TS 36.523-1; ETSI TS 134 229-1; 3GPP TS 34.229-1; ETSI TS 134 229-2; 3GPP TS 34.229-2; ETSI TS 138 523-1; 3GPP TS 38.523-1; ETSI TS 138 521-4; 3GPP TS 38.521-4; ETSI TS 134 229-5; 3GPP TS 34.229-5; HKCA 1002; HKTA 1003; HKCA 1008; HKCA 1010; HKCA 1033; HKCA 1034; HKCA 1035; HKCA 1039; HKCA 1043; HKCA 1044; HKCA 1049; HKCA 1050; HKCA 1052; HKCA 1053; HKCA 1054; HKTA 1056; HKTA 1057; HKTA 1061; HKTA 2001; HKTA 2011; MIC Article 2-1 Item (19); MIC Article 2-1 Item (19)-2; MIC Article 2-1 Item (19)-2-2; MIC Article 2-1 Item (19)-2-3; MIC Article 2-1 Item (19)-3; MIC Article 2-1 Item (19)-3-2; MIC Article 2-1 Item (19)-11; MIC Article 2-1 Item (19)-3-3; MIC Article 2-1 Item (11)-3; MIC Article 2-1 Item (11)-4; MIC Article 2-1 Item (11)-7; MIC Article 2-1 Item (11)-8; MIC Article 2-1 Item (11)-19
IEC 61000 series
IEC 61000-3-2Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current ≤ 16 A per phase)
ANSI C63.4; CISPR 32; AS/NZS CISPR 32; FCC OST/MP-5; AS/NZS 61000-3-2; EN IEC 61000-3-2; BS EN IEC 61000-3-2; IEC 61000-3-2; GB 17625.1; AS/NZS 61000-3-3; EN 61000-3-3; IEC 61000-3-3; GB 17625.2; EN 61000-4-2; IEC 61000-4-2; EN IEC 61000-4-3; IEC 61000-4-3; EN 61000-4-4; IEC 61000-4-4; EN 61000-4-5; IEC 61000-4-5; EN IEC 61000-4-6; IEC 61000-4-6; EN 61000-4-8; IEC 61000-4-8; EN IEC 61000-4-11; IEC 61000-4-11; ISO/IEC 17025:2017
IEC 61000-3-3Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤ 16 A per phase and not subject to conditional connection
ANSI C63.4; CISPR 32; AS/NZS CISPR 32; FCC OST/MP-5; AS/NZS 61000-3-2; EN IEC 61000-3-2; BS EN IEC 61000-3-2; IEC 61000-3-2; GB 17625.1; AS/NZS 61000-3-3; EN 61000-3-3; IEC 61000-3-3; GB 17625.2; EN 61000-4-2; IEC 61000-4-2; EN IEC 61000-4-3; IEC 61000-4-3; EN 61000-4-4; IEC 61000-4-4; EN 61000-4-5; IEC 61000-4-5; EN IEC 61000-4-6; IEC 61000-4-6; EN 61000-4-8; IEC 61000-4-8; EN IEC 61000-4-11; IEC 61000-4-11; ISO/IEC 17025:2017
IEC 61000-4-2Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
ANSI C63.4; CISPR 32; AS/NZS CISPR 32; FCC OST/MP-5; AS/NZS 61000-3-2; EN IEC 61000-3-2; BS EN IEC 61000-3-2; IEC 61000-3-2; GB 17625.1; AS/NZS 61000-3-3; EN 61000-3-3; IEC 61000-3-3; GB 17625.2; EN 61000-4-2; IEC 61000-4-2; EN IEC 61000-4-3; IEC 61000-4-3; EN 61000-4-4; IEC 61000-4-4; EN 61000-4-5; IEC 61000-4-5; EN IEC 61000-4-6; IEC 61000-4-6; EN 61000-4-8; IEC 61000-4-8; EN IEC 61000-4-11; IEC 61000-4-11; ISO/IEC 17025:2017
IEC 61000-4-3Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity testCertificate says EN 61000-4-3. Probably the same standard; not checked against the EN document.
ANSI C63.4; CISPR 32; AS/NZS CISPR 32; FCC OST/MP-5; AS/NZS 61000-3-2; EN IEC 61000-3-2; BS EN IEC 61000-3-2; IEC 61000-3-2; GB 17625.1; AS/NZS 61000-3-3; EN 61000-3-3; IEC 61000-3-3; GB 17625.2; EN 61000-4-2; IEC 61000-4-2; EN IEC 61000-4-3; IEC 61000-4-3; EN 61000-4-4; IEC 61000-4-4; EN 61000-4-5; IEC 61000-4-5; EN IEC 61000-4-6; IEC 61000-4-6; EN 61000-4-8; IEC 61000-4-8; EN IEC 61000-4-11; IEC 61000-4-11; ISO/IEC 17025:2017
IEC 61000-4-4Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
ANSI C63.4; CISPR 32; AS/NZS CISPR 32; FCC OST/MP-5; AS/NZS 61000-3-2; EN IEC 61000-3-2; BS EN IEC 61000-3-2; IEC 61000-3-2; GB 17625.1; AS/NZS 61000-3-3; EN 61000-3-3; IEC 61000-3-3; GB 17625.2; EN 61000-4-2; IEC 61000-4-2; EN IEC 61000-4-3; IEC 61000-4-3; EN 61000-4-4; IEC 61000-4-4; EN 61000-4-5; IEC 61000-4-5; EN IEC 61000-4-6; IEC 61000-4-6; EN 61000-4-8; IEC 61000-4-8; EN IEC 61000-4-11; IEC 61000-4-11; ISO/IEC 17025:2017
IEC 61000-4-5Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test
ANSI C63.4; CISPR 32; AS/NZS CISPR 32; FCC OST/MP-5; AS/NZS 61000-3-2; EN IEC 61000-3-2; BS EN IEC 61000-3-2; IEC 61000-3-2; GB 17625.1; AS/NZS 61000-3-3; EN 61000-3-3; IEC 61000-3-3; GB 17625.2; EN 61000-4-2; IEC 61000-4-2; EN IEC 61000-4-3; IEC 61000-4-3; EN 61000-4-4; IEC 61000-4-4; EN 61000-4-5; IEC 61000-4-5; EN IEC 61000-4-6; IEC 61000-4-6; EN 61000-4-8; IEC 61000-4-8; EN IEC 61000-4-11; IEC 61000-4-11; ISO/IEC 17025:2017
IEC 61000-4-6Electromagnetic compatibility (EMC) - Part 4-6: Testing and measurement techniques - Immunity to conducted disturbances, induced by radio-frequency fields
ANSI C63.4; CISPR 32; AS/NZS CISPR 32; FCC OST/MP-5; AS/NZS 61000-3-2; EN IEC 61000-3-2; BS EN IEC 61000-3-2; IEC 61000-3-2; GB 17625.1; AS/NZS 61000-3-3; EN 61000-3-3; IEC 61000-3-3; GB 17625.2; EN 61000-4-2; IEC 61000-4-2; EN IEC 61000-4-3; IEC 61000-4-3; EN 61000-4-4; IEC 61000-4-4; EN 61000-4-5; IEC 61000-4-5; EN IEC 61000-4-6; IEC 61000-4-6; EN 61000-4-8; IEC 61000-4-8; EN IEC 61000-4-11; IEC 61000-4-11; ISO/IEC 17025:2017
IEC 61000-4-8Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
ANSI C63.4; CISPR 32; AS/NZS CISPR 32; FCC OST/MP-5; AS/NZS 61000-3-2; EN IEC 61000-3-2; BS EN IEC 61000-3-2; IEC 61000-3-2; GB 17625.1; AS/NZS 61000-3-3; EN 61000-3-3; IEC 61000-3-3; GB 17625.2; EN 61000-4-2; IEC 61000-4-2; EN IEC 61000-4-3; IEC 61000-4-3; EN 61000-4-4; IEC 61000-4-4; EN 61000-4-5; IEC 61000-4-5; EN IEC 61000-4-6; IEC 61000-4-6; EN 61000-4-8; IEC 61000-4-8; EN IEC 61000-4-11; IEC 61000-4-11; ISO/IEC 17025:2017
IEC 61000-4-11Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests for equipment with input current up to 16 A per phase
ANSI C63.4; CISPR 32; AS/NZS CISPR 32; FCC OST/MP-5; AS/NZS 61000-3-2; EN IEC 61000-3-2; BS EN IEC 61000-3-2; IEC 61000-3-2; GB 17625.1; AS/NZS 61000-3-3; EN 61000-3-3; IEC 61000-3-3; GB 17625.2; EN 61000-4-2; IEC 61000-4-2; EN IEC 61000-4-3; IEC 61000-4-3; EN 61000-4-4; IEC 61000-4-4; EN 61000-4-5; IEC 61000-4-5; EN IEC 61000-4-6; IEC 61000-4-6; EN 61000-4-8; IEC 61000-4-8; EN IEC 61000-4-11; IEC 61000-4-11; ISO/IEC 17025:2017
IEC 61000-4-18Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61000-6-1Electromagnetic compatibility (EMC) - Part 6-1: Generic standards - Immunity standard for residential, commercial and light-industrial environments
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61000-6-2Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity standard for industrial environments
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61000-6-3Electromagnetic compatibility (EMC) - Part 6-3: Generic standards - Emission standard for equipment in residential environmentsCertificate says EN 61000-6-3. Probably the same standard; not checked against the EN document.
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61000-6-4Electromagnetic compatibility (EMC) - Part 6-4: Generic standards - Emission standard for industrial environments
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
CISPR
CISPR 11Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurementCertificate says EN 55011. Probably the same standard; not checked against the EN document.
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
CISPR 14-1Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1: EmissionCertificate says IEC 55014-1. Probably the same standard; not checked against the EN document.
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
CISPR 14-2Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 2: Immunity - Product family standardCertificate says IEC 55014-2. Probably the same standard; not checked against the EN document.
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
CISPR 15Limits and methods of measurement of radio disturbance characteristics of electrical lighting and similar equipmentCertificate says IEC 55015. Probably the same standard; not checked against the EN document.
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
CISPR 24Information technology equipment - Immunity characteristics - Limits and methods of measurementCertificate says EN 55024. Probably the same standard; not checked against the EN document.
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
CISPR 32Electromagnetic compatibility of multimedia equipment - Emission requirementsCertificate says EN 55032. Probably the same standard; not checked against the EN document.
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
CISPR 35Electromagnetic compatibility of multimedia equipment - Immunity requirementsCertificate says EN 55035. Probably the same standard; not checked against the EN document.
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61326 series
IEC 61326-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61326-2-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-1: Particular requirements - Test configurations, operational conditions and performance criteria for sensitive test and measurement equipment for EMC unprotected applications
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61326-2-2Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-2: Particular requirements - Test configurations, operational conditions and performance criteria for portable testing, measuring and monitoring equipment used in low-voltage distribution systems
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61326-2-3Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-3: Particular requirements - Test configuration, operational conditions and performance criteria for transducers with integrated or remote signal conditioning
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61326-2-4Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61326-2-5Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61326-2-6Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular requirements - In vitro diagnostic (IVD) medical electrical equipment
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61851 series
IEC 61851-1Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 61851-21-2Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 61851-23Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 61851-24Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 61851-25Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62933 series
IEC 62933-1Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62933-4-2Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62933-4-4Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62933-5-1Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
IEC 62933-5-2Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
ISO 15118 series
ISO 15118-1Road vehicles - Vehicle to grid communication interface - Part 1: General information and use-case definition
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
ISO 15118-2Road vehicles - Vehicle-to-Grid Communication Interface - Part 2: Network and application protocol requirements
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
ISO 15118-3Road vehicles - Vehicle to grid communication interface - Part 3: Physical and data link layer requirements
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
ISO 15118-4Road vehicles - Vehicle to grid communication interface - Part 4: Network and application protocol conformance test
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
ISO 15118-5Road vehicles - Vehicle to grid communication interface - Part 5: Physical layer and data link layer conformance test
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
EN
EN 50360Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
EN 50438Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
EN 50530Name not checked yet
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
EN 50566Name not checked yet
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
IEC 60335 series
IEC 60335-1Household and similar electrical appliances - Safety - Part 1: General requirements
ANSI/TIA-603-E; TIA-102.CAAA-E-2016; ANSI C63.26-2015; IEEE Std 1528TM-2013; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335.1; KS IEC 60335-1; GSO IEC 60335-1; UL 60335-1; CSA C22.2 NO. 60335-1; J60335-1; JIS C 9335-1
IEC 60335-2-2Household and similar electrical appliances - Safety - Part 2-2: Particular requirements for vacuum cleaners and water-suction cleaning appliances
IEC 60335-2-2; EN 60335-2-2; BS EN 60335-2-2; AS/NZS 60335.2.2; KS IEC 60335-2-2; GSO IEC 60335-2-2; CSA E60335-2-2; J60335-2-2; JIS C 9335-2-2; IEC 60335-2-54; EN 60335-2-54; BS EN 60335-2-54; AS/NZS 60335.2.54; KS IEC 60335-2-54; GSO IEC 60335-2-54; CSA E60335-2-54; J60335-2-54; JIS C 9335-2-54; IEC 60335-2-65; EN 60335-2-65; BS EN 60335-2-65; AS/NZS 60335.2.65; KS IEC 60335-2-65; GSO IEC 60335-2-65; EN 62233; IEC 60598-1; EN 60598-1; BS EN 60598-1; AS/NZS 60598.1; KS IEC 60598-1; GSO IEC 60598-1; J60598-1; JIS C 8105-1; IEC/EN 62368-1
IEC 60335-2-54Name not checked yet
IEC 60335-2-2; EN 60335-2-2; BS EN 60335-2-2; AS/NZS 60335.2.2; KS IEC 60335-2-2; GSO IEC 60335-2-2; CSA E60335-2-2; J60335-2-2; JIS C 9335-2-2; IEC 60335-2-54; EN 60335-2-54; BS EN 60335-2-54; AS/NZS 60335.2.54; KS IEC 60335-2-54; GSO IEC 60335-2-54; CSA E60335-2-54; J60335-2-54; JIS C 9335-2-54; IEC 60335-2-65; EN 60335-2-65; BS EN 60335-2-65; AS/NZS 60335.2.65; KS IEC 60335-2-65; GSO IEC 60335-2-65; EN 62233; IEC 60598-1; EN 60598-1; BS EN 60598-1; AS/NZS 60598.1; KS IEC 60598-1; GSO IEC 60598-1; J60598-1; JIS C 8105-1; IEC/EN 62368-1
IEC 60335-2-65Name not checked yet
IEC 60335-2-2; EN 60335-2-2; BS EN 60335-2-2; AS/NZS 60335.2.2; KS IEC 60335-2-2; GSO IEC 60335-2-2; CSA E60335-2-2; J60335-2-2; JIS C 9335-2-2; IEC 60335-2-54; EN 60335-2-54; BS EN 60335-2-54; AS/NZS 60335.2.54; KS IEC 60335-2-54; GSO IEC 60335-2-54; CSA E60335-2-54; J60335-2-54; JIS C 9335-2-54; IEC 60335-2-65; EN 60335-2-65; BS EN 60335-2-65; AS/NZS 60335.2.65; KS IEC 60335-2-65; GSO IEC 60335-2-65; EN 62233; IEC 60598-1; EN 60598-1; BS EN 60598-1; AS/NZS 60598.1; KS IEC 60598-1; GSO IEC 60598-1; J60598-1; JIS C 8105-1; IEC/EN 62368-1
Other standards
ANSI C63.4American National Standard for Methods of Measurement of Radio-Noise Emissions from Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz
ANSI C63.4; CISPR 32; AS/NZS CISPR 32; FCC OST/MP-5; AS/NZS 61000-3-2; EN IEC 61000-3-2; BS EN IEC 61000-3-2; IEC 61000-3-2; GB 17625.1; AS/NZS 61000-3-3; EN 61000-3-3; IEC 61000-3-3; GB 17625.2; EN 61000-4-2; IEC 61000-4-2; EN IEC 61000-4-3; IEC 61000-4-3; EN 61000-4-4; IEC 61000-4-4; EN 61000-4-5; IEC 61000-4-5; EN IEC 61000-4-6; IEC 61000-4-6; EN 61000-4-8; IEC 61000-4-8; EN IEC 61000-4-11; IEC 61000-4-11; ISO/IEC 17025:2017
ANSI C63.4:2014; ANSI C63.17-2013; FCC MP-5:1986; ANSI C63.10:2013; FCC KDB 905462 D02 (v02); ANSI/TIA-603-E; TIA-102.CAAA-E-2016; ANSI C63.26-2015
ANSI/TIA-603-EName not checked yet
ANSI/TIA-603-E; TIA-102.CAAA-E-2016; ANSI C63.26-2015; IEEE Std 1528TM-2013; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335.1; KS IEC 60335-1; GSO IEC 60335-1; UL 60335-1; CSA C22.2 NO. 60335-1; J60335-1; JIS C 9335-1
FCC PART 15Radio Frequency Devices
IEC 61000-4-18; EN IEC 61000-6-1; IEC 61000-6-1; GSO IEC 61000-6-1; EN IEC 61000-6-2; IEC 61000-6-2; AS/NZS 61000-6-3; EN IEC 61000-6-3; IEC 61000-6-3; AS/NZS 61000-6-4; EN IEC 61000-6-4; IEC 61000-6-4; EN IEC 61204-3; IEC 61204-3; EN IEC 61326-1; IEC 61326-1; EN IEC 61326-2-1; IEC 61326-2-1; BS EN IEC 61326-2-2; EN IEC 61326-2-2; IEC 61326-2-2; EN IEC 61326-2-3; IEC 61326-2-3; EN IEC 61326-2-4; IEC 61326-2-4; EN IEC 61326-2-5; IEC 61326-2-5; EN IEC 61326-2-6; IEC 61326-2-6; AS/NZS CISPR 11; EN 55011; IEC/CISPR 11; AS/NZS CISPR 14.1; EN IEC 55014-1; IEC/CISPR 14-1; GSO CISPR 14-1; AS/NZS CISPR 14-2; EN IEC 55014-2; IEC/CISPR 14-2; AS/NZS CISPR 15; AS CISPR 15; CISPR 15; EN IEC 55015; IEC/CISPR 15; EN IEC 61547; IEC 61547; IEC/CISPR 22; AS/NZS CISPR 24; CISPR 24; EN 55024; CISPR 32; EN 55032; VCCI-CISPR 32; VCCI V-3; GB 9254; CISPR 35; EN 55035; EN IEC 60601-1-2; IEC 60601-1-2; ETSI EN 300 386; 47 CFR FCC Part 15B (using ANSI C63.4:2014); 47 CFR FCC 18 (using FCC MP- 5:1986); ICES-001; ICES-003; ICES-005; EN IEC 62040-2:2018; IEC 62040-2; IEC 62920; EN 62920; EN IEC 61058-1:2018; IEC 61058-1; EN 61058-1-2; IEC 61058-1-2; EN IEC 60730-2-14; IEC 60730-2-14; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEEE Std.1528; IEEE Std C95.1; IEC/IEEE 62209-1528; IEEE Std C95.3; RSS-102 (Issue 6); RSS-102.SAR.MEAS; MIC Article 14-2; EN 50360; EN 50566; BS EN 50566; EN 62209-1; BS EN 62209-1
MIC Article 2-1 Item (11)-20; MIC Article 2-1 Item (11)-20-2; MIC Article 2-1 Item (11)-20-3; MIC Article 2-1 Item (11)-21; MIC Article 2-1 Item (11)-30; MIC Article 2-1 Item (11)-34; MIC Article 2-1 Item (21)-3; MIC Article 2-1 Item (54); MIC Article 2-1 Item (54)-6; Canada RSS-GEN; RSS-119; RSS-125; RSS-130; RSS-132; RSS-133; RSS-139; RSS-140; RSS-195; RSS-197; RSS-199; RSS-210; RSS-216; RSS-247; RSS-248; RSS-310; U.S. 47 CFR Part 15B; 47 CFR Part 15C; 47 CFR Part 15D; 47 CFR Part 15E; FCC KDB 905462 D02 (v02); 47 CFR Part 15F; 47 CFR Part 15G; 47 CFR Part 15H; 47 CFR Part 18; 47 CFR Parts 22, 24, 25, and 27; 47 CFR FCC Parts 22, 24, 25, 27, 30, 73, 74, 90, 95, 96, 97, and 101; FCC KDB 447498 D01; FCC KDB 941225 D01 and D06; FCC KDB 865664 D01; FCC KDB 941225 D05; FCC KDB 905462 D02 (v02)
ISO 16221Water quality - Guidance for determination of biodegradability in the marine environment
ELVH IEC 62909-1; EN IEC 62909-1; BS EN IEC 62909-1; KS IEC 62909-1; GSO IEC 62909-1; IEC 62909-2; EN IEC 62909-2; BS EN IEC 62909-2; KS IEC 62909-2; IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; KS IEC 61851-1; GSO IEC 61851-24; IEC 61851-23; EN 61851-23; BS EN 61851-23; KS IEC 61851-23; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; IEC 61851-25; EN 61851-25; BS EN 61851-25; KS IEC 61851-25; IEC TS 61851-3-1; IEC TS 61851-3-2; IEC TS 62933-3-2; IEC TS 62933-3-3; IEC TS 62933-3-1; IEC 62933-4-4; IEC TR 62933-4-200; IEC TR 62933-2-201; IEC 62933-4-2; IEC TS 62786-3; IEC TR 61850-90-9; IEC 62933-1; IEC TS 62933-2-2; IEC TS 62933-4-1; IEC 62933-5-1; IEC 62933-5-2; KS IEC 61851-23; GSO IEC 61851-23; AS IEC 61851-23; ISO 15118-1; ISO 15118-2; ISO 15118-3; ISO 15118-4; ISO 15118-5; DIN SPEC 70121; DIN SPEC 70122; PV EN 50530; EN 50438; IEC 61683; EN 61683; BS EN 61683; KS IEC 61683; IEC 61727; EN 61727; BS EN 61727; KS IEC 61727; GSO IEC 61727; IEC 62109-1; EN 62109-1; BS EN 62109-1; KS IEC 62109-1; GSO IEC 62109-1; ISO 16221 (Part 1); IEC 62109-2; 2; BS 2; KS IEC 62109-2; GSO IEC 62109-2; ISO 16221 (part 2); IEC 62116; EN 62116; BS EN 62116; KS IEC 62116; GSO IEC 62116; AS/NZS IEC 62116; ABNT NBR IEC 62116; IS 16169; IEC TS 62910; IEC61251; IEC61730-1; IEC 61730-2; IEC TS 63217; IEC 62670-1; IEC 61215-1; IEC 62891
RSS-119Name not checked yet
MIC Article 2-1 Item (11)-20; MIC Article 2-1 Item (11)-20-2; MIC Article 2-1 Item (11)-20-3; MIC Article 2-1 Item (11)-21; MIC Article 2-1 Item (11)-30; MIC Article 2-1 Item (11)-34; MIC Article 2-1 Item (21)-3; MIC Article 2-1 Item (54); MIC Article 2-1 Item (54)-6; Canada RSS-GEN; RSS-119; RSS-125; RSS-130; RSS-132; RSS-133; RSS-139; RSS-140; RSS-195; RSS-197; RSS-199; RSS-210; RSS-216; RSS-247; RSS-248; RSS-310; U.S. 47 CFR Part 15B; 47 CFR Part 15C; 47 CFR Part 15D; 47 CFR Part 15E; FCC KDB 905462 D02 (v02); 47 CFR Part 15F; 47 CFR Part 15G; 47 CFR Part 15H; 47 CFR Part 18; 47 CFR Parts 22, 24, 25, and 27; 47 CFR FCC Parts 22, 24, 25, 27, 30, 73, 74, 90, 95, 96, 97, and 101; FCC KDB 447498 D01; FCC KDB 941225 D01 and D06; FCC KDB 865664 D01; FCC KDB 941225 D05; FCC KDB 905462 D02 (v02)
Scope as published by A2LA
20 lines
ISO/IEC 17025
Active5768.01
The scope document we hold says it is valid until 2027-02-28.
Labs with overlapping accredited scope in China
- Shenzhen Acote TechnologyShenzhen, Guangdong ProvinceA2LAShares 3 accredited test methodsANSI C63.4ANSI C63.4:2014ANSI/TIA-603-E
- CTC Laboratories, Inc.Shenzhen, GuangdongA2LAShares 2 accredited test methodsANSI C63.4:2014ANSI/TIA-603-E
- Dongguan Nore Testing Center Co.,Dongguan, GuangdongA2LAShares 2 accredited test methodsANSI C63.4:2014ANSI/TIA-603-E
- Guangdong Anbotek Testing Co.,HuizhouA2LAShares 2 accredited test methodsANSI/TIA-603-ERSS-119
- Guangdong Dongdian Testing Service Co.,Dongguan City, Guangdong ProvinceA2LAShares 2 accredited test methodsANSI C63.4:2014ANSI/TIA-603-E
Accreditation data refreshed from the A2LA register on .
This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the A2LA entry linked above.