Al-Ahleia Switchgear Co., K.S.C.C.
PO Box 25876, Safat 13119, Kuwait, Kuwait, United Kingdom
Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.
Only the laboratory you pick gets your contact details. We ask the others without them.
Contact this laboratory
Work at Al-Ahleia Switchgear Co., K.S.C.C.?
Claim this profile to keep it accurate.
Register record
- UKASRefreshed
- 7782Active
Accredited standards
26Our reading of the UKAS scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.
IEC 62271 series
IEC 62271-1Name not checked yet
IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
ISO/IEC 17025:2017; IEC 61439-6; IEC 61439-1; IEC62271-200; IEC62271-1; IEC60060-1; IEC 60529; IEC 60076-1; IEC 60076-3; IEC 60076-11; IEC 60076-2
IEC 62271-100Name not checked yet
IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
IEC 62271-102Name not checked yet
IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
IEC 62271-103Name not checked yet
IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
IEC 62271-105Name not checked yet
IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
IEC 62271-106Name not checked yet
IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
IEC 62271-200Name not checked yet
IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
ISO/IEC 17025:2017; IEC 61439-6; IEC 61439-1; IEC62271-200; IEC62271-1; IEC60060-1; IEC 60529; IEC 60076-1; IEC 60076-3; IEC 60076-11; IEC 60076-2
IEC 62271-202Name not checked yet
IEC 60076-1; IEC 60529; IEC 60076-22-1; IEC 62271-202
IEC 60076 series
IEC 60076-1Name not checked yet
ISO/IEC 17025:2017; IEC 61439-6; IEC 61439-1; IEC62271-200; IEC62271-1; IEC60060-1; IEC 60529; IEC 60076-1; IEC 60076-3; IEC 60076-11; IEC 60076-2
ISO/IEC 17025:2017; IEC 60076-1; IEC 60076-10; IEC 60076-18; IEC 60156; ASTM D3612-2; IEC 60567
IEC 60076-1; IEC 60529; IEC 60076-22-1; IEC 62271-202
IEC 60076-2Name not checked yet
ISO/IEC 17025:2017; IEC 61439-6; IEC 61439-1; IEC62271-200; IEC62271-1; IEC60060-1; IEC 60529; IEC 60076-1; IEC 60076-3; IEC 60076-11; IEC 60076-2
IEC 60076-3Name not checked yet
ISO/IEC 17025:2017; IEC 61439-6; IEC 61439-1; IEC62271-200; IEC62271-1; IEC60060-1; IEC 60529; IEC 60076-1; IEC 60076-3; IEC 60076-11; IEC 60076-2
IEC 60076-10Name not checked yet
ISO/IEC 17025:2017; IEC 60076-1; IEC 60076-10; IEC 60076-18; IEC 60156; ASTM D3612-2; IEC 60567
IEC 60076-11Name not checked yet
ISO/IEC 17025:2017; IEC 61439-6; IEC 61439-1; IEC62271-200; IEC62271-1; IEC60060-1; IEC 60529; IEC 60076-1; IEC 60076-3; IEC 60076-11; IEC 60076-2
IEC 60076-18Name not checked yet
ISO/IEC 17025:2017; IEC 60076-1; IEC 60076-10; IEC 60076-18; IEC 60156; ASTM D3612-2; IEC 60567
IEC 60076-22-1Name not checked yet
IEC 60076-1; IEC 60529; IEC 60076-22-1; IEC 62271-202
IEC
IEC 60060-1Name not checked yet
IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3
ISO/IEC 17025:2017; IEC 61439-6; IEC 61439-1; IEC62271-200; IEC62271-1; IEC60060-1; IEC 60529; IEC 60076-1; IEC 60076-3; IEC 60076-11; IEC 60076-2
IEC 60156Name not checked yet
ISO/IEC 17025:2017; IEC 60076-1; IEC 60076-10; IEC 60076-18; IEC 60156; ASTM D3612-2; IEC 60567
IEC 60529Degrees of protection provided by enclosures (IP Code)
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
ISO/IEC 17025:2017; IEC 61439-1; IEC 61439-2; IEC 60529; IEC 61439-6
ISO/IEC 17025:2017; IEC 61439-6; IEC 61439-1; IEC62271-200; IEC62271-1; IEC60060-1; IEC 60529; IEC 60076-1; IEC 60076-3; IEC 60076-11; IEC 60076-2
IEC 60076-1; IEC 60529; IEC 60076-22-1; IEC 62271-202
IEC 60567Name not checked yet
ISO/IEC 17025:2017; IEC 60076-1; IEC 60076-10; IEC 60076-18; IEC 60156; ASTM D3612-2; IEC 60567
IEC 61439 series
IEC 61439-1Name not checked yet
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
ISO/IEC 17025:2017; IEC 61439-1; IEC 61439-2; IEC 60529; IEC 61439-6
ISO/IEC 17025:2017; IEC 61439-6; IEC 61439-1; IEC62271-200; IEC62271-1; IEC60060-1; IEC 60529; IEC 60076-1; IEC 60076-3; IEC 60076-11; IEC 60076-2
IEC 61439-2Name not checked yet
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
ISO/IEC 17025:2017; IEC 61439-1; IEC 61439-2; IEC 60529; IEC 61439-6
IEC 61439-6Name not checked yet
ISO/IEC 17025:2017; IEC 61439-1; IEC 61439-2; IEC 60529; IEC 61439-6
ISO/IEC 17025:2017; IEC 61439-6; IEC 61439-1; IEC62271-200; IEC62271-1; IEC60060-1; IEC 60529; IEC 60076-1; IEC 60076-3; IEC 60076-11; IEC 60076-2
IEC 61869 series
IEC 61869-1Name not checked yet
IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
IEC 61869-2Name not checked yet
IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3
ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2
IEC 61869-3Name not checked yet
IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3
Other standards
ASTM D3612Name not checked yet
ISO/IEC 17025:2017; IEC 60076-1; IEC 60076-10; IEC 60076-18; IEC 60156; ASTM D3612-2; IEC 60567
Scope as published by UKAS
6 lines
ISO/IEC 17025
Active7782
Accredited scope, certificate 7782
| Line | Discipline | Method | Matrix | Range |
|---|---|---|---|---|
| 1 | electrical | IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC60060-1; IEC61869-3 | Medium voltage switchgear | to 950 GΩ |
| 2 | electrical | ISO/IEC 17025:2017; IEC62271-100; IEC62271-200; IEC62271-102; IEC62271-103; IEC62271-105; IEC62271-106; IEC62271-1; IEC61869-1; IEC61869-2; IEC 60529; IEC 61439-1; IEC 61439-2 | Medium voltage switchgear; Low voltage switchgear | to 5000 A |
| 3 | electrical | ISO/IEC 17025:2017; IEC 61439-1; IEC 61439-2; IEC 60529; IEC 61439-6 | Low voltage switchgear; Low voltage bus duct | to 950 GΩ |
| 4 | electrical | ISO/IEC 17025:2017; IEC 61439-6; IEC 61439-1; IEC62271-200; IEC62271-1; IEC60060-1; IEC 60529; IEC 60076-1; IEC 60076-3; IEC 60076-11; IEC 60076-2 | Low voltage bus duct; Medium voltage bus duct; Distribution and Power transformers - Oil filled; Distribution and Power transformers - Cast resin transformers | - |
| 5 | electrical | ISO/IEC 17025:2017; IEC 60076-1; IEC 60076-10; IEC 60076-18; IEC 60156; ASTM D3612-2; IEC 60567 | Oil filled transformers; Cast resin transformers; Transformer oil; Cable box | to 100 kV |
| 6 | electrical | IEC 60076-1; IEC 60529; IEC 60076-22-1; IEC 62271-202 | Distribution and Power transformers; prefabricated substation (UDS) | to 55 IP |
Ranges are reproduced from the accredited scope document as published. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.
Location
Other Locations
1 other site in this organization
Accreditation data refreshed from the UKAS register on .
This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the UKAS entry linked above.