DNV MARITIME AND ENERGY
C/ Santa María Magdalena 14, 28016, Madrid, Spain
Visit website- Accredited standards
- 9
- ENAC certificate
- 1
- Site in our directory
- 1
What this lab is accredited for
Our reading of the ENAC scope: each standard once, with its official name where we have checked it.
Only this lab. Searches the 9 standard numbers and the 0 official names we hold. When no standard matches, it searches the method text of every scope line.
IEC 61400-12-1
IEC 61400-12-2
IEC 61400-12-3
IEC 61400-12-5
IEC 61400-12-6
IEC 61400-21-1
IEC 61400-50-1
IEC 61400-50-2
IEC 61400-50-3
IEC 61400-12-1:2005; IEC 61400-12-1:2017; IEC 61400-12-1; IEC 61400-50-1; IEC 61400-50-2; Measnet: Power Performance Measurement Procedure; FGW: Technical Guideline for Power Generating Units. Part 2: Determination of Power Performance and Standardised Energy Yield
IEC 61400-12-2:2013; IEC 61400-12-2; IEC 61400-12-6; IEC 61400-12-1:2005; IEC 61400-12-1:2017; IEC 61400-12-5; IEC 61400-12-1:2005; IEC 61400-12-1:2017; IEC 61400-12-3; IEC 61400-21:2001; IEC 61400-21:2008; IEC 61400-21-1; FGW TR3 Rev. 24; FGW TR3 Rev. 25; FGW TR3; Measnet: Power Quality Measurement Procedure
UNE-EN 61400-12-1; IEC 61400-12-1; IEC 61400-50-3
Read from the scope as published by ENAC. Register refreshed 2026-10-10.
Scope as published by ENAC
7 lines
ISO/IEC 17025
Active896/LE1802
Accredited scope, certificate 896/LE1802
| Line | Method | Matrix | Range |
|---|---|---|---|
| 1 | IEC 61400-12-1:2005; IEC 61400-12-1:2017; IEC 61400-12-1; IEC 61400-50-1; IEC 61400-50-2; Measnet: Power Performance Measurement Procedure; FGW: Technical Guideline for Power Generating Units. Part 2: Determination of Power Performance and Standardised Energy Yield | Wind turbines | - |
| 2 | IEC 61400-12-2:2013; IEC 61400-12-2; IEC 61400-12-6; IEC 61400-12-1:2005; IEC 61400-12-1:2017; IEC 61400-12-5; IEC 61400-12-1:2005; IEC 61400-12-1:2017; IEC 61400-12-3; IEC 61400-21:2001; IEC 61400-21:2008; IEC 61400-21-1; FGW TR3 Rev. 24; FGW TR3 Rev. 25; FGW TR3; Measnet: Power Quality Measurement Procedure | wind turbines; FACTS | - |
| 3 | Reglamento UE 2016/631; P.O. 12.2 SENP | Aerogeneradores; Inversores solares; Generadores síncronos | to 10 MW |
| 4 | Reglamento UE 2016/631; P.O. 12.2 SENP | Módulos de generación eléctricos (MGE): Módulos de generación síncronos (MGES) | - |
| 5 | Reglamento UE 2016/631; P.O. 12.2 SENP | Módulos de generación eléctricos (MGE); Módulos de Parque Eléctrico (MPE) | - |
| 6 | Reglamento UE 2016/631; P.O. 12.2 SENP | Componentes adicionales de Módulos de Generación de Electricidad (CAMGE): Sistemas de almacenamiento con baterías, Compensadores síncronos y Power Plant Controllers (PPC) | to 10 MVA |
| 7 | UNE-EN 61400-12-1; IEC 61400-12-1; IEC 61400-50-3 | Power Generator Module (PGM): Synchronous power generator modules (SPGM) and Power Park Modules (PPM); Wind parameters | - |
Ranges are reproduced from the accredited scope document as published, and only where we found that range printed in the document for the line. Otherwise the cell reads “See scope document”. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.
Location
Labs with overlapping accredited scope in Spain
Accreditation data refreshed from the ENAC register on .
This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the ENAC entry linked above.