Registers refreshed 2026-11-20.See refresh dates
Spain

DNV MARITIME AND ENERGY

C/ Santa María Magdalena 14, 28016, Madrid, Spain

Visit website
ENAC 896/LE1802ISO/IEC 17025Register refreshed 46 days ago

We check which accredited labs can do it, starting with this one, and send you a short comparison of time and rough cost within three working days.

  • Free, no obligation.
Accredited standards
9
ENAC certificate
1
Site in our directory
1
ENAC accredited scope

What this lab is accredited for

Our reading of the ENAC scope: each standard once, with its official name where we have checked it.

Only this lab. Searches the 9 standard numbers and the 0 official names we hold. When no standard matches, it searches the method text of every scope line.

IEC 61400-12-1
IEC 61400-12-2
IEC 61400-12-3
IEC 61400-12-5
IEC 61400-12-6
IEC 61400-21-1
IEC 61400-50-1
IEC 61400-50-2
IEC 61400-50-3

Read from the scope as published by ENAC. Register refreshed 2026-10-10.

Scope as published by ENAC

7 lines
ENAC

ISO/IEC 17025

Active

896/LE1802

View scope

Accredited scope, certificate 896/LE1802

LineMethodMatrixRange
1IEC 61400-12-1:2005; IEC 61400-12-1:2017; IEC 61400-12-1; IEC 61400-50-1; IEC 61400-50-2; Measnet: Power Performance Measurement Procedure; FGW: Technical Guideline for Power Generating Units. Part 2: Determination of Power Performance and Standardised Energy YieldWind turbines-
2IEC 61400-12-2:2013; IEC 61400-12-2; IEC 61400-12-6; IEC 61400-12-1:2005; IEC 61400-12-1:2017; IEC 61400-12-5; IEC 61400-12-1:2005; IEC 61400-12-1:2017; IEC 61400-12-3; IEC 61400-21:2001; IEC 61400-21:2008; IEC 61400-21-1; FGW TR3 Rev. 24; FGW TR3 Rev. 25; FGW TR3; Measnet: Power Quality Measurement Procedurewind turbines; FACTS-
3Reglamento UE 2016/631; P.O. 12.2 SENPAerogeneradores; Inversores solares; Generadores síncronosto 10 MW
4Reglamento UE 2016/631; P.O. 12.2 SENPMódulos de generación eléctricos (MGE): Módulos de generación síncronos (MGES)-
5Reglamento UE 2016/631; P.O. 12.2 SENPMódulos de generación eléctricos (MGE); Módulos de Parque Eléctrico (MPE)-
6Reglamento UE 2016/631; P.O. 12.2 SENPComponentes adicionales de Módulos de Generación de Electricidad (CAMGE): Sistemas de almacenamiento con baterías, Compensadores síncronos y Power Plant Controllers (PPC)to 10 MVA
7UNE-EN 61400-12-1; IEC 61400-12-1; IEC 61400-50-3Power Generator Module (PGM): Synchronous power generator modules (SPGM) and Power Park Modules (PPM); Wind parameters-

Ranges are reproduced from the accredited scope document as published, and only where we found that range printed in the document for the line. Otherwise the cell reads “See scope document”. An absent range means the register did not state one. Line numbers are ours, for cross-reference; they follow the order of the scope document.

Location

C/ Santa María Magdalena 14, Madrid, 28016, ES

40.46229, -3.67003

Open in Maps

Accreditation data refreshed from the ENAC register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the ENAC entry linked above.