FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
United States

Element Materials Technology Portland - Evergreen

6775 NE Evergreen Parkway, Suite 400, 97124, Hillsboro, OR, United States

A2LA|3310.02A2LA|3310.01ISO/IEC 17025Register refreshed 2026-09-25
Certificates
2
Scope items
26
Standards
58
Locations
1

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at Element Materials Technology Portland - Evergreen?

Claim this profile to keep it accurate.

Register record

A2LARefreshed
3310.02Active
3310.01Active

Accredited standards

58

Our reading of the A2LA scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

IEC

IEC 60730-1Automatic electrical controls - Part 1: General requirements
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 60730-2-14Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 60945Maritime navigation and radiocommunication equipment and systems - General requirements - Methods of testing and required test results
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 61000-6-7Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 61000-6-8Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 61131-2Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 61131-6Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 61326-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 62040-1-2Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 62233Measurement methods for electromagnetic fields of household appliances and similar apparatus with regard to human exposure
As written on the certificate · Line 10 (A2LA 3310.02)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

As written on the certificate · Line 10 (A2LA 3310.01)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

IEC 62311Assessment of electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (0 Hz to 300 GHz)Certificate says EN 62311. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 10 (A2LA 3310.02)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

As written on the certificate · Line 10 (A2LA 3310.01)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

ETSI

ETSI EN 300 386Name not checked yet
As written on the certificate · Line 10 (A2LA 3310.02)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

As written on the certificate · Line 10 (A2LA 3310.01)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

ETSI EN 300 440Name not checked yet
As written on the certificate · Line 9 (A2LA 3310.02)

RRA Public Notification 2023-11; RRA Public Notification 2023-3; MSIT Public Notification 2023-18; MSIT Public Notification 2024-10; RRA Announce 2011-32; RRA Public Notification 2012-21; RRA Announce 2013-33; RRA Notice 2014-2; RRA Announce 2014-90; RRA Announce 2015-81; RRA Announce 2015-135; RRA Notice 2017-7; RRA Public Notification 2015-23; RRA Public Notification 2017-8; RRA Public Notification 2011-24; RRA Announce 2012-21; RRA 2013-3; RRA 2013-24; RRA 2014-8; RRA 2014-37; RRA Public Notification 2015-27; RRA Announce 2015-110; RRA Public Notification 2016-26; RRA Announce 2016-79; RRA Public Notification 2017-19; RRA Announce 2017-71; RRA Public Notification 2021-22; AS/NZS 2772.2; AS/NZS 4268; AS/NZS 4268:2017 + Amd 1: 2021 ETSI EN 300 440 V2.2.1 (2018-07); LP0002 (2024); IS2019 (2020); RTTE01 (2020); IMDA TS CMT (September 2020); IMDA TS CMT (December 2024); IMDA TS LMR Issue 1 (October 2016); IMDA TS SRD Issue 1, Rev. 3 (Sept 2023); IMDA TS UWB Issue 1 (October 2016); IMDA TS WBA Issue 1 (October 2016)

As written on the certificate · Line 9 (A2LA 3310.01)

RRA Public Notification 2023-11; RRA Public Notification 2023-3; MSIT Public Notification 2023-18; MSIT Public Notification 2024-10; RRA Announce 2011-32; RRA Public Notification 2012-21; RRA Announce 2013-33; RRA Notice 2014-2; RRA Announce 2014-90; RRA Announce 2015-81; RRA Announce 2015-135; RRA Notice 2017-7; RRA Public Notification 2015-23; RRA Public Notification 2017-8; RRA Public Notification 2011-24; RRA Announce 2012-21; RRA 2013-3; RRA 2013-24; RRA 2014-8; RRA 2014-37; RRA Public Notification 2015-27; RRA Announce 2015-110; RRA Public Notification 2016-26; RRA Announce 2016-79; RRA Public Notification 2017-19; RRA Announce 2017-71; RRA Public Notification 2021-22; AS/NZS 2772.2; AS/NZS 4268; AS/NZS 4268:2017 + Amd 1: 2021 ETSI EN 300 440 V2.2.1 (2018-07); LP0002 (2024); IS2019 (2020); RTTE01 (2020); IMDA TS CMT (September 2020); IMDA TS CMT (December 2024); IMDA TS LMR Issue 1 (October 2016); IMDA TS SRD Issue 1, Rev. 3 (Sept 2023); IMDA TS UWB Issue 1 (October 2016); IMDA TS WBA Issue 1 (October 2016)

ETSI EN 301 489-31Name not checked yet
As written on the certificate · Line 8 (A2LA 3310.02)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

As written on the certificate · Line 8 (A2LA 3310.01)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

ETSI EN 301 489-33Name not checked yet
As written on the certificate · Line 8 (A2LA 3310.02)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

As written on the certificate · Line 8 (A2LA 3310.01)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

ETSI EN 301 489-34Name not checked yet
As written on the certificate · Line 8 (A2LA 3310.02)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

As written on the certificate · Line 8 (A2LA 3310.01)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

ETSI EN 301 489-35Name not checked yet
As written on the certificate · Line 8 (A2LA 3310.02)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

As written on the certificate · Line 8 (A2LA 3310.01)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

ETSI EN 301 489-50Name not checked yet
As written on the certificate · Line 8 (A2LA 3310.02)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

As written on the certificate · Line 8 (A2LA 3310.01)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

ETSI EN 301 489-51Name not checked yet
As written on the certificate · Line 8 (A2LA 3310.02)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

As written on the certificate · Line 8 (A2LA 3310.01)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

ETSI EN 301 489-52Name not checked yet
As written on the certificate · Line 8 (A2LA 3310.02)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

As written on the certificate · Line 8 (A2LA 3310.01)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

ETSI EN 303 454Name not checked yet
As written on the certificate · Line 8 (A2LA 3310.02)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

As written on the certificate · Line 8 (A2LA 3310.01)

ETSI EN 301 489-31 V2.1.1 (2016-11); ETSI EN 301 489-31 V2.2.1 (2019-04); ETSI EN 301 489-33 V2.1.1 (2016-11); ETSI EN 301 489-34 V2.1.1 (2019-04); ETSI EN 301 489-35 V.2.1 (2016-12); ETSI EN 301 489-50 V2.1.1 (2017-02); ETSI EN 301 489-50 V2.3.1 (2021-03); ETSI EN 301 489-51 V2.1.1 (2019-04); ETSI EN 301 489-52 V1.2.1 (2021-11); ETSI EN 301 489-52 V1.3.1 (2024-11); ETSI EN 303 454 V1.1.1 (2018-01); HKCA 1002, Issue 6 (January 2008); HKCA 1007, Issue 5 (March 2012); HKCA 1008, Issue 4 (November 2013); HKCA 1010, Issue 1 (June 2003); HKCA 1015, Issue 4 (February 2003); HKCA 1020, Issue 7 (November 2011); HKCA 1033, Issue 7 (March 2012); HKCA 1034, Issue 3 (October 2009); HKCA 1035, Issue 7 (May 2016); HKCA 1039, Issue 6 (June 2015); HKCA 1039, Issue 7 (August 2024); HKCA 1041, Issue 1 (February 2003); HKCA 1042, Issue 2 (February 2003); HKCA 1043, Issue 4 (June 2008); HKCA 1044, Issue 1 (February 2003); HKCA 1046, Issue 3 (September 2008); HKCA 1048, Issue 2, (June 2008); HKCA 1049, Issue 1 (April 2005); HKCA 1050, Issue 1 (January 2006); HKCA 1052, Issue 4 (June 2022); HKCA 1081, Issue 1 (April 2022); KS X 3123; KS X 3124; KS X 3125; KS X 3126; KS X 3134; KS X 3270; KSX 3271; RRA Public Notification 2018-18, (Dec 7, 2018); Equipment to be Subject of Test Procedure for Electromagnetic Field Strength and Specific Absorption Rate (RRA Public Notification 2023-12, Jun 30, 2023); RRA Public Notification 2019-32, (Dec 31, 2019); Technical Requirements for the Human Protection against Electromagnetic Waves (MSIT Public Notification 2019-4, Jan 16, 2019); Regulations on Radio Equipment (Ordinance of MSIT No. 86, Jan 4, 2022)

EN

EN 12895Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

EN 50130-4Alarm systems - Part 4: Electromagnetic compatibility - Product family standard: Immunity requirements for components of fire, intruder, hold up, CCTV, access control and social alarm systems
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

EN 50270Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

EN 50293Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

EN 50364Name not checked yet
As written on the certificate · Line 10 (A2LA 3310.02)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

As written on the certificate · Line 10 (A2LA 3310.01)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

EN 50383Name not checked yet
As written on the certificate · Line 10 (A2LA 3310.02)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

As written on the certificate · Line 10 (A2LA 3310.01)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

EN 50566Name not checked yet
As written on the certificate · Line 10 (A2LA 3310.02)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

As written on the certificate · Line 10 (A2LA 3310.01)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

EN 50663Generic standard for assessment of low power electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (10 MHz - 300 GHz)
As written on the certificate · Line 10 (A2LA 3310.02)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

As written on the certificate · Line 10 (A2LA 3310.01)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

IEC 60601 series

IEC 60601-2-37Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 60601-2-47Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 60601-2-49Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 60601-2-50Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 60601-2-62Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ANSI

ANSI C63.4American National Standard for Methods of Measurement of Radio-Noise Emissions from Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz
As written on the certificate · Line 1 (A2LA 3310.02)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4-2014; CFR 47, FCC Part 18; FCC MP-5:1986; ICES-GEN (Issue 2,February 2024); ICES-001 (Issue 5, July 2020); ICES-002 (Issue 7, September 2020); ICES-003 (Issue 7, October 2020); ICES-004 (Issue 5, October, 2022); ICES-005 (Issue 5, December 2018); ICES-006 (Issue 3, July 2018); IEC/CISPR 11 Ed. 6.0 (2015) +A1 (2016); CISPR 11 Ed. 6.2 (2019); CISPR 11: 2015 A1:2016 A2:2019; IEC CISPR 11: 2024; IEC/CISPR 11 Ed. 4.1 (2004-06) +A2 (2006); IEC/CISPR 11 Ed. 5 (2009-05) +A1 (2010); IEC/CISPR 13 Ed. 5.0 (2009-06); CISPR 14-1:2020; CISPR 14-1 (2005) + A1 (2008) + A2 (2011); CISPR 14-1 (2016); IEC 55014-1:2021; CISPR 14-2 (2020); IEC/CISPR 15 (2018); CISPR 15 (2009); IEC 55015:2020; IEC/CISPR 22 Ed. 5 (2005) +A1(2005) +A2 (2006); IEC/CISPR 22 Ed. 6.0 (2008-09); CISPR 32 Ed. 2.1 (2015) + A1(2019); CISPR 32 Ed. 1 (2012-01); CISPR 16-2-1:2014; CISPR 16-2-1:2014+A1:2017; CISPR 16-2-2:2010; CISPR 16-2-3:2016; CISPR 16-2-3:2019; CISPR 36:2020; CISPR 36:2020+AMD1:2023; ISO/IEC 17025:2017

As written on the certificate · Line 1 (A2LA 3310.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4-2014; CFR 47, FCC Part 18; FCC MP-5:1986; ICES-GEN (Issue 2,February 2024); ICES-001 (Issue 5, July 2020); ICES-002 (Issue 7, September 2020); ICES-003 (Issue 7, October 2020); ICES-004 (Issue 5, October, 2022); ICES-005 (Issue 5, December 2018); ICES-006 (Issue 3, July 2018); IEC/CISPR 11 Ed. 6.0 (2015) +A1 (2016); CISPR 11 Ed. 6.2 (2019); CISPR 11: 2015 A1:2016 A2:2019; IEC CISPR 11: 2024; IEC/CISPR 11 Ed. 4.1 (2004-06) +A2 (2006); IEC/CISPR 11 Ed. 5 (2009-05) +A1 (2010); IEC/CISPR 13 Ed. 5.0 (2009-06); CISPR 14-1:2020; CISPR 14-1 (2005) + A1 (2008) + A2 (2011); CISPR 14-1 (2016); IEC 55014-1:2021; CISPR 14-2 (2020); IEC/CISPR 15 (2018); CISPR 15 (2009); IEC 55015:2020; IEC/CISPR 22 Ed. 5 (2005) +A1(2005) +A2 (2006); IEC/CISPR 22 Ed. 6.0 (2008-09); CISPR 32 Ed. 2.1 (2015) + A1(2019); CISPR 32 Ed. 1 (2012-01); CISPR 16-2-1:2014; CISPR 16-2-1:2014+A1:2017; CISPR 16-2-2:2010; CISPR 16-2-3:2016; CISPR 16-2-3:2019; CISPR 36:2020; CISPR 36:2020+AMD1:2023

ANSI C63.10Name not checked yet
As written on the certificate · Line 11 (A2LA 3310.02)

ANSI C63.10:2013; ANSI C63.10:2020; FCC KDB 905462 D02 (v02); ANSI/TIA-603-E; TIA-102.CAAA-E; ANSI C63.26:2015

As written on the certificate · Line 11 (A2LA 3310.01)

ANSI C63.10:2013; ANSI C63.10:2020; FCC KDB 905462 D02 (v02); ANSI/TIA-603-E; TIA-102.CAAA-E; ANSI C63.26:2015

ANSI C63.26Name not checked yet
As written on the certificate · Line 12 (A2LA 3310.02)

ANSI C63.26:2015; ANSI/TIA-603-E-2016; ANSI/TIA-102.CAAA-E-2016; ANSI C63.26-2015

As written on the certificate · Line 12 (A2LA 3310.01)

ANSI C63.26:2015; ANSI/TIA-603-E-2016; ANSI/TIA-102.CAAA-E-2016; ANSI C63.26-2015

CISPR

CISPR 14-1Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1: EmissionCertificate says IEC 55014-1. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 1 (A2LA 3310.02)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4-2014; CFR 47, FCC Part 18; FCC MP-5:1986; ICES-GEN (Issue 2,February 2024); ICES-001 (Issue 5, July 2020); ICES-002 (Issue 7, September 2020); ICES-003 (Issue 7, October 2020); ICES-004 (Issue 5, October, 2022); ICES-005 (Issue 5, December 2018); ICES-006 (Issue 3, July 2018); IEC/CISPR 11 Ed. 6.0 (2015) +A1 (2016); CISPR 11 Ed. 6.2 (2019); CISPR 11: 2015 A1:2016 A2:2019; IEC CISPR 11: 2024; IEC/CISPR 11 Ed. 4.1 (2004-06) +A2 (2006); IEC/CISPR 11 Ed. 5 (2009-05) +A1 (2010); IEC/CISPR 13 Ed. 5.0 (2009-06); CISPR 14-1:2020; CISPR 14-1 (2005) + A1 (2008) + A2 (2011); CISPR 14-1 (2016); IEC 55014-1:2021; CISPR 14-2 (2020); IEC/CISPR 15 (2018); CISPR 15 (2009); IEC 55015:2020; IEC/CISPR 22 Ed. 5 (2005) +A1(2005) +A2 (2006); IEC/CISPR 22 Ed. 6.0 (2008-09); CISPR 32 Ed. 2.1 (2015) + A1(2019); CISPR 32 Ed. 1 (2012-01); CISPR 16-2-1:2014; CISPR 16-2-1:2014+A1:2017; CISPR 16-2-2:2010; CISPR 16-2-3:2016; CISPR 16-2-3:2019; CISPR 36:2020; CISPR 36:2020+AMD1:2023; ISO/IEC 17025:2017

As written on the certificate · Line 1 (A2LA 3310.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4-2014; CFR 47, FCC Part 18; FCC MP-5:1986; ICES-GEN (Issue 2,February 2024); ICES-001 (Issue 5, July 2020); ICES-002 (Issue 7, September 2020); ICES-003 (Issue 7, October 2020); ICES-004 (Issue 5, October, 2022); ICES-005 (Issue 5, December 2018); ICES-006 (Issue 3, July 2018); IEC/CISPR 11 Ed. 6.0 (2015) +A1 (2016); CISPR 11 Ed. 6.2 (2019); CISPR 11: 2015 A1:2016 A2:2019; IEC CISPR 11: 2024; IEC/CISPR 11 Ed. 4.1 (2004-06) +A2 (2006); IEC/CISPR 11 Ed. 5 (2009-05) +A1 (2010); IEC/CISPR 13 Ed. 5.0 (2009-06); CISPR 14-1:2020; CISPR 14-1 (2005) + A1 (2008) + A2 (2011); CISPR 14-1 (2016); IEC 55014-1:2021; CISPR 14-2 (2020); IEC/CISPR 15 (2018); CISPR 15 (2009); IEC 55015:2020; IEC/CISPR 22 Ed. 5 (2005) +A1(2005) +A2 (2006); IEC/CISPR 22 Ed. 6.0 (2008-09); CISPR 32 Ed. 2.1 (2015) + A1(2019); CISPR 32 Ed. 1 (2012-01); CISPR 16-2-1:2014; CISPR 16-2-1:2014+A1:2017; CISPR 16-2-2:2010; CISPR 16-2-3:2016; CISPR 16-2-3:2019; CISPR 36:2020; CISPR 36:2020+AMD1:2023

CISPR 14-2Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 2: Immunity - Product family standardCertificate says EN 55014-2. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

CISPR 15Limits and methods of measurement of radio disturbance characteristics of electrical lighting and similar equipmentCertificate says IEC 55015. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 1 (A2LA 3310.02)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4-2014; CFR 47, FCC Part 18; FCC MP-5:1986; ICES-GEN (Issue 2,February 2024); ICES-001 (Issue 5, July 2020); ICES-002 (Issue 7, September 2020); ICES-003 (Issue 7, October 2020); ICES-004 (Issue 5, October, 2022); ICES-005 (Issue 5, December 2018); ICES-006 (Issue 3, July 2018); IEC/CISPR 11 Ed. 6.0 (2015) +A1 (2016); CISPR 11 Ed. 6.2 (2019); CISPR 11: 2015 A1:2016 A2:2019; IEC CISPR 11: 2024; IEC/CISPR 11 Ed. 4.1 (2004-06) +A2 (2006); IEC/CISPR 11 Ed. 5 (2009-05) +A1 (2010); IEC/CISPR 13 Ed. 5.0 (2009-06); CISPR 14-1:2020; CISPR 14-1 (2005) + A1 (2008) + A2 (2011); CISPR 14-1 (2016); IEC 55014-1:2021; CISPR 14-2 (2020); IEC/CISPR 15 (2018); CISPR 15 (2009); IEC 55015:2020; IEC/CISPR 22 Ed. 5 (2005) +A1(2005) +A2 (2006); IEC/CISPR 22 Ed. 6.0 (2008-09); CISPR 32 Ed. 2.1 (2015) + A1(2019); CISPR 32 Ed. 1 (2012-01); CISPR 16-2-1:2014; CISPR 16-2-1:2014+A1:2017; CISPR 16-2-2:2010; CISPR 16-2-3:2016; CISPR 16-2-3:2019; CISPR 36:2020; CISPR 36:2020+AMD1:2023; ISO/IEC 17025:2017

As written on the certificate · Line 1 (A2LA 3310.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4-2014; CFR 47, FCC Part 18; FCC MP-5:1986; ICES-GEN (Issue 2,February 2024); ICES-001 (Issue 5, July 2020); ICES-002 (Issue 7, September 2020); ICES-003 (Issue 7, October 2020); ICES-004 (Issue 5, October, 2022); ICES-005 (Issue 5, December 2018); ICES-006 (Issue 3, July 2018); IEC/CISPR 11 Ed. 6.0 (2015) +A1 (2016); CISPR 11 Ed. 6.2 (2019); CISPR 11: 2015 A1:2016 A2:2019; IEC CISPR 11: 2024; IEC/CISPR 11 Ed. 4.1 (2004-06) +A2 (2006); IEC/CISPR 11 Ed. 5 (2009-05) +A1 (2010); IEC/CISPR 13 Ed. 5.0 (2009-06); CISPR 14-1:2020; CISPR 14-1 (2005) + A1 (2008) + A2 (2011); CISPR 14-1 (2016); IEC 55014-1:2021; CISPR 14-2 (2020); IEC/CISPR 15 (2018); CISPR 15 (2009); IEC 55015:2020; IEC/CISPR 22 Ed. 5 (2005) +A1(2005) +A2 (2006); IEC/CISPR 22 Ed. 6.0 (2008-09); CISPR 32 Ed. 2.1 (2015) + A1(2019); CISPR 32 Ed. 1 (2012-01); CISPR 16-2-1:2014; CISPR 16-2-1:2014+A1:2017; CISPR 16-2-2:2010; CISPR 16-2-3:2016; CISPR 16-2-3:2019; CISPR 36:2020; CISPR 36:2020+AMD1:2023

IEC 80601 series

IEC 80601-2-30Medical electrical equipment - Part 2-30: Particular requirements for the basic safety and essential performance of automated non-invasive sphygmomanometers
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 80601-2-49Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

IEC 80601-2-58Name not checked yet
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO

ISO 9919Medical electrical equipment - Particular requirements for the basic safety and essential performance of pulse oximeter equipment for medical use
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO 10605Road vehicles - Test methods for electrical disturbances from electrostatic discharge
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO 14117Active implantable medical devices - Electromagnetic compatibility - EMC test protocols for implantable cardiac pacemakers, implantable cardioverter defibrillators and cardiac resynchronization devices
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO 14708 series

ISO 14708-1Implants for surgery - Active implantable medical devices - Part 1: General requirements for safety, marking and for information to be provided by the manufacturer
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO 14708-3Implants for surgery - Active implantable medical devices - Part 3: Implantable neurostimulators
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO 14708-4Implants for surgery - Active implantable medical devices - Part 4: Implantable infusion pump systems
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO 7637 series

ISO 7637-1Road vehicles - Electrical disturbances from conduction and coupling - Part 1: Vocabulary and general considerations
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO 7637-2Road vehicles - Electrical disturbances from conduction and coupling - Part 2: Electrical transient conduction along supply lines only
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO 7637-3Road vehicles - Electrical disturbances from conduction and coupling - Part 3: Electrical transient transmission by capacitive and inductive coupling via lines other than supply lines
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO 80601 series

ISO 80601-2-55Medical electrical equipment - Part 2-55: Particular requirements for the basic safety and essential performance of respiratory gas monitors
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO 80601-2-56Medical electrical equipment - Part 2-56: Particular requirements for basic safety and essential performance of clinical thermometers for body temperature measurement
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

ISO 80601-2-61Medical electrical equipment - Part 2-61: Particular requirements for basic safety and essential performance of pulse oximeter equipment
As written on the certificate · Line 5 (A2LA 3310.02)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-1:2016; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; MIL-STD-461F; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

As written on the certificate · Line 5 (A2LA 3310.01)

EN 60601-2-37; IEC 60601-2-47; IEC 60601-2-49; EN 60601-2-49; IEC 80601-2-49; IEC 60601-2-50; ISO 80601-2-55; ISO 80601-2-56; ISO 80601-2-61; IEC 80601-2-58:2024; IEC 80601-2-30; EN 80601-2-30; ANSI/AAMI/IEC 80601-2-30; ISO 80601-2-61; IEC 60601-2-62:2013; ISO 9919; ISO 14117; ISO 14708-1; ISO 14708-3; ISO 14708-4; EN 60945; IEC 60945; IEC 61000-6-7; IEC 61000-6-8; EN 50293:2012; EN 50270:2015; EN 61131-2; IEC 61131-2; IEC 61131-6; EN 61131-6; IEC 61326-1; EN 61326-1; EN IEC 61326-1; Lloyd's Register - LR Type; Approval System Test Specification 1; EN 50130-4; EN 55014-2; IEC 60730-1; EN 60730-1; EN 60730-2-14:2019; IEC 62040-1-2; EN 12895:2015; MIL-STD-461D; MIL-STD-461E-G; MIL-STD-461G; RTCA/DO-160; CISPR 25; ISO 10605; ISO 7637-1; ISO 7637-2; ISO 7637-3

Other standards

AS/NZS 2772.2Name not checked yet
As written on the certificate · Line 9 (A2LA 3310.02)

RRA Public Notification 2023-11; RRA Public Notification 2023-3; MSIT Public Notification 2023-18; MSIT Public Notification 2024-10; RRA Announce 2011-32; RRA Public Notification 2012-21; RRA Announce 2013-33; RRA Notice 2014-2; RRA Announce 2014-90; RRA Announce 2015-81; RRA Announce 2015-135; RRA Notice 2017-7; RRA Public Notification 2015-23; RRA Public Notification 2017-8; RRA Public Notification 2011-24; RRA Announce 2012-21; RRA 2013-3; RRA 2013-24; RRA 2014-8; RRA 2014-37; RRA Public Notification 2015-27; RRA Announce 2015-110; RRA Public Notification 2016-26; RRA Announce 2016-79; RRA Public Notification 2017-19; RRA Announce 2017-71; RRA Public Notification 2021-22; AS/NZS 2772.2; AS/NZS 4268; AS/NZS 4268:2017 + Amd 1: 2021 ETSI EN 300 440 V2.2.1 (2018-07); LP0002 (2024); IS2019 (2020); RTTE01 (2020); IMDA TS CMT (September 2020); IMDA TS CMT (December 2024); IMDA TS LMR Issue 1 (October 2016); IMDA TS SRD Issue 1, Rev. 3 (Sept 2023); IMDA TS UWB Issue 1 (October 2016); IMDA TS WBA Issue 1 (October 2016)

As written on the certificate · Line 9 (A2LA 3310.01)

RRA Public Notification 2023-11; RRA Public Notification 2023-3; MSIT Public Notification 2023-18; MSIT Public Notification 2024-10; RRA Announce 2011-32; RRA Public Notification 2012-21; RRA Announce 2013-33; RRA Notice 2014-2; RRA Announce 2014-90; RRA Announce 2015-81; RRA Announce 2015-135; RRA Notice 2017-7; RRA Public Notification 2015-23; RRA Public Notification 2017-8; RRA Public Notification 2011-24; RRA Announce 2012-21; RRA 2013-3; RRA 2013-24; RRA 2014-8; RRA 2014-37; RRA Public Notification 2015-27; RRA Announce 2015-110; RRA Public Notification 2016-26; RRA Announce 2016-79; RRA Public Notification 2017-19; RRA Announce 2017-71; RRA Public Notification 2021-22; AS/NZS 2772.2; AS/NZS 4268; AS/NZS 4268:2017 + Amd 1: 2021 ETSI EN 300 440 V2.2.1 (2018-07); LP0002 (2024); IS2019 (2020); RTTE01 (2020); IMDA TS CMT (September 2020); IMDA TS CMT (December 2024); IMDA TS LMR Issue 1 (October 2016); IMDA TS SRD Issue 1, Rev. 3 (Sept 2023); IMDA TS UWB Issue 1 (October 2016); IMDA TS WBA Issue 1 (October 2016)

FCC PART 15Radio Frequency Devices
As written on the certificate · Line 1 (A2LA 3310.02)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4-2014; CFR 47, FCC Part 18; FCC MP-5:1986; ICES-GEN (Issue 2,February 2024); ICES-001 (Issue 5, July 2020); ICES-002 (Issue 7, September 2020); ICES-003 (Issue 7, October 2020); ICES-004 (Issue 5, October, 2022); ICES-005 (Issue 5, December 2018); ICES-006 (Issue 3, July 2018); IEC/CISPR 11 Ed. 6.0 (2015) +A1 (2016); CISPR 11 Ed. 6.2 (2019); CISPR 11: 2015 A1:2016 A2:2019; IEC CISPR 11: 2024; IEC/CISPR 11 Ed. 4.1 (2004-06) +A2 (2006); IEC/CISPR 11 Ed. 5 (2009-05) +A1 (2010); IEC/CISPR 13 Ed. 5.0 (2009-06); CISPR 14-1:2020; CISPR 14-1 (2005) + A1 (2008) + A2 (2011); CISPR 14-1 (2016); IEC 55014-1:2021; CISPR 14-2 (2020); IEC/CISPR 15 (2018); CISPR 15 (2009); IEC 55015:2020; IEC/CISPR 22 Ed. 5 (2005) +A1(2005) +A2 (2006); IEC/CISPR 22 Ed. 6.0 (2008-09); CISPR 32 Ed. 2.1 (2015) + A1(2019); CISPR 32 Ed. 1 (2012-01); CISPR 16-2-1:2014; CISPR 16-2-1:2014+A1:2017; CISPR 16-2-2:2010; CISPR 16-2-3:2016; CISPR 16-2-3:2019; CISPR 36:2020; CISPR 36:2020+AMD1:2023; ISO/IEC 17025:2017

As written on the certificate · Line 1 (A2LA 3310.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4-2014; CFR 47, FCC Part 18; FCC MP-5:1986; ICES-GEN (Issue 2,February 2024); ICES-001 (Issue 5, July 2020); ICES-002 (Issue 7, September 2020); ICES-003 (Issue 7, October 2020); ICES-004 (Issue 5, October, 2022); ICES-005 (Issue 5, December 2018); ICES-006 (Issue 3, July 2018); IEC/CISPR 11 Ed. 6.0 (2015) +A1 (2016); CISPR 11 Ed. 6.2 (2019); CISPR 11: 2015 A1:2016 A2:2019; IEC CISPR 11: 2024; IEC/CISPR 11 Ed. 4.1 (2004-06) +A2 (2006); IEC/CISPR 11 Ed. 5 (2009-05) +A1 (2010); IEC/CISPR 13 Ed. 5.0 (2009-06); CISPR 14-1:2020; CISPR 14-1 (2005) + A1 (2008) + A2 (2011); CISPR 14-1 (2016); IEC 55014-1:2021; CISPR 14-2 (2020); IEC/CISPR 15 (2018); CISPR 15 (2009); IEC 55015:2020; IEC/CISPR 22 Ed. 5 (2005) +A1(2005) +A2 (2006); IEC/CISPR 22 Ed. 6.0 (2008-09); CISPR 32 Ed. 2.1 (2015) + A1(2019); CISPR 32 Ed. 1 (2012-01); CISPR 16-2-1:2014; CISPR 16-2-1:2014+A1:2017; CISPR 16-2-2:2010; CISPR 16-2-3:2016; CISPR 16-2-3:2019; CISPR 36:2020; CISPR 36:2020+AMD1:2023

RSS-102Name not checked yet
As written on the certificate · Line 10 (A2LA 3310.02)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

As written on the certificate · Line 10 (A2LA 3310.01)

EN 300 386; EN 300 386 V2.2.0:2020; EN 300 386 V2.2.1 (2022-09); AS/CA S042.4:2022; AS/CA S042.5:2022; AS/CA S042.1:2022; RSS-102; RSS-102.NS.MEAS; IEEE Std C95.3:2021; EN 50364 (2018); EN 50383 (2010); EN 50566: 2017 A1 2023 v2.01; EN 50663 (2017); EN 62233 (2008); EN IEC 62311 (2020); EN 62311 (2008); OET Bulletin 65, Edition 97-01; ARPANSA RPS S-1 Rev 1; AS/NZS 2772.2:2016 +A1:2018; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; ANSI C63.10:2020; ANSI C63.17:2013

Scope as published by A2LA

26 lines
A2LA

ISO/IEC 17025

Active

3310.02

The scope document we hold says it is valid until 2027-06-30.

View scope
A2LA

ISO/IEC 17025

Active

3310.01

The scope document we hold says it is valid until 2027-06-30.

View scope

Location

6775 NE Evergreen Parkway, Suite 400, Hillsboro, OR, 97124, US

45.52289, -122.98983

Open in Maps

Accreditation data refreshed from the A2LA register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the A2LA entry linked above.