FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
India

TUV Rheinland (India) Pvt.

27/B, 2nd Cross, Electronics City Phase 1, Bengaluru, 560100, India, Bengaluru, India

A2LA|4271.01ISO/IEC 17025Register refreshed 2026-09-25
Certificates
1
Scope items
15
Standards
28
Locations
1

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at TUV Rheinland (India) Pvt.?

Claim this profile to keep it accurate.

Register record

A2LARefreshed
4271.01Active

Accredited standards

28

Our reading of the A2LA scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

IEC 61000 series

IEC 61000-3-2Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current ≤ 16 A per phase)
As written on the certificate · Line 6 (A2LA 4271.01)

IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3

As written on the certificate · Line 9 (A2LA 4271.01)

CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11

As written on the certificate · Line 12 (A2LA 4271.01)

IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

IEC 61000-3-3Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤ 16 A per phase and not subject to conditional connection
As written on the certificate · Line 6 (A2LA 4271.01)

IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3

As written on the certificate · Line 9 (A2LA 4271.01)

CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11

As written on the certificate · Line 12 (A2LA 4271.01)

IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

IEC 61000-3-11Electromagnetic compatibility (EMC) - Part 3-11: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems - Equipment with rated current ≤ 75 A and subject to conditional connection
As written on the certificate · Line 7 (A2LA 4271.01)

IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11; IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

As written on the certificate · Line 9 (A2LA 4271.01)

CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11

IEC 61000-3-12Electromagnetic compatibility (EMC) - Part 3-12: Limits - Limits for harmonic currents produced by equipment connected to public low-voltage systems with input current >16 A and ≤ 75 A per phaseCertificate says EN 61000-3-12. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 7 (A2LA 4271.01)

IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11; IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

As written on the certificate · Line 10 (A2LA 4271.01)

IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12:2011; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8; IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11

IEC 61000-4-2Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
As written on the certificate · Line 7 (A2LA 4271.01)

IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11; IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

As written on the certificate · Line 10 (A2LA 4271.01)

IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12:2011; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8; IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11

As written on the certificate · Line 12 (A2LA 4271.01)

IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

IEC 61000-4-3Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity testCertificate says EN 61000-4-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 7 (A2LA 4271.01)

IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11; IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

As written on the certificate · Line 10 (A2LA 4271.01)

IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12:2011; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8; IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11

As written on the certificate · Line 12 (A2LA 4271.01)

IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

IEC 61000-4-4Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
As written on the certificate · Line 7 (A2LA 4271.01)

IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11; IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

As written on the certificate · Line 10 (A2LA 4271.01)

IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12:2011; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8; IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11

As written on the certificate · Line 12 (A2LA 4271.01)

IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

IEC 61000-4-5Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test
As written on the certificate · Line 7 (A2LA 4271.01)

IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11; IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

As written on the certificate · Line 10 (A2LA 4271.01)

IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12:2011; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8; IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11

As written on the certificate · Line 12 (A2LA 4271.01)

IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

IEC 61000-4-6Electromagnetic compatibility (EMC) - Part 4-6: Testing and measurement techniques - Immunity to conducted disturbances, induced by radio-frequency fields
As written on the certificate · Line 7 (A2LA 4271.01)

IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11; IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

As written on the certificate · Line 10 (A2LA 4271.01)

IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12:2011; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8; IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11

As written on the certificate · Line 12 (A2LA 4271.01)

IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

IEC 61000-4-8Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
As written on the certificate · Line 7 (A2LA 4271.01)

IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11; IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

As written on the certificate · Line 10 (A2LA 4271.01)

IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12:2011; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8; IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11

As written on the certificate · Line 12 (A2LA 4271.01)

IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8

IEC 61000-4-11Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests for equipment with input current up to 16 A per phase
As written on the certificate · Line 8 (A2LA 4271.01)

IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11; IEC 61000-4-39:2017; IEC 61000-4-39; EN 61000-4-39:2017; EN 61000-4-39; ISO 7637-2:2011; ISO 7637-2; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1

As written on the certificate · Line 10 (A2LA 4271.01)

IEC 61000-3-12:2011+A1:2021; EN 61000-3-12:2011+A1:2024; IEC 61000-3-12:2011; EN 61000-3-12; IEC 61000-4-2:2008; EN 61000-4-2:2009; IEC 61000-4-2; EN 61000-4-2; IEC 61000-4-3:2020; EN IEC 61000-4-3:2020; IEC 61000-4-3; EN IEC 61000-4-3; IEC 61000-4-4:2012; EN 61000-4-4:2012; IEC 61000-4-4; EN 61000-4-4; IEC 61000-4-5:2014+A1:2017; EN 61000-4-5:2014+A1:2017; IEC 61000-4-5; EN 61000-4-5; IEC 61000-4-6:2023; EN IEC 61000-4-6:2023; IEC 61000-4-6; EN IEC 61000-4-6; IEC 61000-4-8:2009; EN 61000-4-8:2010; IEC 61000-4-8; EN 61000-4-8; IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11

As written on the certificate · Line 13 (A2LA 4271.01)

IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11; ISO 7637-2:2011; ISO 7637-2; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2020; ANSI C63.17:2013

IEC 61000-4-39Electromagnetic compatibility (EMC) - Part 4-39: Testing and measurement techniques - Radiated fields in close proximity - Immunity test
As written on the certificate · Line 8 (A2LA 4271.01)

IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11; IEC 61000-4-39:2017; IEC 61000-4-39; EN 61000-4-39:2017; EN 61000-4-39; ISO 7637-2:2011; ISO 7637-2; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1

IEC

IEC 60601-1-2Medical electrical equipment - Part 1-2: General requirements for basic safety and essential performance - Collateral Standard: Electromagnetic disturbances - Requirements and tests
As written on the certificate · Line 5 (A2LA 4271.01)

IEC 61010-2-081; EN IEC 61010-2-081; IEC 61010-2-010; EN IEC 61010-2-010; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); CFR 47, FCC Part 15, Subpart C (using ANSI C63.10:2020); CFR 47, FCC Part 15, Subpart E (using ANSI C63.10:2020); CFR 47, FCC Parts 22 (cellular), 24, 25 (below 3 GHz), 27 (using ANSI/TIA-603-E, ANSI/TIA-102.CAAA-E, and/or ANSI C63.26:2015); CFR 47, FCC Parts 22 (non-cellular), 90 (below 3 GHz), 95, 97, and 101 (below 3 GHz) (using ANSI/TIA-603-E, ANSI/TIA-102.CAAA-E, and/or ANSI C63.26:2015); CFR 47, FCC Part 95 (MBAN) (using ANSI C63.26:2015); RSS-GEN; RSS-119; RSS-130; RSS-132; RSS-133; RSS-139; RSS-170; RSS-199; RSS-210 (up to 40 GHz); RSS-213; RSS-247 (with and without DFS); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2

As written on the certificate · Line 8 (A2LA 4271.01)

IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11; IEC 61000-4-39:2017; IEC 61000-4-39; EN 61000-4-39:2017; EN 61000-4-39; ISO 7637-2:2011; ISO 7637-2; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1

As written on the certificate · Line 11 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035

IEC 61010-2-010Name not checked yet
As written on the certificate · Line 5 (A2LA 4271.01)

IEC 61010-2-081; EN IEC 61010-2-081; IEC 61010-2-010; EN IEC 61010-2-010; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); CFR 47, FCC Part 15, Subpart C (using ANSI C63.10:2020); CFR 47, FCC Part 15, Subpart E (using ANSI C63.10:2020); CFR 47, FCC Parts 22 (cellular), 24, 25 (below 3 GHz), 27 (using ANSI/TIA-603-E, ANSI/TIA-102.CAAA-E, and/or ANSI C63.26:2015); CFR 47, FCC Parts 22 (non-cellular), 90 (below 3 GHz), 95, 97, and 101 (below 3 GHz) (using ANSI/TIA-603-E, ANSI/TIA-102.CAAA-E, and/or ANSI C63.26:2015); CFR 47, FCC Part 95 (MBAN) (using ANSI C63.26:2015); RSS-GEN; RSS-119; RSS-130; RSS-132; RSS-133; RSS-139; RSS-170; RSS-199; RSS-210 (up to 40 GHz); RSS-213; RSS-247 (with and without DFS); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2

IEC 61010-2-081Name not checked yet
As written on the certificate · Line 5 (A2LA 4271.01)

IEC 61010-2-081; EN IEC 61010-2-081; IEC 61010-2-010; EN IEC 61010-2-010; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); CFR 47, FCC Part 15, Subpart C (using ANSI C63.10:2020); CFR 47, FCC Part 15, Subpart E (using ANSI C63.10:2020); CFR 47, FCC Parts 22 (cellular), 24, 25 (below 3 GHz), 27 (using ANSI/TIA-603-E, ANSI/TIA-102.CAAA-E, and/or ANSI C63.26:2015); CFR 47, FCC Parts 22 (non-cellular), 90 (below 3 GHz), 95, 97, and 101 (below 3 GHz) (using ANSI/TIA-603-E, ANSI/TIA-102.CAAA-E, and/or ANSI C63.26:2015); CFR 47, FCC Part 95 (MBAN) (using ANSI C63.26:2015); RSS-GEN; RSS-119; RSS-130; RSS-132; RSS-133; RSS-139; RSS-170; RSS-199; RSS-210 (up to 40 GHz); RSS-213; RSS-247 (with and without DFS); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2

IEC 61326-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
As written on the certificate · Line 6 (A2LA 4271.01)

IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3

As written on the certificate · Line 8 (A2LA 4271.01)

IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11; IEC 61000-4-39:2017; IEC 61000-4-39; EN 61000-4-39:2017; EN 61000-4-39; ISO 7637-2:2011; ISO 7637-2; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1

As written on the certificate · Line 11 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035

IEC 61326-2-6Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-6: Particular requirements - In vitro diagnostic (IVD) medical electrical equipment
As written on the certificate · Line 6 (A2LA 4271.01)

IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3

As written on the certificate · Line 8 (A2LA 4271.01)

IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11; IEC 61000-4-39:2017; IEC 61000-4-39; EN 61000-4-39:2017; EN 61000-4-39; ISO 7637-2:2011; ISO 7637-2; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1

As written on the certificate · Line 11 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035

IEC 62209-1Name not checked yet
As written on the certificate · Line 1 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3; IEEE Std. 1528:2013; BS EN 62209-1; IEC 62209-1; BS EN 62209-2; IEC 62209-2; RSS-102; RSS-102.SAR.MEAS; IEEE Std C95.3; IEC/IEEE 62209-1528; CFR 47, FCC Part 15, Subpart C; ANSI C63.10:2020; CFR 47, FCC Part 15, Subpart E; FCC KDB 905462 D02 (v02); CFR 47, FCC Part 15, Subpart D; ANSI C63.17:2013; CFR 47, FCC Parts 22; CFR 47, FCC Parts 24; CFR 47, FCC Parts 25; CFR 47, FCC Parts 27; ANSI/TIA-603-E; ANSI/TIA-102.CAAA-E; ANSI C63.26:2015; CFR 47, FCC Parts 90; CFR 47, FCC Parts 95; CFR 47, FCC Parts 97; CFR 47, FCC Parts 101

IEC 62209-2Name not checked yet
As written on the certificate · Line 1 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3; IEEE Std. 1528:2013; BS EN 62209-1; IEC 62209-1; BS EN 62209-2; IEC 62209-2; RSS-102; RSS-102.SAR.MEAS; IEEE Std C95.3; IEC/IEEE 62209-1528; CFR 47, FCC Part 15, Subpart C; ANSI C63.10:2020; CFR 47, FCC Part 15, Subpart E; FCC KDB 905462 D02 (v02); CFR 47, FCC Part 15, Subpart D; ANSI C63.17:2013; CFR 47, FCC Parts 22; CFR 47, FCC Parts 24; CFR 47, FCC Parts 25; CFR 47, FCC Parts 27; ANSI/TIA-603-E; ANSI/TIA-102.CAAA-E; ANSI C63.26:2015; CFR 47, FCC Parts 90; CFR 47, FCC Parts 95; CFR 47, FCC Parts 97; CFR 47, FCC Parts 101

CISPR

CISPR 11Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurementCertificate says EN 55011. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 6 (A2LA 4271.01)

IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3

As written on the certificate · Line 9 (A2LA 4271.01)

CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11

As written on the certificate · Line 11 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035

CISPR 14-1Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1: EmissionCertificate says IEC 55014-1. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 6 (A2LA 4271.01)

IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3

As written on the certificate · Line 9 (A2LA 4271.01)

CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11

As written on the certificate · Line 11 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035

CISPR 32Electromagnetic compatibility of multimedia equipment - Emission requirementsCertificate says EN 55032. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 6 (A2LA 4271.01)

IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3

As written on the certificate · Line 9 (A2LA 4271.01)

CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11

As written on the certificate · Line 11 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035

CISPR 35Electromagnetic compatibility of multimedia equipment - Immunity requirementsCertificate says EN 55035. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 6 (A2LA 4271.01)

IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3

As written on the certificate · Line 9 (A2LA 4271.01)

CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035; IEC 61000-3-2:2018+A1:2020+A2:2024; EN IEC 61000-3-2:2019+A1:2021; IEC 61000-3-2; EN IEC 61000-3-2; IEC 61000-3-3:2013+A1:2017+A2:2021; EN 61000-3-3:2013+A2:2021+AC:2022; IEC 61000-3-3; EN 61000-3-3; IEC 61000-3-11:2017; EN IEC 61000-3-11:2019; IEC 61000-3-11; EN IEC 61000-3-11

As written on the certificate · Line 11 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035

Other standards

ANSI C63.4American National Standard for Methods of Measurement of Radio-Noise Emissions from Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz
As written on the certificate · Line 1 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3; IEEE Std. 1528:2013; BS EN 62209-1; IEC 62209-1; BS EN 62209-2; IEC 62209-2; RSS-102; RSS-102.SAR.MEAS; IEEE Std C95.3; IEC/IEEE 62209-1528; CFR 47, FCC Part 15, Subpart C; ANSI C63.10:2020; CFR 47, FCC Part 15, Subpart E; FCC KDB 905462 D02 (v02); CFR 47, FCC Part 15, Subpart D; ANSI C63.17:2013; CFR 47, FCC Parts 22; CFR 47, FCC Parts 24; CFR 47, FCC Parts 25; CFR 47, FCC Parts 27; ANSI/TIA-603-E; ANSI/TIA-102.CAAA-E; ANSI C63.26:2015; CFR 47, FCC Parts 90; CFR 47, FCC Parts 95; CFR 47, FCC Parts 97; CFR 47, FCC Parts 101

FCC KDB 905462 D02 (v02)Name not checked yet
As written on the certificate · Line 14 (A2LA 4271.01)

FCC KDB 905462 D02 (v02); ANSI/TIA-603-E; ANSI/TIA-102.CAAA-E; ANSI C63.26:2015; IEEE Std 1528:2013

FCC PART 15Radio Frequency Devices
As written on the certificate · Line 1 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3; IEEE Std. 1528:2013; BS EN 62209-1; IEC 62209-1; BS EN 62209-2; IEC 62209-2; RSS-102; RSS-102.SAR.MEAS; IEEE Std C95.3; IEC/IEEE 62209-1528; CFR 47, FCC Part 15, Subpart C; ANSI C63.10:2020; CFR 47, FCC Part 15, Subpart E; FCC KDB 905462 D02 (v02); CFR 47, FCC Part 15, Subpart D; ANSI C63.17:2013; CFR 47, FCC Parts 22; CFR 47, FCC Parts 24; CFR 47, FCC Parts 25; CFR 47, FCC Parts 27; ANSI/TIA-603-E; ANSI/TIA-102.CAAA-E; ANSI C63.26:2015; CFR 47, FCC Parts 90; CFR 47, FCC Parts 95; CFR 47, FCC Parts 97; CFR 47, FCC Parts 101

As written on the certificate · Line 5 (A2LA 4271.01)

IEC 61010-2-081; EN IEC 61010-2-081; IEC 61010-2-010; EN IEC 61010-2-010; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); CFR 47, FCC Part 15, Subpart C (using ANSI C63.10:2020); CFR 47, FCC Part 15, Subpart E (using ANSI C63.10:2020); CFR 47, FCC Parts 22 (cellular), 24, 25 (below 3 GHz), 27 (using ANSI/TIA-603-E, ANSI/TIA-102.CAAA-E, and/or ANSI C63.26:2015); CFR 47, FCC Parts 22 (non-cellular), 90 (below 3 GHz), 95, 97, and 101 (below 3 GHz) (using ANSI/TIA-603-E, ANSI/TIA-102.CAAA-E, and/or ANSI C63.26:2015); CFR 47, FCC Part 95 (MBAN) (using ANSI C63.26:2015); RSS-GEN; RSS-119; RSS-130; RSS-132; RSS-133; RSS-139; RSS-170; RSS-199; RSS-210 (up to 40 GHz); RSS-213; RSS-247 (with and without DFS); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2

As written on the certificate · Line 8 (A2LA 4271.01)

IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11; IEC 61000-4-39:2017; IEC 61000-4-39; EN 61000-4-39:2017; EN 61000-4-39; ISO 7637-2:2011; ISO 7637-2; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1

As written on the certificate · Line 11 (A2LA 4271.01)

CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1; CISPR 11:2015+A1:2016+A2:2019; EN 55011:2016+A11:2020; CISPR 11; EN 55011; CISPR 14-1:2020; EN IEC 55014-1:2021; CISPR 14-1; EN IEC 55014-1; CISPR 32:2015+AMD1:2019; EN 55032:2015+A1:2020; CISPR 32; EN 55032; CISPR 35; EN 55035

ISO 7637-2Road vehicles - Electrical disturbances from conduction and coupling - Part 2: Electrical transient conduction along supply lines only
As written on the certificate · Line 8 (A2LA 4271.01)

IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11; IEC 61000-4-39:2017; IEC 61000-4-39; EN 61000-4-39:2017; EN 61000-4-39; ISO 7637-2:2011; ISO 7637-2; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2; IEC 61326-2-6:2020; IEC 61326-2-6; EN IEC 61326-2-6:2021; EN IEC 61326-2-6; IEC 61326-1:2020; IEC 61326-1; EN IEC 61326-1:2021; EN IEC 61326-1

As written on the certificate · Line 13 (A2LA 4271.01)

IEC 61000-4-11:2020; EN 61000-4-11:2020; IEC 61000-4-11; EN 61000-4-11; ISO 7637-2:2011; ISO 7637-2; ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2020; ANSI C63.17:2013

RSS-GENName not checked yet
As written on the certificate · Line 5 (A2LA 4271.01)

IEC 61010-2-081; EN IEC 61010-2-081; IEC 61010-2-010; EN IEC 61010-2-010; CFR 47, FCC Part 15, Subpart B (using ANSI C63.4:2014); CFR 47, FCC Part 18 (using MP-5:1986); ICES-003 Issue 7:2020; ICES 001 Issue 5:2020; VCCI V-3 (up to 6 GHz); CFR 47, FCC Part 15, Subpart C (using ANSI C63.10:2020); CFR 47, FCC Part 15, Subpart E (using ANSI C63.10:2020); CFR 47, FCC Parts 22 (cellular), 24, 25 (below 3 GHz), 27 (using ANSI/TIA-603-E, ANSI/TIA-102.CAAA-E, and/or ANSI C63.26:2015); CFR 47, FCC Parts 22 (non-cellular), 90 (below 3 GHz), 95, 97, and 101 (below 3 GHz) (using ANSI/TIA-603-E, ANSI/TIA-102.CAAA-E, and/or ANSI C63.26:2015); CFR 47, FCC Part 95 (MBAN) (using ANSI C63.26:2015); RSS-GEN; RSS-119; RSS-130; RSS-132; RSS-133; RSS-139; RSS-170; RSS-199; RSS-210 (up to 40 GHz); RSS-213; RSS-247 (with and without DFS); IEC 60601-1-2:2014; IEC 60601-1-2:2014+A1:2020; EN 60601-1-2:2015; EN 60601-1-2:2015+A1:2021; ANSI/AAMI/IEC 60601-1-2:2014; ANSI/AAMI/IEC 60601-1-2:2014+A1:2021; IEC 60601-1-2; EN 60601-1-2; ANSI/AAMI/IEC 60601-1-2

Scope as published by A2LA

15 lines
A2LA

ISO/IEC 17025

Active

4271.01

The scope document we hold says it is valid until 2027-08-31.

View scope

Location

27/B, 2nd Cross, Electronics City Phase 1, Bengaluru, 560100, India, Bengaluru, IN

12.97679, 77.59008

Open in Maps

Accreditation data refreshed from the A2LA register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the A2LA entry linked above.