Registers refreshed 2026-11-20.See refresh dates

BS 1377-4 Accredited Testing Labs Worldwide

30 accredited laboratories in 1 country hold BS 1377-4 in their accredited scope. We don't know yet whether 10 of them take outside work. Primary accreditors include United Kingdom Accreditation Service.

Total labs
30
Countries
1

Available in 1 Country

Sample labs

TD Construction Testing
Merseyside, GB

BS 1377-4:1990 A & B MCV (natural water content) BS 1377-2:2022 A & B Dry density / moisture content relationship – 2.5kg rammer BS 1377-4:1990 A Dry density / water content relationship – 2.5kg rammer BS 1377

MATtest Site Services
East Kilbride, GB

BS 1377-4:1990 X Sampling soils - from undisturbed material - from disturbed material Documented In-House Method No TOP 1:2018 X Dynamic cone penetrometer Documented In-House Method No TOP 9:2009 X Vertical defor

Humberside Materials
North Lincolnshire, GB

BS 1377-4:1990 BS 1377-2:2022 Laboratory Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 BS 1377-2:2022 Laboratory Dry density/moisture content relationship (vibrating hammer) BS 1377-4:1990

GEO Site and Testing Services
Carmarthenshire, GB

BS 1377-4:1990 BS 1377-2:2022 Laboratory One-dimensional consolidation properties BS 1377-5:1990 Laboratory Permeability in a triaxial cell BS 1377-6:1990 Laboratory Shear strength by direct shear (small shearbox

Soil Property Testing
Huntingdon, GB

BS 1377-4:1990 A Dry density/water content relationship (2.5 kg rammer) BS 1377-2:2022 A Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 A Dry density/water content relationship (4.5 kg ram

M & H Testing
Kent, GB

BS 1377-4:1990 BS 1377-2:2022 Lenham Lenham (cont’d) In-situ density - sand replacement method (large pouring cylinder method) BS 1377-9:1990 Site In-situ density - core cutter method BS 1377-9:1990 Site Ve

Terra Tek Limited trading as Igne
Bellshill, GB

BS 1377-4:1990 Aston Clinton Bellshill Dry density/water content relationship (2.5 kg rammer) BS 1377-2:2022 Daventry Bellshill Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 Aston Clinton Be

SOCOTEC UK
Middlesex, GB

BS 1377-4:1990 Lab

Grampian Geotechnical (Scotland)
Aberdeenshire, GB

BS 1377-4:1990 A Dry density/moisture content relationship (4.5 kg rammer) BS 1377-2:2022 BS 1377-4:1990 A Dry density/moisture content relationship (Vibrating Hammer) BS 1377-2:2022 BS 1377-4:1990 A Determin

Construction Testing Solutions
Doncaster, GB

BS 1377-4: 1990 Site MCV - natural water content BS1377-2: 2022 Site In-situ density - sand replacement method (small pouring cylinder) BS 1377-9: 1990 Site In-situ density - sand replacement method (large pouri

Ground Technology Services Ltd T/A ASC Geotesting
Norfolk, GB

BS 1377-4:1990 Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 California Bearing Ratio (CBR) BS 1377-4:1990 California Bearing Ratio (CBR) - soaked BS 1377-4:1990

G2M Testing
Durham, GB

BS 1377-4:1990 A, B Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 A, B Dry density/moisture content relationship (vibrating hammer) BS 1377-4:1990 A Moisture condition value (MCV) - na

DGL Testing Services
Kent, GB

BS 1377-4:1990 Laboratory Dry density/water content relationship (2.5 kg rammer) BS 1377-2:2022 Laboratory Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 Laboratory Dry density/water conten

Aitken Laboratories Ltd
Stirlingshire, GB

BS 1377-4:1990 Dry density / moisture content relationship (4.5 kg rammer) BS 1377-4:1990 California Bearing Ratio (CBR) BS 1377-4:1990 One-dimensional consolidation properties BS 1377-5:1990 Undrained shear stre

BAM Nuttall Limited trading as BAM Ritchies
Glasgow, GB

BS 1377-4:1990 A, D*, F*, Flexi Dry density/moisture content relationship - vibrating hammer BS 1377-2:2022 A, Flexi Moisture condition value (MCV) BS 1377-4:1990 A, C*, D* F*, Flexi Moisture condition value (M

Simtec Materials Testing
East Goscote, GB

BS 1377-4:1990 Leicester Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 Leicester Moisture condition value (MCV) BS 1377-4:1990 Leicester MCV - natural moisture content BS 1377-4:1990 Lei

Geotechnics
Coventry, GB

BS 1377-4:1990 Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 Dry density/moisture content relationship (vibrating hammer) BS 1377-4:1990 Moisture condition value (MCV) at natural moistur

Soil Engineering Geoservices
Leeds, GB

BS 1377-4:1990 BS 1377-2:2022 Laboratory Moisture condition value (MCV) TRL Report 273 : Use and application of the MCA with particular reference to glacial tills. (G D Matheson & M G Winter) Laboratory Chalk crushing

C J Associates Geotechnical
Bridgend, GB

BS 1377-4:1990 B Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 B In-situ density - sand replacement method (large pouring cylinder) BS 1377-9:1990 C In-situ density - core cutter method

Earthworks Testing
Doncaster, GB

BS 1377-4:1990 Laboratory Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 Laboratory Dry density/moisture content relationship (Vibrating Hammer) BS 1377-4:1990 Laboratory California Bearin

Balfour Beatty Civil Engineering
Falkirk, GB
We don't know yet whether this lab takes outside work.

BS 1377-4:1990 A,B,C Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 A,B,C Dry density/moisture content relationship (vibrating hammer) BS 1377-4:1990 A,B,C Moisture condition value BS 1377

Geotechnical Group W.L.L
Doha, QA
We don't know yet whether this lab takes outside work.

BS 1377-4, Clause 3, 3.3, 3.4, 3.5 & 3.6 Determination of dry density / moisture content relationship BS 1377-4, Clause 7 Determination of the California Bearin g Ratio (CBR) Non-Destructive Testing ASTM C805/C805M Rebound Number o

Morgan Sindall Construction and Infrastructure
Coventry, GB
We don't know yet whether this lab takes outside work.

BS 1377-4:1990 NoL* Beckton* In-situ density - sand replacement method - large pouring cylinder BS 1377-9:1990 NoL* Beckton* In-situ density - core cutter method BS 1377-9:1990 NoL * Particle density – gas Ja

Costain
London, GB
We don't know yet whether this lab takes outside work.

BS 1377-4:1990 UB9*, NW10* Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 UB9*, NW10* Dry density/moisture content relationship (vibrating hammer) BS 1377-4:1990 UB9*, NW10* MCV - natura

Northumberland County Council
Northumberland, GB
We don't know yet whether this lab takes outside work.

BS 1377-4:1990 Laboratory Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 Laboratory California Bearing Ratio (CBR) BS 1377-4:1990 Laboratory Undrained shear strength – triaxial compression w

Wills Bros. Civil Engineering Limited trading as Total Construction Materials Testing Services
Airdrie, GB
We don't know yet whether this lab takes outside work.

BS 1377-4:2022 A B C X Temp Dry density/moisture content relationship - (2.5 kg rammer) - (4.5 kg rammer) - (vibrating hammer) BS 1377-2:2022 BS 1377-4:1990 A B C Temp

Volker Fitzpatrick
Hertfordshire, GB
We don't know yet whether this lab takes outside work.

BS 1377-4:1990 E Sand replacement – Small pouring cylinder method BS 1377-9:1990 B,E Sand replacement – Large pouring cylinder method BS 1377-9:1990 A,E Vertical deformation and strength characteristics by the inc

Surrey County Council
Surrey, GB
We don't know yet whether this lab takes outside work.

BS 1377-4:1990 Laboratory Dry density/moisture content relationship (4.5 kg rammer) BS 1377-4:1990 Laboratory Dry density/moisture content relationship (vibrating hammer) BS 1377-4:1990 Laboratory California Bearin

Laing O’Rourke Infrastructure
Kent, GB
We don't know yet whether this lab takes outside work.

BS 1377-4:1990 HPC Dry density/moisture content relationship (4,5 kg rammer) BS 1377-4:1990 NCL Dry density/moisture content relationship (vibrating hammer) BS 1377-4:1990 HPC Moisture condition value

Vattenfall
Älvkarleby, SE
We don't know yet whether this lab takes outside work.

BS 1377-4:1990; Soil; Min density