IEC 61008 Accredited Testing Labs Worldwide
IEC 61008, all parts. Each lab card shows which parts it holds.
- IEC 61008-1Part 112 labs →
- IEC 61008-2-1Part 2-17 labs →
- IEC 61008-2-2Part 2-24 labs →
13 accredited laboratories in 5 countries hold IEC 61008 in their ISO/IEC 17025 scope. Primary accreditors include Deutsche Akkreditierungsstelle, American Association for Laboratory Accreditation.
Available in 5 Countries
Top analytes for IEC 61008
- Copper (1)
Sample labs
IEC 61008-1:2010 EN 61008-1:2012 VDE 0664-10:2018 Fehlerstrom-/Differenzstrom- Schutzschalter ohne eingebauten Überstromschutz (RCCBs) für Hausinstallationen und für ähnliche Anwendungen - Teil 1: Allgemeine Anforderungen C IEC 61
IEC 61008-1:2010+AMD1:2013 +AMD2:2013 PN-EN 61008-2-1:2007 EN 61008-2-1:1994+A11:1998 +AC:1999 IEC 61008-2-1:1990 PN-IEC 1008-2-2:1996 IEC 61008-2-2:1990 Wersja strony: A
IEC 61008-1; EN 61008-1; IEC 61008-2-1; EN 61008-2-1; IEC 61008-2-2; AS/NZS 61008.1 RCBO Safety Test 4 IEC 61009-1; EN 61009-1; IEC 61009-2-1; EN 61009-2-1; IEC 61009-2-2; VC8035; SABS767-1; AS/NZS 61009.1; ‘RCBO Prohibition – Addi
IEC 61008-1:2010, modifiziert + A1:2012, modifiziert + A1:2012/COR1:2016 + A2:2013, modifiziert + A2:2013/Cor.:2014) Deutsche Fassung EN 61008-1:2012 + A1:2014 + A1:2014/AC:2016 + A2:2014 + A11:2015 + A12:2017 SEB IEC 61008 -1:20
IEC 61008-1, EN 61008-1 IEC 61008-2-1, EN 61008-2-1 IEC 61009-1, EN 61009-1 IEC 61009-2-1, EN 61009-2-1 IEC 61009-2-2, IEC 61643-11, EN 61643-11 IEC 61643-31, EN 61643-31 IEC 60137, IEC 60269 A.
IEC 61008-1:2024; IEC 61008-2-1:2024; IEC 61008-2-2:2024; IEC 61008-1:2010+A1:2012+A2:2013; IEC 61008-2-1:1990; IEC 61008-2-2:1990; IEC 61008-1; EN 61008-1; IEC 61008-2-1; EN 61008-2-1; IEC 61008-2-2; AS/NZS 61008.1; IEC 61009-1:2024
IEC 61008 -1: 2010 -02 +A1:2012 +A2: 2013 DIN EN 61008-1: 2018-03 VDE 0664-10 Residual current operated circuit -breakers without integral overcurrent protection for household and similar uses (RCCBs) – Part 1: General rules E