FindTestingLabs
Registers refreshed 2026-11-06.See refresh dates

IEC 61869 Accredited Testing Labs Worldwide

IEC 61869, all parts. Each lab card shows which parts it holds.

10 accredited laboratories in 8 countries hold IEC 61869 in their ISO/IEC 17025 scope. Primary accreditors include Deutsche Akkreditierungsstelle.

Total labs
10
Countries
8

Available in 8 Countries

Germany
4 labs
United Kingdom
1 lab
Italy
1 lab
Kuwait
1 lab
Netherlands
1 lab
Poland
1 lab
Sweden
1 lab
United States
1 lab

Top analytes for IEC 61869

  • Electric Current (1)

Sample labs

Al-Ahleia Switchgear Co., K.S.C.C.
PO Box 25876, Safat 13119, Kuwait, Kuwait, GB
Holds: Part 1 · Part 2 · Part 3

ISO/IEC 17025:2017 Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pin e Tre e s, Ch e rts ey La n e , Sta ine s -u po n-Tha me s , TW18 3 HR, UK Al-Ahleia Switchgear Co., K.S.C.C. Issue No: 018

Siemens Energy Global GmbH & Co. KG PSW-H (Prüffeld der Schaltwerke - Hochspannung)
Berlin, DE
Holds: Part 1 · Part 2

This document is a translation. The definitive version is the original German annex to the accreditation certificate. Testing field Standard / Version Title of Standard Test Range / Restrictions IEEE Std C62.11:2020 IEEE Standard

Universität Duisburg-Essen Hochspannungslabor/ETS
Duisburg, DE
Holds: Part 1 · Part 2 · Part 3 · Part 4 · Part 5 · Part 6

IEC 61869-2:2012-09 Instrument transformers – Part 2: Additional requirements for current transformers Kap. 7.2.3 Kap. 7.3.1 Elektro- technik DIN EN 61869-3 (VDE 0414 -9-3):2012- 05 Messwandler – Teil 3: Zusätzliche Anforderungen

Stowarzyszenie Elektryków Polskich, ul. Świętokrzyska 14, 00-050 Warszawa, Biuro Badawcze ds. Jakości
Warszawa, Biuro Badawcze ds. Jakości, PL
Holds: Part 1 · Part 2

IEC 61869-1:2007 PN-EN 61869-2:2013-06 EN 61869-2:2012 IEC 61869-2:2012 Elementy urządzenia piorunochronnego (LPS) Elementy połączeniowe Odporność na oddziaływanie prądu pioruna (do 200 kA) Badania środowiskowe (oddziaływanie mgły

EUROFINS ELECTRICAL AND ELECTRONIC TESTING NA
Suite A Irvine, CA, US
Holds: Part 2

IEC 61869-2 (CT Testing only); IEC/EN 62052-11; IEC/EN 62053-11; IEC/EN 62053-21; IEC/EN 62053-22; IEC/EN 62053-23; UL/CSA/IEC/EN 62368-1; CFE G0100-05; CFE GWH00-34; CFE GWH00-09; CFE GWH00-78; Telcordia GR-1089; ETSI EN 300 386; RT

DEKRA Certification
ARNHEM, NL
Holds: Part 1 · Part 2

IEC 61869-1, EN 61869-1 IEC 61869-2, EN 61869-2 IEC 61558-1, EN 61558-1 IEC 61558-2-1, EN 61558-2-1 IEC 61558-2-4, EN 61558-2-4 IEC 61558-2-5, EN 61558-2-5 IEC 61558-2-6, EN 61558-2-6 IEC 61558-2-7, EN 61558-2-7 IEC 61558-2-8, EN 6

Laboratorio SVEPPI di Siemens Energy
Salzano, IT
Holds: Part 2

Laboratorio SVEPPI di Siemens Energy S.r.l Via Cornarotta 65 (ingresso da Via Alessandro Volta 34/A) 30030 Salzano VE Allegato al certificato di accreditamento n. 00721 rev. 7 del 18/03/2025 UNI CEI EN ISO/IEC 17025:2018 Revisione: 25

FGH Engineering & Test
Mannheim, DE
Holds: Part 3 · Part 4 · Part 5 · Part 14

IEC 61869-3: 2011-07 Instrument transformers – Part 3: Additional requirements for inductive voltage transformers IEC 61869-4: 2014-08 Instrument transformers – Part 4: Additional requirement for combined transformers IEC 6186

IPH Institut "Prüffeld für elektrische Hochleistungstechnik"
Berlin, DE
Holds: Part 1 · Part 2 · Part 3 · Part 4 · Part 5 · Part 6 +4 more

IEC 61869 -6: 2016 -04 EN 61869-6:2016 DIN EN 61869-6: 2017-06 VDE 414-9-6 Instrument transformers – Part 6: Additional general requirements for low-power instrument transformers. Electrical engineering IEC 61869 -10: 2017 -12

Hitachi Energy Sweden
Ludvika, SE
Holds: Part 1 · Part 2 · Part 3 · Part 5 · Part 14

IEC 61869-1 Elektrisk funktionsverifiering Mättransformatorer Ja 2 Nej sub-clause 6.9 and 7.4.6 Mekanisk hållfasthet Mättransformatorer Ja 2 Nej sub-clause 7.4.5 Värmeutveckling Mättransformatorer Ja 2 Nej sub-clause 7.2.2 IEC 61869-2 Elekt