Registers refreshed 2026-11-20.See refresh dates

IEC 62052 Accredited Testing Labs Worldwide

IEC 62052, all parts. Each lab card shows which parts it holds.

35 accredited laboratories in 10 countries hold IEC 62052 in their accredited scope. Primary accreditors include Deutsche Akkreditierungsstelle, American Association for Laboratory Accreditation, Italian Accreditation Body.

Total labs
35
Countries
10

Available in 10 Countries

Germany
16 labs
Italy
4 labs
Spain
4 labs
China
3 labs
Canada
2 labs
Chile
2 labs
Finland
1 lab
India
1 lab
Netherlands
1 lab
United States
1 lab

Sample labs

VDE Prüf- und Zertifizierungsinstitut
Offenbach, DE
Holds: Part 11 · Part 21 · Part 31

IEC 62052-31:2015); Deutsche Fassung EN 62052- 31:2016 DIN EN 62052 -31 VDE 0418 -2- 31 Berichtigung 1:2020-07 Wechselstrom-Elektrizitätszähler – Allgemeine Anforderungen, Prüfungen und Prüfbedingungen Teil 31: Sicherheitsanforderunge

TUV SUD Canada
Gormley, CA
Holds: Part 11 · Part 21 · Part 31

Test Technology: Test Method(s) 1,2: Communication Networking Devices IEEE 1613; IEEE 1613.1; IEC 61326-2-4; IEC 61850-3; IEC 61000-6-5 Home and Building Electronic, Automation, & Control System EN 50491-5-1; EN 50

CSA Group Bayern
Plattling, DE
Holds: Part 11 · Part 21 · Part 31

IEC 62052-31:2015); Deutsche Fassung EN 62052- 31:2016 Sicherheit IEC 62052-31:2015 Electricity metering e quipment (AC) - General requirements, tests and test conditions - Part 31: Product safety requirements and tests Sicherheit

Bureau Veritas Consumer Products Services Germany
Türkheim, DE
Holds: Part 31

IEC 62052 -31:2015 Electricity metering equipment (AC) - General requirements, tests and test conditions - Part 31: Product safety requirements and tests Produkt - sicherheit DIN EN 62052 -31:2017 - 07 VDE 0418-2-31:2017-07 (EN

Etteplan Finland Oy, Test
FI
Holds: Part 31

T298/M23/2025 Liite 1 / Appendix 1 Sivu / Page 21(23) Vaatimus/Requirement SFS-EN ISO/IEC 17025:2017 17.12.2025 Päätöksen päiväys / Date of decision 22.07.2028 Päätöksen viimeinen voimassaolopäivä / Date of expiry www.finas.fi Voimas

KEMA B.V.
ARNHEM, NL
Holds: Part 11 · Part 31

IEC 62052-31 11. Electrical endurance test EN-IEC 62055-31 EN-IEC 62052-31 12. Fault current making capacity test EN-IEC 62055-31 13. Verification of the ability to make the rated short-circuit current EN-IEC 62052-31 14.

Intertek Testing Services (Shanghai FTZ) Co.,
Shanghai, CN
Holds: Part 11 · Part 31

IEC 62052-11; IEC 62052-31; IEC 62053-11; IEC 62053-21; IEC 62053-22; IEC 62053-23; IEC 62053-24; IEC 62053-41 Inverter Safety IEC/EN 62109-1; IEC/EN 62109-2; IEC/EN 62109-3; IEC/EN 62477-1; IEC/EN 62040-1; IEC/EN 62040-3; IEC/EN 624

Centro de Estudios, Medición y Certificación de Calidad CESMEC
SANTIAGO, CL
Holds: Part 11 · Part 31

IEC 62052-11: 2003 (Limited to clause 5.8 (glow and wire); 5.9 (IP Water, IP Dust) and 5.4 (deflection temperature test)) Single phase or three-phase active electric energy meter classes 1 and 2 (Static/Electronic) Single phase or th

steep GmbH EMV-Zentrum
Bonn, DE
Holds: Part 11 · Part 21 · Part 31

IEC 62052-11:2003 +A1:2016 Electricity metering equipment (AC) - General requirements, tests and test conditions - Part 11: Metering equipment Chapter 7.5 EMV DIN EN 62052-21: 2017-10; VDE 0418-2-21: 2017- 10 Wechselstrom-Elekt

TÜV SÜD Product Service GmbH PS-SL-EMC / PS-SL-ENV-STR
Straubing, DE
Holds: Part 11 · Part 31

IEC 62052-11:2003 + A1:2016); Deutsche Fassung EN 62052-11:2003 + A1:2017 SEB DIN EN 62052 -31: 2017-07 Wechselstrom -Elektrizitätszähler – Allgemeine Anforderungen, Prüfungen und Prüfbedingungen – Teil 31: Sicherheitsanforderu

Intertek Testing Services Zhejiang
Haining, Zhejiang, CN
Holds: Part 11 · Part 31

IEC 62052-11; IEC 62052-31; IEC 62053-11; IEC 62053-21; IEC 62053-22; IEC 62053-23; IEC 62053-24; IEC 62053-41 Inverter Safety IEC/EN 62109-1; IEC/EN 62109-2; IEC/EN 62109-3; IEC/EN 62477-1; IEC/EN 62040-1; IEC/EN 62040-3; IEC/EN 6

Yadav Measurements Private
India, IN
Holds: Part 11 · Part 21 · Part 31

IEC 62052-31:2015 (Withdrawn) AS 62052.31:2017 Clause 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 Annex A to K Equipment temperature limits and resistance to heat (10) Surface temperature limits for protection against burns. Te

Centro de estudios, medición y certificación de Calidad CESMEC
SANTIAGO, CL
Holds: Part 11 · Part 31

IEC 62052-11:2003+AMD1:2016; IEC 62052-31:2015; IEC 62053-61:1998; IEC 62059-31-1:2008; IEC 62059-41:2006; IEC 62056‐6‐1:2017; IEC 61000‐4‐8:2009; IEC 61000‐4‐11:2004+AMD1:2017

INSTITUTO TECNOLÓGICO DE LA ENERGÍA (ITE)
Paterna, ES
We don't know yet whether this lab takes outside work.
Holds: Part 11 · Part 21 · Part 31

IEC 62052-31:2015 IEC 62052-31 A Código Validación Electrónica: TJHwCbP5NW4FYd966m La acreditación mantiene su vigencia hasta notificación en contra. La presente acreditación está sujeta a modificaciones, suspensiones temporales y ret

Secure Meters Sweden AB - Testing Laboratory Rovereto
Rovereto, IT
We don't know yet whether this lab takes outside work.
Holds: Part 11 · Part 31

IEC 62052-31:2025, EN IEC 62052-31:2024, IEC 62052-31:2024 Par 4.4 - Consumo dei circuiti/Power consumption, Par 7.4 - Costante del contatore/Meter Constant, Par 7.5 - Avviamento iniziale del contatore/Initial start-up of the meter, Par 7.