Registers refreshed 2026-11-20.See refresh dates

IEC 62053-23 Accredited Testing Labs Worldwide

Part of a series

See all 25 labs worldwide for IEC 62053 (any part)

Part 11: 12 labs · Part 21: 21 labs · Part 22: 19 labs · Part 23: 17 labs · Part 24: 8 labs · Part 31: 1 lab and 2 more parts

Go to the series ↑

17 accredited laboratories in 7 countries hold IEC 62053-23 in their accredited scope. We don't know yet whether 3 of them take outside work. Primary accreditors include Deutsche Akkreditierungsstelle, American Association for Laboratory Accreditation, Entidad Nacional de Acreditación.

Total labs
17
Countries
7

Available in 7 Countries

Germany
6 labs
Spain
3 labs
Chile
2 labs
China
2 labs
Italy
2 labs
India
1 lab
United States
1 lab

Sample labs

Intek S.p.a.
Rezzato, IT

IEC 62053-23:2021/A11:2021, IEC 62053-23:2020 _ EN 62053-23:2003/A1:2017/AC:2018, IEC 62053-23:2003/AMD1:2016/COR1:20 18 _ O&I X O&I X X Apparati per la misura dell'energia elettrica (c.a.) - Contatori statici per energia attiva

VDE Prüf- und Zertifizierungsinstitut
Offenbach, DE

IEC 62053-23: 2003); Deutsche Fassung EN 62053-23: 2003 DIN EN 62053-23 + A1:2016-01 Wechselstrom -Elektrizitätszähler – Besondere Anforderungen – Teil 23: Blindverbrauchszähler der Genauigkeitsklassen 2 und 3 (IEC 13/1630/CDV:2015);

CSA Group Bayern
Plattling, DE

IEC 62053-23:2003 + A1:2016); German version EN 62053-23:2003 + A1:2017 EMV IEC 62053-24:2014 Electricity metering equipmen t – Particular requirements – Part 24: Static meters for fundamental component reactive energy (classes 0,5S

EUROFINS ELECTRICAL AND ELECTRONIC TESTING NA
Baltimore, MD, US

Test Technology Test Method(s) 2, 3: Family, Product, or Industry Specific Specifications KS C IEC 60601-1-2; KS C IEC 60601-2-2 through 2-13, KS C IEC 60601-2-16 through 2-30, KS C IEC 60601-2-32 through 2-42, KS C IEC 606

Intertek Testing Services (Shanghai FTZ) Co.,
Shanghai, CN

IEC 62053-23; IEC 62053-24; IEC 62053-41 Inverter Safety IEC/EN 62109-1; IEC/EN 62109-2; IEC/EN 62109-3; IEC/EN 62477-1; IEC/EN 62040-1; IEC/EN 62040-3; IEC/EN 62477-2 Battery IEC/EN 62619; IEC/EN 62620; IEC/EN 63056; IEC/EN 63115

Centro de Estudios, Medición y Certificación de Calidad CESMEC
SANTIAGO, CL

IEC 62053-23: 2003; IEC 62052-11: 2003 (Excluding clause 5.8 (glow and wire); clause 5.9 (IP Water, IP Dust) and clause 5.4 (deflection temperature test)) Bidirectional single phase or three-phase active electric energy meter classes

LGAI TECHNOLOGICAL CENTER
Bellaterra, ES

IEC 62053-23 A Ensayos de inmunidad a: Huecos e interrupciones Descargas Electrostáticas Inmunidad Radiada Transitorios rápidos Inmunidad Conducida excepto a corriente diferencial Surge Ondas Oscilatorias Ondas oscilatorias amo

PHOENIX TESTLAB
Blomberg, DE

IEC 62053-23:2003); Deutsche Fassung EN 62053-23:2003 nur EMV gemäß Kapitel 7.5 der DIN EN 62052-11 EMV IEC 62053-23 ed. 1.0: 2003 Electricity metering equipment (AC) – Particular requirements – Part 23: Static meters for reactive

Intertek Testing Services Zhejiang
Haining, Zhejiang, CN

IEC 62053-23; IEC 62053-24; IEC 62053-41 Inverter Safety IEC/EN 62109-1; IEC/EN 62109-2; IEC/EN 62109-3; IEC/EN 62477-1; IEC/EN 62040-1; IEC/EN 62040-3; IEC/EN 62477-2 Battery IEC/EN 62619; IEC/EN 62620; IEC/EN 63056; IEC/EN 631

Yadav Measurements Private
India, IN

IEC 62053-23(2003) + A1:2016 (Withdraw) IEC 62053-23:2020 IEC 62053-61: 1998 IEC 62052-21:2004 IEC 60601-1-2: 2001 (Withdrawn) IEC 62055-31:2005 (Withdrawn) IEC 62053-23 (2003) (Withdrawn) IEC 60695-2-10(2000) (Withdrawn) IEC 60695

CESI S.p.A.
Milano, IT

IEC 62053-23:2021, EN IEC 62053-23:2021/A11:2021, IEC 62053-23:2020 _ CEI EN 62053-23:2003/A1:2017, EN 62053-23:2003/A1:2017/AC:2018, IEC 62053-23:2003/AMD1:2016/COR1:20 18 _ Apparati per la misura dell'energia elettrica (c.a.) - Appara

SLG Prüf- und Zertifizierungs
Hartmannsdorf, DE

IEC 62053-23:2003 + A1:2016); German version EN 62053-23:2003 + A1:2017 EN 62053 -23:2003 + A1:2017 Electricity metering equipment (a.c.) - Particular requirements - Part 23: Static meters for reactive energy (classes 2 and 3)

Centro de estudios, medición y certificación de Calidad CESMEC
SANTIAGO, CL

IEC 62053-23:2003; Decreto Supreme No. 298, of 2005, of the Ministry of Economy, Development, and Reconstruction PE N° 4/12 (01-09-2014) ISO/CASCO 1,3,5 y 7 Bidirectional single phase or three-phase active electric energy met

TÜV NORD CERT
Essen, DE

IEC 62053-23: 2023- 06 VDE 0418-3-23:2023-06 Elektrizitätszähler – Besondere Anforderungen – Teil 23: Elektronische Blindverbrauchszähler der Genauigkeitsklassen 2 und 3 (IEC 62053- 23:2020); Deutsche Fassung EN IEC 62053- 23:2021 + A1

INSTITUTO TECNOLÓGICO DE LA ENERGÍA (ITE)
Paterna, ES
We don't know yet whether this lab takes outside work.

IEC 62053-23 EN IEC 62053-23 IEC 62053-23 UNE-EN 62053-23 :2003 UNE-EN 62053- 23 :2003/A1 :2018 EN 62053-23 :2003 EN 62053- 23 :2003/A1 :2017 EN 62053- 23 :2003/A1 :2017/AC:2018 -05 IEC 62053-23: 2003 IEC 62053-23:2003/ A1:2016

FUNDACIÓN TECNALIA RESEARCH & INNOVATION
Derio, ES
We don't know yet whether this lab takes outside work.

IEC 62053-23 IEC 62053-23 A Código Validación Electrónica: 16iM2Bi772i708477T La acreditación mantiene su vigencia hasta notificación en contra. La presente acreditación está sujeta a modificaciones, suspensiones temporales y retir

Siemens Aktiengesellschaft DI FA DSP SYS TT 2
Erlangen, DE
We don't know yet whether this lab takes outside work.

IEC 62053-23:2003); Deutsche Fassung EN 62053-23:2003 EMV IEC 62053 -23:2003 Electricity metering equipment (a.c.) - Particular requirements - Part 23: Static meters for reactive energy (classes 2 and 3) EMV DIN EN 62054 -21;

Other parts