FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
China

Guangdong Zhonghan Testing Technology Co.,

Room 104/201, Building 1, Yibaolai Industrial Park, Qiaotou Community, Fuhai Street, Bao'an District, Shenzhen, People's Republic of China, Shenzhen, China

A2LA|6713.01ISO/IEC 17025Register refreshed 2026-09-25
Certificates
1
Scope items
13
Standards
88
Locations
1

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at Guangdong Zhonghan Testing Technology Co.,?

Claim this profile to keep it accurate.

Register record

A2LARefreshed
6713.01Active

Accredited standards

88

Our reading of the A2LA scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

IEC

IEC 50364Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 50663Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 50665Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 60529Degrees of protection provided by enclosures (IP Code)
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 60601-1-2Medical electrical equipment - Part 1-2: General requirements for basic safety and essential performance - Collateral Standard: Electromagnetic disturbances - Requirements and tests
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 61326-1Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 61547Equipment for general lighting purposes - EMC immunity requirementsCertificate says EN 61547. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 61851-1Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 61851-21-2Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 61951-1Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 61951-2Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 61960-3Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 61960-4Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 62133-1Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 62133-2Secondary cells and batteries containing alkaline or other non-acid electrolytes - Safety requirements for portable sealed secondary cells, and for batteries made from them, for use in portable applications - Part 2: Lithium systems
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 62233Measurement methods for electromagnetic fields of household appliances and similar apparatus with regard to human exposure
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 62281Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 62311Assessment of electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (0 Hz to 300 GHz)Certificate says EN 62311. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 62368-1Audio/video, information and communication technology equipment - Part 1: Safety requirements
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 62479Assessment of the compliance of low power electronic and electrical equipment with the basic restrictions related to human exposure to electromagnetic fields (10 MHz to 300 GHz)
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 62493Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 62619Secondary cells and batteries containing alkaline or other non-acid electrolytes - Safety requirements for secondary lithium cells and batteries, for use in industrial applications
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 62752Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

ETSI

ETSI EN 300 220-1Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 300 220-2Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 300 220-3-1Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 300 220-3-2Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 300 220-4Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 300 328Wideband transmission systems; Data transmission equipment operating in the 2,4 GHz band; Harmonised Standard for access to radio spectrum
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 300 330Short Range Devices (SRD); Radio equipment in the frequency range 9 kHz to 25 MHz and inductive loop systems in the frequency range 9 kHz to 30 MHz; Harmonised Standard covering the essential requirements of article 3.2 of Directive 2014/53/EU
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 300 440Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 301 345-1Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 301 345-2Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 301 345-3Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 301 357Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 301 489-1Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 301 489-3Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 301 489-9Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 301 489-17Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 301 893Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

ETSI EN 303 417Name not checked yet
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 61000 series

IEC 61000-3-2Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current ≤ 16 A per phase)
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

IEC 61000-3-3Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤ 16 A per phase and not subject to conditional connection
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

IEC 61000-4-2Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

IEC 61000-4-4Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

IEC 61000-4-5Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

IEC 61000-4-6Electromagnetic compatibility (EMC) - Part 4-6: Testing and measurement techniques - Immunity to conducted disturbances, induced by radio-frequency fields
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 61000-4-8Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 61000-4-11Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests for equipment with input current up to 16 A per phase
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 61000-6-1Electromagnetic compatibility (EMC) - Part 6-1: Generic standards - Immunity standard for residential, commercial and light-industrial environments
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 61000-6-2Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity standard for industrial environments
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 61000-6-3Electromagnetic compatibility (EMC) - Part 6-3: Generic standards - Emission standard for equipment in residential environmentsCertificate says EN 61000-6-3. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 61000-6-4Electromagnetic compatibility (EMC) - Part 6-4: Generic standards - Emission standard for industrial environments
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

EN

EN 15194Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

EN 17128Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

EN 50130-4Alarm systems - Part 4: Electromagnetic compatibility - Product family standard: Immunity requirements for components of fire, intruder, hold up, CCTV, access control and social alarm systems
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

EN 50293Name not checked yet
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

EN 50364Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

EN 50563Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

EN 50564Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

EN 50663Generic standard for assessment of low power electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (10 MHz - 300 GHz)
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

EN 50665Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

CISPR

CISPR 11Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurementCertificate says EN 55011. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

CISPR 14-1Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 1: EmissionCertificate says IEC 55014-1. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

CISPR 14-2Electromagnetic compatibility - Requirements for household appliances, electric tools and similar apparatus - Part 2: Immunity - Product family standardCertificate says IEC 55014-2. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

CISPR 15Limits and methods of measurement of radio disturbance characteristics of electrical lighting and similar equipmentCertificate says IEC 55015. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

CISPR 22Information technology equipment - Radio disturbance characteristics - Limits and methods of measurementCertificate says EN 55022. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

CISPR 24Information technology equipment - Immunity characteristics - Limits and methods of measurementCertificate says EN 55024. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

CISPR 32Electromagnetic compatibility of multimedia equipment - Emission requirementsCertificate says EN 55032. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

CISPR 35Electromagnetic compatibility of multimedia equipment - Immunity requirementsCertificate says EN 55035. Probably the same standard; not checked against the EN document.
As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

IEC 60335 series

IEC 60335-1Household and similar electrical appliances - Safety - Part 1: General requirements
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 60335-2-2Household and similar electrical appliances - Safety - Part 2-2: Particular requirements for vacuum cleaners and water-suction cleaning appliances
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 60335-2-8Household and similar electrical appliances - Safety - Part 2-8: Particular requirements for shavers, hair clippers and similar appliances
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 60335-2-9Household and similar electrical appliances - Safety - Part 2-9: Particular requirements for grills, toasters and similar portable cooking appliances
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 60335-2-14Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 60335-2-15Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 60335-2-23Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 60335-2-29Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 60086 series

IEC 60086-1Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 60086-2Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 60086-4Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 60086-5Name not checked yet
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

IEC 62680 series

IEC 62680-1-1Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 62680-1-2Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

IEC 62680-1-3Name not checked yet
As written on the certificate · Line 3 (A2LA 6713.01)

ARIB STD-T66; RSS-102 (Issue 6); RSS-102.NS.MEAS; SPR-002; IEEE C95.3; EN 62311; BS EN 62311; IEC 62311; EN 50665; IEC 50665; EN 62479; EN 50663; BS EN 50663; IEC 50663; EN 50364; BS EN 50364; IEC 50364; EN 62233; BS EN 62233; IEC 62233; EN 62493; BS EN 62493; IEC 62493; IEC 62368-1; EN IEC 62368-1; AS/NZS 62368.1; UL 62368-1; BS EN IEC 62368-1; UL 2595; EN 62680-1-1; EN IEC 62680-1-3; EN IEC 62680-1-2; BS EN 62680-1-1; BS EN IEC 62680-1-3; BS EN IEC 62680-1-2; IEC 62680-1-1; IEC 62680-1-3; IEC 62680-1-2; IEC 60335-1; EN 60335-1; BS EN 60335-1; AS/NZS 60335-1; UL 60335-1; IEC 60335-2-2; EN IEC 60335-2-2; BS EN IEC 60335-2-2; AS/NZS 60335-2-2; IEC 60335-2-8; EN IEC 60335-2-8; BS EN IEC 60335-2-8; AS/NZS 60335-2-8; UL 60335-2-8; IEC 60335-2-9; EN IEC 60335-2-9; BS EN IEC 60335-2-9; AS/NZS 60335-2-9; IEC 60335-2-14; EN 60335-2-14; AS/NZS 60335-2-14; IEC 60335-2-15; EN 60335-2-15; BS EN 60335-2-15; AS/NZS 60335-2-15; IEC 60335-2-23; EN 60335-2-23; BS EN 60335-2-23; AS/NZS 60335-2-23; IEC 60335-2-29; EN 60335-2-29; BS EN 60335-2-29; AS/NZS 60335-2-29

Other standards

ANSI C63.4American National Standard for Methods of Measurement of Radio-Noise Emissions from Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

As written on the certificate · Line 12 (A2LA 6713.01)

ANSI C63.4:2014; FCC MP-5:1986; ANSI C63.10:2013; FCC KDB 905462 D02 (v02)

FCC PART 15Radio Frequency Devices
As written on the certificate · Line 1 (A2LA 6713.01)

CFR 47, FCC Part 15, Subpart B; ANSI C63.4:2014; CFR 47, FCC Part 18; MP-5:1986; IEC/CISPR 22; AS/NZS CISPR 22; EN 55022; IEC/CISPR 32; EN 55032; AS/NZS CISPR 32; BS EN 55032; IEC/CISPR 11; EN 55011; AS/NZS CISPR 11; BS EN 55011; IEC/CISPR 14-1; EN IEC 55014-1; BS EN IEC 55014-1; AS/NZS CISPR 14.1; IEC/CISPR 15; EN IEC 55015; AS CISPR 15; BS EN IEC 55015; EN 50293; BS EN 50293; ICES-001; ICES-003; ICES-005; EN 61000-3-2; EN 61000-3-3; BS EN 61000-3-2; BS EN 61000-3-3; IEC 61000-3-2; IEC 61000-3-3; IEC 61000-4-2; EN 61000-4-2; BS EN 61000-4-2; IEC 61000-4-4; EN 61000-4-4; BS EN 61000-4-4; IEC 61000-4-5; EN 61000-4-5; BS EN 61000-4-5

As written on the certificate · Line 2 (A2LA 6713.01)

IEC 61000-4-6; EN 61000-4-6; BS EN 61000-4-6; IEC 61000-4-8; EN 61000-4-8; BS EN 61000-4-8; IEC 61000-4-11; EN IEC 61000-4-11; BS EN IEC 61000-4-11; IEC 61000-6-1; EN 61000-6-1; AS/NZS 61000-6-1; BS EN 61000-6-1; IEC 61000-6-2; EN 61000-6-2; AS/NZS 61000-6-2; BS EN 61000-6-2; IEC 61000-6-3; EN 61000-6-3; AS/NZS 61000-6-3; BS EN 61000-6-3; IEC 61000-6-4; EN 61000-6-4; AS/NZS 61000-6-4; BS EN 61000-6-4; IEC/CISPR 24; EN 55024; IEC 61547; EN IEC 61547; BS EN IEC 61547; IEC/CISPR 35; EN 55035; BS EN 55035; IEC/CISPR 14-2; EN IEC 55014-2; BS EN IEC 55014-2; AS/NZS CISPR 14.2; IEC 61326-1; EN 61326; EN 61326-1; BS EN 61326; BS EN 61326-1; IEC 60601-1-2; EN 60601-1-2; BS EN 60601-1-2; EN 50130-4; BS EN 50130-4; ETSI EN 301 489-1; ETSI EN 301 489-3; ETSI EN 301 489-9; ETSI EN 301 489-17; EN IEC 61851-21-2; BS EN IEC 61851-21-2; IEC 61851-21-2; 47 CFR, FCC Part 15 C; 47 CFR, FCC Part 15 E; GS0 2693:2022; UAE.S 5021:2018; SAS0 29382019; Canada/ISED RSS-GEN; RSS-210; RSS-216; RSS-247; RSS-310; ETSI EN 300 220-1; ETSI EN 300 220-2; ETSI EN 300 220-3-1; ETSI EN 300 220-3-2; ETSI EN 300 220-4; ETSI EN 300 440; ETSI EN 300 328; ETSI EN 301 893; ETSI EN 301 357; ETSI EN 303 417; ETSI EN 300 330; ETSI EN 301 345-1; ETSI EN 301 345-2; ETSI EN 301 345-3

UN 38.3Lithium metal and lithium ion batteries
As written on the certificate · Line 6 (A2LA 6713.01)

IEC 61851-1; EN IEC 61851-1; BS EN IEC 61851-1; IEC 62752; EN 62752; BS EN 62752; AS/NZS 4665-1; AS/NZS 4665-2; (EU) 2019/1782; EN 50563; BS EN 50563; (EC) No 1275/2008; EN 50564; BS EN 50564; IEC 60529; EN 60529; AS 60529; BS EN 60529; UL 1310; UL 1012; UL 2089; ST/SG/AC.10/11/Rev.7/Amend.1/38.3; ST/SG/AC.10/1/Rev.21 Chapter 3.3 238(a); UN/ST/SG/AC.10/1/Rev.21&Rev.22 /3.3; IEC 62133-2; EN 62133-2; BS EN 62133-2; UL 62133-2; IEC 62281; EN IEC 62281; BS EN IEC 62281; IEC 60086-1; EN IEC 60086-1; BS EN IEC 60086-1; IEC 60086-2; EN IEC 60086-2; BS EN IEC 60086-2; IEC 60086-4; EN IEC 60086-4; BS EN IEC 60086-4; IEC 60086-5; EN IEC 60086-5; BS EN IEC 60086-5; IEC 61960-3; EN 61960-3; BS EN 61960-3; J 62133-2; JIS C 62133-2; UL 2056; UL 1642; UL 2054; UL 2271; UL 2595; UL 2743; UL 4200A; UN38.3 ST/SG/AC.10/11/Rev.8; IEC 62619; EN 62619; IEC 61951-1AMD1; EN 61951-1:2017A1; IEC 61960-3; EN61960-3; IEC 61951-2:+AMD1; EN 61951-2A1; IEC 62133-1; EN 62133-1; IEC 61960-4; EN 61960-4; ANSI C18.1M, Part 1; ANSI C18.3M, Part 2; EN 17128; EN 15194

Scope as published by A2LA

13 lines
A2LA

ISO/IEC 17025

Active

6713.01

The scope document we hold says it is valid until 2026-11-30.

View scope

Accreditation data refreshed from the A2LA register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the A2LA entry linked above.