IEC 60076-13 Accredited Testing Labs Worldwide
See all 28 labs worldwide for IEC 60076 (any part)
Part 1: 16 labs · Part 2: 13 labs · Part 3: 13 labs · Part 4: 4 labs · Part 5: 12 labs · Part 6: 8 labs and 9 more parts
3 accredited laboratories in 1 country hold IEC 60076-13 in their accredited scope. We don't know yet whether 2 of them take outside work.
Available in 1 Country
Sample labs
IEC 60076-13: 2006-05 EN 60076-13:2006 DIN EN 60076-13:2007-07 VDE 0532-76-13 Power transformers – Part 13: Self-protected liquid-filled transformers.
Anexo Técnico/Technical Annex Nº 3/LE130 Rev./Ed. 42 Pág./Page 71 de/of 85 Accreditation will remain valid until notification to the contrary. This accreditation is subject to modifications, temporary suspensions and withdrawal. Its val
IEC 60076-13 B Transformadores de potencia - Transformadores de distribución de regulación de tensión (VRDT) Power transformers - Voltage regulating distribution transformers (VRDT) Todos los ensayos de la norma, excepto los ensa