Registers refreshed 2026-11-20.See refresh dates

IEC 60076-1 Accredited Testing Labs Worldwide

Part of a series

See all 28 labs worldwide for IEC 60076 (any part)

Part 1: 16 labs · Part 2: 13 labs · Part 3: 13 labs · Part 4: 4 labs · Part 5: 12 labs · Part 6: 8 labs and 9 more parts

Go to the series ↑

16 accredited laboratories in 5 countries hold IEC 60076-1 in their accredited scope. We don't know yet whether 9 of them take outside work. Primary accreditors include Entidad Nacional de Acreditación, American Association for Laboratory Accreditation, Deutsche Akkreditierungsstelle.

Total labs
16
Countries
5

Available in 5 Countries

Germany
3 labs
Italy
2 labs
China
1 lab
Kuwait
1 lab
United States
1 lab

Sample labs

Al-Ahleia Switchgear Co., K.S.C.C.
Kuwait, KW

IEC 60076-1 Edition 3 2011-04 IEC 60076-3 Edition 3.1 2018-03 IEC 60076-11 Edition 2 2018-08 Temperature rise test up to 50 MVA * See note at end of Schedule IEC 60076-1 Edition 3 2011-04 IEC 60076-11 E

Intertek Testing Services (Shanghai FTZ) Co.,
Shanghai, CN

Test Technology: Test Method(s) 2: Empty Enclosures for Low- Voltage Switchgear and Control Gear Assemblies Safety Test IEC 62208; EN 62208 Type F and Type B Residual Current Operated Circuit- Breakers with and without Integr

Intertek Testing Services NA
Kentwood, MI, US

IEC 60076-1 Voltage Drop 3 Down to 50 µV Toyota TSC1000G; Honda 342Z-TZ-5-A010-MI; SAE 580b Dielectric Strength 3 Up to 5,000 VAC or 6,000 VDC IEC 60601-1 AC Voltage Source and Measure 3 Source up to 600 VAC – (10 to

Laboratorio SVEPPI di Siemens Energy
Salzano, IT

Laboratorio SVEPPI di Siemens Energy S.r.l Via Cornarotta 65 (ingresso da Via Alessandro Volta 34/A) 30030 Salzano VE Allegato al certificato di accreditamento n. 00721 rev. 7 del 18/03/2025 UNI CEI EN ISO/IEC 17025:2018 Revisione: 25

FGH Engineering & Test
Mannheim, DE

IEC 60076-1: 2011-04 Power transformers – Part 1: General IEC 60076-2: 2011-02 Power transformers – Part 2: Temperature rise for liquid-immersed transformers IEC 60076-3: 2013-07 + 2018 AMD Power transformers – Part 3: Insula

IPH Institut "Prüffeld für elektrische Hochleistungstechnik"
Berlin, DE

IEC 60076-1: 2011-04 EN 60076-1: 2011 DIN EN 60076-1: 2012-03 VDE 0532-76-1 Power transformers – Part 1: General.

CESI S.p.A.
Milano, IT

IEC 60076-11:2019, EN IEC 60076-11:2018/AC:2019, IEC 60076-11:2018 RLV _ Metodo di prova Tecnica di prova O&I Misura di rumore - Misura della pressione acustica/Sound measurement - Sound pressure method CEI EN 60076-10:2017, EN 60076-

Instytut Energetyki - Państwowy Instytut Badawczy
Warszawa, PL
We don't know yet whether this lab takes outside work.

IEC 60076-1:2011 PN-EN 60076-3:2014 PN-EN 60076-3:2014-02/A1:2018-09 IEC 60076-3:2013 IEC 60076-3:2013/AMD1:2018 PN-EN 60076-4:2004 IEC 60076-4:2002 PN-EN IEC 60076-11:2019-01 SFS 2646:1987 PN-EN 60076-6:2008 IEC 60076-6:2007 IEC

Sieć Badawcza Łukasiewicz - Instytut Elektrotechniki
Warszawa, PL
We don't know yet whether this lab takes outside work.

IEC 60076-11:2019-01 IEC 60076-1:2011 IEC 60076-2:2011 IEC 60076-3: 2013 + AMD1: 2018 CSV IEC 60076-4:2002 IEC 60076-5:2006 IEC 60076-6:2007 IEC 60076-11:2018 Impedancja zwarciowa i straty obciążeniowe do 10 kW Straty i prąd s

Bahra Advanced Cables Manufacturer
Jeddah, SA
We don't know yet whether this lab takes outside work.

IEC 60076-11, Cl. 14.2.2 // Part 1, Cl. 11.3 Measurement of the Resistance of the Windings -Transformers IEC 60076-11, Cl. 14.2.1 // Part 1, Cl. 11.2 Separate-Source AC Withstand Voltage Test -Transformers IEC 60076-11, Cl. 14.2.5 /

HITACHI ENERGY SPAIN
Zaragoza, ES
We don't know yet whether this lab takes outside work.

IEC 60076-1 Medida de la relación de transformación y verificación de acoplamiento Measurement of voltage ratio and check of phase displacement UNE-EN 60076-1 IEC 60076-1 Medida de la impedancia de cortocircuito y de las pérdidas d

ORMAZABAL CORPORATE TECHNOLOGY A.I.E.
Amorebieta-Etxano, ES
We don't know yet whether this lab takes outside work.

IEC 60076-1 IEC 60076-1:1993 IEC 60076-1:1993/COR1:1997 IEC 60076-1:1993/A1:1999 Código Validación Electrónica: m2FSsFR0uDfSfW0n17 La acreditación mantiene su vigencia hasta notificación en contra. La presente acreditación está sujet

Karlsruher Institut für Technologie Institut für Elektroenergiesysteme und Hochspannungstechnik (IEH)
Karlsruhe, DE
We don't know yet whether this lab takes outside work.

IEC 60076-1:2011 Leistungstransformatoren - Teil 1: Allgemeines (IEC 60076-1:2011); Deutsche Fassung EN 60076-1:2011 Power transformers - Part 1: General HV DIN EN 60076-2:2012- 02;VDE 0532-76-2:2012-02 VDE 0532-76-2:2012-02

LABORATORIO CENTRAL OFICIAL DE ELECTROTECNIA (LCOE) DE LA FUNDACIÓN PARA EL FOMENTO DE LA INNOVACIÓN INDUSTRIAL
Getafe, ES
We don't know yet whether this lab takes outside work.

Anexo Técnico/Technical Annex Nº 3/LE130 Rev./Ed. 42 Pág./Page 70 de/of 85 Accreditation will remain valid until notification to the contrary. This accreditation is subject to modifications, temporary suspensions and withdrawal. Its val

FUNDACIÓN TECNALIA RESEARCH & INNOVATION
Derio, ES
We don't know yet whether this lab takes outside work.

IEC 60076-1 UNE-EN 60076-2 IEC 60076-2 UNE-EN 60076-3 IEC 60076-3 UNE-EN 60076-5 IEC 60076-5 UNE-EN 60076-10 Método de presión sonora IEC 60076-10 Método de presión sonora UNE-EN 60076-16 IEC 60076-16 B Código Validación Elect

Kyte Powertech
Cavan, IE
We don't know yet whether this lab takes outside work.

IEC 60076-1 (Par:11.3) Edition 3.0 2011 - 04 307 High power testing - .12 Temperature rise tests Temperature rise test W- Watts 40 W - 45 kW IEC 60076-2 Edition 3 2011 - 02 307 High power testing - .99 Other tests Measurement of No

Other parts

All parts on the series page →