FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates

IEC 60076 Accredited Testing Labs Worldwide

IEC 60076, all parts. Each lab card shows which parts it holds.

16 accredited laboratories in 7 countries hold IEC 60076 in their ISO/IEC 17025 scope. Primary accreditors include Deutsche Akkreditierungsstelle, American Association for Laboratory Accreditation. In the register, IEC 60076 scope entries most often cover Sound Emission, Winding Resistance in Construction products and materials, Electronic.

Total labs
16
Countries
7

Available in 7 Countries

Germany
6 labs
Italy
2 labs
Netherlands
2 labs
United States
2 labs
China
2 labs
United Kingdom
1 lab
Sweden
1 lab

Top matrices for IEC 60076

Top analytes for IEC 60076

  • Sound Emission (1)
  • Winding Resistance (1)

Sample labs

Al-Ahleia Switchgear Co., K.S.C.C.
PO Box 25876, Safat 13119, Kuwait, Kuwait, GB
Holds: Part 1 · Part 2 · Part 3 · Part 10 · Part 11 · Part 18 +1 more

IEC 60076-1 Edition 3 2011-04 IEC 60076-3 Edition 3.1 2018-03 IEC 60076-11 Edition 2 2018-08 Temperature rise test up to 50 MVA * See note at end of Schedule IEC 60076-1 Edition 3 2011-04 IEC 60076-11 E

Müller-BBM Industry Solutions GmbH Prüflaboratorium für Schall und Schwingungen, Elektromagnetische Felder und Licht, Immissionsschutz und Gefahrstoffe
Planegg, DE
Holds: Part not stated on the certificate

DIN EN 12549 2008-12 Akustik – Geräuschmessverfahren für Eintreibgeräte – Verfahren der Genauigkeitsklasse 2 DIN EN 13023 2010-08 Geräuschmessverfahren für Druck - und Papierverarbeitungs -, Papierherstellungs- und Ausrüstungs

Siemens Energy Global GmbH & Co. KG PSW-H (Prüffeld der Schaltwerke - Hochspannung)
Berlin, DE
Holds: Part 6

This document is a translation. The definitive version is the original German annex to the accreditation certificate. Testing field Standard / Version Title of Standard Test Range / Restrictions IEEE Std C62.11:2020 IEEE Standard

Thomas A. Edison Technical Center Power Test
Franksville, WI, US
Holds: Part not stated on the certificate

1 Using the following methods and Customer supplied test methods within the capabilities listed above: ANSI/IEEE C37, C57, C62 Standard Series; ANSI C29, IEEE Std. 4, Std. 386, Std. 18, Std. 404, Std. 495, Std. 592, Std. 597, Std. 1247;

VDE Prüf- und Zertifizierungsinstitut
Offenbach am Main, DE
Holds: Part 10

IEC 60076-10:2016 Leistungstransformatoren - Teil 10: Bestimmung der Geräuschpegel (IEC 60076-10:2016); Deutsche Fassung EN 60076-10:2016 A Akustik DIN EN ISO 3744:2011-02 Akustik - Bestimmung der Schallleistungs- und Schallenergiep

Intertek Testing Services (Shanghai FTZ) Co.,
Shanghai, CN
Holds: Part 1 · Part 2 · Part 3 · Part 5 · Part 10 · Part 11

Test Technology: Test Method(s) 2: Empty Enclosures for Low- Voltage Switchgear and Control Gear Assemblies Safety Test IEC 62208; EN 62208 Type F and Type B Residual Current Operated Circuit- Breakers with and without Integr

DEKRA Certification
ARNHEM, NL
Holds: Part not stated on the certificate

IEC 60076, EN 60076 IEEE Std. C57.12.90 CISPR 16 A. 23. Electronics, entertainment equipment (TRON) Type test according to the tests as mentioned in the standard, except the following tests which are subcontracted: - Temperatu

Laboratorio SVEPPI di Siemens Energy
Salzano, IT
Holds: Part 1 · Part 2 · Part 5 · Part 11

IEC 60076-11:2019, IEC 60076-11:2018 RLV _ Metodo di prova Tecnica di prova O&I Par 4.1 - Capacità termica di resistenza al cortocircuito/Thermal ability to withstand short circuit CEI EN 60076-5:2007, EN 60076-5:2006, IEC 60076-5:200

Efectis Nederland
BLEISWIJK, NL
Holds: Part 11

IEC 60076-11 § 14.4.6 BL 28. Buiding materials Determination of heat release rate and smoke production rate; cone calorimeter, dynamic measurement WV-MA12 ISO 5660-1 BL 29. Shipelements and maritime constructions Reaction to Fir

FGH Engineering & Test
Mannheim, DE
Holds: Part 1 · Part 2 · Part 3

IEC 60076-1: 2011-04 Power transformers – Part 1: General IEC 60076-2: 2011-02 Power transformers – Part 2: Temperature rise for liquid-immersed transformers IEC 60076-3: 2013-07 + 2018 AMD Power transformers – Part 3: Insula

Intertek Testing Services Zhejiang
Haining, Zhejiang, CN
Holds: Part not stated on the certificate

Test Technology: Test Method(s) 1: Lightning Protection System Components (LPSC) IEC 62561-1; EN 62561-1; IEC 62561-2; EN 62561-2; IEC 62561-4; EN 62561-4; IEC 62561-5; EN 62561-5 Electric Vehicle Supply Equipment IEC/EN 61

BUREAU VERITAS CONSUMER PRODUCTS SERVICES
Littleton, MA, US
Holds: Part not stated on the certificate

IEC 60076 Power Transformers IEC 61558 Power Transformers, Power Supplies, Reactor and Similar Products IEC 62109-1 Safety of power converters for use in photovoltaic power systems - Part 1: General requirements IEC 62109-2 Safety of

IPH Institut "Prüffeld für elektrische Hochleistungstechnik"
Berlin, DE
Holds: Part 1 · Part 2 · Part 3 · Part 4 · Part 5 · Part 6 +3 more

IEC 60076-1: 2011-04 EN 60076-1: 2011 DIN EN 60076-1: 2012-03 VDE 0532-76-1 Power transformers – Part 1: General.

CESI S.p.A.
Milano, IT
Holds: Part 1 · Part 2 · Part 3 · Part 5 · Part 10 · Part 11

IEC 60076-11:2019, EN IEC 60076-11:2018/AC:2019, IEC 60076-11:2018 RLV _ Metodo di prova Tecnica di prova O&I Misura di rumore - Misura della pressione acustica/Sound measurement - Sound pressure method CEI EN 60076-10:2017, EN 60076-

Hitachi Energy Sweden
Ludvika, SE
Holds: Part 5 · Part 6

IEC 60076-5 Elektrisk ström Transformatorer Ja 2 Nej sub-clause 4 IEC 60076-6 Elektrisk ström Transformatorer Ja 2 Nej sub-clause 8.9.13, 9.10.10 and 12.8.18 IEC 60099-1 Elektrisk funktionsverifiering Avledare Ja 2 Nej sub-clause 8.7 IEC 6

AKUVIB Engineering and Testing
Bochum, DE
Holds: Part 10

DIN 45692 2009-08 Messtechnische Simulation der Hörempfindung Schärfe DIN 45681 2005-03 Akustik - Bestimmung der Tonhaltigkeit von Geräuschen und Ermittlung eines Tonzuschlages für die Beurteilung von Geräuschimmissionen DIN 4