IEC 60512-25-2 Accredited Testing Labs Worldwide
See all 52 labs worldwide for IEC 60512 (any part)
Part 1: 2 labs · Part 1-1: 28 labs · Part 1-2: 19 labs · Part 1-3: 9 labs · Part 1-4: 9 labs · Part 2-1: 43 labs and 99 more parts
5 accredited laboratories in 2 countries hold IEC 60512-25-2 in their accredited scope. We don't know yet whether 3 of them take outside work. Primary accreditors include Deutsche Akkreditierungsstelle.
Available in 2 Countries
Sample labs
Test: Test Methods1: Immunity (continued) Radiated Immunity (RFI) IEC 61000-4-3; BS EN/EN 61000-4-3; AS/NZS 61000.4.3; SANS 61000-4-3 Electrical Fast Transient/ Burst (EFT) IEC 61000-4-4; BS EN/EN 61000-4-4; AS/NZS 61000.4.4; SA
IEC 60512-25-2:2002) Signal integrity IEC 60512-25-2 (2002-03) Connectors for electronic equipment - Tests and measurements - Part 25-2: Test 25b - Attenuation (insertion loss) Signal integrity DIN EN 60512-25-3 (2002-08) Co
DIN EN 60512-9-2 (VDE 0687-512-9-2) 2012-09 Steckverbinder für elektronische Einrichtungen - Mess- und Prüfver- fahren - Teil 9-2: Dauerprüfungen - Prüfung 9b: Elektrische Belastung bei hoher Temperatur DIN EN IEC 60512-23-3 (VDE 0
Bereich Norm oder Prüfverfahren / Ausgabestand Titel der Norm oder des Prüfverfahrens Einschränkungen zum Prüfverfahren EMV IEC 60512 -23 -7:2005 Connectors for electronic equipment - Tests and measurements - Part 23-7: Screenin
Bereich Norm / Hausverfahren / Version Titel der Norm oder des Hausverfahrens (ggf. Abweichungen / Modifizierungen von Normverfahren angeben) Prüfbereich / Einschränkung DIN EN 60512-4-1: 2004-01 Steckverbinder für elektronisc