TÜV SÜD Product Service
Masurenweg 1 - 3, 30163, Hannover, Germany
Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.
Only the laboratory you pick gets your contact details. We ask the others without them.
Contact this laboratory
Work at TÜV SÜD Product Service?
Claim this profile to keep it accurate.
Register record
- DAKKSRefreshed
- D-PL-11321-12-04Withdrawn
- D-PL-11321-12-02Active
- D-PL-11321-12-01Withdrawn
- D-PL-11321-19-00Active
- D-PL-11321-19-01Active
- D-PL-11321-22-00Active
- D-PL-11321-22-01Active
- D-PL-11321-12-03Active
- D-PL-11321-12-00Active
Accredited standards
19Our reading of the DAKKS scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.
IEC 61010 series
IEC 61010-1Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 1: General requirements
IEC 62368-1:2018; DIN EN IEC 62368-1:2021-05; UL 62368-1:2019; CAN/CSA-C22.2 No. 62368-1:2019; IEC 62368-3:2017; DIN EN IEC 62368-3:2020; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019; DIN EN 61010-1:2020; UL 61010-1:2012/R:2018-11; CAN/CSA-C22.2 No. 61010-1:2012/A1:2018-11; IEC 61010-2-010:2014
IEC 61010-2-010Name not checked yet
IEC 62368-1:2018; DIN EN IEC 62368-1:2021-05; UL 62368-1:2019; CAN/CSA-C22.2 No. 62368-1:2019; IEC 62368-3:2017; DIN EN IEC 62368-3:2020; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019; DIN EN 61010-1:2020; UL 61010-1:2012/R:2018-11; CAN/CSA-C22.2 No. 61010-1:2012/A1:2018-11; IEC 61010-2-010:2014
DIN EN 61010 -2-010:2015; UL 61010-2-010:2015; CAN/CSA-C22.2 No. 61010-2-010:2015; IEC 61010 -2-010:2019; DIN EN IEC 61010 -2-010 VDE 0411-2-010:2022-12; UL 61010-2-010:2019; CAN/CSA-C22.2 No. 61010-2-010:2019; IEC 61010 -2-011:2019; DIN EN IEC 61010 -2-011:2023-05; UL 61010-2-011:2019; CAN/CSA-C22.2 No. 61010-2-011:2019; IEC 61010 -2-012:2019
IEC 61010-2-011Name not checked yet
DIN EN 61010 -2-010:2015; UL 61010-2-010:2015; CAN/CSA-C22.2 No. 61010-2-010:2015; IEC 61010 -2-010:2019; DIN EN IEC 61010 -2-010 VDE 0411-2-010:2022-12; UL 61010-2-010:2019; CAN/CSA-C22.2 No. 61010-2-010:2019; IEC 61010 -2-011:2019; DIN EN IEC 61010 -2-011:2023-05; UL 61010-2-011:2019; CAN/CSA-C22.2 No. 61010-2-011:2019; IEC 61010 -2-012:2019
IEC 61010-2-012Name not checked yet
DIN EN 61010 -2-010:2015; UL 61010-2-010:2015; CAN/CSA-C22.2 No. 61010-2-010:2015; IEC 61010 -2-010:2019; DIN EN IEC 61010 -2-010 VDE 0411-2-010:2022-12; UL 61010-2-010:2019; CAN/CSA-C22.2 No. 61010-2-010:2019; IEC 61010 -2-011:2019; DIN EN IEC 61010 -2-011:2023-05; UL 61010-2-011:2019; CAN/CSA-C22.2 No. 61010-2-011:2019; IEC 61010 -2-012:2019
DIN EN IEC 61010 -2-012 : 2023-07; UL 61010-2-012:2019; CAN/CSA-C22.2 No. 61010-2-012:2019; IEC 61010 -2-020:2006; DIN EN 61010 -2-020:2007; CAN/CSA-C22.2 No. 61010-2-020:2009; IEC 61010 -2-030:2017; DIN EN IEC 61010 -2-030 : 2022-11; UL 61010-2-030:2018; CSA C22.2 No. 61010-2-030:2018; IEC 61010 -2-051:2018; DIN EN IEC 61010 -2-051: 2023-01
IEC 61010-2-020Name not checked yet
DIN EN IEC 61010 -2-012 : 2023-07; UL 61010-2-012:2019; CAN/CSA-C22.2 No. 61010-2-012:2019; IEC 61010 -2-020:2006; DIN EN 61010 -2-020:2007; CAN/CSA-C22.2 No. 61010-2-020:2009; IEC 61010 -2-030:2017; DIN EN IEC 61010 -2-030 : 2022-11; UL 61010-2-030:2018; CSA C22.2 No. 61010-2-030:2018; IEC 61010 -2-051:2018; DIN EN IEC 61010 -2-051: 2023-01
IEC 61010-2-030Name not checked yet
DIN EN IEC 61010 -2-012 : 2023-07; UL 61010-2-012:2019; CAN/CSA-C22.2 No. 61010-2-012:2019; IEC 61010 -2-020:2006; DIN EN 61010 -2-020:2007; CAN/CSA-C22.2 No. 61010-2-020:2009; IEC 61010 -2-030:2017; DIN EN IEC 61010 -2-030 : 2022-11; UL 61010-2-030:2018; CSA C22.2 No. 61010-2-030:2018; IEC 61010 -2-051:2018; DIN EN IEC 61010 -2-051: 2023-01
IEC 61010-2-051Name not checked yet
DIN EN IEC 61010 -2-012 : 2023-07; UL 61010-2-012:2019; CAN/CSA-C22.2 No. 61010-2-012:2019; IEC 61010 -2-020:2006; DIN EN 61010 -2-020:2007; CAN/CSA-C22.2 No. 61010-2-020:2009; IEC 61010 -2-030:2017; DIN EN IEC 61010 -2-030 : 2022-11; UL 61010-2-030:2018; CSA C22.2 No. 61010-2-030:2018; IEC 61010 -2-051:2018; DIN EN IEC 61010 -2-051: 2023-01
IEC 61010-2-061Name not checked yet
UL 61010 -2-051:2019; CSA C22.2 No. 61010-2-051:2019; IEC 61010 -2-061:2018; DIN EN IEC 61010 -2-061: 2023-02; EN IEC 61010-2-061:2021 + A11:2021; UL 61010-2-061:2019; CSA C22.2 No. 61010-2-061:2019; IEC 61010 -2-081:2019; DIN EN IEC 61010 -2-081: 2022-07; EN IEC 61010-2-081:2020; UL 61010-2-081:2019; CSA C22.2 No. 61010-2-081:2019; IEC 61010 -2-091:2019; DIN EN IEC 61010 -2-091: 2023-05; EN IEC 61010-2-091:2021 + A11:2021
IEC 61010-2-081Name not checked yet
UL 61010 -2-051:2019; CSA C22.2 No. 61010-2-051:2019; IEC 61010 -2-061:2018; DIN EN IEC 61010 -2-061: 2023-02; EN IEC 61010-2-061:2021 + A11:2021; UL 61010-2-061:2019; CSA C22.2 No. 61010-2-061:2019; IEC 61010 -2-081:2019; DIN EN IEC 61010 -2-081: 2022-07; EN IEC 61010-2-081:2020; UL 61010-2-081:2019; CSA C22.2 No. 61010-2-081:2019; IEC 61010 -2-091:2019; DIN EN IEC 61010 -2-091: 2023-05; EN IEC 61010-2-091:2021 + A11:2021
IEC 61010-2-091Name not checked yet
UL 61010 -2-051:2019; CSA C22.2 No. 61010-2-051:2019; IEC 61010 -2-061:2018; DIN EN IEC 61010 -2-061: 2023-02; EN IEC 61010-2-061:2021 + A11:2021; UL 61010-2-061:2019; CSA C22.2 No. 61010-2-061:2019; IEC 61010 -2-081:2019; DIN EN IEC 61010 -2-081: 2022-07; EN IEC 61010-2-081:2020; UL 61010-2-081:2019; CSA C22.2 No. 61010-2-081:2019; IEC 61010 -2-091:2019; DIN EN IEC 61010 -2-091: 2023-05; EN IEC 61010-2-091:2021 + A11:2021
IEC 61010-2-201Name not checked yet
UL 61010-2-091:2019; CSA C22.2 No. 61010-2-091:2019; IEC 61010-2-201:2017; DIN EN IEC 61010-2-201:2019-04; EN IEC 61010-2-201:2018; UL 61010-2-201:2018; CAN/CSA-C22.2 No. 61010-2-201:2018
IEC
IEC 60529Degrees of protection provided by enclosures (IP Code)
DIN EN 1021-1:2014-10; EN 1021-1:2014; EN 1021 -2:2014; EN 1021-2:2006; EN 60529:1991 + A1:2000 + A2:2013; ISO 20653:2013-02
IEC 60825-1Name not checked yet
IEC 60825-1:2014; DIN EN 60825-1:2022; CSA E 60825-1:2015; IEC 60950-22:2016; DIN EN 60950-22:2017; IEC 62368-1:2014; DIN EN 62368-1:2016; UL 62368-1:2014; CAN/CSA-C22.2 no. 62368-1-2014
IEC 60950-22Name not checked yet
IEC 60825-1:2014; DIN EN 60825-1:2022; CSA E 60825-1:2015; IEC 60950-22:2016; DIN EN 60950-22:2017; IEC 62368-1:2014; DIN EN 62368-1:2016; UL 62368-1:2014; CAN/CSA-C22.2 no. 62368-1-2014
IEC 62368-1Audio/video, information and communication technology equipment - Part 1: Safety requirements
IEC 60825-1:2014; DIN EN 60825-1:2022; CSA E 60825-1:2015; IEC 60950-22:2016; DIN EN 60950-22:2017; IEC 62368-1:2014; DIN EN 62368-1:2016; UL 62368-1:2014; CAN/CSA-C22.2 no. 62368-1-2014
IEC 62368-1:2018; DIN EN IEC 62368-1:2021-05; UL 62368-1:2019; CAN/CSA-C22.2 No. 62368-1:2019; IEC 62368-3:2017; DIN EN IEC 62368-3:2020; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019; DIN EN 61010-1:2020; UL 61010-1:2012/R:2018-11; CAN/CSA-C22.2 No. 61010-1:2012/A1:2018-11; IEC 61010-2-010:2014
IEC 62368-3Name not checked yet
IEC 62368-1:2018; DIN EN IEC 62368-1:2021-05; UL 62368-1:2019; CAN/CSA-C22.2 No. 62368-1:2019; IEC 62368-3:2017; DIN EN IEC 62368-3:2020; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019; DIN EN 61010-1:2020; UL 61010-1:2012/R:2018-11; CAN/CSA-C22.2 No. 61010-1:2012/A1:2018-11; IEC 61010-2-010:2014
Other standards
EN 1021-1Name not checked yet
DIN EN 1021-1:2014-10; EN 1021-1:2014; EN 1021 -2:2014; EN 1021-2:2006; EN 60529:1991 + A1:2000 + A2:2013; ISO 20653:2013-02
EN 1021-2Name not checked yet
DIN EN 1021-1:2014-10; EN 1021-1:2014; EN 1021 -2:2014; EN 1021-2:2006; EN 60529:1991 + A1:2000 + A2:2013; ISO 20653:2013-02
ISO 20653Road vehicles - Degrees of protection (IP code) - Protection of electrical equipment against foreign objects, water and access
DIN EN 1021-1:2014-10; EN 1021-1:2014; EN 1021 -2:2014; EN 1021-2:2006; EN 60529:1991 + A1:2000 + A2:2013; ISO 20653:2013-02
Scope as published by DAKKS
24 lines
ISO/IEC 17025
WithdrawnD-PL-11321-12-04
ISO/IEC 17025
ActiveD-PL-11321-12-02
ISO/IEC 17025
WithdrawnD-PL-11321-12-01
ISO/IEC 17025
ActiveD-PL-11321-19-00
ISO/IEC 17025
ActiveD-PL-11321-19-01
ISO/IEC 17025
ActiveD-PL-11321-22-00
ISO/IEC 17025
ActiveD-PL-11321-22-01
ISO/IEC 17025
ActiveD-PL-11321-12-03
ISO/IEC 17025
ActiveD-PL-11321-12-00
Location
Other Locations
6 other sites in this organization
Accreditation data refreshed from the DAKKS register on .
This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the DAKKS entry linked above.