FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
Germany

TÜV SÜD Product Service

Masurenweg 1 - 3, 30163, Hannover, Germany

DAKKS|D-PL-11321-12-04DAKKS|D-PL-11321-12-02DAKKS|D-PL-11321-12-01DAKKS|D-PL-11321-19-00DAKKS|D-PL-11321-19-01DAKKS|D-PL-11321-22-00DAKKS|D-PL-11321-22-01DAKKS|D-PL-11321-12-03DAKKS|D-PL-11321-12-00ISO/IEC 17025Register refreshed 2026-09-25
Certificates
9
Scope items
24
Standards
19
Locations
7
One of 7 locations. View the organization

Free. We check which accredited labs can do it, starting with this one, and reply within two working days with who can do it, how fast, and roughly what it costs.

Only the laboratory you pick gets your contact details. We ask the others without them.

Follow this lab

We will email you if this laboratory’s accreditation status or scope changes. No newsletter, only changes.

Work at TÜV SÜD Product Service?

Claim this profile to keep it accurate.

Register record

DAKKSRefreshed
D-PL-11321-12-04Withdrawn
D-PL-11321-12-02Active
D-PL-11321-12-01Withdrawn
D-PL-11321-19-00Active
D-PL-11321-19-01Active
D-PL-11321-22-00Active
D-PL-11321-22-01Active
D-PL-11321-12-03Active
D-PL-11321-12-00Active

Accredited standards

19

Our reading of the DAKKS scope: each standard once, with its official name where we have checked it. Click a standard to see the scope line it comes from, word for word.

IEC 61010 series

IEC 61010-1Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 1: General requirements
As written on the certificate · Line 3 (DAKKS D-PL-11321-12-03)

IEC 62368-1:2018; DIN EN IEC 62368-1:2021-05; UL 62368-1:2019; CAN/CSA-C22.2 No. 62368-1:2019; IEC 62368-3:2017; DIN EN IEC 62368-3:2020; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019; DIN EN 61010-1:2020; UL 61010-1:2012/R:2018-11; CAN/CSA-C22.2 No. 61010-1:2012/A1:2018-11; IEC 61010-2-010:2014

IEC 61010-2-010Name not checked yet
As written on the certificate · Line 3 (DAKKS D-PL-11321-12-03)

IEC 62368-1:2018; DIN EN IEC 62368-1:2021-05; UL 62368-1:2019; CAN/CSA-C22.2 No. 62368-1:2019; IEC 62368-3:2017; DIN EN IEC 62368-3:2020; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019; DIN EN 61010-1:2020; UL 61010-1:2012/R:2018-11; CAN/CSA-C22.2 No. 61010-1:2012/A1:2018-11; IEC 61010-2-010:2014

As written on the certificate · Line 4 (DAKKS D-PL-11321-12-03)

DIN EN 61010 -2-010:2015; UL 61010-2-010:2015; CAN/CSA-C22.2 No. 61010-2-010:2015; IEC 61010 -2-010:2019; DIN EN IEC 61010 -2-010 VDE 0411-2-010:2022-12; UL 61010-2-010:2019; CAN/CSA-C22.2 No. 61010-2-010:2019; IEC 61010 -2-011:2019; DIN EN IEC 61010 -2-011:2023-05; UL 61010-2-011:2019; CAN/CSA-C22.2 No. 61010-2-011:2019; IEC 61010 -2-012:2019

IEC 61010-2-011Name not checked yet
As written on the certificate · Line 4 (DAKKS D-PL-11321-12-03)

DIN EN 61010 -2-010:2015; UL 61010-2-010:2015; CAN/CSA-C22.2 No. 61010-2-010:2015; IEC 61010 -2-010:2019; DIN EN IEC 61010 -2-010 VDE 0411-2-010:2022-12; UL 61010-2-010:2019; CAN/CSA-C22.2 No. 61010-2-010:2019; IEC 61010 -2-011:2019; DIN EN IEC 61010 -2-011:2023-05; UL 61010-2-011:2019; CAN/CSA-C22.2 No. 61010-2-011:2019; IEC 61010 -2-012:2019

IEC 61010-2-012Name not checked yet
As written on the certificate · Line 4 (DAKKS D-PL-11321-12-03)

DIN EN 61010 -2-010:2015; UL 61010-2-010:2015; CAN/CSA-C22.2 No. 61010-2-010:2015; IEC 61010 -2-010:2019; DIN EN IEC 61010 -2-010 VDE 0411-2-010:2022-12; UL 61010-2-010:2019; CAN/CSA-C22.2 No. 61010-2-010:2019; IEC 61010 -2-011:2019; DIN EN IEC 61010 -2-011:2023-05; UL 61010-2-011:2019; CAN/CSA-C22.2 No. 61010-2-011:2019; IEC 61010 -2-012:2019

As written on the certificate · Line 5 (DAKKS D-PL-11321-12-03)

DIN EN IEC 61010 -2-012 : 2023-07; UL 61010-2-012:2019; CAN/CSA-C22.2 No. 61010-2-012:2019; IEC 61010 -2-020:2006; DIN EN 61010 -2-020:2007; CAN/CSA-C22.2 No. 61010-2-020:2009; IEC 61010 -2-030:2017; DIN EN IEC 61010 -2-030 : 2022-11; UL 61010-2-030:2018; CSA C22.2 No. 61010-2-030:2018; IEC 61010 -2-051:2018; DIN EN IEC 61010 -2-051: 2023-01

IEC 61010-2-020Name not checked yet
As written on the certificate · Line 5 (DAKKS D-PL-11321-12-03)

DIN EN IEC 61010 -2-012 : 2023-07; UL 61010-2-012:2019; CAN/CSA-C22.2 No. 61010-2-012:2019; IEC 61010 -2-020:2006; DIN EN 61010 -2-020:2007; CAN/CSA-C22.2 No. 61010-2-020:2009; IEC 61010 -2-030:2017; DIN EN IEC 61010 -2-030 : 2022-11; UL 61010-2-030:2018; CSA C22.2 No. 61010-2-030:2018; IEC 61010 -2-051:2018; DIN EN IEC 61010 -2-051: 2023-01

IEC 61010-2-030Name not checked yet
As written on the certificate · Line 5 (DAKKS D-PL-11321-12-03)

DIN EN IEC 61010 -2-012 : 2023-07; UL 61010-2-012:2019; CAN/CSA-C22.2 No. 61010-2-012:2019; IEC 61010 -2-020:2006; DIN EN 61010 -2-020:2007; CAN/CSA-C22.2 No. 61010-2-020:2009; IEC 61010 -2-030:2017; DIN EN IEC 61010 -2-030 : 2022-11; UL 61010-2-030:2018; CSA C22.2 No. 61010-2-030:2018; IEC 61010 -2-051:2018; DIN EN IEC 61010 -2-051: 2023-01

IEC 61010-2-051Name not checked yet
As written on the certificate · Line 5 (DAKKS D-PL-11321-12-03)

DIN EN IEC 61010 -2-012 : 2023-07; UL 61010-2-012:2019; CAN/CSA-C22.2 No. 61010-2-012:2019; IEC 61010 -2-020:2006; DIN EN 61010 -2-020:2007; CAN/CSA-C22.2 No. 61010-2-020:2009; IEC 61010 -2-030:2017; DIN EN IEC 61010 -2-030 : 2022-11; UL 61010-2-030:2018; CSA C22.2 No. 61010-2-030:2018; IEC 61010 -2-051:2018; DIN EN IEC 61010 -2-051: 2023-01

IEC 61010-2-061Name not checked yet
As written on the certificate · Line 6 (DAKKS D-PL-11321-12-03)

UL 61010 -2-051:2019; CSA C22.2 No. 61010-2-051:2019; IEC 61010 -2-061:2018; DIN EN IEC 61010 -2-061: 2023-02; EN IEC 61010-2-061:2021 + A11:2021; UL 61010-2-061:2019; CSA C22.2 No. 61010-2-061:2019; IEC 61010 -2-081:2019; DIN EN IEC 61010 -2-081: 2022-07; EN IEC 61010-2-081:2020; UL 61010-2-081:2019; CSA C22.2 No. 61010-2-081:2019; IEC 61010 -2-091:2019; DIN EN IEC 61010 -2-091: 2023-05; EN IEC 61010-2-091:2021 + A11:2021

IEC 61010-2-081Name not checked yet
As written on the certificate · Line 6 (DAKKS D-PL-11321-12-03)

UL 61010 -2-051:2019; CSA C22.2 No. 61010-2-051:2019; IEC 61010 -2-061:2018; DIN EN IEC 61010 -2-061: 2023-02; EN IEC 61010-2-061:2021 + A11:2021; UL 61010-2-061:2019; CSA C22.2 No. 61010-2-061:2019; IEC 61010 -2-081:2019; DIN EN IEC 61010 -2-081: 2022-07; EN IEC 61010-2-081:2020; UL 61010-2-081:2019; CSA C22.2 No. 61010-2-081:2019; IEC 61010 -2-091:2019; DIN EN IEC 61010 -2-091: 2023-05; EN IEC 61010-2-091:2021 + A11:2021

IEC 61010-2-091Name not checked yet
As written on the certificate · Line 6 (DAKKS D-PL-11321-12-03)

UL 61010 -2-051:2019; CSA C22.2 No. 61010-2-051:2019; IEC 61010 -2-061:2018; DIN EN IEC 61010 -2-061: 2023-02; EN IEC 61010-2-061:2021 + A11:2021; UL 61010-2-061:2019; CSA C22.2 No. 61010-2-061:2019; IEC 61010 -2-081:2019; DIN EN IEC 61010 -2-081: 2022-07; EN IEC 61010-2-081:2020; UL 61010-2-081:2019; CSA C22.2 No. 61010-2-081:2019; IEC 61010 -2-091:2019; DIN EN IEC 61010 -2-091: 2023-05; EN IEC 61010-2-091:2021 + A11:2021

IEC 61010-2-201Name not checked yet
As written on the certificate · Line 7 (DAKKS D-PL-11321-12-03)

UL 61010-2-091:2019; CSA C22.2 No. 61010-2-091:2019; IEC 61010-2-201:2017; DIN EN IEC 61010-2-201:2019-04; EN IEC 61010-2-201:2018; UL 61010-2-201:2018; CAN/CSA-C22.2 No. 61010-2-201:2018

IEC

IEC 60529Degrees of protection provided by enclosures (IP Code)
As written on the certificate · Line 2 (DAKKS D-PL-11321-12-02)

DIN EN 1021-1:2014-10; EN 1021-1:2014; EN 1021 -2:2014; EN 1021-2:2006; EN 60529:1991 + A1:2000 + A2:2013; ISO 20653:2013-02

IEC 60825-1Name not checked yet
As written on the certificate · Line 2 (DAKKS D-PL-11321-12-03)

IEC 60825-1:2014; DIN EN 60825-1:2022; CSA E 60825-1:2015; IEC 60950-22:2016; DIN EN 60950-22:2017; IEC 62368-1:2014; DIN EN 62368-1:2016; UL 62368-1:2014; CAN/CSA-C22.2 no. 62368-1-2014

IEC 60950-22Name not checked yet
As written on the certificate · Line 2 (DAKKS D-PL-11321-12-03)

IEC 60825-1:2014; DIN EN 60825-1:2022; CSA E 60825-1:2015; IEC 60950-22:2016; DIN EN 60950-22:2017; IEC 62368-1:2014; DIN EN 62368-1:2016; UL 62368-1:2014; CAN/CSA-C22.2 no. 62368-1-2014

IEC 62368-1Audio/video, information and communication technology equipment - Part 1: Safety requirements
As written on the certificate · Line 2 (DAKKS D-PL-11321-12-03)

IEC 60825-1:2014; DIN EN 60825-1:2022; CSA E 60825-1:2015; IEC 60950-22:2016; DIN EN 60950-22:2017; IEC 62368-1:2014; DIN EN 62368-1:2016; UL 62368-1:2014; CAN/CSA-C22.2 no. 62368-1-2014

As written on the certificate · Line 3 (DAKKS D-PL-11321-12-03)

IEC 62368-1:2018; DIN EN IEC 62368-1:2021-05; UL 62368-1:2019; CAN/CSA-C22.2 No. 62368-1:2019; IEC 62368-3:2017; DIN EN IEC 62368-3:2020; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019; DIN EN 61010-1:2020; UL 61010-1:2012/R:2018-11; CAN/CSA-C22.2 No. 61010-1:2012/A1:2018-11; IEC 61010-2-010:2014

IEC 62368-3Name not checked yet
As written on the certificate · Line 3 (DAKKS D-PL-11321-12-03)

IEC 62368-1:2018; DIN EN IEC 62368-1:2021-05; UL 62368-1:2019; CAN/CSA-C22.2 No. 62368-1:2019; IEC 62368-3:2017; DIN EN IEC 62368-3:2020; IEC 61010-1:2010 + COR:2011 + A1:2016, modifiziert + A1:2016/COR1:2019; DIN EN 61010-1:2020; UL 61010-1:2012/R:2018-11; CAN/CSA-C22.2 No. 61010-1:2012/A1:2018-11; IEC 61010-2-010:2014

Other standards

EN 1021-1Name not checked yet
As written on the certificate · Line 2 (DAKKS D-PL-11321-12-02)

DIN EN 1021-1:2014-10; EN 1021-1:2014; EN 1021 -2:2014; EN 1021-2:2006; EN 60529:1991 + A1:2000 + A2:2013; ISO 20653:2013-02

EN 1021-2Name not checked yet
As written on the certificate · Line 2 (DAKKS D-PL-11321-12-02)

DIN EN 1021-1:2014-10; EN 1021-1:2014; EN 1021 -2:2014; EN 1021-2:2006; EN 60529:1991 + A1:2000 + A2:2013; ISO 20653:2013-02

ISO 20653Road vehicles - Degrees of protection (IP code) - Protection of electrical equipment against foreign objects, water and access
As written on the certificate · Line 2 (DAKKS D-PL-11321-12-02)

DIN EN 1021-1:2014-10; EN 1021-1:2014; EN 1021 -2:2014; EN 1021-2:2006; EN 60529:1991 + A1:2000 + A2:2013; ISO 20653:2013-02

Scope as published by DAKKS

24 lines
DAKKS

ISO/IEC 17025

Withdrawn

D-PL-11321-12-04

View scope
DAKKS

ISO/IEC 17025

Active

D-PL-11321-12-02

View scope
DAKKS

ISO/IEC 17025

Withdrawn

D-PL-11321-12-01

View scope
DAKKS

ISO/IEC 17025

Active

D-PL-11321-19-00

DAKKS

ISO/IEC 17025

Active

D-PL-11321-19-01

DAKKS

ISO/IEC 17025

Active

D-PL-11321-22-00

DAKKS

ISO/IEC 17025

Active

D-PL-11321-22-01

DAKKS

ISO/IEC 17025

Active

D-PL-11321-12-03

View scope
DAKKS

ISO/IEC 17025

Active

D-PL-11321-12-00

View scope

Location

Masurenweg 1 - 3, Hannover, 30163, DE

52.40019, 9.75072

Open in Maps

Other Locations

6 other sites in this organization

Accreditation data refreshed from the DAKKS register on .

This page mirrors a public register. For a purchasing, audit or regulatory decision, confirm against the DAKKS entry linked above.