IEC 60099 Accredited Testing Labs Worldwide
11 accredited laboratories in 6 countries hold IEC 60099 in their ISO/IEC 17025 scope. Primary accreditors include Deutsche Akkreditierungsstelle. In the register, IEC 60099 scope entries most often cover Coating Thickness, Electrical Voltage in Metal, Other.
Available in 6 Countries
Top matrices for IEC 60099
Top analytes for IEC 60099
- Coating Thickness (1)
- Electrical Voltage (1)
Sample labs
IEC 60099-4 (2014) cl. 8.6 [Flex B] 45 Hochspannungsschaltgeräte und -anlagen sowie Geräte der elektrischen Energietechnik Test to verify long term stability under continuous operating voltage/ Accelerated ageing procedure IEC
1 Using the following methods and Customer supplied test methods within the capabilities listed above: ANSI/IEEE C37, C57, C62 Standard Series; ANSI C29, IEEE Std. 4, Std. 386, Std. 18, Std. 404, Std. 495, Std. 592, Std. 597, Std. 1247;
Assessment Manager: AP Page 1 of 2 `Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 10794 Accredited to ISO/IEC 17025:2017 Wallis Labora
IEC 60099, 60137, 60168, 60383, 60507, 60660, 61109, 60815 HD 630, 639, 60269 IEEE Std 62.11 ANSI C29 CAN/CSA C411.1 A.
IEC 60099-4:2014 Tecnica di prova O&I _ Sezionatori di media tensione per interno isolati in aria e in contenitori isolati in SF6 per quadri per cabine secondarie e apparecchi da palo/ Indoor medium voltage disconnectors insulated in ai
IEC 60099-4:2014 Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems Electrical engineering GB/T11032-2020 Metal-oxide surge arresters without gaps for a. c. systems Electrical engineeri
IEC 60099-4: 2014-06 Surge arresters – Part 4: Metal-oxide surge arresters without gaps for a.c. systems IEC 60099-9: 2014 Surge arresters - Part 9: Metal-oxide surge arresters without gaps for HVDC converter stations IE
IEC 60099 -4: 2014 -06 DIN EN 60099-4: 2015-07 VDE 0675-4 Surge arresters – Part 4: Metal-oxide surge arresters without gaps for a.c. systems Electrical engineering IEC 60099 -5: 2018 -01 DIN EN 60099-5: 2019-02 VDE 0675-5 S
IEC 60099-4:2014 _ Par 08.02 - Prove di tenuta dell'isolamento/Insulation withstand tests, Par 08.03 - Prove di tensione residua/Residual voltage tests, Par 08.04 - Prova per verificare la stabilità a lungo termine sotto tensione di eserc
IEC 60099-1 Elektrisk funktionsverifiering Avledare Ja 2 Nej sub-clause 8.7 IEC 60099-4 Åldring Avledare Ja 2 Nej sub-clause 8.4, 8.6 and Annex B Elektrisk funktionsverifiering Avledare Ja 2 Nej sub-clause 7.2, 8.3, 8.4, 8.5, 8.7, 8.8, 8.9
IEC 60099-4, 2014, Sections 8.10 and 10.8.10 Partial Discharge Measurements IEC 60502-4, 2023, Table 12, 14 and 15; CENELEC HD 629-1-S3, 2019, Table 14, 17, and 18 Facility Capabilities 1, 2: Voltage parameters: 0-900 kV, Current p