IEC 60512-9-2 Accredited Testing Labs Worldwide
See all 52 labs worldwide for IEC 60512 (any part)
Part 1: 2 labs · Part 1-1: 28 labs · Part 1-2: 19 labs · Part 1-3: 9 labs · Part 1-4: 9 labs · Part 2-1: 43 labs and 99 more parts
6 accredited laboratories in 1 country hold IEC 60512-9-2 in their accredited scope. We don't know yet whether 4 of them take outside work. Primary accreditors include Deutsche Akkreditierungsstelle.
Available in 1 Country
Sample labs
Type of test Standard or test method / version Title of the standard or test method Restriction of the test method Electrical engineering IEC 60512-8-2 (2011- 04) Connectors for electronic equipment - Tests and measurements - Part
IEC 60512-9-2 (2011-11) Endurance tests - Test 9b: Electrical load and temperature Elektro- technik IEC 60512-9-3 (2011-06) Endurance tests - Test 9c: Mechanical operation (engaging and separating) with electrical load Elektro- te
DIN EN 60512-9-2 (VDE 0687-512-9-2) 2012-09 Steckverbinder für elektronische Einrichtungen - Mess- und Prüfver- fahren - Teil 9-2: Dauerprüfungen - Prüfung 9b: Elektrische Belastung bei hoher Temperatur DIN EN IEC 60512-23-3 (VDE 0
Bereich Norm oder Prüfverfahren / Ausgabestand Titel der Norm oder des Prüfverfahrens Einschränkungen zum Prüfverfahren Kabel, Ltg. DIN EN 60512 -9-1 VDE 0687-512-9-1:2010-12 Steckverbinder für elektronische Einrichtungen – Mess
Test field [Flex A] Testing Field Standard / In-House Procesdure / Version Title of Standard or In-House Procedure Test Range / Restrictions Connectors DIN EN 60512-6-4: 2003-01 Tests and measurements - Part 6-4: Dynamic stress
IEC 60512-9-2:2011); German version EN 60512-9-2:2012 DT) Connectors IEC 60512 -9-5 :2020 Connectors for electronic equipment - Tests and measurements - Part 9-5: DT)