Registers refreshed 2026-11-20.See refresh dates

IEC 61131-2 Accredited Testing Labs Worldwide

Part of a series

See all 69 labs worldwide for IEC 61131 (any part)

Part 1: 4 labs · Part 2: 65 labs · Part 3: 1 lab · Part 6: 14 labs · Part 9: 3 labs

Go to the series ↑

65 accredited laboratories in 8 countries hold IEC 61131-2 in their accredited scope. We don't know yet whether 16 of them take outside work. Primary accreditors include Deutsche Akkreditierungsstelle, American Association for Laboratory Accreditation, Italian Accreditation Body.

Total labs
65
Countries
8

Available in 8 Countries

Germany
38 labs
United States
8 labs
Japan
6 labs
Canada
4 labs
Italy
3 labs
China
2 labs
Netherlands
2 labs
Taiwan
1 lab

Sample labs

SIAC Test
Johnson City, TN, US
We don't know yet whether this lab takes outside work.

IEC 61131-2 Electromagnetic Compatibility of Multimedia Equipment – Immunity Requirements CISPR 35 (excluding 4.2.2.2 & 4.2.7); KS C 9835 (excluding 4.2.2.2 & 4.2.7) Part 6-2: Generic standards – Immunity for industrial environme

Diehl Aerospace
Überlingen, DE
We don't know yet whether this lab takes outside work.

IEC 61131-2 (2007) Speicherprogrammierbare Steuerungen – Teil 2: Betriebsmittelanforderungen und Prüfungen Programmable controllers – Part 2: Equipment requirements and tests nur EMV-Prüfungen (8 und 9) EMC tests only EMV DIN EN 61

HIMA Paul Hildebrandt GmbH Abteilung EDS, Team TLab
Brühl, DE
We don't know yet whether this lab takes outside work.

This document is a translation. The definitive version is the original German annex to the accreditation certificate. Testing field Standard / in house procedure / Version Title of standard or in house procedure Test range / r

Siemens Aktiengesellschaft SIMATIC TYPE Test Amberg
Amberg, DE
We don't know yet whether this lab takes outside work.

IEC 61131-2:2007) ausgenommen Kapitel 6.1 bis 6.3, Kapitel 6.5 bis 6.10. und Kapitel 11 – 14 und Prüfung elektromagnetisches HF-Feld und Magnetfeld mit energie- technischer Frequenz und Prüfung der Störfeldstärke. 1.1.2 Produktfamil

Pilz GmbH & Co. KG
Ostfildern, DE
We don't know yet whether this lab takes outside work.

IEC 61131-2:2007); Deutsche Fassung EN 61131- 2:2007 Keine Prüfungen nach EN 61000-4-18. Störaussendung: Ohne Funkstörfeldstärke EMV DIN EN 12015:2021 -01 EN 12015:2020-06 Elektromagnetische Verträglichkeit - Produktfamilien-No

Yaskawa Electric Corporation Products Certification Center
Kitakyushu, JP
We don't know yet whether this lab takes outside work.

IEC 61131-2; EN 61131-2; IEC 61131-2:2007; EN 61131-2:2007; IEC 61131-2:2017; IEC 61131-6 (EMC part only); EN 61131-6 (EMC part only); IEC 61131-6:2012 (EMC part only); EN 61131-6:2012 (EMC part only); IEC 61784-3 (EMC part only);

Schweitzer Engineering
Pullman, WA, US
We don't know yet whether this lab takes outside work.

IEC 61131-2; IEC 61131-2:2007 Electromagnetic compatibility for multimedia equipment – Immunity requirements CISPR 35; CISPR 35:2016; EN 55035; EN 55035:2017; KS C 9835 (excluding broadcast receiver equipment) Environmental an

Schneider Electric Systems USA
Foxboro, MA, US
We don't know yet whether this lab takes outside work.

IEC 61131-2; EN 61000-4-2, 3, 4, 5, 6, 8, & 11; IEC 61000-4-2, 3, 4, 5, 6, 8, & 11 Electrical Equipment for Measurement, Control and Laboratory Use – EMC Requirements – Part 2-1: Particular Requirements – Test Confi

Murrelektronik GmbH Prüfzentrum (4)
Oppenweiler, DE
We don't know yet whether this lab takes outside work.

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 Nur Abschnitt 8, 9 & 10 EMV ohne Funkstörfeldstärke, Prüflingsgröße: 1m x 1m EMV DIN EN 61131-2 Berichtigung 1:2009-01 VDE 0411-500 Berichtigung 1:2009-01 Speicherprogrammierb

LABORATORIO CENTRAL OFICIAL DE ELECTROTECNIA (LCOE) DE LA FUNDACIÓN PARA EL FOMENTO DE LA INNOVACIÓN INDUSTRIAL
Getafe, ES
We don't know yet whether this lab takes outside work.

IEC 61131-2 A Equipos de iluminación y similares Electrical lighting and similar equipment Inmunidad a las perturbaciones electromagnéticas Electromagnetic disturbances immunity EN 61547 IEC 61547 IEC 61547:2009 EN 61547:2009 A

HIMA Paul Hildebrandt GmbH Abteilung EDQ, Team HWS
Brühl, DE
We don't know yet whether this lab takes outside work.

This document is a translation. The definitive version is the original German annex to the accreditation certificate. Depart ment Standard / in house procedure / Version Title of standard or in house procedure Test area / reduct

SICK AG Corporate EMC Test Center
Waldkirch, DE
We don't know yet whether this lab takes outside work.

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 Nur EMV nach Kapitel 8 und 9. EMV EN 61131 -2:2007 Industrial-process measurement and control - Programmable controllers - Part 2: Equipment requirements and tests Nur EMV

TDK Electronics AG EMV-Labor
Regensburg, DE
We don't know yet whether this lab takes outside work.

IEC 61131-2 (2007) Programmable controllers – Part 2: Equipment requirements and tests EMC tests only (chapter 8 and 9)

Siemens Aktiengesellschaft DI FA DSP SYS TT 2
Erlangen, DE
We don't know yet whether this lab takes outside work.

Bereich Norm / Hausverfahren/ Version Titel der Norm oder des Hausverfahrens (ggf. Abweichungen / Modifizierungen von Norm- verfahren angeben) Prüfbereich/ Einschränkung EMV DIN EN 61008 -1; VDE 0664-10:2013 Fehlerstrom -/Differ

Weidmüller Interface GmbH & Co. KG Detmold
Detmold, DE
We don't know yet whether this lab takes outside work.

The testing laboratory is permitted, without being required to inform and obtain prior approval from DAkkS, to use standards or equivalent testing methods listed here with different issue dates. The testing laboratory maintains a curren

Showing labs 51–65 of 65. Use pagination below to see more.

Other parts