Registers refreshed 2026-11-20.See refresh dates

IEC 60512-9-5 Accredited Testing Labs Worldwide

Part of a series

See all 52 labs worldwide for IEC 60512 (any part)

Part 1: 2 labs · Part 1-1: 28 labs · Part 1-2: 19 labs · Part 1-3: 9 labs · Part 1-4: 9 labs · Part 2-1: 43 labs and 99 more parts

Go to the series ↑

8 accredited laboratories in 2 countries hold IEC 60512-9-5 in their accredited scope. We don't know yet whether 5 of them take outside work. Primary accreditors include Deutsche Akkreditierungsstelle.

Total labs
8
Countries
2

Available in 2 Countries

Germany
6 labs
United States
1 lab

Sample labs

HARTING Stiftung & Co. KG Corporate Technology Services (CTS)
Espelkamp, DE

IEC 60512-9-5:2020- 06 Connectors for electrical and electronic equipment - Tests and measurements - Part 9-5: Endurance tests - Test 9e: Current loading, cyclic only method A

Contech Research
Rumford, RI, US

IEC 60512-9-5; SAE/USCAR-2; SAE J2030 Temperature Rise EIA 364, TP 70; UL1977; IEC 60512-5-1; SAE/USCAR-2; SAE J2030 Mechanical Operations with Electrical Load IEC 60512-9-3 Magnetic Permeability EIA-364-TP-54; MIL-STD-1344,

SGS Germany
Puchheim, DE

IEC 60512-9-5 (2020-06) Endurance tests - Test 9e: Current loading, cyclic Elektro- technik IEC 60512-10-4 (2003-08) Impact tests (free compone nts), static load tests (fixed components), endurance test and overload tests - Test 10d

LABCO
Loxstedt-Stotel, DE
We don't know yet whether this lab takes outside work.

IEC 60512-9-5 2010-03 Connectors for electronic equipment - Tests and measurements - Part 9-5: Endurance tests - Test 9e: Current loading, cyclic BMW GS 95006-7-2 2018-08 Leitungssätze in Kraftfahrzeugen - Steckverbinder - Slow Mot

GHMT
Bexbach, DE
We don't know yet whether this lab takes outside work.

Bereich Norm oder Prüfverfahren / Ausgabestand Titel der Norm oder des Prüfverfahrens Einschränkungen zum Prüfverfahren Kabel, Ltg. DIN EN 60512 -9-1 VDE 0687-512-9-1:2010-12 Steckverbinder für elektronische Einrichtungen – Mess

Amphenol-Tuchel Electronics Gesellschaft mit beschränkter Haftung Prüflaboratorium
Heilbronn, DE
We don't know yet whether this lab takes outside work.

Test field [Flex A] Testing Field Standard / In-House Procesdure / Version Title of Standard or In-House Procedure Test Range / Restrictions Connectors DIN EN 60512-6-4: 2003-01 Tests and measurements - Part 6-4: Dynamic stress

Weidmüller Interface GmbH & Co. KG Detmold
Detmold, DE
We don't know yet whether this lab takes outside work.

Testing field Standard / in -house procedure / Version Title of Standard or in-house procedure Test range / Restrictions Endurance tests - Test 9e: Current loading, cyclic Connectors DIN EN IEC 60512 -9- 5:2021 Connectors for electr

Instytut Badań i Rozwoju Motoryzacji BOSMAL
Bielsko-Biała, PL
We don't know yet whether this lab takes outside work.

IEC 60512-9-5:2021-03 Seria klimatyczna Climatic tests PN-EN IEC 60512-11-1:2019-10 PN-IEC 68-2-61:1994 PN-IEC 68-2-61:1994/Ap1:1999 Elektryczne układy napędowe w pojazdach kategorii T, C, R, S Electric drivetrains of vehicles cat

Other parts

All parts on the series page →