FindTestingLabs
Registers refreshed 2026-09-25.See refresh dates
ISO/IEC 17025 directory · Standard series

IEC 61131 Accredited Testing Labs in Germany

IEC 61131, all parts28 laboratories in Germany are accredited by DAKKS for at least one part of IEC 61131. Each lab card shows which parts it holds. From the accredited scope text: “IEC 61131-2 2017-08 Ed. 4.0 Programmable controllers - Part 2: Equipment requirements and tests EN 61326-1 2013-01 Electrical equipment for measurement, control and laboratory use - EMC requirements -” “IEC 61131-2:2007); German version EN 61131-2:2007 EN 61131 -2:2007 Programmable controllers – Part 2: Equipment requirements and tests EM C IEC 61131 -2:2007 Programmable controllers – Part 2: Equipme” “IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 IEC 61131 -3 2013-02 Programmable controllers - Part 3: Programming languages EN 61131 -3 2013-05 Programmable controllers - Part 3: Programming lan” “IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 keine Messung der Funkstörfeldstärke im Frequenz- bereich > 30 MHz EMV DIN EN 61800 -3:2012 -09 Drehzahlveränderbare elektrische Antriebe - Teil 3:”

Labs
27
Primary AB
DAKKS28 labs

Accredited Labs

ELMAC GmbH EMV-Labor J. Bühne

Bondorf, DE

HoldsPart 2
Scope

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 Nur EMV Prüfungen Nur einphasig bis 16A Einschränkungen siehe DIN EN 55016-2-3 DIN EN 61000-4-3 Keine Prüfung nach EN 61000-4-18 EMV IEC 61131-2:2017-08 Programmable contro

View lab

TÜV Technische Überwachung Hessen GmbH EMV-Labor

Kassel, DE

HoldsPart 2
Scope

IEC 61131-2:2017 Programmable controllers - Part 2: Equipment requirements and tests Only clause 7 EMV DIN EN IEC 61204-3:2018 VDE 0557-3:2018 (EN IEC 61204-3:2018) Stromversorgungsgeräte für Niederspannung mit Gleichstromausgang -

View lab

TÜV Rheinland LGA Products

Nürnberg, DE

HoldsPart 2
Scope

IEC 61131-2 2017-08 Ed. 4.0 Programmable controllers - Part 2: Equipment requirements and tests EN 61326-1 2013-01 Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements

View lab

VDE Prüf- und Zertifizierungsinstitut

Offenbach am Main, DE

HoldsPart 1Part 2
Scope

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 + Corrigendum:2009-01 nur Kapitel 8, 9, (10)

View lab

CSA Group Bayern

Plattling, DE

HoldsPart 2
Scope

Fach- bereich Norm oder Prüfverfahren / Ausgabestand Titel der Norm oder des Prüfverfahrens Einschränkung zum Prüfverfahren EMV IEC 61000-3-12:2004 Electromagnetic Compatibili ty (EMC) - Part 3-12 - Limits for harmonic current emi

View lab

IMG Electronic & Power Systems

Nordhausen, DE

HoldsPart 2
Scope

Bereich Norm oder Prüfverfahren/ Ausgabestand Titel der Norm oder des Prüfverfahrens Einschränkungen zum Prüfverfahren Umwelt DIN EN 60068 -2-64: 2020 -09 Umgebungseinflüsse - Teil 2-64: Prüfverfahren - Prüfung Fh: Schwingen, Br

View lab

DEKRA Testing and Certification

Stuttgart, DE

HoldsPart 2
Scope

IEC 61131 -2:2007 Programmable controllers - Part 2: Equipment requirements and tests SDS

View lab

EMCE GmbH Ingenieurbüro für EMV-Prüfungen und Schaltungsentwicklung

Burgrieden, DE

HoldsPart 2
Scope

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 Only EMC - requirements, Sections 6.4, 8, 9 and 10 EMV IEC 61131 -2:2017 Industrial-process measurement and control - Programmable controllers - Part 2: Equipment requirements a

View lab

NEMKO

Pfinztal, DE

HoldsPart 2
Scope

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 Nur Abschnitte 8 und 9 EMV IEC 61131 -2:2007 Programmable controllers - Part 2: Equipment requirements and tests Only clauses 8 and 9

View lab

Pilz GmbH & Co. KG

Ostfildern, DE

HoldsPart 2
Scope

IEC 61131 -2:2017 -08 Industrial -process measurement and control – Programmable controllers – Part 2: Equipment requirements and tests Clauses 6.2.2.7 and 7 only. No Tests according to IEC 61000-4-18. Emission without radio inter

View lab

Element Materials Technology Straubing GmbH Element Materials Technology Straubing

Straubing, DE

HoldsPart 2
Scope

IEC 61131-2:2017-08 Industrial-process measurement and control - Programmable controllers - Part 2: Equipment requirements and tests Nur EMV- Prüfungen nach Abschnitt 7 EMV I.S. EN IEC 61204-3:2018 (2018-09-25) Low-voltage switch mo

View lab

RS Schwarze Industrieelektronik GmbH EMV-Laboratorium

Schloss Holte-Stukenbrock, DE

HoldsPart 2
Scope

Fach- bereich Norm oder Prüfverfahren / Ausgabestand Titel der Norm oder des Prüfverfahrens Prüfbereich / Einschränkungen EMV DIN EN 61000-3-3:2020 Elektromagnetische Verträglichkeit (EMV) – Teil 3-3: Grenzwerte – Begrenzung von

View lab

Institute for International Product Safety

Bonn, DE

HoldsPart 1Part 2
Scope

IEC 61131 -1:2003 Programmable controllers - Part 1: General information INSpg DIN EN 61131 -2 VDE 0411-500:2008 Speicherprogrammierbare Steuerungen - Teil 2: Betriebsmittelanforderungen und Prüfungen (IEC 61131-2:2007) Deutsche

View lab

TÜV SÜD Rail GmbH Prüfstelle für Sicherheitsbauteile

München, DE

HoldsPart 1Part 2Part 3Part 6
Scope

IEC 61131 -3 2013-02 Programmable controllers - Part 3: Programming languages EN 61131 -3 2013-05 Programmable controllers - Part 3: Programming languages DIN EN 61131 -3 2014-06 Speicherprogrammierbare Steuerungen - Teil 3:

View lab

TQ-Systems GmbH TQ Product Compliance Center Augsburg

Augsburg, DE

HoldsPart 2
Scope

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 EMV IEC 61131 -2:2017 Industrial-process measurement and control – Programmable controllers – Part 2: Equipment requirements and tests EMV EN 61326 -1:2013 DIN EN 61326-1; (

View lab

Intertek Deutschland

Kaufbeuren, DE

HoldsPart 2
Scope

IEC 61131-2:2007 Programmable controllers - Par t 2: Equipment requirements and tests EMC tests in accordance to section 8 only EMV DIN EN 61131-2:2008-04 + Ber.1:2009-01 (EN 61131-2:2007) Speicherprogrammierbare Steuerungen – Teil

View lab

EMC Test NRW GmbH electromagnetic compatibility

Dortmund, DE

HoldsPart 2
Scope

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 nur Abschnitte 8 und 9 (EMV), keine Prüfung nach EN 61000-4- 18 (ged. Schwingungen / Ringwave) EMV OVE EN IEC 61204-3:2018 Stromversorgungsgeräte für Niederspannung mit Gleich

View lab

EMV Rhein-Neckar

Viernheim, DE

HoldsPart 2
Scope

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 keine Messung der Funkstörfeldstärke im Frequenz- bereich > 30 MHz EMV DIN EN 61800 -3:2012 -09 Drehzahlveränderbare elektrische Antriebe - Teil 3: EMV-Anforderungen einschließl

View lab

steep GmbH EMV-Zentrum

Bonn, DE

HoldsPart 2
Scope

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 Kapitel 8, 9, 10 EMV IEC 61131-2:2007 Programmable controllers - Part 2: Equipment requirements and tests Section 8, 9, 10

View lab

SGS Germany

Puchheim, DE

HoldsPart 2
Scope

IEC 61131-2:2017 Industrial-process measurement and control — Programmable controllers — Part 2: Equipment requirements and tests Only Sec 6.2 and 7 EMV DIN EN 61131-2:2008 (EN 61131-2:2007) Speicherprogrammierbare Steuerungen - T

View lab

TÜV SÜD Product Service GmbH PS-SL-EMC / PS-SL-ENV-STR

Straubing, DE

HoldsPart 2
Scope

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 EMV DIN EN 61131 -2 Berichtigung 1; VDE 0411-500 Berichtigung 1:2009- 01 Speicherprogrammierbare Steuerungen - Teil 2: Betriebsmittelanforderungen und Prüfungen (IEC 61131-2:20

View lab

cetecom advanced

Saarbrücken, DE

HoldsPart 2
Scope

IEC 61131-2:2007); German version EN 61131-2:2007 ☒ ESS EMC tests according to chapters 8 and 9 ☐ SB EMC DIN EN IEC 61204 -3:2018 -11 Low -voltage switch mode power supplies - Part 3: Electromagnetic compatibility (EMC) (IEC

View lab

PHOENIX TESTLAB

Blomberg, DE

HoldsPart 2Part 6
Scope

IEC 61131-2 ed. 3.0: 2007 Programmable controllers – Part 2: Equipment requirements and tests nur Kapitel 2.2, 6.4, 8, 9 und 10 EMV IEC 61131-2 ed. 4.0: 2017 Programmable controllers – Part 2: Equipment requirements and tests EM

View lab

CEcert

Wismar, DE

HoldsPart 2
Scope

IEC 61131-2:2007); German version EN 61131-2:2007 only EMC and tests according to sub- clause 5.2, 5.3, 5.4; 6.2 and 6.3 EMC / KMF IEC 61131-2:2017 Industrial-process measurement and control - Programmable controllers - Part 2: Equi

View lab

SLG Prüf- und Zertifizierungs

Hartmannsdorf, DE

HoldsPart 2
Scope

IEC 61131-2:2007); German version EN 61131-2:2007 EN 61131 -2:2007 Programmable controllers – Part 2: Equipment requirements and tests EM C IEC 61131 -2:2007 Programmable controllers – Part 2: Equipment requirements and tests

View lab

Schneider Electric Automation GmbH

Marktheidenfeld, DE

HoldsPart 2
Scope

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 Nur: leitungsgeführte Störaussendung; 61000-4-2: Entladung statischer Elektrizität; 61000-4-4: Schnelle transiente Störgrößen (Burst); 61000-4-5: Stoßspannung (Surge);

View lab

TÜV NORD CERT

Essen, DE

HoldsPart 2
Scope

IEC 61131-2:2007); Deutsche Fassung EN 61131-2:2007 + Berichtigung zu DIN EN 61131-2: 2008 Einschränkung auf EMV Nur Kapitel 8/9 und Anhang C EMV DIN EN IEC 61204-3:2018-11 + Berichtigung 1:2023-12 VDE 0557-3: 2018-11 + Berichtig

View lab
Refine these results

This page is a fixed slice of the register: every IEC 61131 scope we hold for Germany. Search narrows it further by city, accreditation body, or a term from the scope text itself.

Search labs in Germany

Top matrices for IEC 61131 in Germany

Top analytes for IEC 61131 in Germany

  • Harmonic Currents1
  • Oberschwingungsströme1

About ISO/IEC 17025 in Germany

Deutsche Akkreditierungsstelle (DAKKS) is the primary accreditation body issuing ISO/IEC 17025 accreditation for testing laboratories in Germany.

ISO/IEC 17025 is the international standard for the competence of testing and calibration laboratories. Accreditation to this standard provides independent confirmation that a laboratory operates a quality management system and is technically competent to produce valid results within its declared scope.

Related searches