IEC 61850-3 Accredited Testing Labs Worldwide

Part of a series

See all 20 labs worldwide for IEC 61850 (any part)

Part 3: 18 labs · Part 10: 1 lab

Go to the series ↑

18 accredited laboratories in 6 countries hold IEC 61850-3 in their accredited scope. We don't know yet whether 5 of them take outside work. Primary accreditors include American Association for Laboratory Accreditation, Deutsche Akkreditierungsstelle.

Total labs
18
Countries
6

Available in 6 Countries

United States
6 labs
Canada
4 labs
Germany
3 labs
Finland
1 lab
Netherlands
1 lab
Taiwan
1 lab

Sample labs

CKC Laboratories, Inc.
Mariposa, CA, US

STANDARD 2,3: DESCRIPTION OF STANDARD: FREMONT EN IEC 61326-2-1 EN IEC 61326-2-1: 2021 EN 61326-2-1: 2013 Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-1x Particular requirements - Test co

TUV SUD Canada
Gormley, CA

IEC 61850-3; IEC 61000-6-5 Home and Building Electronic, Automation, & Control System EN 50491-5-1; EN 50491-5-2; EN 50491-5-3 Safety-Related Systems and Equipment Intended to Perform Safety-Related Functions (Functi

MEGALAB Group
Aurora, CA

IEC 61850-3 Home and Building Electronic, Automation, & Control System EN 50491-5-1; EN 50491-5-2 Safety-Related Systems and Equipment Intended to Perform Safety-Related Functions (Functional Safety) – General Industrial Appli

Etteplan Finland Oy, Test
FI

T298/M23/2025 Liite 1 / Appendix 1 Sivu / Page 9(23) Vaatimus/Requirement SFS-EN ISO/IEC 17025:2017 17.12.2025 Päätöksen päiväys / Date of decision 22.07.2028 Päätöksen viimeinen voimassaolopäivä / Date of expiry www.finas.fi Voimass

SGS Taiwan Ltd. Reliability Laboratory.
New Taipei, TW

IEC 61850-3,

KEMA B.V.
ARNHEM, NL

IEC 61850-3 ARN 2. Protection relays & substation automation equipment Above listed methods No. 25, 31, EMC Immunity No. EMC.I.24, EMC.I.21, EMC.I.23, EMC.I.38, EMC.I.22, EMC.I.07, EMC.I.08, EMC.I.33 IEEE 1613, IEEE 1613.1 3.

Element Materials Technology Fremont Newark
Fremont, CA, US

IEC 61850-3 (excluding magnetic immunity) Energy Efficiency Tests ATIS 0600015: 2018 (R2023) Energy Efficiency for Telecommunication Equipment: Methodology for Measurement and Reporting General Requirements; ATIS 0600015.03.2023 En

EUROFINS ELECTRICAL AND ELECTRONIC TESTING NA
Austin, TX, US

Test Technology: Test Method(s) 1, 2: Family Product or Industry Specific Specifications IEC/EN 61000-6-13; IEC/EN 61000-6-23; IEC/EN 61000-6-33; IEC/EN 61000-6-43; KS C 9610-6-1; KS C 9610-6-2; KS C 9610-6-3; KS C 9610-6-4;

SGS Germany
Puchheim, DE

IEC 61850-3:2014 Communication networks and systems for power utility automation – Part 3: General requirements Only chapter 6.7 EMC EMV DIN EN 61850-3:2014 (EN 61850-3:2014) Kommunikationsnetze und -systeme für die Automatisieru

Intertek Testing Services NA
Lexington, KY, US

Test Technology Test Method(s) 1,2: Voltage Dips, Short Interruptions, and Line Voltage Variations IEC 61000-4-11; EN 61000-4-11; KS C 9610-4-11 Radiated Fields in Close Proximity IEC 61000-4-39; EN 61000-4-39 ANSI Standard fo

PHOENIX TESTLAB
Blomberg, DE

IEC 61850-3:2013); Deutsche Fassung EN 61850-3:2014 nur Kapitel 6.7 EMV IEC 61850-3: 2013 Communication networks and sy stems in substations – Part 3: General requirements nur Kapitel 6.7

Element Materials Technology Montréal
Boucherville, CA

IEC 61850-3; IEEE 1613; IEEE 1613.1; IEC 61000-6-5; IEC 60255-26; SN-62.1008-1 (Hydro-Quebec) Low Voltage Equipment SN-62.1008e (clauses 7.10, 7.12, 7.13 only) Electro-sensitive Protective Equipment IEC 61496-1 (clause 4.3.2)

Schneider Electric Automation GmbH
Marktheidenfeld, DE

Bereich Norm oder Prüfverfahren / Ausgabestand Titel der Norm oder des Prüfverfahrens Prüfbereich / Einschränkungen EMV IEC 61850 -3:2013 -12 Communication networks and systems for power utility automation – Part 3: General requ

Reliability Laboratory of New H3C Technologies Co.,
Zhejiang,, CN
We don't know yet whether this lab takes outside work.

IEC 61850-3 (excluding Ripple on d.c. power supply, Mains frequency voltage, and Damped oscillatory wave); EN 61850-3 (excluding Ripple on d.c. power supply, Mains frequency voltage, and Damped oscillatory wave); IEC 62236-3-2; IEC 6

Schweitzer Engineering
Pullman, WA, US
We don't know yet whether this lab takes outside work.

IEC 61850-3; IEC 61850-3:2013; EN 61850-3; EN 61850-3:2014 Instrument Transformers – Part 13: Stand-alone merging unit (SAMU) IEC 61869-13:2021; EN 61869-13:2021 (Clauses 6.607, 7.2.5.2.603 – 7.2.5.2.615, 7.2.5.2.1301, 7.2.

TestX Lab Inc.
Saint-Jean-sur-Richelieu, CA
We don't know yet whether this lab takes outside work.

IEC 61850-3; IEEE 1613; IEEE 1613.1; IEC 61000-6-5; IEC 60255-26; SN-62.1008-1 (Hydro-Quebec) Laboratory Equipment IEC 61326-1; EN 61326-1 General Requirements for Home and Building Electronic Systems (HBES) and Building Auto

Global Compliance and Testing Center of Huawei Technologies Co., Ltd. (Reliability Laboratory of Huawei Technologies Co., Ltd.)
Dongguan, Guangdong, CN
We don't know yet whether this lab takes outside work.

IEC 61850-3, BS EN 61850-3, EN 61850-3: ( the above standards exclude clauses 6.7, 6.9.3, 6.10.1, 6.10.3, 7.3, 7.4, and 7.5) ; IEEE 1613 (clauses 1, 2, 3, 4, 5 only); IEC 60950-22, EN 60950-22, UL 60950-22, BS EN 60950-22: (

Cisco Systems
San Jose, CA, US
We don't know yet whether this lab takes outside work.

IEC 61850-3:2013; EN 60255-21-1:1995; EN 60255-21-2:1995; EN 60255-21-3:1995; IEEE 1613.1:2013; IEEE 1613:2009; IEEE 1613A:2011

Other parts